Skip to content
Surf Wiki
Save to docs
general/space-shuttle-missions

From Surf Wiki (app.surf) — the open knowledge base

STS-131

2010 American crewed spaceflight to the ISS

STS-131

2010 American crewed spaceflight to the ISS

FieldValue
nameSTS-131
imageSTS-131 Canadarm2 grapples Leonardo.jpg
image_captionCanadarm2 grapples the MPLM Leonardo in Discoverys payload bay, prior to berthing
insigniaSTS-131 patch.svg
spacecraft
mission_typeISS logistics
operatorNASA
COSPAR_ID
SATCAT
orbits_completed238
distance_travelled6232235 mi
mission_duration15days, 2hours, 47minutes, 9seconds
launch_mass4521749 lbs(total)
266864 lbs (orbiter)
landing_mass224957 lbs
launch_siteKennedy, LC-39A
launch_dateUTC
landing_dateUTC
landing_siteKennedy, SLF Runway 15
crew_size7
crew_members
crew_photoSTS-131_Official_Crew_Photo.jpg
crew_photo_captionSeated: James Dutton (left) Alan Poindexter (right), Standing (l-r): Rick Mastracchio, Stephanie Wilson, Dorothy Metcalf-Lindenburger, Naoko Yamazaki (JAXA) and Clayton Anderson
docking_targetISS
docking_typedock
docking_portPMA-2
(Harmony forward)
docking_dateApril 7, 2010, 07:44UTC
undocking_dateApril 17, 2010, 12:52UTC
time_docked10days, 5hours, 8minutes
apsisgee
orbit_referenceGeocentric
orbit_regimeLow Earth
orbit_periapsis200 mi
orbit_apoapsis215 mi
orbit_period90 minutes
orbit_inclination51.6°
programmeSpace Shuttle program
previous_missionSTS-130
next_missionSTS-132

266864 lbs (orbiter)

(Harmony forward)

STS-131 (ISS assembly flight 19A) was a NASA Space Shuttle mission to the International Space Station (ISS). launched on April 5, 2010, at 6:21 am from LC-39A, and landed at 9:08 am on April 20, 2010, on runway 33 at the Kennedy Space Center's Shuttle Landing Facility. The mission marked the longest flight for Space Shuttle Discovery and its 38th and penultimate flight.

The primary payload was a Multi-Purpose Logistics Module loaded with supplies and equipment for the International Space Station. The mission also removed and replaced an ammonia tank assembly outside the station on the S1 truss. STS-131 furthermore carried several on-board payloads; this mission had the most payloads since STS-107. It is also the last shuttle mission with a crew of 7.

Crew

Flight Engineer

  • This was the final Space Shuttle mission with a seven person crew.
  • It was the final Space Shuttle crew with any "rookie" astronauts; all of the remaining missions would have all-veteran crews.
  • The launch was the last shuttle mission to take place at night.
  • STS-131 was the third and last mission in the Space Shuttle program with three female astronauts. STS-40 and STS-96 were the first two.
  • STS-131 marked the first time two Japanese astronauts, Naoko Yamazaki from the shuttle crew and Soichi Noguchi on the ISS, were in space together.
  • Expedition 23 Flight Engineer Tracy Caldwell Dyson was on the ISS at the time. This made STS-131 the first time four women have been in space at once.
  • Naoko Yamazaki was the last Japanese astronaut to fly on the Space Shuttle.

Crew seat assignments

title=STS-131url=https://spacefacts.de/mission/english/sts-131.htmurl-status=livearchive-url=https://web.archive.org/web/20250808201553/https://spacefacts.de/mission/english/sts-131.htmarchive-date=August 8, 2025access-date=April 25, 2024work=Spacefacts.de }}LaunchLanding1234567
[[File:Space Shuttle seating plan.svg150px]]
Seats 1–4 are on the flight deck.
Seats 5–7 are on the mid-deck.
Poindexter
Dutton
MastracchioAnderson
Metcalf-Lindenburger
Wilson
Yamazaki
AndersonMastracchio

Mission payload {{anchor|Mission payload}}

Multi-Purpose Logistics Module ''Leonardo''

The primary payload of STS-131 was the Multi-Purpose Logistics Module (MPLM) Leonardo. The MPLM was filled with food and science supplies for the International Space Station (ISS). The MPLM also carried the third and final Minus Eighty Degree Laboratory Freezer for ISS (MELFI), Window Orbital Research Facility (WORF), one Crew Quarters Rack, the Muscle Atrophy Resistive Exercise (MARES) rack, Resupply Stowage Racks (RSRs), and Resupply Stowage Platforms (RSPs).

