From Surf Wiki (app.surf) — the open knowledge base
Toronto subway
Urban rail transit system in Ontario, Canada
Urban rail transit system in Ontario, Canada
| Field | Value | ||
|---|---|---|---|
| box_width | 285px | ||
| name | Toronto subway | ||
| image | TTC.svg | ||
| imagesize | 150px | ||
| owner | {{plainlist | ||
| locale | {{plainlist | ||
| transit_type | Rapid transit | ||
| lines | 4 (plus 2 under construction) | ||
| stations | 87 (plus 43 under construction) | ||
| ridership | () | ||
| annual_ridership | () | ||
| began_operation | |||
| operator | Toronto Transit Commission | ||
| vehicles | {{plainlist | ||
| train_length | {{plainlist | ||
| headway | {{plainlist | ||
| * 6 min 32 s – 12 min 15 s (Line 6)<ref name | "Service Summary" | ||
| system_length | 80.4 km | ||
| (52.2 km under construction) | |||
| track_gauge | {{plainlist | ||
| * {{track gauge | toronto | lk | on}} (Lines 1, 2 and 4) |
| * {{track gauge | sg | lk | on}} (Lines 5 and 6) |
| el | {{plainlist | ||
| * {{600 V DC | conductor | third rail}} (Lines 1, 2 and 4) | |
| * {{750 V DC | conductor | overhead}} (Lines 5 and 6) | |
| top_speed | |||
| average_speed | |||
| map | {{switcher | ||
| {{maplink-road | from | Toronto subway.map}} | |
| {{Toronto subway | inline | yes}} | |
| image2 | Museum TTC 20806772132.jpg | ||
| imagesize2 | 275px | ||
| image3 | Old and new TTC trains.jpg | ||
| imagesize3 | 275px | ||
| caption3 | Top: A subway train at Museum station | ||
| Bottom: T-series and Toronto Rocket subway trains (from left to right) on Line 1 | |||
| alt2 | Subway train at museum station | ||
| alt3 | T-series and Toronto Rocket subway trains (from left to right) on Line 1 |
- City of Toronto (Lines 1, 2 and 4)
- Metrolinx (Lines 5 and 6)
- Toronto, Ontario
- Vaughan, Ontario
- 830 heavy rail cars
- 66 work cars
- 6 cars (Lines 1 and 2)
- 4 cars (Line 4)
- 2 cars (Line 5)
- 1 car (Line 6)
- 2 min 30 s – 5 min (Line 1)
- 2 min 20 s – 6 min (Line 2)
- 5 min 30 s (Line 4)
- 6 min 32 s – 12 min 15 s (Line 6) (52.2 km under construction)
- (Lines 1, 2 and 4)
- (Lines 5 and 6)
- (Lines 1, 2 and 4)
- (Lines 5 and 6) | | Show interactive map | [[File:Toronto rapid transit map 2026.svg|275px]] | Show static map | | Show route diagram Bottom: T-series and Toronto Rocket subway trains (from left to right) on Line 1
The Toronto subway is a rapid transit system serving Toronto and the neighbouring city of Vaughan in Ontario, Canada. It is operated by the Toronto Transit Commission (TTC), an agency of the City of Toronto. The subway system is a rail network consisting of four lines: Line 1 Yonge–University, Line 2 Bloor–Danforth, Line 4 Sheppard, and Line 6 Finch West.
In 1954, the TTC opened Canada's first underground rail line, then known as the "Yonge subway" and now part of Line 1, under Yonge Street between Union Station and Eglinton Avenue with 12 stations. the network encompasses 87 stations and 80.4 km of route. In , the system had a ridership of , or about per weekday as of , making it the busiest rapid transit system in Canada in terms of daily ridership. there are 43 stations under construction as part of two new linesLine 5 Eglinton and the Ontario Lineand two extensions to existing lines.
Lines
The lines of the Toronto subway system are known by both a number and a name. While each line is also assigned a colour, the colours are only used to visually distinguish between them on maps and signage, not as names.
There are four operating rapid transit lines in Toronto:
- Line 1 Yonge–University
- Line 2 Bloor–Danforth
- Line 4 Sheppard
- Line 6 Finch West
Two additional lines are also under construction:
- Line 5 Eglinton
- Ontario Line
Line 1 Yonge–University is the longest and busiest rapid transit line in the system. It opened as the Yonge subway in 1954 with a length of 7.4 km and since then has grown to a length of 38.8 km. The modern line is U-shaped, having two northern terminalsat Vaughan Metropolitan Centre and and its southern end at Union station in downtown Toronto.
Line 2 Bloor–Danforth, opened in 1966, runs parallel to Bloor Street and Danforth Avenue between Kipling station in Etobicoke and Kennedy station in Scarborough. Construction started in 2021 on a three-stop extension of Line 2 northeastward from Kennedy station to Sheppard Avenue and McCowan via Scarborough City Centre.
Line 4 Sheppard, opened in 2002, runs eastward under Sheppard Avenue East from Sheppard–Yonge station on Line 1 to Don Mills station; it is the shortest rapid transit line in Toronto at a length of 5.5 km and the only one without any open sections.
Line 6 Finch West, opened in 2025, runs westward at-grade in the median of Finch Avenue for 11 km and 18 stops from Finch West station on Line 1 to Humber College station. It was the first light rail line to enter service as part of the rapid transit system; construction began in 2019, and the line opened on December 7, 2025.
two new lines are under construction:
- Line 5 Eglinton is an under-construction 19 km light rail line along Eglinton Avenue, planned to run from Kennedy station in the east to Mount Dennis station in the west. The line will have 25 stations, 15 of which will be underground, while the remaining ten will be at-grade stops located in at the road's median. Construction began in 2011. The line was expected to be completed in 2024 at a cost of approximately $12billion, though it has since been delayed.
- An extension of Line 5 westwards for 9.2 km to Renforth station is also under construction. The extension will have seven stations, four of which will be underground and two of which will be elevated. Construction began in 2022 and is scheduled for completion in the 2030s.
- Ontario Line is an under-construction 15.6 km subway line from Exhibition station to Don Valley station that will provide the first east–west rapid transit line through the Financial District and the central downtown core. The project evolved from the long-planned Downtown Relief Line, first proposed in the mid-1980s. The line is scheduled for completion in 2031 at a cost of $17 to $19 billion. Upon opening, the plan is to reassign the "Line 3" moniker formerly used by Line 3 Scarborough to the Ontario Line.
Until July 2023, the TTC operated an elevated light metro service. Line 3 Scarborough, originally known as the Scarborough RT, was an elevated medium-capacity (light metro) rail line serving the city's eponymous suburban district. It opened in 1985, running from Kennedy station to McCowan station via . It was the only rapid transit line in Toronto to use the Intermediate Capacity Transit System (ICTS) technology. Because of maintenance difficulties (along with the Line 2 subway extension into Scarborough), Line 3 was to be decommissioned on November 19, 2023. However, it was decommissioned approximately four months early due to a derailment on July 24, 2023. Bus service replaced Line 3 and is scheduled to continue until the extension of Line 2 to McCowan Road and Sheppard Avenue via Scarborough City Centre opens in 2030.
History
Timeline
| Date | Event |
|---|---|
| March 30, 1954 | The Yonge subway opens from to Union station. It runs under or near Yonge Street and is part of today's Line 1 Yonge–University. |
| February 28, 1963 | The University subway opens from Union station to . It is an extension of the Yonge subway northwest under University Avenue. |
| February 25, 1966 | The Bloor–Danforth subway (now Line 2 Bloor–Danforth) opens from to . It runs under or near Bloor Street and Danforth Avenue. |
| May 10, 1968 | Bloor–Danforth subway extensions open west to and east to . |
| March 30, 1973 | A Yonge subway extension opens from Eglinton to . |
| March 29, 1974 | A further Yonge subway extension opens from York Mills to . |
| January 28, 1978 | The Spadina subway, an extension of the University subway, opens from St. George to . The entire line is renamed the Yonge–University–Spadina subway. |
| November 21, 1980 | Bloor–Danforth subway extensions open west to and east to . |
| March 22, 1985 | The Scarborough RT (later Line 3 Scarborough) opens from Kennedy to . |
| June 18, 1987 | on the Yonge–University–Spadina subway opens. It is an infill station constructed between two existing stations, Sheppard (now ) and Finch. |
| March 31, 1996 | A Spadina subway extension opens from Wilson to Downsview (now ). |
| November 22, 2002 | The Sheppard subway (now Line 4 Sheppard) opens from Sheppard–Yonge to . It runs under Sheppard Avenue. |
| December 17, 2017 | Line 1's Toronto–York Spadina subway extension (TYSSE) opens from Sheppard West to Vaughan Metropolitan Centre. |
| July 24, 2023 | Line 3 Scarborough closes following a derailment and the TTC later announces the closure as permanent in August 2023. The permanent closure of Line 3 had already been scheduled for November 2023, in preparation for the extension of Line 2 further into Scarborough in the early 2030s. |
| December 7, 2025 | Line 6 Finch West opens from to . It primarily runs along the median of Finch Avenue at surface level. |
Line 1 Yonge–University
Main article: Line 1 Yonge–University#History

Canada's first subway, the Yonge subway, opened in 1954 with a length of 7.4 km. The line ran under or parallel to Yonge Street between Eglinton Avenue and Union station. It replaced the Yonge streetcar line, Canada's first streetcar line. In 1963, the line was extended northwards from Union station under University Avenue to Bloor Street, where it would later connect with the Bloor–Danforth subway (opened in 1966) at the double-deck St. George station. In 1974, the Yonge Street portion of the line was extended from Eglinton station north to Finch station. The Spadina segment of the line was constructed north from St. George station initially to Wilson station in 1978, and in 1996 to Downsview station, renamed Sheppard West in 2017. Part of the Spadina segment runs in the median of Allen Road – an expressway formerly known as the Spadina Expressway – and crosses over Highway 401 on overpasses. Six decades of extensions gave the line a U-shaped route running from its two northern terminals (Finch and Vaughan Metropolitan Centre stations) and looping on its southern end at Union station. The latest extension from Sheppard West to opened on December 17, 2017, making the line 38.8 km long, over five times its original length.
