Transportation Technology Center

Railroad equipment testing facility near Pueblo, Colorado, US

Transportation Technology Center

Summary

Railroad equipment testing facility near Pueblo, Colorado, US

FieldValue
nameTransportation Technology Center
logoFRA TTC stacked PNG.png
imageTTCI Facility.jpg
image_captionAerial view of Transportation Technology Center, facing approximately north-northwest. The prominent buildings on the right side of the photograph are the RDL (foreground) and CSB (background).
industryRailroad equipment testing and training
predecessorHigh Speed Ground Test Center
founded
hq_location_cityPueblo, Colorado
hq_location_countryUnited States
area_servedNorth America
ownerFederal Railroad Administration
num_employees_year
website

The Transportation Technology Center (TTC) is a railroad equipment testing and training facility located northeast of Pueblo, Colorado, owned by the Federal Railroad Administration (FRA). It was built in 1971 as the High Speed Ground Test Center (HSGTC) for the Department of Transportation (DOT) and its original purpose was to test several hovertrain concepts. When those projects were completed in the 1970s, the site was handed to the FRA.

Since October 2022, operations at the TTC have been managed by ENSCO under a "indefinite duration, indefinite quantity" (IDIQ) contract establishing responsibility for research and development, testing, engineering, and training services at the TTC.

History

Site selection

Two United States Department of Commerce initiatives are credited with the genesis of the HSGTC: the Northeast Corridor Transportation Project (1964) and the High Speed Ground Transportation Act of 1965, which created the Office of High Speed Ground Transportation (OHSGT). OHSGT was absorbed by the FRA, part of the DOT, following that agency's creation in 1967. At the time, OHSGT, whose charter was to research and develop high speed rail transit, was investigating the use of magnetic or air cushion levitation of rail vehicles, but there were no suitable test sites. A proposed test site was investigated at the former Lowry Air Force Base near Denver, Colorado, but abandoned as the terrain was too rough; further site evaluation led the United States Secretary of Transportation to select the site for HSGTC near Pueblo in December 1969. The Pueblo site offered the advantage of varied weather conditions, with average mean temperatures ranging from 14 to and annual precipitation of 11.84 in, including 31.7 in of snow.

Minimum site dimensions were dictated by the distance and geometry required for the high-speed trains under development to reach their top speeds of 250 to; the minimum specified radius of curvature was 2.5 mi, making the planned test track/guideway oval approximately 5 ×. a 50-year lease was signed by the DOT and the State of Colorado on August 22, 1970. The state land board acquired several small parcels to assemble a contiguous site, and under the terms of the lease, the cost was $10 and had two renewal options.

File:HSGTC Map & Track Layout (1971).jpg|(1971); 1 square = 1 mi File:1972 HSGTA Report, Figure 48.jpg|(1972) File:1977 Report on the high speed ground transportation act, Figure 24.jpg|(1977) File:TTC Map (1981).png|(1981); map below shows buildings

Initial construction

The first track to be started onsite was an initial 6 mi segment of the planned Linear Induction Motor Research Vehicle (LIMRV) test track, built by Morrison-Knudsen; it was anticipated that the initial segment would later be extended to a full 21.8 mi oval and a parallel oval guideway would be completed for the Tracked Air Cushion Research Vehicle (TACRV). In addition, preliminary design work continued for the Suspended Vehicle System (SVS) and the Tube Vehicle System (TVS); SVS was designed to take advantage of existing rights-of-way and be capable of greater roll angles (and higher speeds), and TVS was expected to operate in all weather conditions at speeds up to 500 mph. The TACRV program was planned to be further developed into an Urban Tracked Air Cushion Vehicle (UTACV), with two separate designs by Vought (using a U-Channel guideway) and Rohr, Inc. (using an inverted-T guideway) operating at speeds up to 150 mph.

The initial segment of the LIMRV Test Track and a temporary Maintenance Shed were completed in April 1971; marked by a ceremony and ridealong by Secretary Volpe in the LIMRV. Although the FRA retained overall management of the facility, other government agencies were encouraged to participate, and the Urban Mass Transportation Administration (UMTA) constructed the Rapid Transit Test Track (TTT) onsite to test transit cars; The R42 cars were designated Test Car T-2 and T-3.

