Skip to content
Surf Wiki
Save to docs
general/procurement

From Surf Wiki (app.surf) — the open knowledge base

Supplier-furnished equipment


In aviation, when an aircraft is built and delivered, it will come with supplier-furnished equipment (SFE): materials and parts provided by the manufacturer.

The opposite of SFE is buyer-furnished equipment (BFE), which is purchased by the buyer and given to the aircraft manufacturer to be installed before delivery by the manufacturer. BFE includes preferred galley equipment (ovens for example). In many cases, the aircraft is designed to accommodate BFE during the initial engineering phase.

In contrast is buyer-installed equipment (BIE). BIE is when provision is made for specific equipment the buyer will buy and install- e.g., first aid kits and life vests.

References

Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Supplier-furnished equipment — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report