From Surf Wiki (app.surf) — the open knowledge base
STS-71
1995 American crewed spaceflight to Mir
1995 American crewed spaceflight to Mir
| Field | Value |
|---|---|
| name | STS-71 |
| names_list | Space Transportation System-71 |
| image | Atlantis docked to MIR - GPN-2000-001315.jpg |
| image_caption | Atlantis docked to Mir, photographed from the departing Soyuz-TM spacecraft Uragan |
| insignia | Sts-71-patch.png |
| spacecraft | |
| mission_type | Shuttle-Mir |
| operator | NASA |
| COSPAR_ID | |
| SATCAT | |
| orbits_completed | 153 |
| distance_travelled | 4100000 mi |
| mission_duration | 9 days, 19 hours, 23 minutes, 9 seconds |
| payload_mass | 12191 kg |
| launch_site | Kennedy, LC-39A |
| launch_date | UTC |
| landing_date | UTC |
| landing_site | Kennedy, SLF Runway 15 |
| crew_size | 7 up |
| 8 down | |
| crew_members | |
| crew_launching | |
| crew_landing | |
| crew_photo | STS-71_crew.jpg |
| crew_photo_caption | Left to right – Seated: Dezhurov, Gibson, Solovyev; Standing: Thagard, Strekalov, Harbaugh, Baker, Precourt, Dunbar, Budarin |
| docking | {{Infobox spaceflight/Dock |
| docking_target | Mir |
| docking_type | dock |
| docking_port | Kristall forward |
| docking_date | June 29, 1995, 13:00:16 UTC |
| undocking_date | July 4, 1995, 11:09:42 UTC |
| time_docked | 4 days, 22 hours, 9 minutes 26 seconds |
| apsis | gee |
| orbit_reference | Geocentric |
| orbit_regime | Low Earth |
| orbit_periapsis | 342 km |
| orbit_apoapsis | 342 km |
| orbit_period | 88.9 min |
| orbit_inclination | 51.6 degrees |
| programme | Space Shuttle program |
| previous_mission | STS-67 (68) |
| next_mission | STS-70 (70) |
8 down As the third mission of the US/Russian Shuttle-Mir Program, STS-71 became the first Space Shuttle to dock with the Russian space station Mir. STS-71 began on June 27, 1995, with the launch of Space Shuttle Atlantis from launchpad 39A at the Kennedy Space Center in Florida. The Shuttle delivered a relief crew of two cosmonauts Anatoly Solovyev and Nikolai Budarin to the station and recovered Increment astronaut Norman Thagard. Atlantis returned to Earth on July 7 with a crew of eight. It was the first of seven straight missions to Mir flown by Atlantis, and the second Shuttle mission to land with an eight-person crew after STS-61-A in 1985.
During the five days the Shuttle was docked to Mir, the combined spacecraft became the largest in orbit at the time. STS-71 marked several key achievements: it was the first Shuttle docking with a space station, the first crew exchange between a Shuttle and a station, and the 100th crewed space launch by the United States. The mission carried Spacelab and provided logistical resupply for Mir. The joint US/Russian crews conducted various life science investigations using Spacelab and performed the Shuttle Amateur Radio Experiment-II (SAREX-II).
Crew
Flight Engineer
Crew seat assignments
| Seat | Launch | Landing | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
|---|---|---|---|---|---|---|---|---|---|---|
| [[File:Space Shuttle seating plan.svg | 150px]] | |||||||||
| Seats 1–4 are on the flight deck. | ||||||||||
| Seats 5–8 are on the mid-deck. | ||||||||||
| Seat 8 was located to the starboard (right) side of Seat 7. | ||||||||||
| Gibson | ||||||||||
| Precourt | ||||||||||
| Baker | ||||||||||
| Harbaugh | ||||||||||
| Dunbar | ||||||||||
| Solovyev | Strekalov | |||||||||
| Budarin | Dezhurov | |||||||||
| Thagard |
Mission highlights
The primary objectives of this flight were to rendezvous and perform the first docking between the Space Shuttle and the Russian Space Station Mir on June 29. In the first U.S.-Russian (Soviet) docking in twenty years, Atlantis delivered a relief crew of two cosmonauts Anatoly Solovyev and Nikolai Budarin to Mir.
Other prime objectives were on-orbit joint United States of America-Russian life sciences investigations aboard SPACELAB/Mir, logistical resupply of the Mir and recovery of US astronaut Norman E. Thagard.
Secondary objectives included filming with the IMAX camera and the Shuttle Amateur Radio Experiment-II (SAREX-II) experiment.
STS-71 was the 100th U.S. human space launch conducted from Cape Canaveral, the first U.S. Space Shuttle-Russian Space Station docking and joint on-orbit operations; largest spacecraft ever in orbit; and the first on-orbit changeout of Shuttle crew.
The rendezvous sequence began at 15:32:19 EDT with a lift-off in-plane with Mir's orbit, at the opening of the 10 minute 19 second launch window. Ascent was nominal with no OMS 1 burn required. Almost three hours later the orbit was raised to more typical values of 210 x 159 nautical miles by the OMS 3 burn.
Docking occurred at 9 am EDT, June 29, using R-Bar or Earth radius vector approach, with Atlantis closing in on Mir from directly below. R-bar approach allows natural forces to brake the orbiter's approach more than would occur along standard approach directly in front of the space station; also, an R-bar approach minimizes the number of orbiter jet firings needed for approach. The manual phase of the docking began with Atlantis about a half-mile (800 m) below Mir, with Gibson at the controls on aft flight deck. Stationkeeping was performed when the orbiter was about 75 m from Mir, pending approval from Russian and U.S. flight directors to proceed. Gibson then maneuvered the orbiter to a point about 10 m from Mir before beginning the final approach to station. Closing rate was close to the targeted 0.1 foot per second (30 mm/s), being approximately 0.107 foot per second (33 mm/s) at contact. Interface contact was nearly flawless: less than 25 mm lateral misalignment and an angular misalignment of less than 0.5 degrees per axis. No braking jet firings had been required. Docking occurred about 216 nautical miles (400 km) above Lake Baikal region of the Russian Federation. The Orbiter Docking System (ODS) with Androgynous Peripheral Docking System served as the actual connection point to a similar interface on the docking port on Mir's Kristall module. ODS, located in the forward payload bay of Atlantis, performed flawlessly during the docking sequence.