Line 2 Bloor–Danforth
Main article: Line 2 Bloor–Danforth#History
Opened in 1966, the Bloor–Danforth subway runs east–west under or near Bloor Street and Danforth Avenue. It replaced the Bloor streetcar line (which also served Danforth Avenue). Initially, the subway line ran between Keele station and Woodbine station. In 1968, the line was extended west to Islington station and east to Warden station, and in 1980, it was further extended west to Kipling station and east to Kennedy station.
Line 3 Scarborough
Main article: Line 3 Scarborough#History
Opened in 1985, Line 3 (originally the Scarborough RT) was a light metro line running from Kennedy station to McCowan station. The TTC started to construct the line to use Canadian Light Rail Vehicles. However, the TTC was forced to convert to the Intermediate Capacity Transit System technology because the provincial government threatened to cut funding to the TTC if it did not. This line was never extended, and in July 2023, the line was shut down pending its dismantling due to a derailment that resulted in injuries. It is set to be replaced with an extension of Line 2 to Sheppard Avenue and McCowan Road via Scarborough Town Centre.
Line 4 Sheppard
Main article: Line 4 Sheppard#History
Opened in 2002, the Sheppard subway runs under Sheppard Avenue from Sheppard–Yonge station to Don Mills station. The line was under construction when a change in provincial government threatened to terminate the project, but Mel Lastman, the last mayor of the former City of North York (today part of Toronto), used his influence to save the project. Despite the construction of many high-rise residential buildings along the line since its opening, ridership remains low resulting in a subsidy of $10 per ride. The line was intended to be extended to Scarborough Centre station, but because of the low ridership and the cost of tunnelling, there was a plan to extend rapid transit eastwards from Don Mills station via a surface light rail line, the Sheppard East LRT. However, in April 2019, Premier Doug Ford announced that the provincial government would extend Line 4 Sheppard to McCowan Road at some unspecified time in the future, thus replacing the proposed Sheppard East LRT. Line 4 Sheppard is also the only subway line in Toronto not to have any open sections.
Line 5 Eglinton
Main article: Line 5 Eglinton#History

Metrolinx is funding the 19 km Line 5 Eglinton, a light rail line along Eglinton Avenue. From Mount Dennis in the west to Brentcliffe Road (east of Laird Drive), the line will run almost entirely underground where Eglinton Avenue is generally four to five lanes wide. From east of Brentcliffe Road to Kennedy station, the line will operate on the surface in a reserved median in the middle of Eglinton Avenue, where the street is at least six lanes wide. Building on the surface instead of tunnelling reduces the cost of construction on the eastern end of the line. The average speed of the line is expected to be 28 km/h; as a comparison, the average speed of the heavy-rail Line 2 Bloor–Danforth is 32 km/h. The Eglinton line originated from Transit City, a plan sponsored by then–Toronto mayor David Miller, to expedite transit improvement by building several light rail lines through the lower density parts of the city. Of the light rail lines proposed, only the Eglinton line is under construction and the Finch West line opened in 2025. Line 5 was expected to be completed in 2024, but it has faced numerous delays. The Government of Ontario announced on December 5, 2025, that substantial completion of the line had been achieved and that full operational control would be transferred from Metrolinx to the TTC, with service expected to begin in early 2026.
Line 6 Finch West
Main article: Line 6 Finch West#History
Opened in 2025, Line 6 Finch West, also known as the "Finch West LRT", is a surface light rail line owned by Metrolinx. It is operated by the TTC and was also part of the Transit City proposal announced in 2007. The 10.3 km, 18-stop line extends from Finch West station on Line 1 Yonge–University to Humber College station at the north campus of Humber Polytechnic (formerly Humber College). The line is forecast to carry about 14.6million rides a year or 40,000 a day by 2031. Construction on this line began in 2019. It was scheduled for completion in the first half of 2024, with an estimated cost of $1.2billion, though it was delayed until December 7, 2025.
Ontario Line
Main article: Ontario Line
Ontario Line is an under-construction 15.6 km subway line from Exhibition station to Don Valley station, providing a second rapid transit line through the Financial District and downtown core. Although a subway line along Queen Street was first proposed in the early 1900s, the Downtown Relief Line was first proposed in the mid-1980s. The Ontario Line project extends further west and north than previous proposals to serve more of the city. The line is scheduled for completion in 2031 at a cost of $17 to $19 billion. Upon opening, the plan is for the line to use the "Line 3" moniker formerly used by Line 3 Scarborough.
Major incidents
On March 27, 1963, there was an electrical short in a subway car's motor. The driver decided to continue operating the train, despite visible smoke in the affected car, until the train reached Union station. This decision resulted in the destruction of six subway cars and extensive damage to the tunnel and signal lines west of Union station. Following this incident, safety procedures involving electrical malfunctions and/or fire in subway trains, were revised to improve safety and reduce the likelihood of a similar incident occurring.
On October 14, 1976, arson caused the destruction of four subway cars and damage to Christie station, resulting in the closure of part of the Bloor–Danforth line for three days, and the bypassing of Christie station for some time afterwards for repairs.
On August 11, 1995, the TTC suffered the deadliest subway accident in Canadian history, known as the Russell Hill accident, on the Yonge–University line south of St. Clair West station. Halfway between St. Clair West and Dupont stations, a southbound Line 1 subway train hit the rear of a stationary train ahead of it. Three people died and 100 other people were injured, some of them seriously. This led to a major reorganization at the TTC, with more focus on maintaining a "state of good repair" (i.e., an increased emphasis on safety and maintenance of existing TTC capital/services) and less on expansion.
On July 24, 2023, the last car of a train on Line 3 Scarborough derailed south of Ellesmere station. There were 45 people on board, with five injuries reported. The TTC closed the line while the cause of the accident, which was not immediately apparent, was investigated. Though the TTC planned to close Line 3 in November 2023, it announced on August 24 that the line would not reopen.
Operations and procedures
Line specifications
| Line | Opened | Stations | Length | Technology | Track gauge | Electrification | Under construction | Former lines |
|---|---|---|---|---|---|---|---|---|
| Yonge–University | 1954 | 38 | 38.4 km | Heavy rail | Toronto gauge (1,495mm) | 600 V DC third rail | ||
| Bloor–Danforth | 1966 | 31 | 26.2 km | Heavy rail | Toronto gauge (1,495mm) | 600 V DC third rail | ||
| Sheppard | 2002 | 5 | 5.5 km | Heavy rail | Toronto gauge (1,495mm) | 600 V DC third rail | ||
| Finch West | 2025 | 18 | 10.3 km | Light rail | Standard gauge (1,435mm) | 750 V DC overhead line | ||
| Eglinton | TBA | 25 | 19 km | Light rail | Standard gauge (1,435mm) | 750 V DC overhead line | ||
| Eglinton west extension | 2031 | 7 | 9.2 km | Light rail | Standard gauge (1,435mm) | 750 V DC overhead line | ||
| Bloor–Danforth extension | 2031 | 3 | 7.8 km | Heavy rail | Toronto gauge (1,495mm) | 600 V DC third rail | ||
| Ontario Line | 2031 | 15 | 15.6 km | Heavy rail | Standard gauge (1,435mm) | 1,500 V DC overhead line | ||
| Scarborough | 1985–2023 | 6 | 6.4 km | Light metro | Standard gauge (1,435mm) | 600 V DC fifth rail |
Terminal station reversals and short turns

On the former Line 3 Scarborough, light metro trains were not able to switch direction except at the ends of the line as there were no intermediate crossovers between the two termini. Thus, no short turns on Line 3 were possible.
Train operation
Two-person train operation
Lines 1, 2, and 4 use either a one- or two-person crew. With two-person train operation, the train is driven by a train operator, with an on-board guard at the rear of the train opening and closing the doors, ensuring no one is trapped before the train departs. At each subway platform, a set of three 15 cm platform markers are affixed onto the platform wall. The train operator and guard use them to position the train.
