From Surf Wiki (app.surf) — the open knowledge base
Yanchep line
Suburban rail line in Perth, Western Australia
Suburban rail line in Perth, Western Australia
| Field | Value |
|---|---|
| name | Yanchep line |
| other_name | |
| color | |
| image | View from the Britannia Road footbridge, January 2026 05.jpg |
| image_alt | A freeway with a railway in the median strip |
| caption | A B-series train in the median strip of the Mitchell Freeway in Leederville |
| owner | Public Transport Authority (2003–present) |
| locale | Perth, Western Australia |
| start | Yanchep (north) |
| end | Elizabeth Quay (south) |
| continuesas | Mandurah line |
| stations | 16 |
| type | Suburban rail |
| system | Transperth |
| operator | |
| depot | Nowergup |
| stock | |
| ridership2 | 16,614,973 (year to June 2025) |
| yearcommenced | November 1989 |
| open | |
| lastextension | 14 July 2024 |
| linelength_km | 54.5 |
| tracks | 2 |
| character | At-grade and underground |
| gauge | narrow gauge |
| electrification | from overhead catenary |
| speed_km/h | 130 |
| signalling | Fixed block signalling |
| trainprotection | Automatic train protection |
| map |
| speed_km/h = 130
The Yanchep line, formerly the Joondalup line, is a suburban railway line and service in Perth, Western Australia, linking the city's central business district (CBD) with its northern suburbs. Operated by the Public Transport Authority as part of the Transperth system, the Yanchep line is 54.5 km long and has sixteen stations. It commences in a tunnel under the Perth CBD as a through service with the Mandurah line. North from there, the line enters the median strip of the Mitchell Freeway, where nine of the line's stations are. The Yanchep line diverges from the freeway to serve the centre of Joondalup and permanently leaves the freeway north of Butler for the northernmost four stations to Yanchep.
Planning for a rapid transit service to the northern suburbs began in 1987. After several transport modes were considered, including bus rapid transit, an electric railway was chosen. Known during planning and construction as the Northern Suburbs Railway, the project was approved by state cabinet in late 1989 and construction began in November 1989. The line was built under several different contracts, with the total cost of the original project being A$277million. It used widely spaced stations with bus interchanges and large park-and-rides, distinguishing the line from Perth's three existing rail lines. The line opened on 20 December 1992 as the Joondalup line to limited service and with three stations: Leederville, Edgewater and Joondalup. Four more stations opened in February 1993, and on 21 March 1993, peak service and feeder bus routes commenced. The final station, Currambine, opened on 8 August 1993.
An extension north to Clarkson station and rebuild of Currambine station opened on 4 October 2004, which coincided with the introduction of B-series trains. On 29 January 2005, Greenwood opened as an infill station. The Joondalup line originally through-ran with the Armadale line via Perth station, but in 2005, the line started terminating at Perth station, and on 15 October 2007 the line was rerouted through a new tunnel under the CBD, with two new stations: Perth Underground and Elizabeth Quay. The Mandurah line opened on 23 December 2007 to connect with the southern end of that tunnel. An extension north to Butler station opened on 21 September 2014 and a three station extension north to Yanchep station was opened on 14 July 2024, upon which the line became the Yanchep line.
B-series and C-series trains are the main rolling stock used on the Yanchep line. Trains run at a fifteen minute headway, reducing to as low as a five minute headway in peak, with some services terminating at Whitfords or Clarkson stations during peak. The travel time from Yanchep to Perth Underground is 49 minutes. The Yanchep line received 16,614,973 boardings in the 2024–25 financial year, making it the second busiest line in the Transperth system, after the Mandurah line.
History
Planning
The 1955 Plan for the Metropolitan Region, Perth and Fremantle, also known as the Stephenson–Hepburn Report, proposed a 12 mi railway line branching off the Eastern Railway (Fremantle line) at Daglish, then heading west to Reabold Hill and then north to Whitfords Beach via City Beach, Scarborough, and North Beach. The branch was planned to have about eight or nine stations and projected to have about 20,000 daily passenger journeys. The report also proposed a highway to Yanchep, now known as the Mitchell Freeway. When the Metropolitan Region Scheme was adopted in 1963, the land for the proposed highway was reserved but the not the land for the proposed railway.
In 1979, the Fremantle line was closed due to declining patronage, a lack of growth potential, and to save capital and operational costs. A group named the Friends of the Railways was formed to advocate against the closure. Among the group's other proposals was for the electrification of all three lines and the construction of a line to Joondalup. The Transport 2000: A Perth Study report, which was released in 1982, said that the electrification was not economically viable and that buses were sufficient to provide public transport in the northern suburbs. Following a Labor Party victory in the 1983 state election, the Fremantle line was reopened and planning for the electrification of the suburban rail system commenced.
Following the approval of electrification in 1985, attention turned to public transport in the northern suburbs. the Northern Suburbs Rapid Transit Study was commissioned in 1987 by Transperth and the Department of Transport at the request of the Government of Western Australia. The study, published in September 1988 and written by a team of consultants led by Travers Morgan, considered possible modes of transport and the route to take. Routes considered were along West Coast Highway, Marmion Avenue, the western side of the Mitchell Freeway, the median strip of the Mitchell Freeway, the eastern side of the Mitchell Freeway, Wanneroo Road, and Alexander Drive. The route via the Mitchell Freeway's median strip was determined to have the lowest cost and least environmental impact. Transport modes considered were buses on a separate roadway, buses on a guided busway (like the O-Bahn Busway in Adelaide), light rail, heavy rail, automated rubber-tyred trains, high-capacity monorail, and an automated people mover system. A monorail or automated people mover were ruled out due to the cost and unproven nature of those technologies. Light rail was also ruled out due to having a lower operating speed than other modes and the desire to not introduce another mode to Perth's transport system. A bus expressway, guided busway and electric railway along the Mitchell Freeway were considered in further detail.
Public consultation found that the electric railway was the most supported option, but that a majority supported the two bus options combined. The people who preferred rail chose it because of its greater comfort, lower pollution and less crowding. The people who preferred the bus options chose them because there would be no transfer for trips into the Perth central business district (CBD) and the bus options would cost less than a railway. The study suggested that the bus options could be built in multiple stages and the rail option could first be built between Perth and Warwick and later be extended to Joondalup. The two bus options were projected to increase northern suburbs public transport patronage by fourteen percent and the rail option was projected to increase patronage by nine to twelve percent, less than the bus options due to the time taken to transfer from bus to train. The net cost of the railway was estimated to be A$145million, compared to $87million for the guided busway and $79million for the bus expressway. The study concluded that either of the bus options were preferred over the electrified railway, and that further investigation should determine whether to build a bus expressway or a guided busway.
A majority of Labor members of Parliament and supporters were in support of the railway option despite the conclusions of the Northern Suburbs Rapid Transit Study. In response to the study, the state's minister for transport, Bob Pearce, set up an expert panel consisting of Murdoch University Associate Professor Peter Newman, Tyne and Wear Transport Director General David F. Howard, and University of Pennsylvania Professor Vukan Vuchic. The expert panel concluded that an electrified railway would be the best option. They costed an electric railway at $124million and gave a lower operating cost for the railway compared to the bus options, making up the difference in net cost within 12 to 15 years. The expert panel criticised the Northern Suburbs Rapid Transit Study for concentrating on commuters travelling to the CBD and said that the bus system the study recommended would not serve people doing short or local trips well. The panel said that other cities show that a rail trunk line with feeder buses would attract more passengers. State cabinet officially chose the railway option in December 1988. The Liberal Party supported plans for a bus lane within the Mitchell Freeway, which prompted Pearce to claim that the Liberals did not want the railway. The government's commitment to the rail option helped secure its reelection in the February 1989 state election.
State cabinet approved the Northern Suburbs Transit System Master Plan in the second half of 1989. The planned opening dates were the end of 1992 for Perth to Joondalup and the end of 1993 for Joondalup to Currambine. The master plan was released in November 1989. It laid out the route of the Northern Suburbs Railway and works proposed to occur. The railway was to be 29 km long and have seven new stations: Glendalough, Warwick, Whitfords, Edgewater, Joondalup, and Burns (later renamed Currambine). This made for an average station spacing of 4 km, above the 1.25 km spacing on the other lines, allowing for a higher average speed. The master plan also gave the option of building stations at Oxford Street in Leederville, Wishart Street between Stirling and Warwick, and Hepburn Avenue between Warwick and Whitfords. Perth station, the centre of the rail network and southern terminus of the Northern Suburbs Railway, was planned to be expanded. The railway's planned route was mostly along the median strip of the Mitchell Freeway, deviating in the Perth CBD to reach Perth station and in Joondalup to serve the future city centre of Joondalup. A section between Joondalup and Burns was to be west of the future freeway, which at the time only reached as far north as Ocean Reef Road. The section through Joondalup was to be in a trench below surface level to allow for roads to bridge across. The railway was to be fully grade separated with no level crossings, unlike Perth's existing rail network.