Lightweight Multi-Purpose Equipment Support Structure Carrier

The Lightweight Multi-Purpose Equipment Support Structure Carrier (LMC) carried a refurbished Ammonia Tank Assembly (ATA) to the ISS. The refurbished ATA was removed from the Space Station and returned for use on this mission during STS-128. It was swapped with an empty tank which will ride home on the LMC.

LMC with ATAs STS-131. Note that the MISSE-6 FSE return was deferred to STS-133.
LocationCargoMass
Bays 1–2Orbiter Docking System
EMU 3008 / EMU 30171800 kg
~260 kg
Bay 4PShuttle Power
Distribution Unit (SPDU)~18 kg
Bay 7SROEU 751A umbilical127 kg
Bays 7–12Leonardo (MPLM FM-1)12371 kg
Bay 13Lightweight MPESS Carrier (LMC)1764 kg
Starboard SillOrbiter Boom Sensor System382 kg
Port SillCanadarm410 kg
Total:15332 kg

TriDAR

This mission was the second flight of the TriDAR, a 3D dual-sensing laser camera, intended for potential use as an autonomous rendezvous and docking sensor. TriDAR provides guidance information that can be used to guide a vehicle during rendezvous and docking operations in space. TriDAR does not rely on any reference markers, such as reflectors, positioned on the target spacecraft. To achieve this, it relies on a laser based 3D sensor and a thermal imager. Geometric information contained in successive 3D images is matched against the known shape of the target object to calculate its position and orientation in real-time. The TriDAR tracked the ISS position and orientation from the shuttle during docking, undocking, and flyaround operations.

Mission milestones

The first time four women were in space at the same time.
  • 162nd NASA crewed space flight
  • 131st shuttle mission since STS-1
  • 38th flight of Discovery
  • 33rd shuttle mission to the ISS
  • 106th post-Challenger mission
  • 18th post-Columbia mission
  • 35th and last night launch of a shuttle, 22nd night launch from launch pad 39A
  • 2nd "descending node" entry since 2003

Shuttle processing

Space Shuttle Discovery was moved from its hangar in the Orbiter Processing Facility (OPF) 3 to the nearby Vehicle Assembly Building (VAB) on February 22, 2010. The rollover was completed around 10:30 EST. According to NASA, the rollover occurred a day earlier than announced to take advantage of favorable weather in advance of poor conditions forecasted on the next day.

An earlier plan to move Discovery into the VAB on February 12, 2010, was delayed because of cold weather at the Kennedy Space Center. For the rollover, temperatures in the VAB had to be above 45 F for more than twelve hours because Discovery was not attached to any heating purges to protect its systems from potential damage from the cold.

Space Shuttle Discovery began its trip, known as the rollout, to LC-39A at 23:58 EST on March 2, 2010. The complete shuttle stack and mobile launcher platform were secured to the LC-39A structure at 6:49 EST on March 3, 2010. The 3.4 mi trek took 6 hours 51 minutes to complete. The rollout was delayed 24 hours by the threat of lightning from a passing cold front. That weather moved away, and the stiff wind gusts blowing on Florida's Space Coast on the next day were not a factor for the rollout. Ahead of the rollout, engineers noticed some damage caused by birds to the External Tank (ET-135), which was repaired inside the VAB. Birds had managed to reach the tank, and pecked away at the Thermal Protection System (TPS) foam. Image:STS131_Discovery_rollover3.jpg|Space Shuttle Discovery rolls toward the Vehicle Assembly Building. Image:STS-131_Discovery_Rollout_6.jpg|Space Shuttle Discovery at Launch Pad 39A. Image:STS131_ISS_Moon_Cape.JPG|International Space Station (bottom right) passes over the Cape 15 minutes prior to launch.

Mission timeline

April 5 (Flight Day 1 – Launch)

Discovery lifted off successfully at 06:21 EDT, marking this launch as the last night launch in the Space Shuttle program. After the 8 1/2-minute ride to space, ''Discovery'''s seven person crew began configuring the orbiter from a launch vehicle to an orbital vehicle. Commander Alan Poindexter and pilot Jim Dutton, with help from mission specialist 2 Dorothy Metcalf-Lindenburger, also performed a series of engine firings or burns to adjust their speed and refine their path to the International Space Station. While the engine burns were going on, the rest of the crew opened the payload bay doors, set up the computers and Ku band antenna. The antenna suffered a failure during normal checkout and setup on orbit. Due to the failure, the normal downlink of imagery of the external tank was not completed. The crew on board will monitor the inspections of the thermal protection system (TPS) in real time and will note any spots of interest and let the ground know while downlinking the imagery after docking. The dish antenna also serves as a radar antenna, measuring the distance to the space station. File:Ku Band Antenna.jpg|The failed Ku band dish antenna File:STS-131 launching 1.jpg|Discovery lifts off Launch Pad 39A File:STS-131 launch video.ogg|Launch video (9 min 55 secs)