, the platform markers used for Lines 1, 2, and 4 are as follows:
.jpg)
- Circular red disk (Lines 1, 2, and 4)This marker is typically mounted on the station platform wall to assist the train operator in positioning the train in the station. When the operator's window is aligned with the red disk, the train is properly berthed in the station.
- Green triangle (Lines 1 and 2)This marker is typically mounted on the station platform wall to indicate to the guard, who is positioned in the trailing car, that it is safe to open the doors. When the guard's window is aligned with this marker, the guard must confirm the stop position by physically pointing to the green triangle. If the guard cannot see the green triangle, they are not permitted to open the train doors. After the doors are opened, the guard is required to stick their head out the cab window to observe passengers boarding and exiting. The train doors remain open for at least 15 seconds.
- Orange triangle (Lines 1 and 2)This marker is mounted on the station platform wall to assist the guard, who is positioned in the last car, in observing the platform as the train exits the station to ensure that no passengers are being dragged along by the train. When the guard reaches this triangle, they can cease observations. The distance between the green and orange triangles is typically the length of three cars.
When the guard determines that boarding is complete, electronic chimes sound and orange lights above the doorways flash while the automated announcement "please stand clear of the doors" is played over the train's public address system, and subsequently the doors are closed. The chimes are played before the automated announcement because such announcements may not be heard when the station is crowded. In 1991, the chimes and flashing lights were tested and gradually introduced system-wide during the 1990s. After the doors are closed, a light turns on in the operating cab. Until 1991, the guard alerted patrons to the closing doors with two short whistle blasts.

Prior to 2017, when subway guards operated the doors from the fifth car instead of the trailing car in the T1 trains on Line 2, different platform markers were used. The following markers have now fallen into disuse as a result of a March 2017 policy change that required all guards to work from the trailing car on Line 2:
- Circular green diskThis marker was mounted on the station platform wall in front of the guard's window in the fifth car from the lead unit. It indicated to the guard that the train was properly berthed. The guard was required to point to the circle before opening the doors to confirm the stop position.
- Circular orange diskThis marker was mounted on the station platform wall to indicate to the guard when they could cease train departure platform observations. At this point, the guard closed the cab window.
One-person train operation
With one-person train operation (OPTO), used on other large subway systemssuch as the London Underground, the Paris Metro, the Chicago "L" and the Montreal Metrothe train operator opens and closes the doors as well as driving the train.
Initially, Lines 1, 2, and 4 all used two-person train operation. On October 9, 2016, Line 4 Sheppard was converted to OPTO. Beginning August 1, 2021, the TTC tested OPTO on a portion of Line 1 on Sundays only. Effective November 21, 2021, the TTC applied OPTO every day on Line 1 between Vaughan Metropolitan Centre and St. George stations, continuing to use two-person train operation between St. George and Finch until fully adopting OPTO on the line on November 20, 2022. Line 5 Eglinton and Line 6 Finch West trains have used OPTO since they began service, as did Line 3 Scarborough, which operated from 1985 to 2023.
A 2020 survey conducted by the Amalgamated Transit Union Local 113 indicated that two-thirds of Torontonians surveyed opposed the TTC's plan to eliminate the train guard on Line 1, and that three-quarters of them disapproved of the lack of public consultation before train guards were removed from Line 4 in 2016, citing safety concerns, among other issues, as key reasons motivating their response.
Station announcements
.jpg)
On January 8, 1995, train operators began to announce each stop manually over the train's speaker system as a result of pressure from advocacy groups for the visually impaired, but announcements were sporadic until the TTC began to enforce the policy circa 2005. Later, automated announcements were implemented under further pressure from the advocacy groups. All TTC trains use an automated system to announce each station, which is played twice over the speaker system: when the train departs a station (e.g. "The next station is: Dufferin, Dufferin station") and when it arrives at the following station (e.g. "Arriving at: Dufferin, Dufferin station"). In addition, trains on all lines except Line 2 provide visible and audible automatic stop announcements. These trains also announce connections to other TTC subway lines as well as regional and intercity public transit service providers (such as "transfer for Line 4 Sheppard and GO Transit" used on Line 1 trains when approaching Sheppard–Yonge station) and terminus stations ("this is the final station") where applicable. They also display arrows and verbally announce, except at terminus stations, which side the train doors will open on at each stop based on the direction of train travel.
Winter operations
Switches and power rails are vulnerable to malfunction under extreme winter conditions such as heavy snow or freezing rain. During such events, the TTC runs "storm trains" overnight along subway lines to keep power rails clear of ice. The TTC also has trains to apply an anti-freeze to the power rail once freezing rain starts.
These precautions were also used on Line 3 Scarborough, which used two power rails. After reviewing operations during the winter of 2018–2019, the TTC decided to change its procedures for Line 3. Thus, about two hours before an expected storm, the TTC would decide whether to shut down Line 3 and replace it with bus service. Just before the storm of February 2, 2022, the TTC replaced all Line 3 trains with 25 buses.
To keep switches in the yards from freezing, crews use switch heaters and manually monitor them to ensure they stay in working order during winter storms. Workcars are run as storm trains within the yards to prevent ice from building up on the power rails. The TTC stores subway trains in tunnels along main lines rather than in exterior yards.
Stations
Main article: List of Toronto subway stations
.jpg)
The Toronto subway has 87 stations and stops across four lines. Most stations are named for the nearest major arterial road crossed by the line in question. A few are named for major landmarks, such as shopping centres or transportation hubs, served by the station. The stations along the University Avenue section of Line 1 Yonge–University, in particular, are named entirely for landmarks and public institutions (, , and ) and major churches ( and ). All trains, except for short turns, stop at every station along their route and run the entire length of their line from terminus to terminus. Many stations outside the central business district have termini for local TTC bus routes and streetcar routes situated within their fare-paid areas.
Payment
Main article: Toronto Transit Commission fares
To pay their fare, riders can tap their Presto, debit or credit card, or mobile wallet on a Presto card reader in a station before boarding a train or on the bus or streetcar. All regular TTC bus and streetcar routes permit two-hour free transfers both to and from connecting TTC lines.
Fare gates or transaction processors with electronic payment options are installed in all stations. On Line 6 Finch West, passengers tap on the Presto card readers (station fare transaction processors) installed on the platform entry ramps of the surface stops before boarding.
Accessibility
Main article: Toronto Transit Commission accessibility
.jpg)
Most of the Toronto subway system was built before wheelchair access was a requirement under the Ontarians with Disabilities Act (ODA). However, all stations built since 1996 are equipped with elevators. , 86 percent (75 of 87) of the stations are accessible following upgrade works to add elevators, wide fare gates, and access doors to the station.
Although plans were made to ensure all stations were accessible for people with disabilities by 2025, in September 2024, it was reported this goal would not be met until 2026. only Christie, College, Greenwood, Islington, King, Lawrence, Museum, Old Mill, Rosedale, Spadina, Summerhill and Warden stations are not fully accessible. In comparison, the Montreal Metro plans for all stations to be accessible by 2038, the Chicago "L" plans for all stations to be accessible in the 2030s, and the New York City Subway plans for 95 percent of stations to be accessible by 2055.
All TTC trains offer level boarding for customers with wheelchairs and other accessibility needs, with priority seating and dedicated wheelchair areas onboard each train.
Cleanliness
The May 2010 TTC cleanliness audit of subway stations found that none of them meet the transit agency's highest standard for cleanliness and general state of repair. Only 21 stations scored in the 70- to 80-percent range in the TTC's cleanliness scale, a range described as "ordinary tidiness", while 45 fell in the 60- to 70-percent range, achieving what the commission describes as "casual inattentiveness". The May audit was the third in a series of comprehensive assessments that began in 2009. The commission announced a "cleaning blitz" that would add 30 new temporary cleaners for the latter part of 2010 to address major issues and has other action plans that include more full-time cleaners, and new and more effective ways at addressing station cleanliness.
The TTC implemented stricter cleanliness protocols during the COVID-19 pandemic from 2020 to 2022.
Design and public art
Main article: Toronto subway public art
.jpg)
According to a 1991 CBC report, "aesthetics weren't really a priority" on Toronto's subway system, describing stations as "a series of bathrooms without plumbing". Since that time, Toronto's subway system has had over 40 pieces installed in various subway stations. More art appeared as new stations were built and older ones were renovated.
In 2004, USA Today said of Line 4 Sheppard (then known as the Sheppard subway): "Despite the remarkable engineering feats of this metro, known as Sheppard Subway, [it is] the art covering walls, ceilings, and platforms of all five stations that stands out. Each station is 'a total art experience where artists have created imaginative environments, uniquely expressing themes of community, location, and heritage' through panoramic landscapes and ceramic wall murals."
Internet and mobile phone access
Wireless service implementation
In 2012, the TTC awarded a contract to BAI Communications Canada to design, build and maintain a celular and Wi-Fi system along Toronto subway lines. BAI agreed to pay $25million to the TTC over a 20-year period for the exclusive rights to provide the service. BAI in turn would sell access to the cellular system to other carriers.