The Northern Suburbs Railway's route was placed in the Mitchell Freeway's median strip to reduce costs as the freeway was already grade separated from other roads and had its own right of way. The disadvantage of freeway-running railways is that access to the stations is more difficult, with walking distance in earlier plans from a bus interchange to the platform being between 70 m and 180 m, and even longer for park and ride passengers. Earlier plans also had limited shelter and facilities at each station. This was deemed bad for patronage, so the master plan instead located bus interchanges closer to the station platform. In the cases of Stirling, Warwick and Whitfords stations, the bus interchanges are on a bridge directly above the train platforms. The feeder buses were planned to run between pairs of adjoining stations at a 10 to 15 minute headway in peak, covering the area between Wanneroo Road and the coastline. According to forecasts, two thirds of Northern Suburbs Railway passengers would use the feeder buses and 120 buses would be required. The opening of the railway would allow for express buses along the Mitchell Freeway to be phased out.
Much of the Mitchell Freeway was designed with provisions for a public transport corridor in its median strip. However, a 5 km section between Loftus Street in Leederville and Hutton Street in Osborne Park was not. This section was built as a single carriageway with a dividing barrier. On that section, a second carriageway, which now carries the freeway's northbound lanes, was planned to be constructed. Additional bridges would be built across Vincent Street, Powis Street, and Scarborough Beach Road for the new carriageway and the railway. Twelve other road bridges and nine pedestrian bridges needed minor modifications so that there was enough clearance for the overhead wires, and four bridges over the railway in Joondalup needed to be constructed. New stowage tracks at Claisebrook depot would be required, and trains would also be stored at Whitfords station temporarily and at Currambine station.
The total cost of the Northern Suburbs Railway was estimated to be $222.8million (equivalent to $million in ), of which $133.17million was for the railway's construction and $89.63million was for the acquisition of 22 two-car electric multiple unit trains. An additional $27million for the works to widen the Mitchell Freeway between Leederville and Osborne Park was funded separately and managed by the Main Roads Department. The rest of the construction works were managed by Westrail. The total cost was higher than the $145million estimated in 1988 due to an underestimation in the cost of some parts of the project, an increase in facilities at stations, more bridges, the extension to Currambine which was not accounted for, additional railcars due to higher forecast demand, and inflation. The railway was planned to open between Perth and Joondalup by the end of 1992 and from Joondalup to Currambine by the end of 1993, although meeting the 1992 deadline was regarded as unrealistic as it meant that detailed design and construction had to occur in three years.
Construction
In November 1989, the Fremantle line was realigned north between Perth station and the Mitchell Freeway to make way for the Roe Street tunnel. The premier of Western Australia, Peter Dowding, hammered in the first spike on 14 November 1989, marking the start of construction. That year, the Parliament of Western Australia passed the Perth-Joondalup Railway Act, authorising the railway's construction; the legislation received royal assent on 15 January 1990.

By the end of 1990, earthworks at Joondalup and the Mitchell Freeway roadworks between Loftus Street and Hutton Street were underway. The project's first contract was awarded in December 1990 to Remm Constructions. It was a $4.3million contract for the construction of the walls of the tunnel under Roe Street. The tunnel is 130 m long, with 250 m ramps at each end. The tunnel and ramp's route partially followed a bus on-ramp from Roe Street to the freeway, allowing the reuse of a bridge carrying the Mitchell Freeway's westbound carriageway above the bus lane. A temporary bus on-ramp replaced it until the railway was opened. The tunnel walls were constructed using secant piles. The close proximity of the tunnel to the Mitchell Freeway's bridge footings complicated the construction process and necessitated preventing any ground movement. The tunnel's second contract, for the excavation and construction of the floor and roof, was awarded to Leighton Contractors. Construction on that phase was planned to take place in the second half of 1991. The tunnel's total cost was about $8–9million.


The second Mitchell Freeway carriageway between Loftus Street and Hutton Street passed in close proximity to the environmentally sensitive lake Galup, known at the time as Lake Monger. After criticism over the encroachment on the lake, Premier Carmen Lawrence announced in July 1990 that a review of the plans would be undertaken by Peter Newman in cooperation with Main Roads engineers. In response to Newman's report, the new carriageway was scaled back from five lanes to four. About 650000 tonnes of sand from the Joondalup area was used to compact the marshy soil next to the lake. Most of the Mitchell Freeway roadworks were done in-house by Main Roads Department day labourers, but the freeway and rail bridges across Vincent Street, Powis Street, and Scarborough Beach Road were built by Leighton Contractors for $8.8million. Work started on those bridges in April 1991. The bridges were incrementally launched to avoid disruption to road traffic. Completion of the freeway bridge across Vincent Street was delayed by three months due to a technical problem, resulting in the completion of the freeway project being delayed. Three cable-stayed footbridges across the freeway were also constructed by Leighton under a separate $5.3million contract. The Britannia Road footbridge was new, while the Oxford Street and Leeder Street bridges were replacing old footbridges that were not long enough for the widened freeway. The latter two footbridges provide access to Leederville and Glendalough stations respectively. The new northbound Mitchell Freeway carriageway opened on 21 June 1992, after eighteen months of construction, allowing railway work along that section to begin.
The Fitzgerald Street level crossing, used exclusively by buses to access Wellington Street bus station, was relocated 250 m west to avoid intersecting with the Northern Suburbs Railway. The master plan said the level crossing should be replaced by a bridge, but Parliament passed legislation in November 1991 to prevent the bridge from being built without the government consulting the Perth City Council, residents and businesses. The legislation was introduced to Parliament by the independent member for Perth, Ian Alexander, who wanted the railway tunnelled and a ground-level bus road built instead, calling the bridge a "cheap and nasty solution". Transport Minister Pam Beggs said that tunnelling the railway would cost an additional $11million and that she would rather spend money on the outer suburbs. Beggs submitted a report to the Legislative Assembly detailing consultation with the stakeholders, but a resolution to build the bridge failed to pass, leading to the bridge's cancellation. The new level crossing opened in March 1993. A nearby bus bridge next to the Mitchell Freeway opened in 2010 as part of the construction of Perth Arena.
Perth station underwent an upgrade and expansion. A new track and platform were constructed at the northern side of the station, providing for a total of four through tracks. To accommodate the extra track, the Barrack Street Bridge had an additional span added to its northern end, which was done in conjunction with a refurbishment of the bridge to improve its structural integrity. A new overpass was constructed at the station's western end as well. Stirling, Warwick, and Whitfords stations were built by Leighton; Glendalough, Edgewater, and Joondalup stations were built by Sabemo, a division of Transfield Constructions; and Leederville station was built by John Holland Constructions. Due to construction delays, Glendalough, Stirling, Warwick, and Whitfords stations were not finished by the end of 1992. In total, the value of the station construction contracts, excluding Currambine, was $40million. Currambine station was built by Doubikin Constructions for $2.9million.
The overhead line equipment was built by Barclay Mowlem as an extension to their contract for the electrification of the existing rail network. Installation of the masts for the overhead line equipment, which were manufactured by Delta Corporation, was underway by April 1992. Unusually, the masts were installed before the tracks were laid, as track laying was delayed by the Mitchell Freeway works. Track laying by Westrail started in July 1992, starting at the southern end and heading north. This was delayed by a quarry workers' strike in August, a week-long track workers' strike in September, and a 10-day strike in October and November by Westrail locomotive drivers, who were delivering rails and ballast. The Edgewater traction substation was turned on for the first time on 31 October, and the overhead line equipment was energised on 1 November, allowing the first A-series train to run on the line on 20 November. The completion of the signalling system was delayed by an electrical workers' strike; it was finished on 11 December and commissioned over the following two days, allowing driver training to commence on 14 December.
Opening

The first stage of the Joondalup line was officially opened on 20 December 1992 by Premier Carmen Lawrence and Transport Minister Pam Beggs. This involved the opening of Leederville, Edgewater and Joondalup stations. The West Australian newspaper reported that hundreds of people attended the opening of Leederville and Edgewater stations, and thousands of people attended the opening of Joondalup station, but that the state opposition criticised the opening ceremonies by saying that they were an "expensive political extravaganza". Wanneroo Mayor and Liberal Party candidate Rob Johnson boycotted the opening after being told he would not be greeting Premier Lawrence at Joondalup station. From 21 December, train services ran under a limited service "discoveride" brand, meaning that train services had a limited frequency of every half-an-hour and only operated between 9:30am and 2:30pm.
