FieldValue
nameTrans-Anatolian Natural Gas Pipeline
typeNatural gas
photoFile:TANAP_logo.jpg
mapTrans-Anatolian gas pipeline.png
countryTurkey
ownerTANAP project company
partnersSOCAR (58%)
BOTAŞ (30%)
BP (12%)
operatorSOCAR
construction2015
est2018
length1841
discharge16 e9m3 per year
websitehttp://www.tanap.com/

BOTAŞ (30%) BP (12%)

The Trans-Anatolian Natural Gas Pipeline (TANAP; , ) is a natural gas pipeline in Turkey. It is the central part of the Southern Gas Corridor, which connects the giant Shah Deniz gas field in Azerbaijan to Europe through the South Caucasus Pipeline and the Trans Adriatic Pipeline. The pipeline has a strategic importance for both Azerbaijan and Turkey. It allows the first Azerbaijani gas exports to Europe, beyond Turkey. It also strengthens the role of Turkey as a regional energy hub.

The construction of the 1841 km-long pipeline started in March 2015, | access-date = 2015-03-17}} and it was inaugurated in June 2018. | access-date = 2018-06-17}}

History

The project was announced on 17 November 2011 at the Third Black Sea Energy and Economic Forum in Istanbul.{{cite news |access-date = 2011-12-25 |archive-date = 2018-06-13 |archive-url = https://web.archive.org/web/20180613184411/https://news.az/articles/economy/51212 |url-status = dead

In spring 2012, the process of conducting the technical-economic feasibility study was launched.{{cite news | author-link = Vladimir Socor |access-date=2012-05-24}} On 26 June 2012, President of Azerbaijan Ilham Aliyev and then Prime Minister of Turkey Recep Tayyip Erdoğan signed a binding intergovernmental agreement on the pipeline.{{cite news |archive-url= https://archive.today/20130118151220/http://www.businessweek.com/ap/2012-06-26/turkey-azerbaijan-sign-gas-pipeline-deal |url-status= dead |archive-date= January 18, 2013 |access-date=2012-06-28}} | author-link = Vladimir Socor |access-date=2012-06-29}} Also, the agreement was signed by Azerbaijani Industry and Energy Minister Natig Aliyev and Turkish Minister of Energy and Natural Resources Taner Yıldız. The initial agreement on organizational issues between BOTAŞ and SOCAR was signed by Natig Aliyev and Taner Yildiz, SOCAR President Rovnag Abdullayev and BOTAŞ Deputy Director General Mehmet Konuk. The host country agreement was signed by Yildiz and Abdullayev. On March 17, 2015, both Erdoğan and Aliyev met with Giorgi Margvelashvili, President of Georgia, in the city of Kars in Eastern Turkey to formally lay the foundations for the pipeline and marking the work as started.

On 12 June 2018, the TANAP was inaugurated at the compressor-measuring station in Eskişehir. The ceremony was attended by the Turkish president Erdoğan, the Azerbaijani president Aliyev, the Ukrainian president Petro Poroshenko, the Serbian president Aleksandar Vučić, and the Bulgarian prime minister Boyko Borisov, as also by the head of SOCAR Abdullayev, Turkish minister of energy and natural resources Berat Albayrak, and the chief executive officer of BP Bob Dudley.

On November 21, 2018, TANAP and the Trans-Adriatic Pipeline (TAP) were joined along the shores of the Maritsa River at the Turkish-Greek border. As a result of the joining of these two pipelines, Azerbaijani natural gas from the Shah Deniz-2 field is now transported to Italy via Azerbaijan, Georgia, Turkey, Greece, Albania, and the Adriatic Sea.

In 2022 the flow rate doubled from 6 to 12 bcma.

As of 2024 TANAP pipeline has a capacity of 16.2 bcm annually, supplying 5.7 bcm to Turkey and the remaining volume to Europe. According to SOCAR, over 62 bcm of gas has been transported through TANAP as of May 1, 2024.

Description

The pipeline cost US$8.5 billion.

The capacity of the pipeline is 16 e9m3 of natural gas per year at initial stage and would be increased later up to 23 e9m3 by 2023, 31 e9m3 by 2026, and at the final stage 60 e9m3 to be able to transport additional gas supplies from Azerbaijan and, if the Trans-Caspian Gas Pipeline, from Turkmenistan. |access-date=2012-05-24}} | author-link = Vladimir Socor | access-date=2012-09-12}} Its capacity would be increased by adding parallel loops and compressor stations according to the increase of available supplies. The pipeline will consist of 56 in pipes until Eskişehir, and 48 in pipes thereafter and 36 in across Marmora sea. |access-date= 14 August 2018}} The maximum height of the pipeline is 2,700 metres above mean sea level.