April 6 (Flight Day 2 – Inspections)

The seven person crew of STS-131 was awakened to begin their first full day in space on Flight Day 2. Due to the lack of Ku-band communication, changes to the crews daily plan were read up for them to write out. After their post sleep activities, commander Alan Poindexter and pilot Jim Dutton fired *Discovery'''s Orbital Maneuvering System (OMS) engines to correct and further refine the shuttle's path to the ISS. Astronauts Naoko Yamazaki and Dorothy Metcalf-Lindenburger began activating and checking out the Shuttle Remote Manipulator System (SRMS) also known as the Canadarm. While Metcalf-Lindenburger and Yamazaki were working with Canadarm, Stephanie Wilson was getting equipment together and set up to record the inspections of the shuttle's heat shield. The inspections were recorded so they could be downlinked to the ground once docked to the ISS. Once all that work was done, commander Poindexter and pilot Dutton joined Metcalf-Lindenburger, Yamazaki, and Wilson to conduct the inspection of the shuttle's heat shield. While the inspection was going on, Rick Mastracchio and Clayton Anderson were on the mid-deck of *Discovery'' checking out the Extravehicular Mobility Units (EMU) and getting them ready for their three spacewalks. The last portion of the crew day was spent preparing and checking out all of the tools used during rendezvous.

April 7 (Flight Day 3 – Docking)

Space Shuttle Discovery successfully docked with the space station at 07:44 UTC (03:44 EDT) on April 7, 2010, as the two spacecraft sailed 220 miles above the Caribbean. The crew performed six successful engine firings to set up the on-time docking. Prior to docking commander Poindexter guided Discovery through the standard Rendezvous Pitch Maneuver (RPM). Station commander Oleg Kotov and flight engineer T.J. Creamer took more than 350 photos of *Discovery'''s heat shield. Once *Discovery'' docked to the International Space Station (ISS), a series of leak checks were done on both sides of the hatch by the shuttle and station crews. The hatches between the two vehicles were opened at 09:11 UTC (05:11 EDT), which was 30 minutes earlier than planned. Once the hatches were opened the STS-131 crew got a safety briefing from the station crew, then began to transfer items that would be needed for later in the day and early on flight day 4. Two items that were transferred were the two EMUs that will be used for the three spacewalks. The crew also completed a grapple of the Orbiter Boom Sensor System (OBSS) with the Space Station Remote Manipulator System (SSRMS) also known as Canadarm2. Once the OBSS was grappled it was unberthed from the starboard sill of the space shuttle payload bay, and handed off to the SRMS. Throughout the day, after docking to the station, the shuttle crew began downlinking all of the inspection video from flight day 2, and launch imagery and video.

Image:Aft Portion Of Discovery Including Three Main Engines During RPM.jpg|Aft portion of Discovery, including the three main engines, during the RPM. Image:STS 131 RPM.jpg|View of the underside of the crew cabin of Discovery during the RPM. Image:STS-131 Discovery approaches ISS for docking.jpg|Discovery approaches the Space Station for docking. Image:Kibo STS 131.jpg|Kibo, photographed by a crew member while Discovery was docked with the station.

April 8 (Flight Day 4 – MPLM ingress)

On flight day 4, Stephanie Wilson and Naoko Yamazaki grappled and berthed the Multi-purpose Logistics Module (MPLM) Leonardo. The MPLM was berthed to the station at 04:24 UTC (00:24 EDT). The hatches were opened by station flight engineer Soichi Noguchi and shuttle mission specialist Clayton Anderson at 11:58 UTC (07:58 EDT). The joint STS-131/Expedition 23 crews began transferring cargo from the MPLM, with the first item being a Rate Gyro Assembly (RGA) which will be replaced on the first spacewalk of the mission. During flight day 4, commander Alan Poindexter did several in-flight interviews. Commander Poindexter was joined by mission specialists Rick Mastracchio and Stephanie Wilson. The interviews were with the Tom Joyner Radio Show, WVIT-TV and Fox News Radio. At the end of the day, Mastracchio and Anderson entered the Quest airlock and begin breathing pure oxygen for an hour, while the atmospheric pressure inside the airlock was lowered to 10.2 psi. This procedure is known as the pre-breathe protocol and is done before every spacewalk, to purge nitrogen from the blood stream and prevent decompression sickness. File:Stephanie Wilson and Naoko Yamazaki in the Cupola.jpg|Stephanie Wilson and Naoko Yamazaki in the Cupola. File:Stephanie Wilson STS-131 mission specialist in US lab.jpg|Wilson in the US lab File:STS-131 Soichi Noguchi, Stephanie Wilson and Naoko Yamazaki.jpg|Robotic workstation File:Stephanie Wilson inside the Japanese Experiment Module.jpg|The crew sorting out blueprints in the Japanese Experiment Module File:ISS cupola with Stephanie Wilson.jpg|Wilson relaxing in the Cupola