On December 13, 2013, Wi-Fi Internet access was launched at and St. George stations. The ad-supported service (branded as "TConnect") was provided by BAI Canada. The TTC and BAI Canada planned to offer TConnect at all underground stations. Commuters had to view a video advertisement to gain access to the Internet. It was expected that all of the 70 subway stations would have service by 2017, as well as the six stations along the Line 1 extension to Vaughan. From early December 2015 to late January 2016, users of TConnect were required to authenticate using a Twitter account, with Twitter's Canadian operations sponsoring the TConnect Wi-Fi network. Users of the network could sign in to enable an automatic Wi-Fi connection for 30 days. This arrangement was resumed on an optional basis from July 2016 to early December 2016. By August 2017, Wi-Fi was available at all existing stations and would be available in all future stations.
On June 17, 2015, the TTC announced that Wind Mobile (later rebranded Freedom Mobile) customers would be able to access cellular connectivity at some TTC subway stations. Service was initially between Bloor–Yonge and St. George stations on Line 1, and between Bloor–Yonge and Spadina stations on Line 2. Other carriers declined to use the BAI cellular system because of the price BAI was asking for access.
In April 2023, Rogers Communications took over BAI Communications and honoured existing access to Freedom Mobile customers. In August 2023, Rogers implemented 5G wireless service at all the TTC's downtown stations and within the tunnels between them. In September 2023, the federal government imposed new licence conditions requiring that cellphone and data services be available on the entire subway network by the end of 2026 and that all carriers, including Telus and Bell, were to have access to it. On October 2, 2023, Bell and Telus offered its cellular customers access to the subway's 5G system.
By November 2023, wireless service had been expanded to all TTC stations and to the tunnels between Sheppard West and Vaughan Metropolitan Centre stations, but only for Rogers and Freedom customers. Bell and Telus customers continued to have wireless service at a limited number of stations. In December 2023, Telus and Bell reached a deal with Rogers to provide their customers the same subway wireless services as Rogers and Freedom customers.
Rogers and the TTC decided to end TConnect, the free public Wi-Fi service, on December 27, 2024, due to low usage, the lack of security, the slow speed, and the cost of upgrading it.
Current wireless services
Rogers 5G wireless service is available in all underground stations for customers of Rogers, Freedom Mobile, Telus and Bell, but service access between stations is limited. 5G wireless service is available in open sections, as well as between Bloor–Yonge and Dupont stations on Line 1, and between and Keele stations on Line 2. 5G service is also available in the tunnels between Sheppard West and Vaughan Metropolitan Centre stations. Wireless service is available to customers of Rogers, Freedom Mobile, Bell and Telus (including flanker brands of these companies such as Koodo and Virgin Plus). This wireless service is not free, and users require a subscription from one of the four aforementioned carriers, given the lack of subsidized wireless plans in Ontario.
Naming

The TTC considers multiple factors when naming stations and stops, such as local landmarks, the location's cross streets, distinct communities of the past and present in the vicinity of the location, names of other stations and stops in the system, and the grade of the station or stop infrastructure.
Metrolinx uses five criteria for naming stations and stops. These are:
- Simplicity
- Names must be logical and relevant to the area the station is built in
- Names should be relevant for the life of the station
- Names should help passengers locate themselves within the region
- Uniqueness

Metrolinx will use the word "stop" in place of "station" at 10 of the 25 stations along the first phase of Line 5 Eglinton located on street-running sections.
Rolling stock
Main article: Toronto subway rolling stock
The following table shows the vehicle type by line:
| Line | Vehicle | Number of cars | Cars per train | Passenger capacity per train | Under construction | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Yonge–University | Toronto Rocket (TR) | 456 vehicles ordered for six-car TR trainsets, 444 delivered as of January 2017.}} | url=https://www.ttc.ca/About_the_TTC/Operating_Statistics/2013.jsp | title=2013 TTC Operating Statistics | publisher=Toronto Transit Commission | date=December 31, 2013 | access-date=January 17, 2017 | archive-url=https://web.archive.org/web/20150213234803/https://www.ttc.ca/About_the_TTC/Operating_Statistics/2013.jsp | archive-date=February 13, 2015}} | 1080 | ||||||||||
| Bloor–Danforth | T series (T1) | 370 | 6 | 1000 | ||||||||||||||||
| Sheppard | Toronto Rocket (TR) | 24 vehicles ordered for 4-car TR trainsets, 16 delivered as of January 2017.}} | url=http://www.cbc.ca/news/canada/toronto/sheppard-subway-line-gets-new-toronto-rocket-trains-1.3607811 | title=Sheppard subway line gets new Toronto Rocket trains | publisher=Canadian Broadcasting Corporation | date=May 30, 2016 | access-date=January 15, 2017 | archive-date=October 4, 2017 | archive-url=https://web.archive.org/web/20171004152256/http://www.cbc.ca/news/canada/toronto/sheppard-subway-line-gets-new-toronto-rocket-trains-1.3607811 | url-status=live }} | 720 | |||||||||
| Finch West | url=http://www.cbc.ca/news/canada/toronto/metrolinx-alstom-bombardier-1.4111844 | title=Metrolinx to buy vehicles from Bombardier competitor as backup plan for Eglinton Crosstown | publisher=CBC | website=CBC News | access-date=July 1, 2018 | archive-date=January 6, 2018 | archive-url=https://web.archive.org/web/20180106072710/http://www.cbc.ca/news/canada/toronto/metrolinx-alstom-bombardier-1.4111844 | url-status=live }} | 17 | 1 | 336 | |||||||||
| Eglinton | Flexity Freedom | url=https://www.thestar.com/news/gta/2016/07/20/metrolinx-threatens-legal-action-over-late-delivery-of-light-rail-vehicles.html | title=Metrolinx threatens legal action over late delivery of light rail vehicles | newspaper=Toronto Star | first=Ben | last=Spurr | date=July 20, 2016 | access-date=July 20, 2016 | archive-date=July 20, 2016 | archive-url=https://web.archive.org/web/20160720112525/https://www.thestar.com/news/gta/2016/07/20/metrolinx-threatens-legal-action-over-late-delivery-of-light-rail-vehicles.html | url-status=live }} | 2 | url=http://www.thecrosstown.ca/the-project/fact-sheets/crosstown-infographic | title=Crosstown Infographic | publisher=Metrolinx | access-date=January 17, 2017 | archive-date=January 18, 2017 | archive-url=https://web.archive.org/web/20170118215250/http://www.thecrosstown.ca/the-project/fact-sheets/crosstown-infographic | url-status=live }} |
Heavy rail stock
Line 1 Yonge–University and Line 4 Sheppard operate using the newest version of Toronto's subway cars, the Toronto Rocket, while Line 2 Bloor–Danforth uses the older T1 subway trains.
The TTC's original G-series cars were manufactured by the Gloucester Railway Carriage and Wagon Company. All subsequent heavy-rail subway cars were manufactured by Bombardier Transportation or one of its predecessors (Montreal Locomotive Works, Hawker Siddeley, and UTDC). All cars starting with the Hawker Siddeley H series in 1965 have been built in Bombardier's Thunder Bay, Ontario, plant. The final H4 subway cars were retired on January 27, 2012. This was followed by the retirement of the H5 subway cars, which had their final in-service trip on June 14, 2013, and the H6 retirement, which followed one year later with a final run on June 20, 2014.
Following the introduction of the Toronto Rocket trains on Lines 1 and 4, all the T1 trains were moved to Line 2. The T1s were expected to last until 2026. By the end of 2019, the TTC had proposed an overhaul to extend the T1 fleet's life by 10 years at an estimated cost of $100 million. By mid-2020, the TTC had started the design phase for a new generation of subway trains to replace the T1 fleet on Line 2 Bloor–Danforth. In late 2021, the TTC expected that the new trains would be introduced between 2026 and 2030, at an estimated cost of $1.6 billion. On October 13, 2022, the TTC issued a request for proposals to construct 480 new subway cars (80 six-car train sets) of a design different from the T1 and Toronto Rocket fleet for delivery between 2027 and 2033. , the TTC plans to overhaul the T1 fleet if newer trains cannot be delivered in time.
The Ontario Line will use smaller train sets and a smaller gauge than those used on the Toronto subway system. By using driverless trains with automatic train control (ATC), Metrolinx expects the line to be as frequent as the existing subway lines despite using smaller, lighter trains. In conjunction with ATC, stations will have platform-edge doors for safety, also allowing riders to exit and enter trains more quickly. The trains will be manufactured by Hitachi Rail, similar to trains in Copenhagen or Rome.
In January 2026, Alstom was awarded a contract valued at $2.3 billion to supply 70 six-car Metropolis subway trains for the subway. The new fleet will primarily replace trains on Line 2, with additional units allocated for planned subway extensions. The trains will be assembled in Thunder Bay, Ontario, and tested in Kingston, Ontario.
