From Surf Wiki (app.surf) — the open knowledge base
XXI Corps (United States)
| Field | Value | |
|---|---|---|
| unit_name | XXI Corps | |
| image | XXI CORPS SSI.gif | |
| image_size | 150 | |
| caption | Shoulder sleeve insignia of XXI Corps | |
| dates | 1943–45 | |
| 1957–70 | ||
| country | USA United States | |
| branch | ||
| size | Corps | |
| battles | World War II | |
| notable_commanders | Frank W. Milburn | |
| Jean de Lattre de Tassigny | ||
| Ralph C. Cooper | ||
| Van H. Bond | ||
| Harry L. Hillyard | ||
| identification_symbol_2 | [[File:Flag of the United States Army XXI Corps.png | 200px]] |
| identification_symbol_2_label | XXI Corps Flag |
1957–70 Jean de Lattre de Tassigny Ralph C. Cooper Van H. Bond Harry L. Hillyard The XXI Corps was a corps of the U.S. Army during World War II. It was constituted on 2 December 1943, and activated on 6 December 1943 at Camp Polk, Louisiana. XXI Corps fought for 116 days in the European Theater of Operations, starting in the Alsace, crossing into southern Germany, and swarming into Austria, with individual elements reaching into northern Italy. The corps was commanded in combat by Major General Frank W. Milburn as a subordinate unit of the Seventh U.S. Army.
On 3 February 1944 the Headquarters and Headquarters Battery, 214th Field Artillery Group was constituted in the Army of the United States and was assigned to XXI Corps, Fourth United States Army. It was activated on 17 April 1944 at Camp Van Dorn, Mississippi.
Eastern France
The corps entered combat on 17 January 1945, during pitched battle by the U.S. Seventh Army to regain ground lost to Germany's Operation Nordwind New Year's offensive into Alsace. From 25 January until 16 February 1945, XXI Corps was attached to the French First Army and took part in bitter winter combat that ultimately collapsed the Colmar Pocket. After a period of rest, the corps returned to the front on 28 February 1945 and pushed to the edge of the Siegfried Line during the first week of March, 1945.
Germany and Austria

On 20 March 1945, after five days of combat, the corps broke through the Siegfried Line and captured Saarbrücken. Crossing the Rhine behind the U.S. XV Corps in Operation Undertone, the XXI Corps captured Würzburg on 5 April 1945, after a three-day battle marked by an assault across the Main River. Facing determined opposition, the corps fought its way into Schweinfurt on 12 April 1945, after five days of battle. Assaulting Fuerth on 18 April 1945, the corps seized Ansbach the following day and began a drive on the Danube River, over which the corps seized an intact bridge at Dillingen on 22 April 1945. On 28 April 1945, Augsburg fell to the XXI Corps, and on 1 May 1945, the corps seized Bad Tölz and captured German Field Marshal Gerd von Rundstedt. On 3 May 1945, units of the corps that included the 12th Armored Division entered Austria via Kufstein, and advanced along the Inn River as far as Wörgl until met the next day by troops of the 409th Infantry Regiment of the Fifth Army's 103rd Infantry Division of VI Corps radiating northeast from Innsbruck. German forces in the area unconditionally surrendered on 6 May 1945.
Other XXI Corps elements, which included the attached 101st Airborne Division, reached Berchtesgaden from the northwest by 8 May.
XXI Corps Headquarters was inactivated in Germany on 30 September 1945.
Post WWII
Subsequent to the Second World War, the corps was active from September 1957 until June 1970. The post-Second World War activation and inactivation occurred at Indiantown Gap Military Reservation, Pennsylvania.
Campaign credit
- Ardennes-Alsace Battle Credit
- Rhineland
- Central Europe
References
- Williams, Mary H., compiler (1958). "U.S. Army in World War II, Chronology 1941–1945". Washington D.C.: Government Printing Office.
- Wilson, John B., compiler (1999). "Armies, Corps, Divisions, and Separate Brigades". Washington D.C.: Government Printing Office. .
References
- Wallace, Linnel, Lt. Col., Commanding Officer, ''Summary History of the 289th Engineer Combat Battalion - WW II'', 1990, [[U.S. Army Heritage and Education Center]], Carlisle, PA, pp. 27–28 Company B (with Wallace) cleared up into Brenner pass for an element of 12th Armored Division; Wallace describes being photographed in Italy, likely 4 May 1945.
- [http://www.lonesentry.com/gi_stories_booklets/12tharmored/ ''Speed is the Password: The Story of the 12th Armored Division'']
- [http://digicom.bpl.lib.me.us/cgi/viewcontent.cgi?article=1007&context=ww_reg_his ''549th Engineer Light Ponton Company History'']
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about XXI Corps (United States) — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report