The remaining four stations opened throughout February 1993: Whitfords on 14 February, Glendalough and Stirling on 21 February, and Warwick on 28 February. Full service on the line between Perth and Joondalup was originally scheduled to commence on 7 March 1993, but was delayed by two weeks as driver training took longer than expected. Full service commenced on 21 March 1993. This included trains in peak hour for the first time and feeder buses servicing the Joondalup line's bus interchanges. Bus routes along the Mitchell Freeway were withdrawn, including some of Perth's busiest bus routes, such as the 396 to Warwick. The bus changes encountered resistance, particularly for their impact on schoolchildren, which led to the retention of two of the school bus services that were planned to be cancelled. Services to and from Joondalup through ran with the Armadale line, while services to and from Whitfords terminated at Perth. Recently appointed Coalition Transport Minister Eric Charlton held a small opening ceremony at Joondalup station, in contrast to the large opening ceremony conducted by the Labor government in December 1992. He also highlighted the increased operating costs that the new line would have and the debt resulting from the line's construction, which was used as a justification for a fare increase. The final part of the Northern Suburbs Railway, the 3 km from Joondalup to Currambine station, opened on 8 August 1993. The final cost was $277million.
Expansion under New MetroRail
In 1995, the government began planning an extension north of Currambine. During the 1996 state election campaign, Liberal Premier Richard Court committed to constructing an extension from Currambine to Clarkson by 2000 for $28million, plus $12million for additional rolling stock. In December 1997, the state government also committed to building Greenwood station at Hepburn Avenue, which was one of the sites given for an optional station by the 1989 master plan. Parliament passed legislation authorising the extension to Clarkson and the construction of the Mandurah line in November 1999.
In June 1999, it was announced that the completion of the Clarkson extension had been delayed beyond 2001, and in June 2000, it was announced that the extension had been delayed until 2003. Later that month, the Currambine to Butler Extension Master Plan was released. It detailed the plans for the extension north to Clarkson, the construction of Greenwood station, and a later extension to Butler. The extension to Clarkson was planned to be within the freeway's median, for consistency with the rest of the Joondalup line and the planned Mandurah line, and for "environmental and social benefits". This meant that Currambine station would have to be rebuilt, as the original station was on the western side of the future Mitchell Freeway rather than the median. Other works proposed in the master plan were for the construction of a railcar depot in Nowergup north of Clarkson station to allow for more trains and replace the stowage facility at Currambine, and extensions to all the platforms along the line to allow for six-car trains. The estimated cost of the whole project was $58million for the infrastructure, and $23million for the additional rolling stock, for a total of $81million. By October, the projected cost had risen to $99million.

The first contract for the Clarkson extension was awarded in March 2001 to Brierty Contractors to undertake earthworks for $14million. Earthworks began in May 2001 and was completed in November 2002. In July 2001, the contract for the construction of the rail bridge over Burns Beach Road was awarded to Transfield for $1.7million. The bridge was completed in May 2003. In April 2002, Barclay Mowlem and Alstom were awarded a contract worth $17million for the rail infrastructure for the extension. This contract included the design and construction of the track, traction power, signalling and communications systems, as well as track relocation at Greenwood station. The $3.2million contract for the construction of Currambine station was awarded to John Holland Group in March 2002, and in November 2002, an $8.7million contract was awarded to Transfield for the construction of Clarkson station. In February 2004, a $6.8million contract to build Greenwood station was awarded to John Holland Group. Construction of Greenwood station began in March 2004.
The contract for the platform extensions was awarded to Lakis Constructions in 2003 for $4.8million. By April 2004, the extensions at Leederville and Edgewater stations were complete. The extensions at Warwick and Whitfords stations were complete by July 2004, and the extensions at Glendalough, Stirling and Joondalup stations were complete soon after that, ready for the extension to Clarkson to open.
Nowergup depot, which cost $36million, officially opened in June 2004. The extension to Clarkson and the new Currambine station opened on 4 October 2004, the same day on which the first five B-series trains entered service on the Joondalup line. The railway line south of Currambine station was largely left as is, and was not relocated until the Mitchell Freeway was extended to Burns Beach Road in 2007 and 2008 by Macmahon Contractors. This extension also involved the construction of a tunnel to carry the railway line under the freeway. On 29 January 2005, Greenwood station was opened.
Mandurah line
Main article: William Street tunnel
In March 1999, the South West Metropolitan Railway Master Plan for the construction of the Mandurah line was approved by the state government. It was to branch off the Armadale line at Kenwick to head to Mandurah, south of Perth. Running the Mandurah line via the Kwinana Freeway was not considered viable due to its median strip being narrower than the Mitchell Freeway's. It was decided that the Joondalup line would begin through-running with the Mandurah line upon its opening, as they were forecast to be the busiest lines, with six-car trains required to meet demand on both lines. Following the election of a Labor government, in July 2001, the state government announced that the proposed Mandurah line would be rerouted via the Kwinana Freeway, with a tunnel under the Perth CBD to connect the Mandurah line to the Joondalup line. A new master plan was released in August 2002, which divided the Mandurah line's construction into several packages, Package F being for the City Project, which involved the construction of the tunnel under the Perth CBD and connection with the Joondalup line. This project included the construction of 690 m of twin bored tunnels under the Perth CBD, a tunnel portal west of Perth station, and two underground stations: William Street (now known as Perth Underground), which connects to the original Perth station, and Esplanade (now known as Elizabeth Quay).
.jpg)
The contract for the City Project was awarded to Leighton–Kumagai Gumi in February 2004 for $324.5million. Construction began later that month. With the opening of the Thornlie line as a branch of the Armadale line, through services to the Armadale line ceased on 8 August 2005 and Joondalup line trains began terminating at Perth station, in preparation for through running with the Mandurah line. By October 2005, the Joondalup line tracks west of Perth station had been slewed 6 m to the south to make way for the construction of the tunnel portal. The City Project reached practical completion in September 2007. From 7 October to 14 October 2007, the Joondalup line was shut down between Leederville and Perth stations and the Fremantle line was fully shut down to connect the tunnel tracks to the Joondalup line. The Joondalup line reopened on 15 October 2007 with its new southern terminus at Esplanade station. The Mandurah line opened on 23 December 2007.
In September 2008, the Liberal Party committed $49million to expanding parking along the Joondalup and Mandurah lines by three thousand bays, in response to car parks reaching capacity following the opening of the Mandurah line. Labor committed to adding two thousand bays instead. Following the Liberal Party's victory in the 2008 state election, work began on the car park expansions in October 2009, starting with Greenwood and Whitfords stations. By July 2012, the three thousand parking bay promise had been exceeded.
Extension to Butler
In August 2008, Labor Premier Alan Carpenter committed to extending the Joondalup line from Clarkson to Butler by 2012. Following the September 2008 state election, the newly elected Liberal government deferred the extension; in February 2009, the government committed to building the extension for $160million. Legislation authorising the Butler extension was introduced to Parliament in November 2009, by which point the projected cost was $240million. The legislation was passed in July 2010. Only one station was to be built as part of the extension instead of two as was previously proposed, meaning there would not be a separate station for park-and-ride outside the Butler town centre. The opposition criticised this, but Transport Minister Simon O'Brien said that the Public Transport Authority had told him that one station would be better.
The first contract for the Butler extension, for earthworks north of Nowergup depot to Landbeach Boulevard, a distance of 4 km, was awarded to RJ Vincent & Co in December 2010 for $6million. The contract for the construction of three bridges to cross over the railway was awarded in May 2011 to Bocol Constructions and RJ Vincent & Co for $9.8million. By June 2012, Cooper and Oxley had been awarded the contract to construct Butler station for $22million. Construction on the station began in July 2012. By October 2012, earthworks and bridge construction were complete, allowing track laying to commence. The $24million track laying contract had been awarded to John Holland. In November 2012, the contract for signalling was awarded to Ansaldo STS Australia for $19.7million. By October 2013, track laying was eighty percent complete, and by April 2014, Butler station was complete.

The first train ran on the Butler extension on 25 August 2014, with train driver familiarisation beginning after that. The extension was opened on 21 September 2014 by Premier Colin Barnett and Minister for Transport Dean Nalder, three months early and $20million under budget. Following the opening of the extension, some nearby residents experienced excessive vibrations when trains passed by, with a petition complaining about the problem gaining 178 signatures. Acoustic matting was used for parts of extension, but not the area closest to Butler station, which was where the complaints were coming from. The results of noise monitoring were released in December 2014. The results concluded that noise and vibration levels near Butler station were within acceptable limits, but another section of the extension was above acceptable limits, so a larger noise wall was built there.