April 9 (Flight Day 5 – EVA 1)

Flight day 5 saw the completion of the first spacewalk by Rick Mastracchio and Clayton Anderson. The pair released the new ammonia tank assembly for transfer to station for installation on a later spacewalk. They also removed an experiment from outside on the Kibo Exposed Facility, replaced a Rate Gyro Assembly (RGA) and performed several get-ahead tasks. The spacewalking pair was assisted by the SSRMS which was operated by pilot Jim Dutton and mission specialist Stephanie Wilson. While the spacewalk took place, Naoko Yamazaki was assisted by commander Alan Poindexter, and the Expedition 23 crew to move several of the large science racks from the MPLM Leonardo to their new location on the ISS. File:STS-131 first spacewalk highlights.ogg|Highlights from the first spacewalk (21 mins 43 secs). Image:Mastracchio During STS-131 EVA 1.jpg|Mastracchio during EVA 1. File:STS-131 Metcalf-Lindenburger, Poindexter, Wilson, Yamazaki at Kibo.jpg|The crew enjoying time off

April 10 (Flight Day 6 – Transfers)

Flight day 6 was dedicated to transferring supplies from the MPLM Leonardo and the Space Shuttle mid-deck. The crews transferred the Windows Observational Research Facility (WORF) to the Destiny lab. Mission specialist Naoko Yamazaki, along with flight engineer Soichi Noguchi also transferred the Express Rack 7 (ER7) to its final location. During the crews morning, a smoke alarm sounded in the Russian segment of the station, which prompted the joint crew to move into emergency procedures. However the alarm was false and was cleared within a couple of minutes and all normal work resumed. Mission specialists Clay Anderson, Rick Mastracchio and Stephanie Wilson conducted in-flight interviews with Nebraska Public Radio, CBS Newspath and Radio Network and KETV-TV in Omaha, Nebraska. Later in the day commander Alan Poindexter, pilot Jim Dutton and mission specialist Dorothy Metcalf-Lindenburger talked with students at the Naval Postgraduate School in Monterey, California. At the end of the crews work day, the joint crew got together and reviewed the procedures for the second spacewalk. After the procedures review spacewalkers Clay Anderson and Rick Mastracchio entered the Quest airlock, closed the hatch and lowered the inside pressure to 10.2 psi. The pair also breathed pure oxygen for an hour while the pressure was being lowered. File:STS-131 Flight Day 6 highlights.ogv|Flight Day 6 highlights (19 minutes 58 seconds). Image:STS-131_Dorothy_Metcalf-Lindenburger_in_the_Leonardo_MPLM.jpg|Dorothy Metcalf-Lindenburger inside the MPLM Leonardo. File:255-STS-s131e008502.jpg|Stephanie Wilson with technical blueprints in Node 1

April 11 (Flight Day 7 – EVA 2)

On flight day 7, astronauts Clay Anderson and Rick Mastracchio performed their second spacewalk of the STS-131 mission. Mastracchio and Anderson exited the airlock at 05:30 UTC, a full 45 minutes ahead of the planned time, and spent 7 hours and 26 minutes outside the ISS. The pair removed the old Ammonia Tank Assembly (ATA) from the S1 truss and installed the new ATA. Anderson and Mastracchio ran into a small problem when one of the four bolts that holds the tank in place wouldn't turn. They loosened the other three and tried them all again and the fourth bolt was successfully tightened. The two spacewalkers helped guide the SSRMS to temporarily stow the old ATA on the truss structure. The new ATA had its electrical connections made, but the fluid connections were deferred until the third spacewalk since the EVA was behind the time-line. Mastracchio and Anderson also installed two radiator grapple fixture stowage beams on the P1 truss. While Anderson and Mastracchio were outside, members of the STS-131 crew continued transferring items from Space Shuttle Discoverys mid-deck and the MPLM Leonardo. Overall, the crew had completed about half of the transfer work. File:STS-131 second spacewalk highlights.ogg|Highlights from the second spacewalk (23 mins 54 secs) File:STS-131 group pose with Stephanie Wilson in Cupola.jpg|Group photo while in the cupola observing the EVA Image:Mastracchio During STS-131 EVA 2.jpg|Mastracchio during EVA 2.

April 12 (Flight Day 8 – Off duty)

Astronaut Clayton Anderson playing with a water bubble.

