From Surf Wiki (app.surf) — the open knowledge base
Siemens ACS-64
American electric locomotive
American electric locomotive
| Field | Value | |
|---|---|---|
| name | Siemens ACS-64 | |
| powertype | Electric | |
| image | Northbound Crescent at Wilmington, Delaware, March 2021.jpg | |
| caption | Amtrak ACS-64 No. 600 with the Crescent in 2021 | |
| builder | Siemens Mobility | |
| ordernumber | Amtrak: 70 | |
| SEPTA: 15 (option for 3 additional) | ||
| builddate | Amtrak: 2012–2016 | |
| SEPTA: 2015–2018 | ||
| trucks | Siemens model SF4 | |
| wheelbase | 9.9 m | |
| (bogie center distance) | ||
| wheeldiameter | 1117 mm (new) | |
| 1041 mm (worn) | ||
| minimumcurve | 76 m | |
| length | 20,320 mm | |
| width | 2984 mm | |
| height | 3810 mm (excluding pantograph) | |
| axleload | 54250 lb | |
| weightondrivers | 100% | |
| headendpower | 1340 hp 3-phase, 60 Hz, 480 VAC, 1,000 kVA | |
| transmission | Pinion hollow shaft drive with partially suspended gearboxes | |
| multipleworking | Yes | |
| factorofadhesion | 2.99 (33.4%) | |
| locobrakeforce | 150 kN, 5000 kW Maximum | |
| operator | Amtrak, SEPTA | |
| fleetnumbers | {{Plainlist | |
| nicknames | Sprinters | |
| deliverydate | 2013-2018 | |
| firstrundate | February 7, 2014 with Amtrak | |
| maxspeed | 125 mph Service | |
| 135 mph Design | ||
| gauge | ||
| locoweight | 215537 lb | |
| electricsystem | Overhead line; | |
| collectionmethod | Pantograph | |
| tractionmotors | 3-phase, AC, fully suspended, Siemens built (Norwood, Ohio) | |
| poweroutput | 6400 kW Maximum (short-time) | |
| 5000 kW Continuous | ||
| tractiveeffort | Starting: | |
| 320 kN | ||
| Short-time: | ||
| 270 kN @ 53.5 mph | ||
| 115 kN @ 125 mph | ||
| Continuous: | ||
| 282 kN @ 40 mph | ||
| 89 kN @ 125 mph | ||
| safety | FRA standards | |
| ACSES II | ||
| locobrakes | Regenerative braking, NYAB electro-pneumatic cheek-mounted disk brakes | |
| trainbrakes | Electro-pneumatic | |
| notes | Sources: except where noted | |
| aarwheels | B-B | |
| uicclass | Bo'Bo' |
SEPTA: 15 (option for 3 additional) SEPTA: 2015–2018 (bogie center distance) 1041 mm (worn)
- Amtrak: 600–665, 667–670
- SEPTA: 901–915 135 mph Design 5000 kW Continuous 320 kN Short-time: 270 kN @ 53.5 mph 115 kN @ 125 mph Continuous: 282 kN @ 40 mph 89 kN @ 125 mph ACSES II
The Siemens ACS-64, or Amtrak Cities Sprinter, is an electric locomotive designed by Siemens Mobility for use on the Northeast Corridor (NEC) and the Keystone Corridor in the northeastern United States. The design was based on locomotives Siemens created for use in Europe and Asia, but with changes to comply with American standards. The ACS-64 is built at the Siemens factory in Florin, California, located outside of Sacramento.
The first 70 locomotives were built for Amtrak to replace the railroad's fleet of aging AEM-7 and unreliable HHP-8 locomotives. The first ACS-64 entered service in February 2014 and deliveries continued until August 2016.
The Southeastern Pennsylvania Transportation Authority (SEPTA), in Southeastern Pennsylvania, operates a fleet of 15 ACS-64s since August 2018, on the agency's Regional Rail Lines.
Design

The design is based on the EuroSprinter and the Vectron platforms, which Siemens sells in Europe and Asia. Significant structural changes to the design were made to comply with American crashworthiness requirements, including the addition of crumple zones and anti-climbing features as well as structural strengthening of the cab, resulting in a heavier locomotive than the previous models. The body is a monocoque structure with integral frames and sidewalls.