Extension to Yanchep
In July 2011, the government's Public Transport in Perth in 2031 plan was released, which planned for an extension to Yanchep to be constructed by 2020 as one of two key transformational projects, the other being light rail from the CBD to Mirrabooka. In 2014, the government said the Yanchep extension would not commence construction until the Forrestfield–Airport Link is completed, delaying the opening of the Yanchep extension until the mid-2020s. The Perth and Peel@3.5million report, released in July 2016, said that the Yanchep extension would be built by the time Perth's population reaches 2.7million. Meanwhile, the Yanchep extension was committed to by the Labor Party ahead of the 2013 state election as part of its Metronet project. The Labor Party lost, so ahead of the 2017 state election, the Labor Party again committed to opening the Yanchep extension by 2021 for $386million. The 2017 election resulted in the election of a Labor government.
In May 2017, following negotiations between the federal and state governments, it was announced that federal funding for the cancelled Perth Freight Link would be used on the Yanchep Rail Extension, subject to assessment by Infrastructure Australia. The September 2017 state budget gave the Yanchep Rail Extension a cost of $520.2million. The business case for the Yanchep Rail Extension was submitted to Infrastructure Australia in August 2017, which released its assessment of the project in November 2018, adding the project to the Infrastructure Priority List as a "High Priority Project" and giving it a projected economic benefit of $2.549billion and a benefit–cost ratio of 2.6. Infrastructure Australia recommended that the contract for the Thornlie–Cockburn Link be combined with the contract for the Yanchep Rail Extension to save costs during procurement, although local contractors expressed concerns that the two projects had different requirements, were in different parts of Perth, and that combining the projects would price out smaller contractors. The Infrastructure Australia assessment allowed $700million in federal funding to be spent on the two projects, of which $350million was for the Yanchep Rail Extension.
Legislation was introduced to Parliament in May 2018 and passed in November 2018. The project definition plan, detailing the scope of the Yanchep Rail Extension, was approved by state cabinet in July 2018. A request for proposal was released in September 2018 for the design and construct contract for the Yanchep Rail Extension and the Thornlie–Cockburn Link. Two consortia were shortlisted in April 2019: METROconnex, a joint venture between Coleman Rail, Clough Group, and Georgiou Group; and NEWest Alliance, a joint venture between CPB Contractors and Downer. In November 2019, NEWest Alliance was announced as the preferred proponent, and the contract was awarded in the following month, the cost of the Yanchep Rail Extension rising to $531.7million.
.jpg)
.jpg)
Early works began in November 2019 and a sod turning ceremony took place on 24 November, making the Yanchep Rail Extension the second Metronet project to begin construction, after the Forrestfield–Airport Link. Major works on the Yanchep Rail Extension began in mid-2020. Construction at Alkimos station had begun by March 2021, with the first major concrete pour taking place that month. In June 2021, PerthNow reported that work on the Yanchep Rail Extension had stalled, but the Public Transport Authority was still saying the extension would open in late 2022. The government first raised the potential for a delay in July 2021, and after the September 2021 state budget, it was revealed that the Yanchep Rail Extension's opening date would be delayed by a year to late 2023 due to a skills shortage and to ease pressure on Western Australia's construction industry. To cut costs, the construction of a shared path along the extension was cancelled, with the decision being justified by there also being a shared path along Marmion Avenue and a proposed one to be constructed as part of the extension of the Mitchell Freeway. The decision to cancel the shared path was criticised by cycling groups and the City of Wanneroo. By the end of 2021, work on all three stations was underway. At Eglinton and Yanchep stations, the foundations were being poured, and at Alkimos station, retaining walls had been put up.
The March 2022 federal budget revealed the federal government would provide $90million of additional funding for the project, bringing its share of the project to $440million. The May 2022 state budget revealed a $175.3million cost increase, the May 2023 state budget revealed a $375.3million cost increase, and the May 2024 state budget revealed a $288million cost increase, bringing the extension's total cost to $1.27billion. The Liberal Party has readily criticised the cost increases, saying the money should instead be spent on healthcare among other things, but Transport Minister Rita Saffioti blamed the overruns on the cost of steel, diesel, and concrete, and the COVID-19 pandemic.
After the May 2023 state budget, the government said that the Yanchep extension "is due for completion at the end of 2023, with services commencing in the new year" That month, the first 2.7 km of track had been laid. The first train ran on the Yanchep Rail Extension on 22 December 2023. The opening date was revealed in April 2024. The extension was officially opened by Premier Roger Cook and Transport Minister Saffioti on 14 July 2024, with celebrations occurring at Yanchep station. Regular train and bus services commenced the following day. Upon the extension's opening, the Joondalup line was renamed the Yanchep line.
Future
There are provisions for a special events station to serve Arena Joondalup between Joondalup and Currambine stations. Placing a station between Edgewater and Joondalup stations at Hodges Drive to serve the Edith Cowan University campus was also considered in the 1990s, but that was ruled too close to Joondalup station, so the site was not reserved.
The proposed East Wanneroo line is planned to link the Ellenbrook line to the Yanchep line near Clarkson station.
Description

The Yanchep line was built with narrow gauge track. Trains are powered by overhead line equipment supplied with electricity by three substations at Sutherland Street in West Perth, Edgewater, and Nowergup. The maximum speed is 110 km/h south of Currambine and 130 km/h north of Currambine. The line uses automatic train protection and is signalled to allow for headways as low as three minutes using fixed block signalling. As part of the High Capacity Signalling Project, the signalling system will be replaced by a moving block system using communications-based train control (CBTC), allowing for higher frequencies. As of 2021, the CBTC system is planned to be implemented on the Joondalup and Mandurah lines by June 2029.
Route
The Yanchep line runs from Perth Underground station in the south to Yanchep station in the north, a distance of 54.5 km. South of Perth Underground station, the line continues as the Mandurah line, although services in the William Street tunnel between Perth Underground and Elizabeth Quay stations are considered to be part of the Yanchep line and Mandurah line simultaneously.
North of Perth Underground station, the tunnel curves westward, passing under the Fremantle line tunnel by 1.2 m, before surfacing parallel to the Fremantle line, 0.6 km from Perth Underground station. At 0.9 km, the Yanchep line dives down to enter a short tunnel and bend north to pass under Roe Street and enter the freeway's median strip. The Yanchep line continues along the Mitchell Freeway for 23 km until it reaches Joondalup. There are seven stations along this section: Leederville, Glendalough, Stirling, Warwick, Greenwood, Whitfords, and Edgewater. South of Leederville and north of Whitfords stations are turnback sidings for trains to change direction.

At the 24.6 km mark, the Yanchep line enters a short tunnel to exit the Mitchell Freeway median strip for a 3.3 km deviation through Joondalup. For this section, the railway line is in a cutting below ground level. North of Joondalup station, the Yanchep line passes under the Lakeside Joondalup Shopping Centre, before bending west and north to enter a tunnel and reach the freeway's median again.
North of Joondalup, the Yanchep line has two stations in the freeway median: Currambine and Clarkson. North of Clarkson station is the Nowergup depot, which is between the two main lines. At 38.8 km, the Yanchep line exits the Mitchell Freeway median for the last time, entering the residential suburb of Butler. The remaining 16 km of the Yanchep line is largely within a cutting below ground level, passing through developing residential areas and bushland. There are four stations: Butler, Alkimos, Eglinton, and Yanchep, where the line terminates. North of Yanchep station are tracks to stow trains.
Stations
All stations on the Yanchep line are fully accessible except for Leederville, Stirling, and Edgewater stations, which have platform gaps that are too large. Leederville station also has a ramp that is too steep. All stations except Greenwood, Edgewater, and Currambine have bus interchanges. All platforms are approximately 150 m long, allowing six-car trains to stop at all stations.