The joint STS-131/Expedition 23 crews had the morning off on flight day 8. After their morning off the crews continued their transfer activities, which are more than seventy percent complete. The crews also conducted several PAO events, including VIP events with Roscosmos, Russian president Dmitry Medvedev, RSC Energia, the Japanese Aerospace Exploration Agency (JAXA), Japanese students, astronaut Mamoru Mohri, and Japanese dignitaries. Later, commander Alan Poindexter, pilot Jim Dutton, and mission specialists Dorothy Metcalf-Lindenburger and Stephanie Wilson participated in an in-flight interview with several American media outlets including Fox News, ABC World News, and MSNBC. While the PAO events took place, Rick Mastracchio and Clay Anderson were preparing the spacesuits and tools they will use for the third and final spacewalk. Later in the day the pair will have a procedures review with other members of the ISS and shuttle crews. After the review, they will enter the airlock, close the hatch and lower the pressure to 10.2 psi and breathe pure oxygen for their campout.

April 13 (Flight Day 9 – EVA 3)

On flight day 9, Rick Mastracchio and Clay Anderson completed the third and final spacewalk of the STS-131 mission. Their tasks included hooking up the ammonia and nitrogen lines to the new Ammonia Tank Assembly (ATA), installing the old ATA in the shuttle's payload bay, retrieving some Micro-Meteoroid Orbital Debris (MMOD) shields, bolting a grapple bar (which had been removed from the old ATA) onto the new ATA, and preparation of some cables on the Z1 truss and tools to be used during STS-132. During the installation of the old ATA in ''Discovery'''s payload bay, the spacewalkers had some problems securing a bolt on the ATA to the LMC. The spacewalk took 6 hours and 24 minutes, bringing the total EVA time to 20 hours and 19 minutes. While the EVA was going on, commander Alan Poindexter and mission specialist Naoko Yamazaki continued transferring items from the MPLM to the ISS. Transfer is more than seventy-five percent complete. File:STS-131 Flight Day 9 highlights.ogg|Highlights from flight day 9 (38 mins 14 secs). Image:Mastracchio & Anderson Working In Discovery's Aft Payload Bay During STS 131 EVA 3.jpg|Mastracchio and Anderson working in Discoverys aft payload bay during EVA 3. Image:STS-131_EVA3_Clayton_Anderson_3.jpg|Clayton Anderson during EVA 3. File:STS-131 Stephanie Wilson and James Dutton at robotic workstation.jpg|Stephanie Wilson and James Dutton in the US lab robotic workstation area

April 14 (Flight Day 10 – Final transfers/off duty)

The crew of STS-131 continued with transfer activities on the morning of flight day 10. The morning was devoted largely to transferring items to the MPLM Leonardo. There are only a few items awaiting transfer to Space Shuttle Discoverys mid-deck left. The crew enjoyed an hour long mid-day meal with the Expedition 23 crew. The entire joint crew took part in a crew photo, which was followed by a joint crew news conference with U.S., Russian and Japanese media. Later in the day, commander Alan Poindexter, mission specialists Dorothy Metcalf-Lindenburger, Stephanie Wilson, and Clayton Anderson took time out to talk with students from Eastern Guilford High School in Gibsonville, North Carolina and with third and fourth graders from that school district. The majority of the crews afternoon was spent off duty.

Image:STS131_Naoko_Yamazaki_Apr14.jpg|Naoko Yamazaki eats a snack in the Kibo laboratory. Image:STS-131 & Expedition 23 Group Portrait.jpg|STS-131 and Expedition 23 crew members gather for a group portrait.

April 15 (Flight Day 11 – MPLM unberthing)

On flight day 11, the MPLM Leonardos hatches were closed at 07:38 UTC (03:38 EDT) and the MPLM was unberthed from the nadir or Earth facing port of the Harmony node at 20:24 UTC (16:24 EDT). It was placed in a low hover, about 3 ft above Shuttle Discoverys payload bay. This was done because the MPLM was unberthed from Harmony later than planned. The delay in unberthing was caused by a set of bolts on the Common Berthing Mechanism (CBM) getting stuck due to a broken pin. The crew will finish putting Leonardo in the payload bay on flight day 12, prior to the docked late inspection. The crews conducted some transfer operations between the ISS and shuttle mid-deck, which brings the overall transfer operations to ninety-four percent complete for the mission.

April 16 (Flight Day 12 – Late inspection)

The MPLM ''Leonardo'' secured in ''Discovery''{{'}}s payload bay.

On flight day 12, the crew of Space Shuttle Discovery secured the MPLM Leonardo in the payload bay for return to Earth. Mission specialist Dorothy Metcalf-Lindenburger activated the latches to secure Leonardo in the payload bay at 07:15 UTC (03:15 EDT). After Leonardo was secured, Metcalf-Lindenburger, pilot Jim Dutton began the late inspection of Discoverys heat shield. The pair were joined by commander Alan Poindexter and mission specialist Naoko Yamazaki to complete the inspection of the shuttle's Reinforced Carbon-Carbon (RCC) panels on the wings and nose and the heat-resistant tiles. The scan, which takes about 7 hours, was completed 3 hours ahead of schedule, and it was done while still docked to the International Space Station (ISS) due to the loss of the shuttle's Ku-Band antenna.