When linked, Atlantis and Mir formed the largest spacecraft ever in orbit, with a total mass of about 225 metric tons (almost one-half million pounds), orbiting some 218 nautical miles (404 km) above the Earth. After hatches on each side opened, STS-71 crew passed into Mir for a welcoming ceremony. On the same day, the Mir 18 crew officially transferred responsibility for the station to the Mir 19 crew, and the two crews switched spacecraft.

For the next five days, about 100 hours in total, joint U.S.-Russian operations were conducted, including biomedical investigations, and transfer of equipment to and from Mir. Fifteen separate biomedical and scientific investigations were conducted, using the Spacelab module installed in the aft portion of Atlantiss payload bay, and covering seven different disciplines: cardiovascular and pulmonary functions; human metabolism; neuroscience; hygiene, sanitation and radiation; behavioral performance and biology; fundamental biology; and microgravity research. The Mir 18 crew served as test subjects for investigations. Three Mir 18 crew members also carried out an intensive programme of exercise and other measures to prepare for re-entry into gravity environment after more than three months in space.
Numerous medical samples as well as disks and cassettes were transferred to Atlantis from Mir, including more than 100 urine and saliva samples, about 30 blood samples, 20 surface samples, 12 air samples, several water samples and numerous breath samples taken from Mir 18 crew members. Also moved was a broken Salyut-5 computer. Transferred to Mir were more than 450 kg of water generated by the orbiter for waste system flushing and electrolysis; specially designed spacewalking tools for use by the Mir 19 crew during a spacewalk to repair a jammed solar array on the Spektr module; and transfer of oxygen and nitrogen from Shuttle's environmental control system to raise air pressure on the station, to improve Mirs consumables margin.

The spacecraft undocked on July 4, following a farewell ceremony, with the Mir hatch closing at 3:32 pm EDT. July 3 and hatch on Orbiter Docking System shut 16 minutes later. Gibson compared separation sequence to a "cosmic" ballet: Prior to the Mir-Atlantis undocking, the Mir 19 crew temporarily abandoned station, flying away from it in their Soyuz spacecraft so they could record images of Atlantis and Mir separating. Soyuz unlatched at 6:55 am EDT, and Gibson undocked Atlantis from Mir at 7:10 am EDT. Whilst both spacecraft were undocked from Mir, the station suffered a computer malfunction and started to drift in attitude. The Mir 19 crew performed a hasty re-docking, monitored by Atlantis. They subsequently replaced computer hardware allowing them to regain attitude control.
The returning crew of eight equaled the largest crew (STS-61-A, October 1985) in Shuttle history. To ease their re-entry into gravity environment after more than 100 days in space, Mir 18 crew members Thagard, Dezhurov and Strekalov lay supine in custom-made recumbent seats installed prior to landing in the orbiter middeck.
Inflight problems included a glitch with General Purpose Computer 4 (GPC 4), which was declared failed when it did not synchronize with GPC 1; subsequent troubleshooting indicated it was an isolated event, and GPC 4 operated satisfactorily for the remainder of mission.
During the SAREX portion of the flight, the crew contacted several schools. One was Redlands High School in Redlands, California. Charlie Precourt was able to contact students, former students and technicians that built the communications package. A cross polarized, dual band yagi antenna array and automatic rotor was installed on the roof of the electronics classroom. A dual band radio was installed inside the radio room of the classroom. The contact window lasted about 10 minutes, during which time, about twelve people were able to ask questions. While most were basic or technical questions, one was peculiar. "What would happen of you sneezed inside your helmet?" Precourt answered that you'd probably, "spray your face shield a little bit.." and carry on.
External tank
The external tank used on this mission (ET-70) was involved in a historic marine salvage court case. The tank was being delivered by barge in November 1994, when the tow vehicle encountered issues in Hurricane Gordon. Their mayday signal was picked up by the oil tanker Cherry Valley, which responded and towed the tug and its cargo to safety. Under the tradition of marine salvage, NASA offered $5 million to the crew of the tanker as a reward, but the United States Department of Justice reduced the offer to $1 million. The tanker company and crew sued and were awarded $6.4 million, believed to be the largest such award in U.S. history. This was reduced to $4.125 million on appeal. The crew split the award with their employer. At least one crew member was able to use his cut of the proceeds to buy a house, which he calls "the house that NASA bought."
References
References
- "STS-71". Spacefacts.
- (1995-06-23). "Storms threaten launch of shuttle". The Gainesville Sun.
- Brown, Irene. (1995-06-23). "Weather scrubs shuttle launch". UPI.
- Ballingrud, David. (1995-06-25). "Atlantis' launch off; will try again Tuesday". Tampa Bay Times.
- (September 1, 2011). "Space Shuttle Missions Summary". NASA.
- {{NASA. link. Dumoulin, Jim
- (1995). "STS-71 Day 1 Highlights". NASA.
- Fricke Jr.. (August 1, 1995). "STS-71 Space Shuttle Mission Report". NASA.
- {{cite court. (July 1, 1998). link
- (January 26, 2024). "Rescues at sea, and how to make a fortune". NPR.
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about STS-71 — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report