Skip to content
Surf Wiki
Save to docs
geography/south-africa

From Surf Wiki (app.surf) — the open knowledge base

South African Class GH 4-6-2+2-6-4

1928 articulated steam locomotive


Summary

1928 articulated steam locomotive

FieldValue
nameSouth African Class GH 4-6-2+2-6-4
imageClass GH (4-6-2+2-6-4).jpg
captionNo. 2320 at Monument Station, Cape Town, c. 1930
powertypeSteam
designerMaffei
builderMaffei
serialnumber5687–5688
buildmodelClass GH
builddate1928
totalproduction2
whytetype4-6-2+2-6-4 (Double Pacific)
uicclass2'C1'+1'C2'h4t
driver2nd & 5th coupled axles
gauge
leadingdiameter30 in
coupleddiameter60 in
trailingdiameter30 in
wheelbase76 ft
engine total25 ft each
leading6 ft each
coupled10 ft each
pivotcentres39 ft
over couplers85 ft
height12 ft
frametypeBar
axleload18 lt
leadingbogie/pony25 lt front
25 lt rear
coupled 118 lt
coupled 218 lt
coupled 318 lt
coupled 417 lt
coupled 517 lt
coupled 617 lt
trail bogie/pony13 lt front
12 lt rear
weightondrivers107 lt
locoweight184 lt
fueltypeCoal
fuelcap13 lt
watercap3650 impgal front
2350 impgal belly
fireboxtypeRound-top
firearea60 sqft
pitch8 ft
diameterinside6 ft
lengthinside13 ft
smalltubediameter195: 2+1/4 in
largetubediameter43: 5+1/2 in
boilerpressure180 psi
safetyvalvetypePop
totalsurface2655 sqft
tubearea2416 sqft
archarea25 sqft
fireboxarea214 sqft
superheaterarea665 sqft
cylindercountFour
cylindersize19+1/2 in bore
26 in stroke
valvegearHeusinger
valvetypePiston
couplingAAR knuckle
tractiveeffort44490 lbf @ 75%
operatorSouth African Railways
operatorclassClass GH
numinclass2
fleetnumbers2320–2321
deliverydate1928
firstrundate1928
withdrawndatec. 1958

| leadingbogie/pony= 25 lt front 25 lt rear | trail bogie/pony= 13 lt front 12 lt rear 2350 impgal belly 26 in stroke

The South African Railways Class GH 4-6-2+2-6-4 of 1928 was an articulated steam locomotive.

In 1928, the South African Railways placed two Class GH 4-6-2+2-6-4 Double Pacific type passenger versions of the Class U Union Garratt articulated steam locomotive in service. The Union Garratt design embodied the Garratt design at the front end and the Modified Fairlie design at the rear end.

Manufacturer

The Class GH, the heavy passenger version of the Class U Union Garratt, was designed and built by Maffei in Munich, Germany, to the specifications of Colonel F.R. Collins DSO, Chief Mechanical Engineer of the South African Railways (SAR). Two locomotives were delivered in 1928, numbered 2320 and 2321. They were erected at the Salt River shops in Cape Town.

If the same classification practice as that which was used for Garratt and Mallet locomotives had been followed, the Classes GH and U Union Garratts should have been designated Class UA and Class UB respectively. During the design phase of the two Union Garratt types, they were designated classification letters in the regular SAR Garratt range as Classes GH and GJ respectively. When orders were placed with the manufacturers, however, the Class designation of the Class GH was retained while that of the Class GJ Double Prairie type was changed to Class U. The reasoning behind this inconsistency is not known.

Characteristics

The locomotives were superheated and had round-topped fireboxes, bar frames, Walschaerts valve gear and Z-ported cylinders with short-lap, short-travel valves. The design of the two Union Garratt types deviated from the Garratt principle, the patent of which was held by Beyer, Peacock and Company, and the end results were hybrid locomotives, part Garratt and part Modified Fairlie. The front end of the locomotive was of a typical Garratt arrangement with a water tank mounted on the front engine unit's frame, while the rear end was constructed in the Modified Fairlie fashion with the coal bunker mounted on a rigid extension of the locomotive's main frame and with the pivoting rear engine unit positioned beneath the coal bunker.