April 17 (Flight Day 13 – Undocking)

Space Shuttle Discovery successfully undocked from the International Space Station (ISS) at 12:52 UTC (08:52 EDT). Discovery was docked to the ISS for 10 days, 5 hours, and 8 minutes. After Discovery departed from the ISS, pilot Jim Dutton took control of the shuttle and performed a fly around of the space station. The undocking was preceded by a farewell ceremony, where shuttle commander Alan Poindexter and station commander Oleg Kotov said farewells on behalf of their crews. After undocking the shuttle crew stowed the Orbiter Boom Sensor System (OBSS) and the Shuttle Remote Manipulator System (SRMS) since they will not be needed for the rest of the flight. The crew was also informed that Discoverys heat shield was cleared for re-entry into Earth's atmosphere.

File:STS-131 ISS flyaround.ogg|Space Shuttle Discovery flies around the ISS after undocking (44 mins 7 secs). File:STS-131 Discovery separates from the ISS.jpg|Discovery separates from the Space Station. Image:STS 131 Post-Undocking Relative Separation.jpg|The underside of Discovery soon after post-undocking relative separation. Image:ISSpoststs131.jpg|ISS seen from Discovery after undocking.

April 18 (Flight Day 14 – Landing prep)

On flight day 14, the crew of Space Shuttle Discovery began their final preparations for landing. The crew packed and stowed away items they no longer need for the rest of the flight. Throughout the day, commander Alan Poindexter and pilot Jim Dutton completed a series of checkouts of flight systems. These checks include 2 firings of the Reaction Control System (RCS) jets and a test of the Flight Control System (FCS). Once those checkouts were complete the pair began doing communications checkouts with the Merritt Island tracking station and tracking stations at the White Sands Space Harbor in New Mexico and Dryden Flight Research Center at Edwards Air Force Base. The crew also took time out of their day to conduct an in-flight interview with WBZ-AM in Boston, Massachusetts; the Associated Press; and KEZI-TV in Eugene.

April 19 (Flight day 15 – First landing opportunity)

The crew of STS-131 awoke for flight day 15 and began their deorbit preparations. These preparations include closing the payload bay doors, activating the Flash Evaporator System (FES) and getting into their Advanced Crew Escape Suits (ACES). The crew got as far as "fluid loading", where the crew consumes a set quantity of fluids to counteract the effects of gravity, in their deorbit preps. The crew was informed of the one orbit wave off about one hour prior to the deorbit burn. After the crew was told of the wave off, they held in their procedures to see if they would be given a go for the second landing opportunity. However, they were not given a go for the second chance and the crew began backing out of their deorbit preps. Both landing chances were waved off due to bad weather at the Kennedy Space Center.

April 20 (Flight day 16 – Landing)

Space Shuttle Discovery landed at 09:08 EDT (13:08 UTC) on runway 33 at Florida's Kennedy Space Center following a two-week mission in space.{{Cite web|url=http://www.spaceflightnow.com/shuttle/sts131/100420fd16/index.html|title=Shuttle Discovery safely returns to Florida spaceport

File:STS-131 landing.ogg|Landing video (7 mins 49 secs). Image:STS 131 Touchdown.jpg|Discovery lands on runway 33 at KSC ending the STS-131 mission. Image:STS131_Ground_Track1.jpg|Flyover cities during the landing. Image:STS-131_Crew_after_landing_in_front_of_Discovery.jpg|Crew on the tarmac.

Spacewalks

At least three spacewalks were planned for this mission. The main objectives for the three EVAs were as follows:

date=April 2010title=STS-131 Mission Summaryurl=http://www.nasa.gov/pdf/435319main_STS131%20mission%20summary.pdfurl-status=deadarchive-url=https://web.archive.org/web/20100325071223/http://www.nasa.gov/pdf/435319main_STS131%20mission%20summary.pdfarchive-date=March 25, 2010access-date=March 25, 2010publisher=NASA }}title=STS-131 Mission Informationurl=http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts131/index.htmlurl-status=deadarchive-url=https://web.archive.org/web/20100208191359/http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts131/index.htmlarchive-date=February 8, 2010access-date=February 5, 2010publisher=NASA }}Start (UTC)End (UTC)Duration
EVA 1Rick Mastracchio
Clayton AndersonApril 9, 2010
05:31April 9, 2010
11:586 hours 27 minutes
The crew inside used the station's robotic arm to remove a new ammonia tank from shuttle's payload bay and temporarily stow it on the station. The spacewalkers then retrieved a seed experiment from outside the Japanese laboratory, installed a grapple bar to the new ammonia tank on the station's truss and replaced a failed gyroscope that is part of the station's navigation system, along with several get-ahead tasks.
EVA 2Mastracchio
AndersonApril 11, 2010
05:30April 11, 2010
12:567 hours 26 minutes
Crew members, using the station's arm, removed an empty ammonia tank from the station's truss and temporarily stowed it on an equipment cart. The new tank was then installed and electrical connections were made to it. The station's arm then temporarily stowed the old tank on another part of the station's structure until the mission's third spacewalk.
EVA 3Mastracchio
AndersonApril 13, 2010
06:14April 13, 2010
12:366 hours 24 minutes
Using the station's arm, the crew moved the old tank into the shuttle's payload bay for return to Earth. The spacewalkers also removed a grapple bar from the old ammonia tank and attached it to the new one. The pair then relocated a foot restraint and some tools and prepared some cables for the STS-132 mission.