Light metro stock
Line 3 Scarborough used 28 S-series trains built by the Urban Transportation Development Corporation (UTDC) in Millhaven, Ontario. These Intermediate Capacity Transit System (ICTS) trains were Mark I models, similar in design to the original trains found on the Vancouver SkyTrain and the Detroit People Mover. These were the original vehicles on the line and were in service from the line's opening in 1985 to its closure in 2023. Because of the trains' age, they were refurbished for operation and initially intended to last until the extension of Line 2 Bloor–Danforth was built. In February 2021, the TTC announced plans to accelerate the retirement of Line 3, intending to close it in 2023. This was due to delays in planning and construction of the Line 2 extension (which was then projected to open in 2030 at the earliest) along with the increasing difficulty of performing critical maintenance work on the trains. Following an initial temporary closure owing to a derailment in July 2023, the TTC decided in August 2023 not to reopen the line. The TTC proposed selling some of these trains to the Detroit People Mover, which uses a similar technology in December 2023. The sale was finalized in June 2024, with repairs and upgrades paid by the Detroit People Mover.
Light rail stock
.jpg)
Metrolinx plans to use 76 Flexity Freedom low-floor, light-rail vehicles (LRVs) for Line 5 Eglinton. Due to delivery delays from Bombardier, Metrolinx reduced the order for Flexity Freedom vehicles and instead uses 17 Citadis Spirit vehicles on Line 6 Finch West.
| Vehicle | Citadis Spirit | Flexity Freedom |
|---|---|---|
| Length | 48.4 m | 31.9 m |
| Maximum capacity | 292 | 164 |
| Maximum speed | 100 km/h | 80 km/h |
Technology
| Technology | Lines used | Vehicle floor type | Track gauge | Line voltage | Electrical feed | Electrical pickup |
|---|---|---|---|---|---|---|
| Heavy rail | High floor | 600 V DC | Third rail | Bogie-mounted shoe | ||
| Light rail | Low floor | 750 V DC | Overhead wire | Roof-mounted pantograph |
The heavy rail lines have some characteristics in common: such lines are fully isolated from road traffic and pedestrians; the station platforms are covered, and the trains are boarded through many doors from high platforms within a fare-paid zone separated by faregates.
In contrast, the surface portions of the light rail lines (Lines 5 and 6) fit into the street environment. Light-rail tracks are located on the surface within reserved lanes in the middle of the street, and cross street intersections at grade. Surface stations have simple, low-level platforms. However, like heavy rail and light metro, passengers board and alight the light rail trains by multiple doors.
Line 3 Scarborough, a light metro, used a more complex technology than heavy rail, which a TTC document describes as follows: :Track is the 5 rail system on direct fixation and car is powered by an induction or "reaction rail" situated between the running rails at the same top of rail elevation. There are two side contacting power rails +300V and −300V respectively situated a distance of about 14 in. from the closest gauge line of one running rail.
Signals
Main article: Toronto subway signals
Heavy rail
Fixed-block signalling was originally used on the Toronto subway since the opening of Toronto's first subway in 1954 and was the first signalling system used on Lines 2 and 4. Lines 2 and 4 use fixed-block signalling but Line 1 no longer does. Fixed-block signalling uses automatic signalling to prevent rear-end train collisions, while interlocking signals are used to prevent collisions from conflicting movements on track crossovers.
, automatic train control (ATC) has been implemented along the entire length of Line 1. In 2009, the TTC awarded a contract to Alstom to upgrade the signalling system of the existing section of Line 1, as well as equip its extension into Vaughan, with moving block–based communications-based train control (CBTC) by 2012. The estimated cost to implement ATC on Line 1 was $562million, $424million of which was funded by Metrolinx. The first section of the "Urbalis 400" ATC system on Line 1 entered revenue service on December 17, 2017, between Sheppard West and Vaughan stations, in conjunction with the opening of the Toronto–York Spadina subway extension (TYSSE) project.
The benefits of ATC on Line 1 are:
- a reduced headway between trains from 2.5 minutes to 2 minutes during rush hours, allowing a 25 percent increase in the number of trains that can operate
- fewer signal-related delays relative to the old fixed-block system
- more efficient use of electricity, thus reducing operational costs
- allowing single-track, bidirectional operation for trains in passenger service, albeit with reduced frequency, to allow for off-hour maintenance of the opposite track
The TTC has plans to convert Line 2 to ATC by 2030, subject to the availability of funding.
Light metro
Line 3 Scarborough was equipped with automatic train control from the outset, using the same SelTrac IS system as Vancouver's SkyTrain, meaning it could be operated autonomously. However, the TTC opted to equip each S-series train with an operator on board for door monitoring.
The future Ontario Line will use automatic train control with driverless trains. Its stations will be equipped with platform screen doors.
Light rail
When completed, Line 5 Eglinton will use Bombardier Transportation's Cityflo 650 CBTC automatic train control on the underground section of the line between Laird station and Mount Dennis station, along with the Eglinton Maintenance and Storage Facility adjacent to Mount Dennis station.
Track

Lines 1, 2 and 4the heavy-rail linesrun on tracks built to the Toronto gauge of , the same gauge used on the Toronto streetcar system. According to rail historians John F. Bromley and Jack May, the reason that the Yonge subway was built to the streetcar gauge was that between 1954 and 1965, subway bogies were maintained at the Hillcrest Complex, where the streetcar gauge was used for shop tracks. The Davisville Carhouse was not equipped to perform such heavy maintenance, and the bogies would be loaded onto a specially built track trailer for shipment between Davisville and Hillcrest. This practice ceased with the opening of the shops at the Greenwood Yard in 1965.
Line 3 Scarborough used standard-gauge tracks, as the ICTS design for the line did not allow for the interchange of rail equipment between the traditional subway system and Line 3. When its ICTS vehicles needed anything more than basic service (which could be carried out at the McCowan Yard), they were carried by truck to the Greenwood Subway Yard.
The Line 5 Eglinton and Line 6 Finch West LRT lines are constructed with standard-gauge tracks. The projects are receiving a large part of their funding from the Ontario provincial transit authority Metrolinx and, to ensure a better price for purchasing vehicles, it wanted to have a degree of commonality with other similar projects within Ontario. The Ontario Line subway will similarly be built to standard gauge.
Facilities
The subway system has the following yards to provide storage, maintenance and cleaning for rolling stock. All yards are located above ground, though the Keele Yard is partially underground.
.jpg)
| Facilities | Opened | Lines | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| served | Remarks | |||||||||
| Davisville Yard | 1954 | |||||||||
| Eglinton MSF | TBA | Line under construction | ||||||||
| Finch MSF | 2025 | |||||||||
| Greenwood Yard | 1966 | |||||||||
| Keele Yard | 1966–1978; 2017 | url=https://swanboatsteve.files.wordpress.com/2017/06/20170524_ttc-notice-keele-yard.pdf | title=Keele Yard reopens to operation | publisher=Toronto Transit Commission | date=May 24, 2017 | access-date=May 30, 2018 | archive-date=November 7, 2017 | archive-url=https://web.archive.org/web/20171107031046/https://swanboatsteve.files.wordpress.com/2017/06/20170524_ttc-notice-keele-yard.pdf | url-status=live }} | |
| McCowan Yard | 1985–2023 | Line in decommissioning phase | ||||||||
| Wilson Yard | 1977 |
In the second quarter of 2018, the City of Toronto moved to expropriate Canadian Pacific Railway's disused Obico Yard at 30 Newbridge Road / 36 North Queen Street in Etobicoke for use as a potential future yard at the western end of Line 2 Bloor–Danforth. The yard is situated immediately to the southwest of Kipling station, the western terminus of Line 2.
Safety
There are several safety systems for use by passengers in emergencies:

- Emergency alarms (formerly "Passenger assistance alarms"): Located throughout all subway trainsWhen the yellow strip is pressed, an audible alarm is activated within the car, a notification is sent to the train crew and the Transit Control Centre, which in turn dispatches a tiered response. An orange light is activated on the outside of the car with the alarm for emergency personnel to see where the problem is.
- Emergency power cut devices: Marked by a blue light, located at both ends of each subway platformFor use to cut DC traction power in the event a person falls or is observed at track level or any emergency where train movement into the station would be dangerous. These devices cut power in both directions for approximately one station each way.
- Emergency stopping mechanisms (PGEV: passenger/guard emergency valve): Located at each end of each subway car (with exception of the Toronto Rocket trains)Will activate the emergency brakes of the vehicle stopping it in its current location (for use in extreme emergencies, such as persons trapped in doors as train departs station, doors opening in the tunnel, derailments etc.)
- Passenger intercoms: Located on subway platforms and near/in elevators in stationsFor use to inform station collector of security/life safety issues
- Automated external defibrillators (AEDs): Located in several subway stations near collector boothsFor use in the event someone suffers cardiac arrest
- Public telephones: Located in various locations in all stations, and at the Designated Waiting Area's on each subway platform. Emergency calls can be made to 911 toll free. Phones located at the DWAs also include a "Crisis Link" button that connect callers, free of charge, to a 24-hour crisis line in the event that they are contemplating self-harm. Bell Canada operates these phones.
Stations with high platforms have a crawl space under the platform edge, which the TTC recommends that a person who has fallen onto the track use to avoid an oncoming train. Lying flat between the two rails is not recommended due to shallow clearances. The platform edge has a yellow strip behind which passengers should wait to avoid a fall.