Route

The TANAP pipeline passes through 20 provinces of Turkey – Ardahan, Kars, Erzurum, Erzincan, Bayburt, Gümüşhane, Giresun, Sivas, Yozgat, Kırşehir, Kırıkkale, Ankara, Eskişehir, Bilecik, Kütahya, Bursa, Balıkesir, Çanakkale, Tekirdağ and Edirne. The pipeline starts from Sangachal terminal and in territory of Azerbaijan is the expansion of South Caucasus Pipeline (SCPx). From end point of SCPx which is in Erzurum it continues to Eskişehir where it unloads 6bcm of gas entitled to Turkish buyers. From Turkey-Greece border continues through Greece, Albania and ends in Italy. |access-date = 2011-12-27 |url-status = dead |archive-url = https://web.archive.org/web/20121205031248/http://abc.az/eng/news_27_12_2011_60953.html |archive-date = 2012-12-05 The exact route of the pipeline is not clear. However, it was announced that one branch from Turkey would go to Greece and the other to Bulgaria. |access-date=2011-12-25}} It would be connected with Trans Adriatic Pipeline. |access-date=2013-03-08}} The Turkish government said in March 2015 that a branch from Greece through North Macedonia and Serbia to Hungary was also under consideration.{{cite news

Shareholders

The TANAP is operated by SOCAR. SGC holds 58% stake in the project. Turkey's pipeline operator BOTAŞ own 30%, while BP acquired 12% in the project on March 13, 2015.{{cite news TANAP is headquartered in Ankara, Turkey.

Initially, Azerbaijan had held an 80% stake, with Turkey owning the remainder. The Turkish stake was divided between the Turkish upstream company TPAO (15%) and the Turkish pipeline operator BOTAŞ (5%). The international companies from the Shah Deniz consortium (BP, Statoil and Total) had an option to take up to 29% in TANAP. However, only BP exercised this option in December 2013. The Turkish government decided then that only BOTAŞ will hold a stake (20%) in TANAP. The Turkish pipeline operator acquired an additional 10% in May 2014. SOCAR's initial plan was to retain 51% and operatorship of the project. Several private Turkish companies had been interested in the remaining 7%, but this did not materialize.

CEO of TANAP is Saltuk Düzyol, the former general manager of BOTAŞ.

Contractors

  • Bechtel - Front End Engineering Design (FEED)
  • WorleyParsons - Engineering, Procurement, Construction Management (EPCM)
  • ABB - SCADA/Telecommunications System Engineering, Procurement and Construction (EPC) Works
  • Yüksel inşaat - Construction, installation, personnel training, and testing
  • Fernas Construction Company
  • Akkord Industry Construction Investment Corporation
  • Tekfen
  • SICIM - SICIM is a Construction Company established in 1962 and offering all types of services related to the installation of pipelines and relevant ancillary facilities for the transmission and distribution of oil, gas and water on an international basis
  • Punj Lloyd
  • Limak Holding
  • Sapura Energy
  • Noksel Steel Pipe Co.

Subcontractors

  • Rouge Pipeline and Process Services LLC - Based in Dubai, ROUGE Pipeline & Process Services is broadly divided into 3 divisions – Pipeline Services, Process Services and Talent Solutions. With its strategic alliances and representative offices in GCC countries (KSA, Oman, Kuwait), Algeria, Russia, Azerbaijan, Turkey and India, ROUGE is a market leader providing specialist services to both Onshore & Offshore companies in the Oil & Gas Industry.

References

References

  1. "Azerbaycan'la tarihi anlaşma". Sabah.
  2. "Turkic Council News Bulletin 15 June – 15 July 2012". Turkic Council Secretariat.
  3. Abbasov, Kamran. (October 2015). "Role of energy in Azerbaijan's foreign policy during Ilham Aliyev era". Middle East Technical University.
  4. (2018-06-12). "Erdogan opens new pipeline to pump Azerbaijan gas to Europe". [[The Washington Post]].
  5. (2018-06-12). "Ukraine hopes to receive gas via TANAP in future – Poroshenko". Interfax-Ukraine.
  6. (2018-11-21). "TANAP gas pipeline connected with TAP at Turkish-Greek border". AzerNews.az.
  7. "TANAP, TAP p/lines interconnect at Turkey-Greece border".
  8. Roberts, John. (2022-12-12). "Europe and the Caspian: The gas supply conundrum".
  9. (2024-06-10). "TANAP Considers Expansion to Supply More Gas to European Markets".
  10. JIS. "Trans Anatolian Natural Gas Pipeline (TANAP) {{!}} Socar Midstream".
  11. [http://en.trend.az/business/economy/2344645.html BOTAS, BP Pipelines intend to become TANAP shareholders, trend.az, 17 December 2014, retrieved on 19 January 2015]
  12. (27 May 2014). "Socar and BP kick off Trans Anatolian Natural Gas Pipeline construction".
  13. "RESULT OF TENDER FOR TANAP PROJECT'S SCADA/TELECOMMUNICATIONS SYSTEM ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) WORKS ANNOUNCED {{!}} TANAP".
  14. "TANAP - Trans Anadolu Doğal Gaz Boru Hattı, Lot 2".
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Trans-Anatolian gas pipeline — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report