Trawsfynydd nuclear power station
Decommissioned nuclear power plant in Wales
Decommissioned nuclear power plant in Wales
| Field | Value |
|---|---|
| name | Trawsfynydd nuclear power station |
| image | Trawsfynydd Nuclear Power Plant.jpg |
| coordinates | |
| country | Wales, United Kingdom |
| location | Trawsfynydd, Gwynedd |
| status | Decommissioning in progress |
| construction_began | 1959 |
| commissioned | 1965 |
| decommissioned | 1991 |
| cost | £103million |
| owner | Nuclear Decommissioning Authority |
| operator | Nuclear Restoration Services |
| ps_units_manu_model | Richardsons Westgarth |
| ps_units_decommissioned | 2 x 235 MW |
| ps_electrical_capacity | 500 MWe |
| <ref name | "unit2" |
| np_reactor_type | Magnox |
| np_reactor_supplier | Atomic Power Constructions |
Trawsfynydd nuclear power station () is a former Magnox nuclear power station situated in Snowdonia National Park in Gwynedd, Wales. The plant, which became operational in 1965, was the only nuclear power station in the UK to be built inland, with cooling water that was taken from the artificial Llyn Trawsfynydd reservoir which also supplies the hydro-electric Maentwrog power station. It was closed in 1991. Its ongoing decommissioning by Nuclear Restoration Services was expected to take almost 100years, but in 2021 the Welsh government arranged for the power station to be redeveloped using small-scale reactors.
History
The power station, which takes its name from the nearby village of Trawsfynydd, was designed by Basil Spence. The construction, which was undertaken by a consortium involving Crompton Parkinson, International Combustion, Fairey Engineering and Richardsons Westgarth, and known as the Atomic Power Constructions (APC), began in July 1959, and both of the reactors were in operation by March 1965, with the station opening fully in October 1968, at a cost of £103million. It had two Magnox reactors producing 470megawatts (MW) in total from four turbines, each rated at 145MWe. The reactors were supplied by APC and the turbines by Richardsons Westgarth. and Trollope & Colls. The architectural consultant for the buildings was Sir Basil Spence and the landscape architect was Sylvia Crowe. The setting for the power station which Crowe developed is designated Grade II* on the Cadw/ICOMOS Register of Parks and Gardens of Special Historic Interest in Wales. Four Paxman 12YLC diesel engines, each driving a 1.2MW Crompton Parkinson alternator were installed for emergency standby duties.
Nuclear flasks were transported to Trawsfynydd on a section of the former Bala to Blaenau Ffestiniog railway that had been closed in January 1961. A single track was restored northwards with an entirely new line through the centre of Blaenau Ffestiniog that connected to the Conwy Valley branch. In 1963-64, a "Goliath" gantry crane was installed over sidings about 1/2 mi east of the power station. Beginning on 20 April 1964, nuclear flasks could be transported by rail between destinations such as Sellafield in Cumbria. The last train to carry nuclear material from Trawsfynydd left on 22 April 1997 hauled by EWS Loco 37426. The line was subsequently mothballed. In 2016, enthusiasts, who want to create a heritage railway, began clearing vegetation along the route but have since been halted and are negotiating a new licence to clear.
Decommissioning
Trawsfynydd was shut down in 1991. The Nuclear Decommissioning Authority subsidiary Nuclear Restoration Services, formerly Magnox Ltd, is decommissioning the site. The work is expected to last decades.
Beginning in 1993, the highly-radioactive spent fuel rods were removed from both Magnox reactors and sent by rail to Sellafield. This was completed in 1997. Intermediate level waste such as on the walls of the cooling ponds or pipes is being carefully removed using robots over the next decades. Contaminated material is stored in a specially designed building on the site.
From autumn 2025, Costain will carry out a £70million four year programme to reduce the height of both reactor buildings from 54 to. Final clearance of the site is scheduled to begin in 2071. By 2083, the area was expected to have been restored to its pre-nuclear state; 124 years after construction started and 92 years after the closure of Trawsfynydd power station.
Reestablishment
The Welsh government has decided to redevelop the plant using small-scale reactors, as a step toward meeting the UK's targets for reducing carbon emissions. In 2021, the government chose Mike Tynan of Westinghouse to lead a company tasked with developing the new reactors. On 20 May 2022, the government announced that the NDA will work with Cwmni Egino (the Welsh Development Agency company) to develop land adjacent to the site for a 300MW small modular reactor (SMR). Cwmni Egino said it will now discuss with interested parties and hoped to announce plans within one year. In December 2022, a second consortium presented its proposals to use their own design of SMR in competition to the original bid.
Citations
;References
;Bibliography
References
- (20 March 2024). "TRAWSFYNYDD-1". [[International Atomic Energy Agency.
- (20 March 2024). "TRAWSFYNYDD-2". [[International Atomic Energy Agency.
- (30 December 2015). "So just how do you decommission a nuclear power station?". www.walesonline.co.uk.
- (25 August 2021). "Wales advances its plans for small nuclear plants". [[Financial Times]].
- Hirst, Clayton. (21 December 2009). "Pulling down Snowdonia's power station would be a nuclear waste".
- "The UK Magnox and AGR Power Station Projects".
- "Industcards.com".
- (February 1969). "POWER REACTORS 1969". Nuclear Engineering International.
- "Trollope & Colls". National Archives.
- "Trawsfynydd Nuclear Power Station | Canmore".
- {{NHAW
- "Paxman YL Engines". Richard Carr.
- "Railways of North Wales 1975-1983: blaenauffestiniog:Trawsfynydd Branch 1".
- (22 April 1997). "Inquiry into radioactivity scare". The Independent.
- (21 September 2016). "Clearance work on disused Trawsfynydd railway line to start". BBC News.
- (31 October 2023). "Major nuclear company rebrands as 'Nuclear Restoration Services'". Nuclear Decommissioning Authority.
- "NUCLEAR RESTORATION SERVICES LIMITED overview - Find and update company information - GOV.UK".
- (28 October 2013). "How do you close a nuclear power station?". BBC.
- (7 October 2025). "Major decommissioning contract awarded at Trawsfynydd site". [[Nuclear Restoration Services]].
- (30 December 2015). "So just how do you decommission a nuclear power station?". Wales Online.
- Owen Hughes. (20 May 2022). "Nuclear Decommissioning Authority and Cwmni Egino announce plan for Trawsfynydd nuclear development".
- (22 December 2023). "Second company reveals plans for a new nuclear power plant at Trawsfynydd". nation.cymru.
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Trawsfynydd nuclear power station — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report