Skip to content
Surf Wiki
Save to docs
general/railway-stations-in-the-london-borough-of-merton

From Surf Wiki (app.surf) — the open knowledge base

Wimbledon Chase railway station

Railway station in South London


Summary

Railway station in South London

FieldValue
nameWimbledon Chase
image_nameWimbledon Chase railway station, London (geograph 3292657).jpg
railcodeWBO
managerThameslink
fare_zone3
localeWimbledon
boroughLondon Borough of Merton
years17 July 1929
events1Openedsymbol=rail
platforms2
dft_categoryF1
<!--raillowexits040570,073
raillowexits050674,491
railexits06070.392
railexits07080.335
railexits08090.305
railexits09100.282
railexits10110.322
railexits11120.379
railexits12130.390
railexits13140.455
railexits14150.481
railexits15160.342
railexits16170.290
railexits17180.321
railexits18190.319
railexits19200.379 --
railexits20210.103
railexits21220.192
railexits22230.234
railexits23240.259
railexits24250.272
coordinates

Wimbledon Chase railway station is in the London Borough of Merton in South London. The station is served by Thameslink trains on the Sutton Loop Line. It is in London fare zone 3 and is arranged as an island eight-car platform, with stairs descending to street level towards the southern end.

History

Parliamentary approval for a line from Wimbledon to Sutton had been obtained by the Wimbledon and Sutton Railway (W&SR) in 1910 but work had been delayed by World War I. From the W&SR's inception, the District Railway (DR) was a shareholder of the company and had rights to run trains over the line when built. In the 1920s, the London Electric Railway (LER, precursor of London Underground) planned, through its ownership of the DR, to use part of the route for an extension of the City and South London Railway (C&SLR, now the Northern line) to Sutton. The SR objected and an agreement was reached that enabled the C&SLR to extend as far as Morden in exchange for the LER giving up its rights over the W&SR route. The SR subsequently built the line, one of the last to be built in the London area.

Wimbledon Chase station was not included in the original 1910 permission, stations at Elm Grove to the north and Cannon Hill to the south were planned, but were not constructed. The station opened on 7 July 1929 when the first section of the line to South Merton came into operation. The route opened to Sutton on 5 January 1930.

Services

All services at Wimbledon Chase are operated by Thameslink using EMUs.

The typical off-peak service in trains per hour is:

  • 2 tph to
  • 2 tph to

A small number of late evening services are extended beyond St Albans City to and daytime services on Sundays are extended to .

|note-row1=

Connections

London Buses routes 152, 163, 164, K5 and 655 serve the station.

References

Bibliography

References

  1. {{NRtimes. May 2022. 173, 179
Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Wimbledon Chase railway station — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report