Stations do not have platform screen doors, a feature which for Lines 1, 2 and 4 would require station modification, automatic train control (ATC) and a $1.35-billion investment which is not funded . ATC is needed to stop trains at a precise position along the platform to line up train doors with platform doors. , ATC has been activated along the entire length of Line 1; thus, it would be possible to install platform screen doors along Line 1. The future Ontario Line will be built to operate with ATC and will feature platform doors from its opening. The benefits of platform doors would be:
- Blocking those attempting suicide or trespassers from the tracks: it takes 70 to 90 minutes to resume operations each time there is a personal injury at track level
- Eliminating fires from debris falling on the tracks and the third rail
- Allowing trains to enter crowded stations at speed, thus speeding up service along the line
The light-rail Line 5 Eglinton will use a guideway intrusion detection system (GIDS) to detect trespassers on the tracks on the underground sections of the line. When GIDS detects a trespasser on the tracks, it will issue an audio warning to the trespasser, provide live CCTV video to central control, and automatically stop the train without driver intervention. Each station will be equipped with multiple GIDS scanners along the station platform. There will also be GIDS scanners at each tunnel portal. In addition, there will be scanners within the yellow tactile strips along the platform edge to issue an audio warning if a person steps on it before the train has arrived.
A trial program began in 2008 with Toronto EMS and has been expanded and made permanent, with paramedics on hand at several stations during peak hours: Spadina and Bloor–Yonge (morning peak: 7am–10am) and Union and Eglinton (evening peak: 2pm–6pm).
By September 2023, the TTC was making naloxone available at each subway station so that designated trained TTC staff could attempt to rescue anyone having a drug overdose. Kits containing naloxone nasal spray would be stored at station collector booths. TTC special constables would carry naloxone.
Training
Subway operators begin their training at Hillcrest with a virtual reality mockup of a Toronto Rocket car. The simulator consists of the operator cab with full functions, a door and partial interior of a subway car. The simulator is housed in a simulated subway tunnel. Construction of a new subway training centre was underway at the Wilson Complex, as part of the Toronto Rocket subway car program.
Expansion plans
| Line | Opening | Stations | Length | Technology | Track gauge | Electrification |
|---|---|---|---|---|---|---|
| Yonge North subway extension | 2030/31 | 5 | 8 km | Heavy rail | Toronto gauge (1,495mm) | 600 V DC third rail |
| Eglinton East LRT | 2034 | 27 | 18.6 km | Light rail | Standard gauge (1,435mm) | 750 V DC overhead line |
| Sheppard east extension | TBD | TBD | TBD | Heavy rail | Toronto gauge (1,495mm) | 600 V DC third rail |
| Sheppard west extension | TBD | TBD | TBD | Heavy rail | Toronto gauge (1,495mm) | 600 V DC third rail |
| Eglinton airport extension | TBD | TBD | TBD | Light rail | Standard gauge (1,435mm) | 750 V DC overhead line |
| Finch West airport extension | TBD | TBD | TBD | Light rail | Standard gauge (1,435mm) | 750 V DC overhead line |
Provincially supported projects
On April 10, 2019, Ontario premier Doug Ford announced rapid transit–related projects that the Province of Ontario would support with either committed or future financing. One such project is the Ontario Line, a proposed 15.5 km rapid transit line that has succeeded the Relief Line proposal. Initially, the project was projected to be completed in 2027, but this was later pushed back to 2030. A groundbreaking ceremony for the Ontario Line was held on March 27, 2022.
The Line 5 west extension to Pearson Airport is a proposal to extend Line 5 Eglinton from its terminus at Mount Dennis station west along Eglinton Avenue West to the proposed Pearson Transit Hub in Mississauga. In April 2019, Ford said that he would commit funds for this proposal.
The Yonge North subway extension (YNSE) is a proposal to extend Line 1 Yonge–University north along Yonge Street from Finch station, the existing terminus of Line 1, to near Highway 7 in Richmond Hill. There would be new stations at Steeles Avenue, Clark Avenue, between Highway 7 and Highway 407 near Langstaff GO Station and Richmond Hill Centre Terminal (dubbed "Bridge station"), and High Tech Road. The extension was proposed in the province's 2007 MoveOntario 2020 plan. A major problem with this proposal was that Line 1 was at capacity, and the TTC said in 2016 that the proposed Relief Line and SmartTrack would both need to be in service before opening the YNSE. In 2020, a preliminary agreement was signed between the Ontario provincial government and York Region that anticipated the completion of the extension by approximately 2030.
The Scarborough subway extension (SSE) is a project to replace Line 3 Scarborough with an eastward extension of Line 2 Bloor–Danforth. On October 8, 2013, Toronto City Council conducted a debate on whether to replace Line 3 with a light rail line or a subway extension. In 2014, the city council voted to extend Line 2 to Scarborough City Centre, which would result in the closure of Line 3. The SSE would be 6 km long and add one new station to Line 2 at Scarborough Town Centre. TTC and city staff finalized the precise route of the SSE in early 2017. In 2019, the Government of Ontario proposed a modified version of the proposal now known as the Line 2 East Extension (L2EE). The L2EE is 7.8 km long and adds three new stations, rather than one. The proposed completion deadline for the project is between 2029 and 2030.
The Line 4 eastward extension to McCowan is a proposal to extend Line 4 Sheppard east along Sheppard Avenue East to McCowan Road, where it will connect with the Scarborough subway extension. Doug Ford said in April 2019 that he would commit funds related to this proposal.
Other active proposals
The Eglinton East LRT is a City of Toronto proposal to construct an LRT line (separate from Line 5 Eglinton) from Kennedy station east to Malvern. This proposal was originally part of the cancelled Scarborough–Malvern LRT in Transit City. It would have stations at Eglinton GO and Guildwood GO, as well as the University of Toronto Scarborough campus.
Inactive proposals
The Jane LRT is a proposed LRT line that would begin at Jane station on Line 2 and proceed north to Pioneer Village station on Line 1. While initially part of the cancelled Transit City plan, the Jane LRT is part of the 2018–2022 TTC Corporate Plan and tentatively referred to as Line 8.
The Line 4 west extension to Sheppard West station is a proposal that would extend Line 4 Sheppard west along Sheppard Avenue West to Sheppard West station, where it would link to Line 1 Yonge–University and Wilson Yard. It is currently listed as an "unfunded future rapid transportation project" in the City of Toronto's 2013 Feeling Congested? report.
The Line 6 east extension to Finch station is a proposal that would extend Line 6 Finch West east along Finch Avenue West to Finch station, where it would link up with Line 1 Yonge–University. In March 2010, the Ontario government eliminated the proposed section of line between Finch West station and Finch station because of budget constraints. This section of the line was part of the original Transit City proposal. In 2013, this plan was revived as an "unfunded future rapid transit project" in the City of Toronto's Feeling Congested? report, meaning this extension may be constructed sometime in the future. The extension was later shown in the 2018–2022 TTC Corporate Plan with no timeline for completion.
Along with a proposal to extend Line 6 to Finch station, there was another proposal that would have extended the line farther to Don Mills station, where it would have provided a connection to Line 4 Sheppard. In May 2009, Metrolinx proposed that the line be extended from Finch station along Finch Avenue East and Don Mills Road into Don Mills station to connect with the Sheppard East LRT and create a seamless crosstown LRT line in northern Toronto to parallel the Eglinton Crosstown LRT (later designated Line 5 Eglinton) in central Toronto. The TTC said that a planning study would have commenced in 2010.
The Line 6 west extension to Pearson Airport is a proposal that would extend Line 6 Finch West west to Pearson Airport, where it would provide a link to Line 5 Eglinton. In 2009, the TTC studied the feasibility of potential routings for a future westward extension of the Etobicoke–Finch West LRT to the vicinity of the Woodbine Live development, Woodbine Mall, and Pearson International Airport. This extension was later reclassified as a future transit project as described in the 2013 Feeling Congested? report by the City of Toronto. Metrolinx revealed in January 2020 that they would study a possible connection to the Pearson Transit Hub at Pearson Airport.
Abandoned plans
The Queen subway line was a subway line first proposed in 1911. When Line 1 was first built, a roughed-in station was included under Queen station, with the intention that the Queen subway would be the city's second subway line. The route of the Queen subway line is included in the routes for both the Relief Line and the Ontario Line proposals.
The Eglinton West line was a proposed subway line in the late 1980s on which construction began in the early 1990s. It was cancelled after the election of Mike Harris as premier of Ontario. Much of its planned route is included in Line 5 Eglinton.
One proposed expansion of Line 2 Bloor–Danforth into Mississauga included eight potential stations stretching west from Kipling station to Mississauga City Centre, retrofitting some existing GO Transit stations. The plan was for the subway stations to open in 2011. Then–Mississauga mayor Hazel McCallion and the Regional Municipality of Peel did not support the project.