UMTA]] Administrator Carlos Villarreal

The TTT was dedicated on October 12, 1972, during a ceremony that also included the unveiling of the State-of-the-Art Car (SOAC); the principal speaker was Secretary Volpe. By 1972, plans to complete the LIMRV test track oval had been dropped, although a similarly sized oval would be built for the TACRV guideway, and plans for an 11 mi oval guideway for the UTACV had been added. In addition to SOAC testing, other early tests conducted at HSGTC included the evaluation of the US Standard Light Rail Vehicle (US SLRV). TTT initially offered testing with an electrified third rail; overhead catenary wire was added to TTT in summer 1975 to test the US SLRV.

Temporary site headquarters and personnel offices initially were set up in five trailers to support early testing; the Program Management Building (PMB) was the first permanent structure to be completed, housing administrative personnel, designed by Bertrum Bruton Associates (of Denver); The CSB and Ops building were completed in January and August 1975, respectively.

Renaming

LIMRV]] testing at HSGTC

The LIMRV set a world record for rail vehicle speed at HSGTC on August 14, 1974, 255.4 mph. The site had cost $55 million to construct to-date, and plans were advancing to continue research on hovertrains. Meanwhile, the first 1.5 mi segment of TACRV guideway was completed in March 1973, and a second segment of equal length was completed in November 1973. The UTACV program selected Rohr to build a Prototype Tracked Air Cushion Vehicle (PTACV), and construction of an inverted-T guideway began in May 1973.

However, the high-speed aspect of rail transportation began to be de-emphasized and the HSGTC was renamed to the Transportation Test Center (TTC) in December 1974 to reflect its new mission. A contract was let in 1972 to begin grading the route for the Railroad Test Track (RTT), a planned 14 mi high-speed loop operating conventional rail vehicles up to 160 mph; within the high-speed loop, a Dynamics Track sub-loop 9.9 mi long would investigate passenger and freight train dynamics at slower speeds. The first portions of RTT completed were the Impact Track, 0.76 mi long, and a segment of the Dynamics Track, which totaled 5.7 mi long at full build. Work on the high-speed loop was started in 1975. A static facility was added to test tank car thermal insulation, named the Tank Car Torch Test Facility.

The Facility for Accelerated Service Testing (FAST) is a dedicated facility to study wear and fatigue of railroad track; it first was recommended in September 1975. Tracks were laid for FAST within the RTT loop at TTC starting in spring 1976 and the first train began operating over the FAST loop on September 22, 1976. Trains operated at relatively low speeds up to 35 mph for 16 hours a day; one early conclusion was that steel railroad ties were impractical, as they began to crack after bearing 26 million gross tons of freight. In June 1985, a cut-off track was completed, shortening the FAST loop from 4.78 to, its present length; the shortened loop was renamed the High Tonnage Loop (HTL). Typically, TTC operated 100-ton cars over the HTL, so named for their loading capacity; with an empty car weight of 31.5 ST, the total weight of 131.5 ST translates to a per-axle load of 33 ST. In 1988, 125-ton cars were added to consists, better reflecting actual loads and capacities in the United States. The 125-ton car has a tare weight of 33 ST and an axle load of 39 ST. This change was implemented as the Heavy Axle Load (HAL) program.

In Fiscal Year 1995, the TTC received its most recent name change to the Transportation Technology Center, reflecting "a major consolidation of activities and broadening of functions conducted at TTC".

Public-private partnership

A [[Caltrain]] [[Stadler KISS]] EMU undergoing testing at the TTC in April 2021.

Operations and maintenance (O&M) of the site typically has been supported by a contractor since the first permanent buildings were completed; a request for proposals was issued in Fiscal Year 1971, soliciting bids for an operations contractor, which would support test contractors, provide test track maintenance, and housekeeping services. AAR consolidated its Research & Test Department at TTC from 1995 to 1997 and formed its TTCI subsidiary to administer the contract on January 1, 1998 and the contract has been renewed periodically as a single-source award since then.

In March 2021, the FRA awarded the "care, custody, and control" contract to ENSCO, who assumed responsibility for operations and maintenance of TTC in October 2022. In addition, ENSCO will expand the use of TTC to support more general ground transportation research. The former TTCI was subsequently renamed as MxV Rail in March 2022.

Facility

2015 as-built plan

The Transportation Technology Center occupies a 30,000 acre site northeast of Pueblo, Colorado and just north of the US Army's Pueblo Chemical Depot. The site has laboratories and approximately 48 mi of railroad track used to test locomotives, vehicles, track components, and signaling devices. The tracks are designed to replicate conditions seen on service environments, varying from precisely engineered high-speed tracks to track intentionally designed with irregularities.