Wake-up calls

NASA began a tradition of playing music to astronauts during the Gemini program, which was first used to wake up a flight crew during Apollo 15. Each track is specially chosen, often by their families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities.

Flight DaySongArtistPlayed forLinks
Day 2"Find Us Faithful"Steve GreenClay AndersonWAV, MP3
TRANSCRIPT
Day 3"I Will Rise"Chris TomlinJim DuttonWAV, MP3
TRANSCRIPT
Day 4"Hato to Shōnen" (The Pigeons and a Boy)Joe HisaishiNaoko YamazakiWAV, MP3
TRANSCRIPT
Day 5"Defying Gravity"Idina Menzel & Kristin ChenowethDorothy Metcalf-LindenburgerWAV, MP3
TRANSCRIPT
Day 6"We Weren't Born to Follow"Bon JoviRick MastracchioWAV, MP3
TRANSCRIPT
Day 7"Stairway To The Stars"Ella FitzgeraldStephanie WilsonWAV, MP3
TRANSCRIPT
Day 8"Because We Believe"Andrea BocelliAlan PoindexterWAV, MP3
TRANSCRIPT
Day 9"Galileo"Indigo GirlsDorothy Metcalf-LindenburgerWAV, MP3
TRANSCRIPT
Day 10"The Miracle of Flight"Mike HydenClay AndersonWAV, MP3
TRANSCRIPT
Day 11"The Earth in the Color of Lapis Lazuli"Seiko MatsudaNaoko YamazakiWAV, MP3
TRANSCRIPT
Day 12Opening theme to Stargate SG-1Joel GoldsmithRick MastracchioWAV, MP3
TRANSCRIPT
Day 13"Joy"NewsboysJim DuttonWAV, MP3
TRANSCRIPT
Day 14"What A Wonderful World"Louis ArmstrongStephanie WilsonWAV, MP3
TRANSCRIPT
Day 15"Star Spangled Banner"Alan PoindexterWAV, MP3
TRANSCRIPT
Day 16"On The Road Again"Willie NelsonThe entire crewWAV, MP3
TRANSCRIPT

