| const | 2007 |
The Sofoline Interchange is a transportation hub and a major landmark under construction in Kumasi, Ghana. Construction began in 2007, and was expected to be completed by 2010, but was halted due to a lack of funds.
History
The Sofoline Interchange began construction in 2007 by China Geo-Engineering Corporation (CGC) as part of an effort to ease bottleneck traffic congestion. The project also included the construction of an interchange at Komfo Anokye Teaching Hospital and the reconstruction of an 11 km dual carriageway, and was funded by the government of Ghana. The project was due for completion in 2010, but construction was halted due to a lack of funds. Construction resumed in 2018, following a settlement of GH₵30 million in arrears to CGC, which was paid by the Ministry of Roads and Highways. , the Interchange is 75 percent complete.
Illegal occupants
There have been two instances of illegal occupants having been stationed near the Sofoline Interchange; the first was in late 2021 and early 2022, where car dealers were given until 31 December 2021 to vacate the interchange, but this ultimatum was extended to 20 January 2022, after which vehicles would be removed at the cost of the owners, according to a statement by the Ashanti Regional Coordinating Council. In April 2024, the Regional Security Council (REGSEC) gave traders at the Kwadaso Onion Market, which was stationed near the Interchange, 3 weeks to relocate to Atwima Takyiman.
Sanitation and safety concerns
In September 2018, parts of the Sofoline Interchange started to fall apart following heavy rain, including a 10-meter long concrete wall connecting several roads to the Ashanti Region. In 2025, sanitation concerns among residents and commuters using the interchange rose, as its underpass was being misused as a public dumping ground. Additionally, the underpass area is prone to flooding, making commuting dangerous.
References
References
- Anane-Frimpong, Douglas. (22 February 2025). "People and Places: The Sofoline Interchange".
- "Ghana: Sofoline, Asokwa Interchanges in Danger". www.allafrica.com2100715.html.
- (9 November 2016). "Gov't halts Sofoline Interchange project over lack of funds - Napo".
- (4 June 2011). "Sofoline Interchange Stopped".
- (24 November 2018). "Work resumes on Sofoline Interchange following settlement of GH¢30 million arrears".
- (24 October 2017). "Work To Resume On Stalled Sofoline Interchange Project".
- (18 January 2022). "Car dealers, illegal occupants at Sofoline Interchange asked to vacate before Jan 20".
- (14 January 2022). "Illegal occupants at Sofoline interchange given January 20 ultimatum to vacate area".
- (5 April 2024). "REGSEC gives Sofoline Interchange traders 3 week ultimatum to relocate to Atwima Takyiman".
- (15 September 2018). "Sofoline Interchange Now Death Trap".
- (12 September 2018). "10-Meter Wall Collapses At Sofoline Interchange Project".
- Appiah, Francis. (10 July 2025). "Kumasi: Sofoline interchange 'underpass' turns into public toilet, refuse dump".
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Sofoline Interchange — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report