Tracks and guideways

  • Railroad Test Track (RTT): 13.5 mi loop permitting speeds of 165 mph and equipped with overhead catenary capable of supplying power at 12.5 kV, 25 kV, and 50 kV. The RTT is used to test the performance and endurance of vehicles at high speeds. The track has one 1525 m radius curve, four 800 m radius curves, and a balloon loop to turn trains around and test a tighter curve. The RTT also has a section of track called the High Speed Adjustable Perturbation Slab (HS-APS) or Precision Geometry Slab Track, which can be adjusted to introduce irregularities.
  • Transit Test Track (TTT): 9.1 mi loop permitting speeds of 80 mph and equipped with a DC electrified third rail capable of supplying power at up to 1,150 volts and up to 12,000 amps. with grades ranging up to 1.4665%.
    • The TTT also has a section of track called the Tight Turn Loop (also known as the "screech loop"), with a 150 ft radius, used to investigate wheel noise and car curving performance.
  • Facility for Accelerated Service Testing (FAST): Initially completed in 1976 as a 4.8 mi test loop, then split in 1983 to form the HTL and WRM.
    • High Tonnage Loop (HTL): 2.7 mi loop designed to quickly test both rolling stock and track components, such as rail, ties, switches, ballast, and bridges. As part of the FAST program, a full-scale train with three EMD SD70 locomotives and 110 cars each loaded with 315,000-pound of weight regularly operates over the HTL at speeds of up to 40 mph. The equipment used is on loan from AAR member railroads, and the program is funded by AAR member railroads and railroad suppliers often contribute their components for testing. Since 1976, the FAST program has operated up to 140-million gross tons per year over the HTL.
    • Wheel/Rail Mechanism Track (WRM): 3.5 mi loop designed to test vehicle performance over track that has several different types of curves and intentional irregularities designed to induce poor performance.
  • Precision Test Track (PTT): 6.2 mi segment designed with intentional irregularities to test vehicles for dynamic pitch and bounce, dynamic twist and roll, and dynamic yaw and sway. It was initially used as the LIMRV Test Track.
  • Train Dynamics Track (TDT) and the Impact Facility or Impact Track: Track designed for crash-testing to determine crashworthiness and crash energy management. Facility is built to withstand loads of 3,000,000 lbs as vehicles impact a stationary object. Two trains can also be crashed into each other at the facility. Other sections of the TDT evaluate rail vehicle dynamic responses to grades, curves, switches, humps, and yard tracks. The TDT is 1.7 mi long and the Impact Track is 4400 ft long.

In addition, there are two leftover guideways constructed during the HSGTC period:

  • Prototype Track Air Cushion Vehicle Guideway: Inverted-T guideway, designed for operation at 150 mph, 5.7 mi long.
  • Tracked Levitated Air Cushion Vehicle Guideway: U-shaped concrete channel, used between 1973 and 1976. The channel is 18 ft wide and 5 mi long. A Vehicle Impact Wall capable of withstanding an impact load of 3000000 lbf was built on the site of the TLRV guideway in October 2008.

File:High Speed Ground Test Center Ceremony, May 1971.jpg|LIMRV Test Track dedication (May 19, 1971) File:Secretary Volpe at completion of ride in LIMRV, May 19, 1971.jpg|Secretary Volpe exits the LIMRV (1971) File:RTTT (1972).png|Plan of the TTT, first test loop at TTC (1972) File:Chessie System hopper cars crash test.jpg|Aftermath of a test at the TTC in which a locomotive intentionally hit a hopper car

Buildings and structures

|shape-color1=#d00 |shape-outline1=#fff |mark-size1=20 |mark-coord1 = |mark-title1 =Operations Building |mark-coord2 = |mark-title2 =Project Management Building |mark-coord3 = |shape-color3=#d80 |shape-outline3=#000 |mark-title3 =Rail Dynamics Laboratory |mark-coord4 = |shape-color4=#dd0 |shape-outline4=#000 |mark-title4 =Center Services Building |mark-coord5 = |shape-color5=#080 |mark-title5 =Warehouse/Laboratory Facility and Components Test Laboratory |mark-coord6 = |shape-color6=#00d |mark-title6 =Security and Emergency Response Training Center |mark-coord7 = |shape-color7=#808 |mark-title7 =Transit Maintenance Building |mark-coord8 = |shape-color8=#d0d |mark-title8 =Storage & Maintenance Building |mark-coord9 = |shape-color9=#000 |mark-title9 =Urban Rail Building |mark-coord10= |shape-color10=#fff |shape-outline10=#000 |mark-title10=Passenger Rail Services Building |fullscreen-option=1 |auto-caption=1 In addition to the test tracks, there are several buildings at the site.