| Station | Image | Distance from Perth | Location | Opened | Connections | km | mi | Elizabeth Quay | Perth Underground | Leederville | Glendalough | Stirling | Warwick | Greenwood | Whitfords | Edgewater | Joondalup | Currambine | Clarkson | Butler | Alkimos | Eglinton | Yanchep | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| [[File:Esplanade station platforms.jpg | 100x100px | alt=Elizabeth Quay station underground platform]] | −0.6 | −0.4 | Perth | Bus at Elizabeth Quay bus station Services continue on the Mandurah line | |||||||||||||||||||
| [[File:Perth Underground station interior.jpg | 100x100px | alt=Perth Underground station concourse]] | 0.0 | 0.0 | Perth | Bus at Perth BusportAustralind, Airport, Armadale, Ellenbrook, Fremantle, Midland and Thornlie–Cockburn lines | |||||||||||||||||||
| [[File:Transperth Leederville Train Station.jpg | 100x100px | alt=Leederville station platform]] | 2.4 | 1.5 | Leederville, West Leederville | Bus | |||||||||||||||||||
| [[File:Glendalough station platforms 01.jpg | 100x100px | alt=Glendalough station platform]] | 5.6 | 3.5 | Glendalough, Osborne Park, Mount Hawthorn | Bus | |||||||||||||||||||
| [[File:New rail cars at stirling station.jpg | 100x100px | alt=Stirling station platform]] | 8.8 | 5.5 | Innaloo, Osborne Park, Stirling | Bus | |||||||||||||||||||
| [[File:Warwick station train level.jpg | 100x100px | alt=Warwick station platform]] | 14.5 | 9.0 | Carine, Duncraig, Hamersley, Warwick | Bus | |||||||||||||||||||
| [[File:Greenwood stn looking N from inside.jpg | 100x100px | alt=Greenwood station platforms]] | 17.7 | 11.0 | Duncraig, Greenwood, Kingsley, Padbury | ||||||||||||||||||||
| [[File:Whitfords station from Whitfords Ave.jpg | 100x100px | alt=Whitfords station platform]] | 19.8 | 12.3 | Craigie, Kingsley, Padbury, Woodvale | Bus | |||||||||||||||||||
| [[File:WTJ Toos42 Edgewater platform.jpg | 100x100px | alt=Edgewater station platform]] | 22.9 | 14.2 | Edgewater, Heathridge | ||||||||||||||||||||
| [[File:Joondalup stn overview.jpg | 100x100px | alt=Joondalup station platform in a trench]] | 26.2 | 16.3 | Joondalup | Bus | |||||||||||||||||||
| [[File:Currambine Station, December 2021 19.jpg | 100x100px | alt=Currambine station platform]] | 29.2 | 18.1 | Currambine, Joondalup | ||||||||||||||||||||
| [[File:Clarkson Station, December 2021 24.jpg | 100x100px | alt=Clarkson station platform]] | 33.2 | 20.6 | Clarkson | Bus | |||||||||||||||||||
| [[File:Butler Station, Western Australia, August 2021 03.jpg | 100x100px | alt=Butler station building]] | 40.7 | 25.3 | Butler | Bus | |||||||||||||||||||
| [[File:Alkimos Station, Western Australia, July 2024 77.jpg | 100x100px | alt=Alkimos station platforms]] | 43.0 | 26.7 | Alkimos | Bus | |||||||||||||||||||
| [[File:Eglinton Station, Western Australia, July 2024 31.jpg | 100x100px | alt=Eglinton station platforms]] | 46.7 | 29.0 | Eglinton | Bus | |||||||||||||||||||
| [[File:Yanchep Station, Western Australia, July 2024 40.jpg | 100x100px | alt=Yanchep station platforms]] | 54.5 | 33.9 | Yanchep | Bus |
Service
Transperth train services are operated by the Public Transport Authority's Transperth Train Operations division. Prior to 2003, it was operated by Westrail under contract to Transperth. Yanchep line train headways reach as low as five minutes during peak, increasing to fifteen minutes outside peak and on weekends, and half-an-hour to an hour at night. During peak, some services terminate or commence at Whitfords or Clarkson stations. The travel time from Yanchep station to Perth Underground station is 49 minutes. On weeknights, the last train arrives at Yanchep station at 1:06am and the first train departs at 4:38am. On Saturday and Sunday nights, the last train arrives at Yanchep station at 3:04am and the first train departs at 5:05am on Saturdays and 6:28am on Sundays.
During events at Perth Stadium, additional services operate along the Yanchep line direct to Perth Stadium station, bypassing Perth station.
Before January 2016, express services operated on the Yanchep line during peak periods to manage overcrowding. The introduction of more B-series sets allowed for most trains during peak to be six cars long, which increased capacity and allowed for all services to stop at all stations from 31 January 2016 onwards. Before then, some peak trains from Perth to Butler or Clarkson skipped Leederville and Glendalough, and trains from Perth to Whitfords skipped Greenwood. Before June 2009, services terminating at Whitfords operated off-peak as well, making for 7½-minute headways between Perth and Whitfords during the day. The Perth to Whitfords service is sometimes known as the Whitfords shuttle. These services were withdrawn to save money.
From 2031, peak frequencies on the Yanchep line are planned to reach 18 trains per hour, which will be made possible by C-series trains having three doors per car, which reduces dwell times compared to B-series trains, and the communications-based train control signalling upgrade.
Rolling stock


The main rolling stock used on the Yanchep line is Transperth B-series and C-series trains, with A-series trains sometimes used. The A-series trains entered service between 1991 and 1999, have a maximum speed of 110 km/h, and consist of two cars which are usually joined to form four-car trains. Each car has two doors on each side. The B-series trains entered service between 2004 and 2019, have a maximum speed of 130 km/h, and consist of three cars which are usually joined to form six-car trains. Each car has two doors per side. The C-series trains have been entering service since 2024, have a maximum speed of 130 km/h, and consist of six cars with three doors on the side of each car.
In 1989, twenty-two A-series sets were ordered from ABB and Walkers Limited as an extension to their existing contract for the delivery of railcars for the electrification of the other lines. Five more A-series sets were delivered in 1998 and 1999 to increase capacity. These trains are stored and maintained at Claisebrook depot in East Perth; a small amount of trains were also stored at Currambine station before the Clarkson extension opened.
In May 2002, the government signed a contract with EDI Rail and Bombardier Transportation for the construction of Nowergup depot and the delivery and maintenance of thirty-one three-car B-series trains to be used on the Joondalup and Mandurah lines. The first five B-series trains entered service when the Clarkson extension opened on 4 October 2004. The first six-car trains ran on the line on 31 December 2004 on the Whitfords shuttle. In December 2006, the government ordered fifteen more B-series trains. The first of the additional railcars entered service in June 2009, allowing for some A-series trains to be transferred to other lines. In July 2011, a further fifteen B-series trains were ordered. This order eventually increased to twenty-two. The first of these trains entered service in December 2013. By the end of that order, all A-series trains had been transferred to other lines and almost every peak hour train on the Joondalup line was six-cars long.
In December 2019, the government signed a contract with Alstom for the delivery and maintenance of forty-one C-series trains to replace the A-series trains and provide the rolling stock required for network expansions such the Yanchep extension. The C-series trains have three doors on the side of each car, decreasing dwell times. The first C-series train entered service on the Joondalup and Mandurah lines on 8 April 2024. The C-series trains are planned to only be used on the Yanchep and Mandurah lines initially, with B-series trains transferred to other lines to replace the retiring A-series trains.
Patronage
The 1989 master plan predicted there would be 41,000 passengers boarding the Joondalup line per day by 2001. By June 1993, approximately 24,200 passengers were using the Joondalup line on an average weekday, of which 56 percent travelled during peak.. In the 1993–94 financial year, the first full year since the Joondalup line opened, the line received 8,221,000 passengers, significantly more than predicted. Patronage on the whole system almost doubled from 13.6million in the previous financial year to 22.9million. By 2003, patronage was short of projections by four thousand boardings per day.
The Clarkson extension's opening in 2004 resulted in a significant increase in patronage. Upon the Mandurah line's opening in 2007, the Joondalup line was relegated to being Perth's second-most-used line, while also causing another significant increase in patronage, reaching a peak of 17,449,891 boardings in 2012–13. Following years of growth, the Joondalup line's patronage decreased in 2013–14, due to shutdowns relating to the Perth City Link and economic factors. The line recorded a small increase in patronage the following financial year with the opening of the extension to Butler, but patronage declined over the following three years due to economic conditions. In the 2018–19 financial year, patronage was increasing again, but the COVID-19 pandemic's onset in 2020 resulted in a massive decrease, reaching a low of 11,752,572 boardings in 2021–22. By the line's 30th anniversary on 20 December 2022, over 381million trips had been made. In the latest financial year, 2024–25, there were 16,614,973 boardings on the Yanchep line.
Within nine days of opening, Butler station had reached its goal of two thousand boardings per day. By August 2015, the combined bus and train patronage within the surrounding area was up thirteen percent. On the other hand, by March 2025, the three stations on the Yanchep Rail Extension were receiving about 1,900 boardings per weekday in total, and in July 2025, 1,691 boardings per weekday, well below the 5,200 boardings expected upon opening.
