From Surf Wiki (app.surf) — the open knowledge base
West Drayton railway station
Railway station in the United Kingdom serving Yiewsley and West Drayton
Railway station in the United Kingdom serving Yiewsley and West Drayton
| Field | Value |
|---|---|
| name | West Drayton |
| image_name | West Drayton stn 22nd May 2022 04.jpg |
| caption | Station entrance seen in May 2022 |
| railcode | WDT |
| manager | Elizabeth line |
| owner | Network Rail |
| fare_zone | 6 |
| locale | Yiewsley, London, England |
| borough | London Borough of Hillingdon |
| symbol | crossrail |
| platforms | 5 |
| railexits0405 | 0.742 |
| railexits0506 | 0.800 |
| railexits0607 | 1.321 |
| railexits0708 | 1.501 |
| railexits0809 | 1.385 |
| railexits0910 | 1.255 |
| railexits1011 | 1.688 |
| railexits1112 | 1.781 |
| railexits1213 | 1.888 |
| railexits1314 | 2.060 |
| railexits1415 | 2.342 |
| railexits1516 | 2.125 |
| railexits1617 | 2.066 |
| railexits1718 | 2.046 |
| railexits1819 | 2.197 |
| railexits1920 | 2.380 -- |
| railexits2021 | 0.712 |
| railexits2122 | 1.731 |
| railexits2223 | 2.262 |
| railexits2324 | 3.225 |
| railexits2425 | 3.534 |
| coordinates | |
| years1 | 4 June 1838 |
| years2 | 9 August 1884 |
| years3 | 1895 |
| years4 | 6 May 1974 |
| events1 | Original station opened as West Drayton |
| events2 | Station re-sited |
| events3 | Renamed West Drayton and Yiewsley |
| events4 | Renamed West Drayton |
| dft_category | E |
West Drayton railway station serves West Drayton and Yiewsley, western suburbs of London. It is served and managed by the Elizabeth line. It is 13 mi down the line from and is situated between to the east and to the west.
History
West Drayton station is on the original line of the Great Western Railway, and was opened on 4 June 1838 at the same time as the line. The original station was located approximately 200 m to the west of the current station and was opened in its current position on 9 April 1884. This was four months before the Staines and West Drayton Railway branch line was opened on 9 August 1884. Initially trains operated as far as Colnbrook, with services to Staines commencing on 2 November 1885. From 1 March 1883, the station was served by District Railway services running between and Windsor. The service was discontinued as uneconomic after 30 September 1885. West Drayton was the junction station for both the Staines branch, and an earlier branch to that opened on 8 September 1856. The Uxbridge branch line closed to passengers on 10 September 1962, but the line south of the Grand Union Canal was retained for freight traffic until 8 January 1979. The Staines branch closed to passengers on 29 March 1965, but freight trains still run from West Drayton serving the aviation fuel terminal for Heathrow Airport at Colnbrook and aggregates depots at Thorney and Colnbrook.
From 1895 the station was named West Drayton and Yiewsley; it reverted to the original name West Drayton on 6 May 1974.
In preparation for the introduction of Elizabeth line services, the operation of the station was transferred from Great Western Railway to MTR Crossrail on behalf of Transport for London at the end of 2017.
Description
West Drayton station is situated on Station Approach in Yiewsley. It is north of the centre of West Drayton and immediately to the south of the Grand Union Canal, in the London Borough of Hillingdon.
The station has five platforms. Platform 1 down main line (away from London), platform 2 is the up main line (towards London), platform 3 is the down relief line, platform 4 is the up relief line. A fifth platform on the up goods line is not used for passenger services. This is used for freight services to access the branch line to Colnbrook and also to wait to continue on the up relief line. The platforms on the main lines see little use, other than when the relief lines are closed for maintenance. Access between the platforms is via steps and a pedestrian underpass.
Crossrail and the Elizabeth line
The station received major improvements through the Crossrail construction project in preparation for Elizabeth line services which commenced in May 2022. A new glass and steel extension was built together with a redeveloped main ticket office and new platform canopies. The platforms were extended to be greater than 200 m long, accessed by a new over-platform footbridge with four lifts.
Services
Off-peak, all services at West Drayton are operated by the Elizabeth line using EMUs.
The typical off-peak service in trains per hour (tph) is:
- 4 tph to
- 4 tph to of which 2 continue to
Additional services call at the station during the peak hours, increasing the service to up to 6 tph in each direction.
The station is also served by a small number of early morning and late evening Great Western Railway services between and Reading.
Connections
London Buses routes 222, 350, 698, U1, U3 and U5 serve the station.
References
References
- MacDermot, E T. (1927). "History of the Great Western Railway". [[Great Western Railway]].
- Butt, R.V.J.. (1995). "The Directory of Railway Stations". Patrick Stephens Ltd.
- Aerofilms. (2006). "London's Railways from the Air". Ian Allan.
- (3 November 1885). "General News". The Globe.
- Rose, Douglas. (December 2007). "The London Underground: A Diagrammatic History". Capital Transport.
- (2008). "The Story of London's Underground". Capital Transport.
- "Disused Stations Site Record - West Drayton".
- "West Drayton Station".
- {{NRtimes. May 2023. 117
- "Elizabeth line timetable: May 2023". [[Transport for London]].
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about West Drayton railway station — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report