References

References

  1. (September 2011). "Space Shuttle Missions Summary". [[NASA]].
  2. (September 2009). "Remaining Space Shuttle Missions". [[NASA]].
  3. Bergin, Chris. (April 10, 2010). "STS-131: NASA managers plan out extra docked day late inspections". [[NASASpaceflight]].
  4. (April 2010). "STS-131 Press Kit". [[NASA]].
  5. (February 16, 2010). "NASA's Shuttle and Rocket Launch Schedule". [[NASA]].
  6. Bergin, Chris. (February 15, 2010). "STS-131: Cold weather delays flow – DDO constraint pushes launch into April". [[NASASpaceflight]].
  7. (September 24, 2009). "Consolidated Launch Manifest". [[NASA]].
  8. (December 5, 2008). "NASA Assigns Astronaut Crews for Future Space Shuttle Missions". [[NASA]].
  9. Spotts, Peter. (April 5, 2010). "After space shuttle launch: three spacewalks, among other chores". [[The Christian Science Monitor]].
  10. (April 7, 2010). "Women in Space". [[NASA]].
  11. (March 8, 2010). "Preflight Interview: Naoko Yamazaki, Mission Specialist". [[NASA]].
  12. (April 3, 2010). "Впервые в космосе одновременно окажутся четыре женщины". [[Roscosmos]].
  13. "STS-131". Spacefacts.de.
  14. (August 26, 2009). "STS-131 Crew Patch". [[NASA]].
  15. Gebhardt, Chris. (February 22, 2009). "STS-131: Discovery's Logistics Flight Baselined by PRCB". [[NASASpaceflight]].
  16. (March 29, 2010). "Canadian Content on Shuttle Mission STS-131". [[Canadian Space Agency]].
  17. Harwood, William. (February 28, 2010). "STS-131 Quick-Look 2". [[CBS News]].
  18. (February 22, 2010). "Two Shuttles, Two Crews on the Move". [[NASA]].
  19. Cooper, Ben. (February 2010). "Discovery gets ready for tank and boosters". Spaceflight Now.
  20. (February 22, 2010). "One in, one out – Discovery and Endeavour tag for next mission". [[NASASpaceflight]].
  21. Malik, Tariq. (February 23, 2010). "NASA Prepares Shuttle Discovery for April Launch". [[Space.com]].
  22. Dean, James. (February 10, 2010). "Cold weather delays Discovery's rollover to VAB". [[Florida Today]].
  23. Bergin, Chris. (February 15, 2010). "STS-131: Cold weather delays flow – DDO constraint pushes launch into April". [[NASASpaceflight]].
  24. Ray, Justin. (March 3, 2010). "Discovery perched atop launch pad for April flight". Spaceflight Now.
  25. Bergin, Chris. (March 3, 2010). "STS-131: Discovery rolls out to Pad 39A – ET repaired following bird vandalism". [[NASASpaceflight]].
  26. Harwood, William. (April 5, 2010). "Discovery's Ku-band antenna likely lost for the mission". Spaceflight Now.
  27. Bergin, Chris. (April 5, 2010). "STS-131: Crew begin FD2 inspections, without KU capability". [[NASASpaceflight]].
  28. (April 5, 2010). "NASA's Shuttle Discovery Heads to Station After Predawn Launch". [[NASA]].
  29. (April 6, 2010). "STS-131 MCC Status Report #03". [[NASA]].
  30. Harwood, William. (April 6, 2010). "Crew inspects shuttle, but data downlink has to wait". Spaceflight Now.
  31. (April 6, 2010). "STS-131 MCC Status Report #04". [[NASA]].
  32. Harwood, William. (April 7, 2010). "Shuttle Discovery docks to space station right on time". Spaceflight Now.
  33. Gebhardt, Chris. (April 7, 2010). "Discovery docks with ISS following successful Ku Band workaround". [[NASASpaceflight]].
  34. Harwood, William. (April 8, 2010). "Delivery van pulls up to the International Space Station". Spaceflight Now.
  35. (April 7, 2010). "STS-131 MCC Status Report #06". [[NASA]].
  36. (April 8, 2010). "STS-131 MCC Status Report #07". [[NASA]].
  37. Gebhardt, Chris. (April 8, 2010). "STS-131 EVA-1 completed – No FI required for Discovery’s clean TPS". [[NASASpaceflight]].
  38. (April 9, 2010). "STS-131 MCC Status Report #09". [[NASA]].
  39. Harwood, William. (April 10, 2010). "Astronauts discuss upcoming spacewalks, space summit". Spaceflight Now.
  40. (April 10, 2010). "STS-131 MCC Status Report #11". [[NASA]].
  41. (April 11, 2010). "STS-131 MCC Status Report #13". [[NASA]].
  42. (April 12, 2010). "STS-131 MCC Status Report #15". [[NASA]].
  43. (April 13, 2010). "STS-131 MCC Status Report #17". [[NASA]].
  44. (April 14, 2010). "STS-131 MCC Status Report #19". [[NASA]].
  45. (April 15, 2010). "STS-131 MCC Status Report #22". [[NASA]].
  46. Harwood, William. (April 16, 2010). "Discovery crew puts away module, scans heat shield". Spaceflight Now.
  47. Bergin, Chris. (April 16, 2010). "STS-131: Discovery berths MPLM and completes DLI ahead of undocking". [[NASASpaceflight]].
  48. (April 16, 2010). "STS-131 MCC Status Report #24". [[NASA]].
  49. Harwood, William. (April 17, 2010). "Departing Discovery leaves station stocked with supplies". Spaceflight Now.
  50. Bergin, Chris. (April 17, 2010). "STS-131: Discovery undocks – STORRM and TriDAR highlighted". [[NASASpaceflight]].
  51. (April 17, 2010). "STS-131 MCC Status Report #26". [[NASA]].
  52. (April 18, 2010). "STS-131 MCC Status Report #28". [[NASA]].
  53. (April 19, 2010). "STS-131 MCC Status Report #30". [[NASA]].
  54. (April 20, 2010). "STS-131: Discovery returns home for perfect landing at KSC". [[NASASpaceflight]].
  55. (April 2010). "STS-131 Mission Summary". [[NASA]].
  56. "STS-131 Mission Information". [[NASA]].
  57. (August 2, 2005). "Chronology of Wakeup Calls". [[NASA]].
  58. "STS-131 Wakeup Calls". [[NASA]].
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about STS-131 — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report