The busiest stations on the Yanchep line as of 2018, excluding Perth Underground and Elizabeth Quay, are Warwick, Joondalup, Stirling, and Whitfords. The least-busiest are Currambine, Edgewater, and Greenwood. Warwick and Joondalup were the fourth and fifth busiest stations in Perth in October 2017, with 5,125 and 4,791 boardings per day respectively.
| Year | Patronage | ±% |
|---|---|---|
| 2010–11 | 15,611,836 | — |
| 2011–12 | 16,700,234 | |
| 2012–13 | 17,449,891 | |
| 2013–14 | 16,897,361 | |
| 2014–15 | 17,105,797 | |
| 2015–16 | 16,917,029 | |
| 2016–17 | 16,658,559 | |
| 2017–18 | 16,477,387 | |
| 2018–19 | 16,531,788 | |
| 2019–20 | 13,374,710 | |
| 2020–21 | 11,885,779 | |
| 2021–22 | 11,752,572 | |
| 2022–23 | 14,045,991 | |
| 2023–24 | 16,135,201 | |
| 2024–25 | 16,614,973 |
Notes
References
Sources
References
- (1955). "Plan for the Metropolitan Region, Perth and Fremantle". Government Printing Office.
- (21 July 2011). "Lib's public transport opportunity".
- (1963). "Metropolitan Region Scheme Map 13".
- (22 February 2017). "Grandson of town planner Gordon Stephenson sets record straight".
- (6 June 1988). "New 'super buses' plan for city link". The West Australian.
- (14 December 1988). "Land deals may fund line". The West Australian.
- Westrail. (1989). "Annual Report 1988–1989".
- (21 January 1989). "Row over Coalition rail plans". The West Australian.
- (23 January 1989). "Liberals 'against train'". The West Australian.
- (23 August 2002). "A train the voters are learning not to love". The Australian.
- Westrail. (1990). "Annual Report 1989–1990".
- (1997). "The Vital Link: A History of Main Roads Western Australia 1926–1996". University of Western Australia Press.
- (December 1989). "Westrail News". Westrail.
- "Perth–Joondalup Railway Act 1989". Department of Justice.
- "Perth–Joondalup Railway Act". Department of Justice.
- (17 December 1990). "Work will start soon to construct a tunnel under Roe Street as part of the $223 million program to provide an electrified rail link to Perth's northern suburbs". Government of Western Australia.
- (18 December 1990). "Work to start on rail tunnel". The West Australian.
- (29 October – 1 November 1995). "High-Performance Concrete in Rail Structures".
- (17 June 2025). "Lake Monger name changes to Galup".
- (17 June 2025). "Lake Monger officially reinstates Whadjuk Noongar name, Galup, after Geographic Names Committee endorsement".
- (12 February 1990). "Lake's future at crossroads". The West Australian.
- (5 July 1990). "Premier today announced a review of Main Roads Department plans for the development of Mitchell Freeway between Loftus and Vincent Streets". Government of Western Australia.
- (July 1990). "Review of Mitchell Freeway widening at Leederville and Lake Monger".
- (13 August 1990). "A compromise solution to the widening of the Mitchell Freeway around Lake Monger was announced today by Premier". Government of Western Australia.
- (14 August 1990). "Lake to escape freeway surgery". The West Australian.
- (1994). "Three Cable-Stayed Footbridges".
- (19 June 1992). "Changes to Mitchell Freeway". Government of Western Australia.
- (15 October 1992). "Fitzgerald St railway crossing to be moved". Government of Western Australia.
- (16 October 1992). "New railway crossing wins council backing". The West Australian.
- (8 November 1991). "Bridge Bill through". The West Australian.
- "Fitzgerald Street Bus Bridge Act 1991".
- (18 October 1991). "Bus bridge still best bet: Beggs". The West Australian.
- (5 December 1991). "Bridge plan put on hold". The West Australian.
- (18 March 1993). "Bus drivers ban level crossing". The West Australian.
- (31 July 2010). "Bus bridge set to ease congestion".
- (7 December 2010). "City bus bridge to open this month". Community Newspaper Group.
- (1992). "Refurbishment of Barrack Street Bridge".
- (12 June 1992). "Lifting of northern pedestrian overpass at Perth Station". Government of Western Australia.
- (19 December 1992). "Rail team defies mission's odds". The West Australian.
- (19 March 1992). "Contract for northern suburbs rapid transit system". Government of Western Australia.
- (24 March 1992). "Contracts awarded for work on northern suburbs transit system". Government of Western Australia.
- (2 July 1992). "Contract awarded for work on Edgewater station". Government of Western Australia.
- Westrail. (1993). "Annual Report 1992–1993".
- "Joondalup street scenes – 6".
- Westrail. (1992). "Annual Report 1991–1992".
- (10 November 1992). "Guard rail barrier between freeway and northern subs railway line". Government of Western Australia.
- (22 April 1992). "Work underway on masts for northern suburban transit system". Government of Western Australia.
- (21 March 1993). "Design sits poles apart in top looks". The Sunday Times.
- (19 December 1992). "Poles before the track was a master stroke". The West Australian.
- (14 July 1992). "Gangs get new railway on track". The West Australian.
- (13 July 1992). "Progress on Northern Suburbs Rapid Transit System (A/Min)". Government of Western Australia.
- (8 September 1992). "Track workers' dispute ends". The West Australian.
- (30 October 1992). "Ban puts rail work on hold". The West Australian.
- (31 October 1992). "Hearing sought to end rail dispute". The West Australian.
- (6 November 1992). "Union eases restrictions on northern line project". The West Australian.
- (31 October 1992). "Power switched on for northern suburbs railway". Government of Western Australia.
- (31 October 1992). "The Power's On From November 1 (advertisement)". The West Australian.
- (1 November 1992). "Northern line a track star". The Sunday Times.
- (20 November 1992). "Trial of first northern suburbs electric train a success". Government of Western Australia.
- (12 December 1992). "Green light for new rail service". The West Australian.
- (13 December 1992). "Glamor rail service won't be on track". The Sunday Times.
- (20 December 1992). "Opening of Perth–Joondalup rail link". Government of Western Australia.
- (21 December 1992). "Northern suburbs railway an instant hit". Government of Western Australia.
- (21 December 1992). "Transperth tips rail boom". The West Australian.
- (21 December 1992). "Back on track". The Canberra Times.
- (20 December 1992). "$250,000 rail party shunned". The Sunday Times.
- (11 February 1993). "Transperth Information (advertisement)". The West Australian.
- (18 February 1993). "Transperth Information (advertisement)". The West Australian.
- (25 February 1993). "Transperth Information (advertisement)". The West Australian.
- (28 January 1993). "Bus/train interchanges on northern subs railway to open February". Government of Western Australia.
- (25 February 1993). "Training delays new line". The West Australian.
- (21 March 1993). "Inspection of Joondalup train-bus interchange". Government of Western Australia.
- (21 March 1993). "History is right on track". The Sunday Times.
- (22 March 1993). "New rail line faces first big test". The West Australian.
- [[Metropolitan Transport Trust. (1998). "Annual Report 1997–1998".
- (20 March 1993). "Busiest buses axed to make way for trains". The West Australian.
- (16 March 1993). "Bus changes hit students". The West Australian.
- (17 March 1993). "Perth's new trains bring bad news". The West Australian.
- (21 March 1993). "Feeder service set for trains". The Sunday Times.
- (24 March 1993). "More delays as snarls hit new railway". The West Australian.
- (27 March 1993). "Fare rises certain as rail debt climbs". The West Australian.
- (17 July 1993). "Opening of Currambine railway station next month". Government of Western Australia.
- (8 August 1993). "New warning devices for Fastrak trains". Government of Western Australia.
- (9 August 1993). "Door chimes help rail safety". The West Australian.
- (18 March 1995). "Opposition promise to 'fast track' transport systems pre-empted by Govt". Government of Western Australia.
- (20 November 1996). "Extension of northern suburbs transit system to Neerabup Drive, Clarkson". Government of Western Australia.
- (21 November 1996). "Pledge War On Northern Line". The West Australian.
- (5 December 1997). "Go-ahead for new railway station at Hepburn Avenue, Greenwood". Government of Western Australia.
- (26 November 1999). "Way cleared for construction of SW Metropolitan Railway to Mandurah.". Government of Western Australia.
- "Railway (Northern and Southern Urban Extensions) Bill 1999".
- (5 June 1999). "Northern Rail Line Promise Off The Rails". The West Australian.
- (9 June 2000). "Cabinet lacks will to expand rail: ALP". The West Australian.
- (22 June 2000). "Station to move in rail extension". The West Australian.
- (21 June 2000). "Minister says the push is on for earlier Clarkson rail link". Government of Western Australia.
- (18 October 2000). "Green light for rail extension to Clarkson: Premier". Government of Western Australia.
- "OnTrack: March 2003".
- (1 May 2001). "Trains Revamp – New lines, rail carriages to cost $1.5b". The West Australian.
- (2 May 2001). "Minister to commence extension to the Northern Suburbs Transit System". Government of Western Australia.
- "Bulk Earthworks".
- (11 July 2001). "Contract Awarded for Burns Beach Road Rail Bridges". Government of Western Australia.