The Relief Line was a proposed heavy-rail subway line running from Pape station south to Queen Street East and then west to the vicinity of Toronto City Hall. The proposal included intermediate stations at Sherbourne Street, Sumach Street, Broadview Avenue, and another near Gerrard Square. In January 2016, alignment options and possible stations were still being studied, and the project was unfunded. Construction was expected to take about ten years to complete. As early as 2008, Metrolinx chair Rob MacIsaac expressed the intent to construct the Relief Line to prevent overcrowding along Line 1. Toronto City Council also expressed support for this plan. In April 2019, the Government of Ontario under Doug Ford announced that the Ontario Line would be built instead of the Relief Line. As a result, TTC and City of Toronto staff suspended further planning work on the Relief Line in June 2019.
Transit City
The Sheppard East LRT was a proposed light rail line running east from Don Mills station to Morningside Avenue in Scarborough. The line was to be 13 km long with 25 surface stations and one underground connection at Don Mills station on Line 4 Sheppard. Construction of the Sheppard East LRT was to start upon completion of Line 6 Finch West. However, in July 2016, the Toronto Star reported the Sheppard LRT had been deferred indefinitely. In April 2019, Premier Doug Ford announced that the provincial government would extend Line 4 Sheppard to McCowan Road at some unspecified time in the future, replacing the proposed Sheppard East LRT.
The Don Mills LRT was a proposed LRT line that would have headed north from Pape station along Don Mills Road to Don Mills station. Its route was later incorporated into the Relief Line and Ontario Line proposals.
Notes
References
Citations
Sources
- Welcome Aboard – Tomorrow's Transit Today – UTDC 1985
References
- "Toronto-York Spadina Subway Extension".
- (December 7, 2025). "Service Summary: December 7 – December 20, 2025". Toronto Transit Commission Service Planning and Scheduling Department.
- "Eglinton Crosstown LRT".
- (January 2023). "Scarborough Subway Extension". [[Metrolinx]].
- (October 23, 2013). "TTC maps: are subway names better than numbers?". CBC News.
- "Traffic authorities from all over world see subway opened", ''Toronto Daily Star'', March 30, 1954, p. 3.
- "Scarborough Subway Extension".
- (October 23, 2016). "The Sheppard Subway". Transit Toronto.
- Thompson, John. (September 18, 2019). "Ontario LRT Update".
- (July 25, 2023). "Finch West LRT likely won't be open to public until 2024 despite construction progress". [[CityNews]].
- "For a Greater Region – Eglinton Crosstown LRT". Metrolinx..
- Kalinowski, Tess. (September 24, 2015). "Eglinton Crosstown to open a year later than expected". [[Toronto Star]].
- Ranger, Michael. (May 16, 2023). "Eglinton Crosstown won't open until 2024, construction group to take legal action: Metrolinx".
- (December 30, 2019). "Eglinton Crosstown LRT could be $330{{nbsp}}million over budget and open seven months late, internal documents warn".
- "Metrolinx – Eglinton Crosstown West Extension".
- (November 23, 2022). "Ontario Line costs nearly double after awarding of latest contracts". [[Toronto Star]].
- (February 10, 2021). "Future TTC Rapid Transit Map – 2031 Projection". [[Toronto Transit Commission.
- Bow, James. (December 28, 2016). "The Scarborough Rapid Transit Line". Transit Toronto.
- Marchesan, John. (August 24, 2023). "TTC says Scarborough Line 3 will not resume operation following derailment". City News Toronto.
- Moore, Oliver. (February 10, 2021). "TTC board green-lights plan to close Rapid Transit line". [[The Globe and Mail]].
- "2013 TTC Operating Statistics". Toronto Transit Commission.
- "TTC Subway/RT Route Histories – Transit Toronto – Content".
- Byford, Andy. (March 26, 2015). "Toronto-York Spadina Subway Extension – Schedule and Budget Change". [[Toronto Transit Commission]].
- (December 7, 2025). "Finch West LRT opens with free rides as TTC launches 'first new transit line since 2002'". [[CTV News]].
- (April 10, 2019). "How Doug Ford's $28.5-billion transit overhaul compares with Toronto's existing plans". [[Toronto Star]].
- (December 5, 2025). "Eglinton Crosstown expected to open ‘in the coming weeks,’ province says". CP24.
- "For a Greater Region – Finch West LRT".
- "Burned-out ruins of four Bloor subways cars are examined by firefighters at Christie subway station". Toronto Star.
- "THE CHRISTIE STATION FIRE SUBWAY DIVERSION (OCTOBER 15–17, 1976)".
- Pelley, Lauren. "20 years after Russell Hill, Toronto's deadliest subway crash". [[Toronto Star]].
- (August 6, 2005). "Ten Years After – Toronto Star". Transit Toronto.
- Casaletto, Lucas. (July 24, 2023). "TTC train derails in Scarborough, passengers injured".
- (August 24, 2023). "Scarborough RT officially shut down: TTC". CBC News.
- Byford, Andy. (January 20, 2017). "Necessity of TTC subway closures explained". [[Toronto Transit Commission]].
- Monro, Steve. (October 23, 2017). "TTC Service Changes Effective Sunday, November 26, 2017".
- (August 26, 2010). "Rocket Talk: What Are Those Subway Symbols For? | news". Torontoist.
- [http://www.cp24.com/news/ttc-switching-to-single-operator-model-for-line-4-subway-as-of-oct-9-1.3091153 "TTC switching to single-operator model for Line 4 subway as of Oct. 9"] {{Webarchive. link. (September 27, 2016 . ''CP24'', Chris Fox, September 27, 2016)
- "Operational factors – Factors influencing observation approaches". Transit Cooperative Research Program (TCRP).
- (September 11, 2015). "2014 TTC APTA Audit". [[Toronto Transit Commission]].
- TechnicaProductions. (October 17, 2012). "TTC M1s In Operation".
- (March 28, 2017). "TTC union rep blames policy change for worker assault".
- (1995). "TCRP Report 4: Aids for Rail Car Side-Door Observation". Telephonics Corporation.
- (February 20, 2015). "TTC subway guards pointing at the wall. Why? Some don't know". Global News.
- "OPTO".
- (November 29, 2021). "Toronto Transit Commission Board Meeting – November 29, 2021". [[Toronto Transit Commission]].
- (November 20, 2022). "Line 1 (Yonge-University)–Service increase". [[Toronto Transit Commission]].
- (February 26, 2020). "Majority of Torontonians say no to TTC plan to remove subway guards: poll – 680 NEWS".
- (February 25, 2020). "Toronto – Torontonians' attitudes on eliminating subway guards and public consultation on TTC subway safety".
- (October 15, 2007). "Ontario Transit Services Expected To Announce All Transit Stops". Ontario Human Rights Commission.
- Ku, Christina. (June 3, 2007). "Our lady of the stations: Meet the calm-voiced woman behind the TTC's automated subway announcements". [[Toronto Star]].
- "Service changes in the event of a winter storm{{Snd}}Streetcar". [[Toronto Transit Commission]].
- (April 16, 2018). "Service changes in the event of an ice storm". [[Toronto Transit Commission]].
- Iqbal, Maria. (February 2, 2022). "TTC closes Scarborough Line 3 as Toronto hit by winter storm". [[Toronto Star]].
- (September 18, 2023). "Pay your fare with your debit or credit card". Toronto Transit Commission.
- "Fare payment — Line 6 Finch West". Toronto Transit Commission.
- (December 2025). "TTC Subway, Light Rail and Streetcar Map". Toronto Transit Commission.
- Reporter, Sheila Wang Investigative. (September 19, 2023). "TTC won't meet Ontario's 2025 accessibility deadline, staff report says".
- (March 7, 2017). "STM Metro accessibility plan will mean more elevators, ramps". Canadian Broadcasting Corporation.
- "All Stations Accessibility Program (ASAP)".
- Gold, Michael. (June 22, 2022). "New York's Subway System Vows to Be 95 Percent Accessible by 2055". The New York Times.
- "Accessibility".
- (July 12, 2010). "No TTC stations meet cleanliness standard". [[CBC.ca.
- (July 14, 2010). "Subway Station Appearance Improvement Update". Toronto Transit Commission.
- "Coronavirus update".
- (February 17, 1991). "Montreal metro's masterpieces". [[Canadian Broadcasting Corporation]].
- Sell, Shawn. (September 2, 2004). "10 great places to stop for subway art". [[USA Today]].
- (September 18, 2023). "On the Toronto transit phone dispute, Montreal shows the better way". [[The Globe and Mail]].
- "TTC, BAI Canada launch free WiFi at two subway stations".
- Reserved., . All Rights. (November 26, 2013). "Two Toronto subway stations now have free Wi-Fi".
- "Wi-fi Now Available At". TCONNECT.
- "Wi-Fi expands to four more TTC subway stations".
- "Wi-Fi In Our Stations".
- "TTC, BAI Canada & WIND Mobile launch cellular service underground".
- (September 11, 2023). "Rogers ordered to open TTC wireless network to all carriers: Minister". [[Toronto Star]].
- (October 2, 2023). "Major wireless carriers now active on Toronto's subway network after months of talks". [[Toronto Star]].