The locomotives are able to operate from the 25 kV 60 Hz, 12.5 kV 60 Hz, and 12 kV 25 Hz power supplies used on the Northeast Corridor, and have a maximum power of 6400 kW. The locomotives are designed to be capable of accelerating 18 Amfleet cars to maximum speeds as high as 125 mph on the Northeast Corridor in a little over eight minutes, with trains of eight Amfleets taking two and a half minutes to reach the same speed. They had advanced safety systems, including specialized couplers designed to keep trains from rolling over, jackknifing, or derailing during a collision. Additionally, the new locomotives are more energy-efficient than those that they replace, and lack dynamic braking grids in favor of 100% regenerative braking, depending on grid receptiveness. Energy generated from the brake may also be used to meet HEP needs, further reducing current draw from the grid.
Each locomotive has two electrical converter units with three IGBT based, water cooled output inverters per converter. Two of the inverters power the traction motors; the third unit supplies head-end and auxiliary power. The HEP/auxiliary inverters are dual-redundant and identical (rated 1000 kW), allowing the locomotive to remain in service should one inverter fail en route. The locomotive bogies are fabricated steel designs, with low-lying traction links and center pivot pin. The traction motors are frame-mounted, with torque transmitted via a hollow shaft drive. Locomotive braking is facilitated by cheek mounted disc brakes on each wheel.
The locomotives are compliant with the "Buy America Act" and were assembled at the Siemens factory in Florin, California, with traction and electrical equipment being manufactured at Siemens facilities in Norcross and Alpharetta, Georgia. Traction inverters were manufactured in Alpharetta, and the traction motors and gear units were manufactured in Norwood, Ohio.
Amtrak
Procurement
In October 2010, Amtrak ordered 70 locomotives at a cost of US$466 million, to be delivered beginning in February 2013. The order was the second part of Amtrak's company-wide fleet-replacement program, after an order for 130 Viewliner II passenger cars was placed in July 2010. On June 30, 2011, US Secretary of Transportation Ray LaHood announced that Amtrak had received a $562.9 million loan from the federal government's Railroad Rehabilitation and Improvement Financing program for the new locomotives. The additional funding over and above the $466 million will cover capital spare parts and facility improvements to accommodate the ACS-64s.
Amtrak and Siemens Mobility unveiled the first three completed locomotives on May 13, 2013. They were tested during the summer of 2013: Nos. 600 and 601 at the Transportation Technology Center in Pueblo, Colorado, and No. 602 on the NEC.

On February 6, 2014, then-Vice President Joe Biden visited 30th Street Station in Philadelphia to tour ACS-64 #600. In his subsequent remarks he stressed the importance of infrastructure investment as well as the important role Amtrak's new locomotives will play in serving the critical artery of the Northeast Corridor.
Amtrak and Siemens celebrated the completion of the last ACS-64, No. 670, in Florin, California, on June 2, 2016. The celebration concluded with unit No. 670 being towed by Amtrak CEO Joe Boardman's train bound for Washington, D.C. Locomotive No. 670 entered service in August 2016, completing the acceptance of the Amtrak order.
Service
Unit 600 entered service on February 7, 2014, on Northeast Regional train 171 from Boston to Washington, D.C. As the new locomotives entered service, they gradually displaced the electric locomotives that Amtrak had previously operated. The extra six ACS-64 units were to be used to increase the number of locomotives available for use at any point, and to add more frequent service in the future. The final unit, #670, was delivered from Siemens on June 2, 2016, and entered revenue service in August of the same year.
SEPTA

In May 2015, SEPTA (Philadelphia's mass-transit authority) approved an initial order for 13 ACS-64 locomotives for commuter service to replace its 7 AEM-7 and single ALP-44 locomotives on push-pull express trains, with an option for an additional five locomotives to be added to the order. On November 11, 2015, Siemens announced that it was awarded the $118 million contract for the initial 13 locomotives. The total contract value, including the option for additional locomotives, is worth $154 million.