- "Bridges".
- "Railway and Track Infrastructure".
- (13 November 2002). "$8.7million contract awarded for construction of Clarkson Station". Government of Western Australia.
- (12 February 2004). "Work to start on Greenwood station". Government of Western Australia.
- "Greenwood Station Construction".
- (April 2004). "What's going on with Greenwood Station?".
- (April 2004). "OnTrack: Issue 5".
- (October 2003). "OnTrack: Issue 3".
- (April 2004). "OnTrack: Issue 5".
- (July 2004). "OnTrack: Issue 6".
- (13 June 2004). "First railcars arrive at new Nowergup train depot". Government of Western Australia.
- "Currambine".
- (30 September 2004}}). "Free rail travel to celebrate network expansion". Government of Western Australia.
- (5 October 2004). "Costs spiral on $1.5bn WA rail link". Australian Financial Review.
- (14 December 2006). "Work begins on Mitchell Freeway extension". Government of Western Australia.
- "Mitchell Freeway Extension – Hodges Drive to Burns Beach Road – Concept Plan".
- (24 October 2008). "Extensions to ease congestion on roads to the north". The West Australian.
- (29 January 2005). "Services commence from Greenwood Railway Station". Government of Western Australia.
- (30 January 2005). "Rail link on track". The Sunday Times.
- (16 July 2001). "Gallop Government unveils vision for faster rail link to Mandurah". Government of Western Australia.
- (17 July 2001). "Rail Switch – New train link across city foreshore". The West Australian.
- (13 August 2002). "Master Plan shows new line a winner". Government of Western Australia.
- (14 August 2002). "ALP claims win on freeway line". The West Australian.
- (14 February 2004). "City section of New MetroRail Project signed". Government of Western Australia.
- (15 February 2004). "Consortium lands $320m WA railway contract".
- (16 February 2004). "It's underground from here on as railway deal signed, sealed". The West Australian.
- (26 February 2004). "Premier signals beginning of Southern Suburbs Railway work". Government of Western Australia.
- (27 February 2004). "On track for political hazards". The West Australian.
- (27 February 2004). "Rail link to cause 'many months' of traffic delays". The Australian.
- (6 August 2005). "Transperth passengers will benefit from the new Thornlie Station (advertisement)". The West Australian.
- (September 2005). "Table Talk". Australian Timetable Association.
- (October 2005). "OnTrack: Issue 10".
- (8 September 2007). "City tunnel project completion announced.". Government of Western Australia.
- "Your Guide to the Shutdown".
- (16 December 2015). "WA Government attacked for costly renaming of Elizabeth Quay bus and train station".
- (21 January 2016). "Elizabeth Quay opening celebrations to last three weeks".
- (14 October 2007). "Perth's new underground railway stations ready for action.". Government of Western Australia.
- (15 October 2007). "Perth CBD's first underground train station in operation".
- (23 December 2007). "Mandurah line train makes maiden voyage".
- (23 December 2007). "1500 take first railway trip to Mandurah".
- (23 December 2007). "Perth to Mandurah line takes first passengers".
- (5 September 2008). "Liberals put faith in railway station carparks as Labor backs more trains". The West Australian.
- (20 January 2009). "Train station carparks full by 8am". The West Australian.
- (27 October 2009). "Work starts on expanding train station car parks". Government of Western Australia.
- (2 March 2012). "Buswell admits bays for all will never happen 1754". The West Australian.
- (16 July 2012). "Government to exceed 3,000 car bay promise". Government of Western Australia.
- (13 August 2008). "Labor to extend Perth's northern rail line".
- (14 August 2008). "Carpenter promises train line to Butler". The West Australian.
- (31 October 2008). "Barnett halts northern extension and rail to airport". The West Australian.
- (2 February 2009). "Health, education and public housing key priorities in capital works program". Government of Western Australia.
- (3 February 2009). "Subi stadium dumped as $2b in projects axed". The West Australian.
- (27 November 2009). "Butler rail plans 'disappointing'".
- (26 November 2009). "Libs give green light to $240m Joondalup rail extension".
- (26 November 2009). "Liberal-National Government gives green light to Joondalup rail extension". Government of Western Australia.
- (13 July 2010). "Butler to Brighton railway extension moves closer". Government of Western Australia.
- (13 July 2010). "Joondalup rail line extension closer".
- (8 December 2010). "RJ Vincent wins $6m Joondalup rail contract".
- (8 December 2010). "Government contract kicks off Joondalup rail line extension". Government of Western Australia.
- (20 May 2011). "Bridges contract awarded for Butler extension". Government of Western Australia.
- (20 May 2011). "State awards rail extension deal".
- (8 June 2012). "Work to start on Butler station". Government of Western Australia.
- (8 June 2012). "Butler train station works to begin".
- "Our history".
- (19 October 2012). "Butler Station moves step closer as track laid". Government of Western Australia.
- (13 November 2012). "Work starts on taking train line further north".
- (13 November 2012). "Another big step for Butler rail project". Government of Western Australia.
- (23 October 2013). "Butler extension full steam ahead". Government of Western Australia.
- (17 April 2014). "Butler Station construction complete". Government of Western Australia.
- (30 August 2014). "Trains start using new Butler extension". Government of Western Australia.
- (21 September 2014). "Barnett opens rail extension as first train leaves Butler station".
- (21 September 2014). "Butler train station and rail extension opens".
- (21 September 2014). "Extended northern railway: Butler train station open today".
- (23 September 2014). "Residents rattled by rail".
- (23 September 2014). "Government to monitor noise complaints".
- (13 October 2014). "Train vibrations send residents loco".
- (13 December 2014). "No housing near station". The West Australian.
- (July 2011). "Public Transport for Perth in 2031: Draft for Consultation".
- (14 July 2011). "Light rail, train extension in transport plan".
- (14 July 2011). "Light rail, bus rapid transit and railway to Yanchep part of 20-year public transport plan". Government of Western Australia.
- (18 August 2014). "Yanchep rail on hold".
- (29 July 2016). "Transport plan snapshot – new rail lines".
- (29 July 2016). "Nalder gets digging in transport plan".
- (16 December 2012). "Labor promises new Perth rail network".
- (16 December 2012). "Labor unveils $1.6b rail plans".
- (8 February 2017). "Trains to Yanchep by 2021 with $386m Labor plan".
- (7 February 2017). "WA election: Preferences, hecklers and The Big Issue dominate campaign trail".
- (11 March 2017). "Labor romps to power as McGowan is crowned WA Premier".
- (11 March 2017). "WA election: Mark McGowan's Labor Party sweeps Colin Barnett's Liberal-National Government out of office".
- (7 May 2017). "$2.3 billion jobs boost for WA".
- (7 September 2017). "METRONET well underway with major funding injection". Government of Western Australia.
- (13 September 2017). "Western Australia budget backs rail growth".
- (8 September 2017). "Budget 2017: Metronet construction to start in 2019".
- (21 August 2017). "METRONET progress on track". Government of Western Australia.
- (18 November 2018). "Project Evaluation Summary METRONET: Yanchep Rail Extension".
- (16 November 2018). "METRONET projects get Infrastructure Australia tick of approval". Government of Western Australia.
- (16 November 2018). "National infrastructure tsar gives green light to Perth Metronet plan".
- (26 February 2018). "Contractors call for rethink on procurement".
- (15 November 2018). "Federal Funding Secured".
- (16 November 2018). "Yanchep: Infrastructure Australia approves $700m federal contribution to Metronet rail projects".
- (10 May 2018). "METRONET Bill to enshrine rail commitment in legislation". Government of Western Australia.
- (1 June 2018). "Metronet legislation to pave way for construction of Yanchep rail extension".
- (16 November 2018). "METRONET Rail Enabling Bill Passed".
- (3 July 2018). "Two METRONET projects on track to begin construction next year". Government of Western Australia.
- (9 September 2018). "Joint media statement – Wanted: Contractor to build Perth's new METRONET rail lines". Government of Western Australia.
- (10 September 2018). "Request for Proposal released for two major METRONET projects WA".
- (6 April 2019). "METROconnex, NEWest Alliance consortiums vie for $1.1b Metronet's Thornlie–Cockburn and Yanchep rail work".
- (8 April 2019). "Two bidders for rail projects".
- (6 April 2019). "METRONET's Thornlie–Cockburn Link and Yanchep Rail Extension tender reaches next phase". Government of Western Australia.
- (24 November 2019). "NEWest Alliance appointed to deliver Yanchep rail extension and Thornlie–Cockburn link".
- (26 November 2019). "NEWest Alliance chosen for Yanchep Rail Extension".
- (24 November 2019). "CPB-Downer JV selected as preferred contractor for METRONET projects".
