Tyra Field

Gas condensate field in the North Sea


Gas condensate field in the North Sea

FieldValue
nameTyra Field
countryDenmark
regionNorth Sea
block5504/11
5504/12
offonshoreoffshore
location_mapNorth Sea
coordinates
operatorTotal
partnersTotal
Noreco
Nordsofonden
imageTyra East.jpg
captionPlatform at Tyra East
discovery1968
start_production1984
production_gas_mmcuft/d237.8
est_gas_bft1250
formationsDanian and Upper Cretaceous Chalk

5504/12 Noreco Nordsofonden | oil_production_bbl/d = | production_gas_mmcuft/d = 237.8 | production_gas_mmscm/d = | production_gas_bcm/y = Tyra Field is the largest gas condensate field in the Danish Sector of the North Sea.{{cite book |url-status=dead

History

In August 2017 Maersk Oil was sold to Total S.A. with the takeover completed in 2018.

Facilities

The Tyra Field has two production complexes named Tyra West and Tyra East, connected by pipelines. Tyra West includes oil and gas processing plants which in addition to the gas produced at the Tyra field, processes also gas from Halfdan field and the Valdemar oil field. The complex consists of two wellhead platforms, one processing and accommodation platform, and one gas flare stack. Tyra East processes also oil and gas from Valdemar, Roar, Svend, Tyra Southeast, Harald gas field, Lulita, Gorm and Dan oil fields. It consists of two wellhead platforms, one processing and accommodation platform, one gas flare stack, and one riser platform.

The installations developed for the Tyra field were:

InstallationLocation BlockPlatformsFunctionTypeLegsWell slotsInstalledProduction startProduction to
Tyra West6.2TW-AProcessing (2 x 135 MMSCFD)Steel jacket4March 1982May 1984TE-E
TW-BDrilling & wellheadSteel jacket412March 1982May 1984TW-A
TW-CDrilling & wellheadSteel jacket412May 19831985TW-A
TW-DFlareSteel jacket3April–May 1983
TW-EProductionSteel jacket1984
Tyra East6.2TCP-AProcessing (2 X 135 MMSCFD) & accommodationSteel jacket8March–June 1983June 1984TE-E
TE-BDrilling & wellheadSteel jacket412February 1983 1982June 1984TCP-A
TE-CDrilling & wellheadSteel jacket412May 19831985TCP-A
TE-DFlareSteel jacket3April–May 1983
TE-ERiserSteel jacket4March 19821984Jutland onshore
TE-FProductionSteel jacket1995

In total, the field has 20 gas-producing wells, and 28 oil and gas-producing wells.

Fluids from the drilling & wellhead platforms are routed to an inlet three phase inlet separator on the ‘A’ processing platforms. The separator separated the fluids into gas, condensate and produced water. Gas undergoes water dehydration through contact with glycol. On TCP-A the gas is comingled with gas from Gorm, Dan and Tyra West. The combined gas stream is chilled to achieve a hydrocarbon dewpoint. The gas is compressed from 1000 to 2000 psi (pounds-force per square inch) in 5 Ruston TB5000 gas turbine driven gas compressors (24,500 brake horse power total), and is fiscally metered before export onshore to Jutland. The design export rate is 405 e6ft3 per day at standard conditions.

Condensate from the inlet separator is routed to a coalescer after which it is comingled with condensate from Tyra West. The combined stream is routed successively through a 1st stage, 2nd stage and 3rd stage separators operating at successively lower pressures. Gas from the 2nd and 3rd stage separators is compressed and joins the gas from the 1st stage separator and is routed into the inlet separator. Condensate from the 3rd stage separator is fiscally metered and is exported onshore via the Gorm installation. The design export rate is 20,000 barrels/day.

Produced water from the inlet separator is treated to remove and condensate and is discharged overboard.

Produced oil is transported to the Gorm E riser platform in the Gorm field, and further through the subsea pipeline to the oil terminal in Fredericia, Denmark. Produced natural gas is transported from the Tyra East riser platform to Nybro Gas Processing Plant, Denmark, and from Tyra West riser platform to the Netherlands through the Tyra West – F3 and NOGAT pipelines.{{cite book | author-link = International Energy Agency

Redevelopment project

Due to the production facilities having sunk 6m Maersk Oil announced on 1 December 2017 Maersk Oil the redevelopment of Tyra Field, which would mean decommissioning the 35 year old facilities and installing new ones. The living and processing platform on Tyra East and Tyra West will be scrapped. One new living platform and one new processing platform will be built. The living quarter platform will be constructed by Italian EPC contractor Rosetti marino, while processing platform will be constructed in Kuala Lumpur by American EPC contractor McDermott International.

In July 2018 Modern American Recycling Services based in Frederikshavn secured a contract to scrap the two platforms.

Up until the temporary closure in September 2019, the Tyra field processed 90% of all gas produced in the Danish part of the North Sea.

The decommission project is estimated to cost 4 Billion DKK and the new facilities will cost 17 Billion DKK. All in all the project is expected use 1.3 million working hours.

The new facilities were planned to be ready for production in July 2022, but this was postponed to July 2023 due to the COVID-19 pandemic.

Tyra field satellites

The Tyra field has a number of satellite fields. These include Roar, Svend and Tyra Southeast fields.

The characteristics of the satellite fields are as follows.

Discovered19681975 North Arne, 1982 Otto1992

The Roar, Svend and Tyra Southeast fields are developed through three offshore installations as shown.

Export, well fluids11 km 16-inch multiphase pipeline to Tyra Eastpipeline to Tyra Eastpipeline to Tyra East

The oil and gas production profile of the Roar, Svend and Tyra Southeast fields is as shown.

Tyra Southeast493343580614446377429374225
Tyra Southeast16514898911182833833161625,644
Tyra Southeast4474521,2331,3371,108848889939911
Tyra Southeast62661030620124855498173439112,816

References

References

  1. "Tyra Gas Field Starts its Redevelopment | Exploration & Production".
  2. Oilfield Publications Limited. (1985). "The North Sea Platform Guide". Oilfield Publications Limited.
  3. (1 December 2017). "Største Nordsø-investering nogensinde: Tyrafelt ombygges for 21 mia. kroner".
  4. "Tyra Gas Field Redevelopment".
  5. (2018-12-19). "Merry Christmas and Happy New Year".
  6. "Efter milepæl på Tyra begynder nu jobfest i Nordsøen med arbejde til flere hundreder".
  7. OSPAR. "OSPAR Inventory of Offshore Installations - 2021".
  8. "Oil and gas production in Denmark 2013".
  9. (15 August 2016). "Monthly and yearly production".
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Tyra Field — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report