- (November 17, 2023). "Rogers turns on cell service at remaining TTC subway stations for its own customers". [[Toronto Star]].
- (December 15, 2023). "Rogers reaches deal with rival carriers on TTC wireless access". [[Toronto Star]].
- (September 12, 2024). "Rogers, TTC ending free Wi-Fi in subway stations will widen 'digital divide', say critics". [[Toronto Star]].
- (December 20, 2024). "TTC sets date for when its free Wi-Fi goes offline as Rogers continues 5G rollout at subway stations". [[Toronto Star]].
- (November 23, 2015). "Eglinton Line Station Names Combined Report". Toronto Transit Commission.
- "Stop Naming Finch West LRT".
- "Stations and Stops". Metrolinx.
- (January 8, 2017). "Service Summary". [[Toronto Transit Commission]].
- (December 31, 2013). "2013 TTC Operating Statistics". [[Toronto Transit Commission]].
- (May 30, 2016). "Sheppard subway line gets new Toronto Rocket trains". [[Canadian Broadcasting Corporation]].
- "Metrolinx to buy vehicles from Bombardier competitor as backup plan for Eglinton Crosstown". CBC.
- "Citidis Spirit Light Rail Vehicle".
- Spurr, Ben. (July 20, 2016). "Metrolinx threatens legal action over late delivery of light rail vehicles". [[Toronto Star]].
- "Crosstown Infographic". [[Metrolinx]].
- Kalinowski, Tess. (March 4, 2011). "So what happened to those TTC improvements?". [[Toronto Star]].
- Tapper, Josh. (January 27, 2012). "Long-running subway car takes final journey". [[Toronto Star]].
- (December 11, 2021). "TTC 15-Year Capital Investment Plan, Real Estate Investment Plan and 2022 – 2031 Capital Budget & Plan". [[Toronto Transit Commission]].
- (October 13, 2022). "P76PH22075 – Request for Proposals For New Subway Trains". [[Toronto Transit Commission]].
- Munro, Steve. (October 20, 2022). "TTC Issues RFP For New Subway Trains". [[Steve Munro]].
- Moore, Oliver. (October 18, 2022). "Toronto's parks, transit and roads are falling apart. Can the next mayor stop their decline before it gets worse?". [[The Globe and Mail]].
- (September 17, 2019). "Ontario Line: A world of role models available for subway planners". [[Metrolinx]].
- "Contract Awarded for Ontario Line RSSOM Package".
- (2026-01-15). "Alstom to provide New Subway Train (NST) fleet for Toronto’s subway".
- "The future of TTC's Line 3 Scarborough (SRT)".
- (February 10, 2020). "SRT Life Extension Project Options Analysis". Toronto Transit Commission.
- (February 10, 2021). "TTC board votes to replace Line 3 Scarborough RT with new, express bus services as of 2023". Global News.
- Harvey, Lex. (August 24, 2023). "TTC ends Scarborough RT service permanently".
- (December 20, 2023). "Toronto near deal to sell Scarborough RT cars to Detroit".
- Rahal, Sarah. "New railcars are coming to the Detroit People Mover from Toronto".
- (29 March 2022). "Full fleet of Crosstown LRT vehicles testing new route".
- Spurr, Ben. (May 13, 2017). "How do TTC's streetcar options compare? It's Bombardier versus Alstom". [[Toronto Star]].
- "Stations and Stops". [[Metrolinx]].
- (April 28, 2015). "Request for Information (RFI) For Rail Milling Services RFI No. R31CA15135". [[Toronto Transit Commission]].
- (November 20, 2014). "TTC signal solution promises subway relief someday — but for now, it's more delays".
- (February 8, 2014). "Driverless Toronto needs driverless trains: James".
- (September 29, 2022). "TTC's Line 1 now running on an ATC signalling system". [[Toronto Transit Commission]].
- (May 5, 2009). "Alstom lands CBTC contract in Toronto". Simmons-Boardman Publishing Inc..
- (December 18, 2017). "Alstom's signalling system equips Toronto subway extension".
- (April 27, 2020). "Line 1: Vaughan Metropolitan Centre to Pioneer Village single-track operation April 27 to 30". [[Toronto Transit Commission]].
- "Line 1 (Yonge-University)–Wilson to Lawrence West single track operation June 4 and 5 – REVISED". [[Toronto Transit Commission]].
- "Service alerts". [[Toronto Transit Commission]].
- Spurr, Ben. (November 6, 2017). "TTC test of new signalling system 'exceeded expectations'". [[Toronto Star]].
- (September 17, 2019). "Ontario Line: A world of role models available for subway planners". [[Metrolinx]].
- Munro, Steve. (June 17, 2013). "Metrolinx Announces Design Changes and Public Meetings on Eglinton LRT (Update 8)". Steve Munro.
- "Frequently Asked Questions About Toronto's Streetcars". Transit Toronto.
- (June 25, 2015). "The Greenwood Subway Yards". Transit Toronto.
- (January 6, 2010). "Transit City measures up to international standard". [[Toronto Star]].
- (May 24, 2017). "Keele Yard reopens to operation". [[Toronto Transit Commission]].
- "Expropriation of 30 Newbridge Road and 36 North Queen Street" (PDF). ''City of Toronto''. April 18, 2018.
- "Security features". Toronto Transit Commission.
- "What to do in an emergency". Toronto Transit Commission.
- Spurr, Ben. (April 18, 2022). "What you should do if you find yourself in the path of a TTC subway train". [[Toronto Star]].
- Spurr, Ben. (June 19, 2018). "Subway death renews calls for TTC to install platforms barriers". [[Toronto Star]].
- (May 31, 2022). "Metrolinx enhances platform safety on Eglinton Crosstown LRT". [[Metrolinx]].
- (March 20, 2009). "TTC and Toronto EMS place more paramedics in Toronto's subway system". Toronto Transit Commission.
- (September 12, 2023). "TTC improves access to naloxone to prevent and respond to opioid overdose". [[Toronto Transit Commission]].
- (July 10, 2008). "Procurement Authorization – Wilson Carhouse Expansion – Toronto Rocket – Contract C1-34". Toronto Transit Commission.
- Spurr, Ben. (April 10, 2019). "Ford promises $10.9-billion Ontario Line will be built by 2027 — leaving experts, politicians looking for details". [[Toronto Star]].
- (April 10, 2019). "Doug Ford commits $11.2B for 4 major GTA transit projects, including new 'Ontario Line'". [[CBC News]].
- (December 17, 2020). "$11-billion Ontario Line may not open until 2030, three years later than Ford's initial promise". Toronto Star.
- (March 27, 2022). "Ford, Tory break ground on new Ontario Line, promise support to impacted businesses".
- (December 3, 2019). "A subway connection is in the works for Pearson Airport | inTheHammer".
- "Ontario scales back on proposed Yonge subway extension". [[The Globe and Mail]].
- (July 16, 2021). "Clark Station to be included as fourth stop on Yonge North Subway Extension". Metrolinx.
- Spurr, Ben. (June 2, 2016). "Yonge subway extension to York Region takes step forward". [[Toronto Star]].
- (June 2, 2020). "StackPath".
- (June 24, 2014). "Toronto Transit Commission Report No. ?? – Scarborough_Subway_Extension_Update". [[Toronto Transit Commission]].
- (July 4, 2014). "A Scarborough Subway: Do the Numbers Add Up?". [[The Globe and Mail]].
- Spurr, Ben. (January 11, 2017). "Scarborough subway report delayed . . . again". [[Toronto Star]].
- "Metrolinx: For a Greater Region – Scarborough Subway Extension".
- "Attachment 5 – Assessment of Provincial Proposals Line 2 East Extension".
- "What you need to know about Doug Ford's contentious plan for transit in the GTA". CBC News.
- (May 2023). "Eglinton East Light Rail Transit (EELRT)–Functional (10%) Design Phase".
- "2018–2022 TTC Corporate Plan".
- (January 27, 2020). "StackPath".
- (August 22, 2017). "5 unbuilt projects that could have changed Mississauga | inSauga".
- Moore, Oliver. (January 29, 2016). "City proposes Queen Street route for Toronto's downtown relief line". [[The Globe and Mail]].
- Hertz, Barry. (September 4, 2008). "New subway line still a way's off, Metrolinx head says". [[National Post]].
- Vincent, Donovan. (January 29, 2009). "City favours relief line over subway". [[Toronto Star]].
- Spurr, Ben. (June 18, 2019). "TTC hits pause on relief line work amid provincial transit plans". [[Toronto Star]].
- Fox, Chris. (April 27, 2015). "Construction on Finch West LRT to begin in 2016 but Sheppard East LRT on hold". [[CP24]].
- (June 22, 2015). "Procurement Authorization Amendment To Modify Four Toronto Rocket Train Sets for Service on Line 4". [[Toronto Transit Commission]].
- "Toronto Rocket unveiled".
- (December 16, 2019). "TTC 15-Year Capital Investment Plan & 2020 – 2029 Capital Budget & Plan". [[Toronto Transit Commission]].
- "New Subway Train Public Engagement". [[Toronto Transit Commission]].
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Toronto subway — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.