On February 29, 2016, Amtrak unit 664 began test runs on SEPTA Regional Rail branches to test the height of the locomotives on SEPTA territory, and to ensure clearance through the Center City Tunnel. After testing the unit on most of SEPTA's lines, it was returned to Amtrak on March 21, 2016, for completion of its acceptance testing. From July 2016 until April 2017, SEPTA leased several ACS-64 units to pull five Amfleet cars and several MARC Train sets as emergency rolling stock after all Silverliner V cars were temporarily pulled from service.
SEPTA's first ACS-64 was delivered on December 14, 2017, by which time SEPTA had increased its order to 15 locomotives. The first unit entered service on the Paoli/Thorndale Line on July 11, 2018.
References
References
- "ACS-64 Info Graphic and Fact Sheet". Siemens.
- (October 29, 2010). "Siemens AG bags $466-mn order from US railroad company Amtrak". domain-b.com.
- Amtrak. (February 15, 2011). "PRIIA Specifications for single level cars".
- "Amtrak City Sprinter Class ACS64 Electric Locomotive For Amtrak's North East Corridor (NEC) High Speed Passenger Service". Siemens AG Infrastructure & Cities Sector Rail Systems Division.
- (October 29, 2010). "Siemens breaks into the U.S. long-distance passenger rail market". Siemens.
- (October 29, 2010). "Amtrak orders Siemens 200 km/h Cities Sprinter locomotives".
- Latour, Michael. (September 2011). "A new face in the Northeast Corridor".
- Michael Latour. (June 2011). "Amtrak ACS-64: Speed, power, efficiency". Railway Age.
- (August 1, 2013). "In-cab video of 601 + 8 Amfleets performing an acceleration test at Pueblo, CO". [[Youtube.com]].
- (October 29, 2010). "Amtrak orders 70 new electric locomotives from Siemens".
- (June 30, 2011). "Amtrak receives $562.9m loan to purchase 70 locomotives for Northeast Corridor". Rail.co.
- Siemens USA. "Siemens Provides First Look at New Amtrak Locomotives". Synaptic Digital.
- (July 29, 2013). "New Amtrak Locomotives Advancing in Rigorous Testing Program". Amtrak.
- Matheson, Kathy. (February 6, 2014). "Biden stresses infrastructure investment in Philly". Associated Press.
- (June 2, 2016). "Siemens completes 70th ACS-64 locomotive for Amtrak". Progressive Railroading.
- (August 2016). "ACS-64 Locomotives Usher in New Era of Mobility on Northeast Corridor". Amtrak.
- (February 6, 2014). "New Amtrak Locomotives Ready for Service and Set to Power Northeast Economy". Amtrak.
- (October 29, 2010). "Amtrak contracts Siemens to supply 70 electric locomotives". Progressive Railroading.
- Worrell, Carolina. (November 11, 2015). "Siemens to build new locomotives for SEPTA".
- Siemens USA. (November 11, 2015). "Siemens to build 13 electric locomotives for the Southeastern Pennsylvania Transportation Authority".
- Dan, McQuade. (November 11, 2015). "SEPTA Is Buying 13 New Locomotives for $113 Million". Philadelphia Magazine.
- Nussbaum, Paul. (May 27, 2015). "SEPTA plans to spend $154 million on new locomotives". [[The Philadelphia Inquirer]].
- (May 2015). "May 2015 Special Agenda ". Southeastern Pennsylvania Transportation Authority.
- (March 1, 2016). "SEPTA testing an ACS-64 in March". Trains News Wire.
- (March 27, 2016). "Railfan Pictures of the Week - 3/27/2016". The Philadelphia Chapter of the National Railway Historical Society.
- Smith, Sandy. (July 8, 2016). "SEPTA to Add 1,700 Regional Rail Seats Starting Monday". Philadelphia Magazine.
- (December 18, 2017). "Siemens delivers new locomotives to Baltimore, Philadelphia agencies".
- (December 7, 2017). "Siemens ships first ACS-64 locomotive for SEPTA".
- (December 15, 2017). "SEPTA's first new electric locomotive has pulled into Philly". Curbed Philadelphia.
- Gambardello, Joseph A.. (July 11, 2018). "SEPTA's new Regional Rail locomotive makes debut". [[The Philadelphia Inquirer]].
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Siemens ACS-64 — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report