  • Operations Building (OPS) and Project Management Building (PMB): administrative offices, including the center's cafeteria. OPS was completed in 1976 and expanded in 1980, and has a total interior floor area of 54487 ft2. The PMB, completed in 1972 at 17400 ft2 of space, was abandoned in 2007 due to the presence of asbestos-containing ceiling materials.
  • Rail Dynamics Laboratory (RDL): evaluates rail vehicle dynamic responses to simulated track irregularities, including the Vibration Test Unit, which can accommodate vehicles up to 180 ft in length with axle loads up to 80000 lb on a curve radius as short as 100 ft, using actuators to simulate dynamic loads on a static vehicle. The other major machine within RDL is the Roll Dynamics Unit, which is a dynamometer that simulates travel over perfectly smooth rails at more than 144 mph. Two bridge cranes are used to move rail vehicles between the two machines. The high bay at RDL measures 330 × (L×W×H)
  • Center Services Building (CSB): includes equipment for maintenance and repair of rail vehicles and test equipment, including a wheel truing machine. CSB also has a high bay, measuring 367 × (L×W×H).
  • Warehouse (WLF) and Components Test Lab (CTL): mechanical, metallurgical, instrumentation, and metrology laboratories. The two buildings jointly contain 53428 ft2 of floor space and were completed in 1979 and 1980.
  • Security and Emergency Response Training Center (SERTC): originally built as the PTACV maintenance facility in 1974 as a prefabricated metal building; training in hazardous material response began in 1985 and four more classrooms were added in 1995.
  • Transit Maintenance Building (TMB): the original building completed in 1973 to support operations on the TTT, largely duplicating equipment and facilities from the URB. It is a prefabricated metal building measuring 40 × (W×L).
  • Storage and Maintenance Building (SMB): Also a prefabricated metal building, completed in 1973, measuring 130 × (W×L).
  • Urban Rail Building (URB): a 20000 ft2 building within the TTT oval that has complete maintenance facilities for transit vehicles. There are two 190 ft long service tracks through the building, a maintenance pit under one of the service tracks, and a 600V DC power supply. The URB is the permanent maintenance facility for TTT, completed in 1980.
  • Passenger Rail Services Building (PSB): completed as the Japan Rail Facility in 1999 and 2000, a prefabricated metal building; renamed to PSB during the completion of the second phase (2005–08) which added a high bay facility.

Rolling stock

In addition to its test tracks and laboratories, TTC also operates several locomotives, including:

NameMfr.ModelYearNotesDOT 203DOT 004AAR 2000TTCI 2001DODX 413DOT 928DOT 942
EMDGP40-21978Built new for the DOT; 3000 hp capable of speeds up to 107 mph with modified trucks and gearing
EMDGP91954Originally built for Union Pacific as No. 205; retired 1978 and sold to Precision National Corporation; rebuilt in 1980 for DOT; 1850 hp capable of speeds up to 65 mph
EMDGP401966Geared for 107 mph
EMDGP40-21977Geared for 107 mph. Ex-DOT 003
EMDGP40PH-21977Geared for 107 mph
EMD/ AlstomAEM-7AC1981/2002Ex. Amtrak, used for the testing of high speed equipment
EMD/AlstomAEM-7AC1982/2002Ex. Amtrak, used for the testing of high speed equipment

Similar to DOT 004, DOT 005 and 006 also were ex-UP EMD GP9s (No. 147 and 162, respectively) that were sold to Precision National in 1979 and rebuilt for the Department of Transportation.