- (17 December 2019). "Metronet Thornlie–Cockburn link between Armadale and Mandurah train lines delayed to 2023 after $200m blowout".
- (18 December 2019). "Major Metronet project over budget and delayed".
- (17 December 2019). "WA Government signs contracts with NEWest Alliance".
- (24 November 2019). "Joint media statement – Work starts on METRONET Yanchep Rail Extension unlocking thousands of local jobs". Government of Western Australia.
- (17 December 2020). "Eight months of milestones for Yanchep Rail Extension".
- (21 May 2021). "Yanchep Rail Extension taking shape".
- (17 June 2021). "Stalled: Yanchep Rail Extension work veering off track".
- (22 July 2021). "Yanchep rail timetable shift flagged amid skills shortage".
- (9 September 2021). "Projects adjusted to deliver a strong economy for the long term". Government of Western Australia.
- (9 September 2021). "State projects delayed to ease pressure on 'hot' WA construction market".
- (9 September 2021). "Metronet projects, including Thornlie–Cockburn link and Yanchep train line, will be DELAYED by 12-months".
- (10 September 2021). "Plans for principal shared path from Butler to Yanchep as part of rail extension scrapped to save money".
- (25 November 2021). "Wanneroo Council calls for cycle path to return as part of new Alkimos train station".
- (8 September 2021). "Concerns about Yanchep rail cost cutting as cycle path deleted".
- (16 December 2021). "Metronet: Yanchep rail extension hits milestone with work underway at Alkimos, Eglinton and Yanchep stations".
- (16 December 2021). "All stations go for Perth's northern corridor".
- (3 April 2022). "2022–23 Federal Budget: $2.1bn funding for WA infrastructure projects".
- (31 March 2022). "CEO Newsletter – Federal Budget Update 2022".
- (12 May 2022). "Record $33.9b for infrastructure projects as Premier plays down construction costs".
- (23 May 2023). "Budget Estimates: Premier Mark McGowan refuses to rule out more blowouts to Metronet costs".
- (11 May 2023). "McGowan hammers cost-of-living as WA to hit $4.2b budget surplus".
- (May 2023). "2023–24 Budget: Economic and Fiscal Outlook".
- (9 May 2024). "WA State Budget 2024: Treasurer Rita Saffioti announces WA's sixth surplus in a row, Metronet blowout".
- (9 May 2024). "WA Budget live: Unpacking what's in Roger Cook and Rita Saffioti's budget for 2024–25".
- "2024–25 Budget Statements. Budget Paper No. 2 – Volume 2".
- (11 May 2023). "State Budget delivers continued METRONET investment".
- (16 May 2023). "Joint media statement – First track laid for METRONET Yanchep Rail Extension". Government of Western Australia.
- (21 May 2023). "Metronet: Yanchep rail extension project crawls ahead after first 3km of track laid".
- (22 December 2023). "First test run for $1.08b Metronet Yanchep rail extension marks major milestone after years of delays".
- (22 December 2023). "Test train hits tracks on Yanchep extension".
- (23 April 2024). "Joint Media Statement – Date Announced For First Train Services On Metronet Yanchep Rail Extension". Government of Western Australia.
- (23 April 2024). "Metronet project: July opening date announced from Butler to Yanchep railway extension".
- (14 July 2024). "Yanchep rail extension officially opened after significant delays and cost blow outs".
- (14 July 2024). "WA government hails Yanchep train extension 'spectacular project' despite cost, time blow-outs".
- (14 July 2024). "WA Labor, Liberals trade barbs over 'MetroDEBT' as Yanchep extension opens".
- (5 June 2024). "Next stop... YANCHEP!".
- (27 April 2024). "Mayor questions name change on train line from Joondalup to Yanchep as opening date is revealed".
- (14 November 1996). "WA Australian Sports Centre Trust to take over ownership of the Arena Joondalup". Government of Western Australia.
- "Structure Plan For Arena Joondalup Precinct".
- (2016). "The Joondalup story : A city and a university campus in the making".
- (March 2018). "Perth and Peel@3.5million: The Transport Network".
- "High Capacity Signalling Fact Sheet".
- "METRONET: High Capacity Signalling".
- (30 September 2021). "HCS SWTR Book 1 – Scope of Works DRAFT 01-09-21_Redacted".
- "System Map".
- (August 2002). "City Project Plan Map".
- (21 June 2013). "Secrets of high-tech tunnel".
- (2005). "Proposed extensions to Lakeside Joondalup Shopping Centre fronting Grand Boulevard and Boas Avenue on part of lot 504 Joondalup Drive – [08431]".
- (7 June 2000). "Cinemas had to screen out trains". The West Australian.
- "Stations & Maps".
- (13 March 2025). "Manual – Rail Access".
- "Transperth".
- [[Metropolitan Transport Trust. (1998). "Annual Report 1997–1998".
- (1 July 2003). "One agency runs public transport". The West Australian.
- (30 June 2003). "New PTA to provide better planned and integrated services". Government of Western Australia.
- (13 October 2025). "Yanchep Line Train Timetable".
- (December 2012). "new Perth Stadium Transport Project Definition Plan".
- "Optus Stadium".
- (9 January 2016). "Bus, rail and ferry services to change".
- (31 January 2016). "Bus, Train and Ferry – Major Timetable Changes".
- (21 September 2014). "Joondalup Line Train Timetable".
- (17 August 2008). "Joondalup Line Timetable".
- (1 March 2009). "Joondalup Line Timetable".
- (4 June 2009). "Timetables change as train capacity boosted". Government of Western Australia.
- (5 June 2009). "Shuttle train service cuts will save $2m". The West Australian.
- (1 July 2009). "Cockburn to Whitfords trains slashed".
- (April 2015). "A-Series EMU Railcar Review".
- (10 December 2019). "Last ever B-series railcar delivered – METRONET railcars next". Government of Western Australia.
- (September 2008). "New Metro Rail: Perth 'B' Series Electric Multiple Units". Engineers Australia.
- (16 December 1998). "Official commissioning of Westrail's five new electric train sets". Government of Western Australia.
- (12 May 2002). "Railcar contract seals railway commitment". Government of Western Australia.
- (13 May 2002). "$437m deal for fast rail cars". The West Australian.
- (30 December 2004). "Six-car train sets arrive in time for New Year's Eve". Government of Western Australia.
- (31 December 2004). "Six-car train ready for new year rush". The West Australian.
- (19 September 2006). "More trains for Perth's transport system". Government of Western Australia.
- (20 September 2006). "Commuters face 3-year wait for new trains". The West Australian.
- (22 September 2006). "WA Government secures new railcars". Government of Western Australia.
- (20 July 2011). "Downer wins $160m PTA train contract".
- (25 July 2011). "Downer JV finalises $285m PTA rail deal".
- (6 November 2013). "Perth grapples with growth and funding challenges".
- (4 November 2012). "More rail cars for Perth transport system". Government of Western Australia.
- (2 December 2013). "First new railcar on Transperth network". Government of Western Australia.
- (10 December 2019). "New Transperth trains revealed for Metronet expansion to be built in Perth under $1.3 billion deal".
- (10 December 2019). "Historic contract signed for WA-made METRONET railcars". Government of Western Australia.
- (December 2018). "WA Railcar Program Project Definition Plan".
- (19 March 2024). "C-series Metronet train due to enter service next month".
- (7 April 2024). "Metronet is the WA government's signature project, but as new trains are unveiled, is the project delivering on its promise?".
- (7 April 2024). "First locally-made METRONET train makes maiden journey". Government of Western Australia.
- Westrail. (1994). "Annual Report 1993–1994".
- (9 August 2003). "North line figures down". The West Australian.
- (2005). "Annual Report 2004–05".
- (2008). "Annual Report 2007–08".
- (June 2014). "PATREC Perspectives: Perth Public Transport Patronage: "Off The Rails" or "Back On Track"?".
- (2014). "Annual Report 2013–14".
- (2015). "Annual Report 2014–15".
- (2016). "Annual Report 2015–16".
- (2017). "Annual Report 2016–17".
- (2018). "Annual Report 2017–18".
- (2019). "Annual Report 2018–19".
- (2020). "Annual Report 2019–20".
- (20 December 2022). "Joondalup Line celebrates 30 years of train services". Government of Western Australia.
- (20 September 2015). "First birthday for Butler train extension". Government of Western Australia.
- (29 September 2015). "Use passes expectation: Butler train station".
- (7 April 2025). "Metronet: Ghost trains in Yanchep to haunt Government after $14 billion spent".
- (9 August 2025). "Record numbers ride Perth ferries, buses and trains but rail trips still below projections".
- (13 March 2018). "Welcome to Seaforth — the loneliest train station on the Perth rail network".
- "Transport performance".
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Yanchep line — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report