Since the rear bunker carried only coal, an additional large underbelly water tank under the boiler compensated for the resulting diminished water capacity. All the engine's water was carried in the front bunker tank and in the underbelly water tank, with a combined capacity of 6000 impgal, while the rear bunker had a coal capacity of 13 lt. The main frame therefore carried the smokebox, boiler, firebox, cab, coal bunker, as well as the underbelly water tank.

The Class GH were massive and powerful locomotives and, having been designed for passenger service, were built for speed with their large 60 in diameter coupled wheels. With their 60 sqft firegrates, they were equipped with mechanical stokers of the duplex type. One reason which was put forward for the construction of the rear end of the Union Garratts on the Modified Fairlie principle was to enable their coal bunkers to be rigidly in line with their boiler frames to ensure a satisfactory arrangement for the installation of mechanical stokers. The subsequent designs of the Classes GL and GM Garratts showed that this precaution was unnecessary.

Shortcomings

The Modified Fairlies and the Union Garratt variations of it were not successful in South Africa and they suffered from the same shortcomings.

On the Union Garratts, as on the Modified Fairlies, the frames were prone to metal fatigue and cracking, brought about by the long frame overhang at the rear beyond the engine unit pivot centre. The overhang, laden with the coal bunker which extended completely beyond the rear engine unit's pivot centre was subjected to severe vertical oscillation while the locomotive was in motion and this led to structural weakening of the frame over time.

In addition, since the coal bunker was mounted on the frame instead of on the engine unit, the rear pivot bearings were subject to quite rapid wear since they carried a considerable additional vertical load compared to those on a purebred Garratt. As was the case with the Modified Fairlies, this resulted in increased frequency of maintenance and as a consequence, increased operating cost.

Service

The Class GH was acquired for working the named fast passenger trains of the era, the Union Express and Union Limited, and was initially shedded in Cape Town. The service career of the Class GH had a rough start, however, since on the first trip it was discovered that it exceeded the loading gauge in width. It returned to Salt River minus its steps and sundry fittings after having scraped the platforms of every station along its route. Considerable modifications had to be carried out before the two locomotives could be placed back in regular service.

The Class GH made several trips working the Union Express out of Cape Town and was capable of taking the train up Hex River Railpass without a banker, but they were not as successful as had been hoped and they were soon taken off that duty. Their mechanical stokers also proved to be troublesome and were eventually removed. They were transferred to Natal and worked on the Natal mainline north of Glencoe for the rest of their service lives. Both were withdrawn from service by 1958.

Illustration

File:SAR Class GH (4-6-2+2-6-4) Union b.jpg|Class GH Union Garratt staged at Glencoe, Natal, c. 1950

References

References

  1. {{Holland-Vol 2
  2. Espitalier, T.J.; Day, W.A.J. (1945). ''The Locomotive in South Africa – A Brief History of Railway Development. Chapter VII – South African Railways (Continued).'' South African Railways and Harbours Magazine, December 1945. p. 969.
  3. South African Railways & Harbours/Suid Afrikaanse Spoorweë en Hawens (15 August 1941). ''Locomotive Diagram Book/Lokomotiefdiagramboek, 3'6" Gauge/Spoorwydte''. SAR/SAS Mechanical Department/Werktuigkundige Dept. Drawing Office/Tekenkantoor, Pretoria. p. 32.
  4. South African Railways & Harbours/Suid Afrikaanse Spoorweë en Hawens (15 August 1941). ''Locomotive Diagram Book/Lokomotiefdiagramboek, 2'0" & 3'6" Gauge/Spoorwydte, Steam Locomotives/Stoomlokomotiewe''. SAR/SAS Mechanical Department/Werktuigkundige Dept. Drawing Office/Tekenkantoor, Pretoria. p. 32.
  5. {{Paxton-Bourne
  6. Drawing: ''2-6-2-2-6-2 Type Garratt Engine, Class GJ (Ordered as Class U)''. S.A.R. Mechanical Department, Drawing Office, Pretoria, 29-10-25. Approved by F.R. Collins, Chief Mechanical Engineer, 31-10-25. ([[:File:Class U 2-6-2+2-6-2 drawing.TIF. Class U 2-6-2+2-6-2 drawing]]).
  7. [https://sites.google.com/site/soulorailway/home/system-1/part-4 Soul of A Railway, System 1, Part 2: Cape Town to Wellington. Caption 3.] (Accessed on 26 November 2016)
  8. {{Durrant-Twilight
Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about South African Class GH 4-6-2+2-6-4 — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report