Skip to content
Surf Wiki
Save to docs
geography/australia

From Surf Wiki (app.surf) — the open knowledge base

Yeelirrie uranium project

Mineral deposit in Western Australia


Summary

Mineral deposit in Western Australia

FieldValue
nameYeelirrie uranium project
pushpin_mapAustralia
pushpin_labelYeelirrie uranium project
coordinates
placeWiluna
subdivision_typeState
state/provinceWestern Australia
countryAustralia
ownerCameco
official websitehttps://www.camecoaustralia.com/projects/yeelirrie
discovery year1971
acquisition year2012

| state/province = Western Australia

The Yeelirrie uranium project is a uranium deposit located approximately 70 km southwest of Wiluna, in the Mid West region of Western Australia. The name Yeelirrie is taken from the local sheep station.

There are proposals to mine other uranium deposits in the Wiluna area: the Lake Maitland, Centipede, Millipede and Lake Way uranium projects.

History

The Yeelirrie uranium deposit was discovered in mid-1971 by WMC Resources. WMC reached an agreement with Esso and the German Urangesellschaft Australia Pty Ltd in 1978 to co-finance the project, which was then scheduled for production by 1984.

Work on the mine development was underway by 1980 and trial mining was carried out. A pilot processing plant was established at Kalgoorlie in late 1980 and detailed metallurgical studies were undertaken from 1980 to 1982. A feasibility study for production at the rate of 2500 t of U3O8 per year was completed in August 1982. There was also potential for 1,000 tonnes per year of vanadium oxide by-product.

The election of the Hawke government and the Australian Labor Party's Three mine policy put a stop to the project by 1983. Yeelirrie was placed in care and maintenance. Site rehabilitation was completed in 2003.

The project was acquired by BHP in 2005 when it acquired WMC Resources. BHP reactivated the project after the strongest uranium market in over 25 years and a 2008 change in government policy. BHP planned to start mining at Yeelirrie by 2014, producing approximately 80 t of uranium oxide per week. The mine was expected to have a life of 20–40 years. Ore would be treated on site and then transported by road to Kalgoorlie, from where it would be railed to either South Australia or the Northern Territory, where there are established facilities to store and export uranium oxides.

BHP scaled back the production of the proposed mine in early 2010, from 5000 t per annum to 3500 t of U3O8, in part because a proposed additional acid heap leach circuit was deemed uneconomic due to high acid consumption.

The project came under criticism at BHP's 2010 annual general meeting from local Aboriginal groups regarding their concerns which included the employment of indigenous residents near BHP's mines in WA, and the need for reassurance from BHP that there would be minimal impact on the surrounding land at the planned mine. The local Wongutha people considered Yeelirrie as a "place of death", and that needed to be explored in heritage surveys.

In February 2011, an environmental impact survey found a total of 143 species from 70 genera were recorded, most of which were widespread and common in the region. The survey also discovered 3 new previously unknown species. One of these species, now known as Atriplex yeelirrie, was declared threatened and has a highly restricted distribution, only found in two known locations, approximately 30 km apart. The north western population (of an estimated 84,510 individuals) is located on ground that coincides with the central part of the proposed open pit mine. The south western population comprises an estimated 190,656 individuals and was unimpacted by planned developments.

In August 2012, BHP sold the project to Canadian mining company Cameco for US$430 million.

The Yeelirrie uranium project was granted environmental approval by the Western Australian Minister for the Environment in January 2017. An application to invalidate the decision was lodged by the Environmental Defenders Office on behalf of the Conservation Council of Western Australia and a small number of traditional owners. It did not challenge the merits of the environmental assessment, but rather disputed the Environmental Protection Act 1986 procedure and the ability of the Minister for the Environment to make approval decisions. This was rejected in February 2018. An appeal to the Western Australia Court of Appeal was dismissed in 2019. In April 2022, Environment Minister Reece Whitby denied an application to have the approval extended.

Reserves and resources

At 31 December 2018 the measured and indicated resource for the project was 58,100 tonnes (128.1 million pounds) of U3O8, with an average grade of 0.15% U3O8.

References

References

  1. (8 March 2017). "Wiluna Uranium Project". Toro Energy Limited.
  2. (7 January 2010). "Toro gets approval for uranium project". [[Sydney Morning Herald]].
  3. (1991). "Case Histories of Mineral Discoveries Vol. 3: Porphyry copper, molybdenum, and gold deposits, [[Volcanogenic massive sulfide ore deposit". Society for Mining, Metallurgy, and Exploration.
  4. (24 November 2009). "Yeelirrie uranium deposit in Western Australia". [[Parliament of Australia]].
  5. [https://web.archive.org/web/20110218120754/http://www.bhpbilliton.com/bbContentRepository/docs/yeelirrieProjectOverview.pdf Yeelirrie Project Overview] [[BHP]], published: June 2009, accessed: 17 February 2011
  6. "Yeelirrie".
  7. (9 February 2010). "BHP cuts Yeelirrie uranium estimate". [[The Australian]].
  8. (16 November 2010). "BHP bosses grilled at AGM in Perth". [[Sunday Times (Western Australia).
  9. "Threatened Flora - Rare Flora Notice".
  10. (2015). "A rare, new species of Atriplex (Chenopodiaceae) comprising two genetically distinct but morphologically cryptic populations in arid Western Australia: implications for taxonomy and conservation". Australian Systematic Botany.
  11. (February 2011). "Flora and Vegetation Survey Baseline Report". Western Botanical.
  12. (26 August 2012). "Cameco Acquires Yeelirrie Uranium Project In Western Australia". Cameco.
  13. (27 August 2012). "BHP sells Australia's mammoth uranium deposit". MINING.com.
  14. "Yeelirrie uranium project receives Federal environmental approval". Cameco Australia.
  15. "Western Australia Court of Appeal dismisses appeal of Yeelirrie Project decision". Cameco Australia.
  16. [https://www.abc.net.au/news/2022-04-14/wa-uranium-mine-cameco-yeelirre-project-reece-whitby/100991146 Cameco Corp still set on WA uranium mine, despite government knockback, Indigenous opposition] ''[[ABC News (Australia). ABC News]]'' 14 April 2022
  17. "Reserves & Resources". Cameco Corporation.
Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Yeelirrie uranium project — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report