  • T-16: "High Speed Research Car", rebuilt from an ex-Amtrak Budd Metroliner car with instrumentation to measure and gather data at speeds up to 160 mph for track geometry, rail head profile, ride quality, and wheel-rail forces. Operation began with T-16 in November 2000.
  • T-18: "Gage Restraint Measurement System", a purpose-built vehicle procured in May 2004. It is equipped with a fifth axle that can laterally load the rails to measure rail motion, enabling the detection of weak ties and fasteners.--

References

References

  1. {{USPL. 89. 220
  2. 1 The 1968 amendment to the High Speed Ground Transportation Act authorized the Secretary of Transportation to acquire a test site.{{USPL. 90. 423
  3. (January 16, 2021). "The Test Center". Pueblo Railway Museum.
  4. Reiff, Glenn A.. (September–October 1972). "New Capabilities in Railroad Testing". American Railway Engineering Association.
  5. Sanko, John J.. (November 19, 1973). "Sun-Baked Desert Now Test Ground". The Coshocton Tribune.
  6. Secretary of Transportation. (1970). "Fourth Report on the High Speed Ground Transportation Act of 1965". U.S. Department of Transportation.
  7. (March 2016). "Status of the Transportation Technology Center - 2015 (DOT/FRA/ORD-16/05)". US Department of Transportation, Federal Railroad Administration, Office of Research and Development.
  8. (June 30, 2015). "TTCI's Scientific Software Suite and NUCARS® Overview". Transportation Technology Center, Inc..
  9. Secretary of Transportation. (1971). "Fifth Report on the High Speed Ground Transportation Act of 1965". U.S. Department of Transportation.
  10. Secretary of Transportation. (1972). "Sixth Report on the High Speed Ground Transportation Act of 1965". U.S. Department of Transportation.
  11. Madigan, Ronald J.. (October 1974). "Urban Rail Supporting Technology Program, Fiscal Year 1973, Year End Summary {{!}} Report No. UMTA-MA-06-0025-74-9". Office of Research and Development, Urban Mass Transportation Administration, United States Department of Transportation.
  12. Benedict, Howard. (September 11, 1974). "Transit center near Pueblo: A Buck Rogers world". Fort Collins Coloradoan.
  13. Kizzia, Tom. (October 1975). "New trains are reviving America's romance with the rails".
  14. Reiff, Richard. (November 6–9, 1995). "A World of Change: 1st Annual AAR Research Review". Association of American Railroads, Transportation Technology Center.
  15. McKenzie, William H.. (April 1980). "Pokey FAST train drives for safety".
  16. House of Representatives, One Hundred Fourth Congress, First Session; Subcommittee on the Department of Transportation and Related Agencies Appropriations; Frank R. Wolf, Chairman. (1995). "Hearings before a subcommittee of the Committee on Appropriations". U.S. Government Printing Office.
  17. (March 5, 2021). "TTCI Is Evolving". Transportation Technology Center, Inc..
  18. (September 15, 2000). "Federal Railroad Administration Announces Contract Agreement with the Transportation Technology Center, Inc.". Federal Railroad Administration.
  19. Luczak, Marybeth. (March 8, 2021). "TTC Management Transitioning to 'DOT-Wide' Contract". Railway Age.
  20. (March 9, 2021). "ENSCO awarded contract to manage Transportation Technology Center". Progressive Railroading.
  21. (2022-03-15). "Building Momentum: Railroad Industry Introduces MxV Rail".
  22. (September 13, 1971). "Pueblo: Test-tube for tomorrow's railroads".
  23. "On-Site Track at TTCI".
  24. "Transportation Technology Center Inc. (TTCI) - Railway Research (developed by UIC)".
  25. (July 29, 1998). "Having a smashing time in Pueblo".
  26. "Railroad Test Track (RTT)". Transportation Technology Center, Inc..
  27. "Transit Test Track (TTT)". Transportation Technology Center, Inc..
  28. (January 1975). "SOAC - State-of-the-Art Car Engineering Tests at Department of Transportation High Speed Ground Test Center". Urban Mass Transportation Administration.
  29. "High Tonnage Loop (HTL/FAST)". Transportation Technology Center, Inc..
  30. "Wheel/Rail Mechanism". Transportation Technology Center, Inc..
  31. "Precision Test Track (PTT)". Transportation Technology Center, Inc..
  32. "Impact Facility". Transportation Technology Center, Inc..
  33. (May 1981). "Transportation Test Center: Rail Transit Services". Urban Mass Transportation Administration, U.S. Department of Transportation.
  34. "Rail Dynamics Laboratory". Transportation Technology Center, Inc..
  35. "Union Pacific Railroad: Roster of Diesel and Turbine Locomotives, 1934-2009, Part 3".
  36. "Union Pacific Railroad: Roster of Diesel and Turbine Locomotives, 1934-2009, Part 2".
  37. "High Speed Research Car T-16". United States Department of Transportation, Federal Railroad Administration.
  38. "Gage Restraint Measurement System T-18". United States Department of Transportation, Federal Railroad Administration.
Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Transportation Technology Center — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report