Shamkir reservoir


FieldValue
nameShamkir reservoir
pushpin_mapAzerbaijan
locationShamkir Rayon, Azerbaijan
coords
typereservoir
inflowKura River
outflowKura River
basin_countriesAzerbaijan
length4.5 km
area116 sqkm
depth18.2 m
volume2,677 e6m3

| max-depth = The Shamkir reservoir () is a large reservoir built on the Kura River in the Shamkir Rayon of northwestern Azerbaijan. It is the second-largest reservoir in the Caucasus after the Mingachevir reservoir, also in northwestern Azerbaijan.

Overview

The Shamkir reservoir was built on the Shamkir section of the Kura River in 1982. The area of the Shamkir reservoir is 116 sqkm. The overall volume of the reservoir is 2,677 million m3 and the exploited volume of water is 1,425 million m3. The normal water level of the reservoir is 158 m and the surface area is 115 sqkm. Its dam top length is 4500 m and height is 70 m. The reservoir provides irrigation water to 46000 ha of land in Shamkir, Samukh, Goygol and Goranboy rayons. A 380 megawatt hydroelectric power station with 2 turbines is a part of the reservoir complex.

New Shamkir reservoir

A new reservoir in Shamkir Rayon was completed in 2014 by the Azerbaijani government on the Shamkirchay river. The main purpose of the new reservoir is to provide irrigation water to Shamkir, Samukh Goygol and Goranboy rayons. The project was initiated by the President of Azerbaijan, Ilham Aliyev, in 2009 at a cost of $400 million. The construction of the reservoir and dam was to last three years. Over 50 pieces of heavy machinery and 240 laborers are currently involved in construction. According to experts, about 50000 ha of land will be irrigated with the water from the new reservoir. The reservoir will have a volume capacity of 160 million m3 and an average water flow of 260 million m3, and will also provide more drinking water to the city of Shamkir. The maximum length at the new reservoir will be 122 m. The top length of the dam will be 692 m, width - 12 m. Over 85,000 m3 of concrete and 7,000 metal structures and fittings will be used for construction of the dam. Also, a 36 megawatt hydroelectric power station will be built at the reservoir. The annual energy production of the station will be 56 million kWh. The construction is being carried out by a Turkish company.

References

References

  1. Coene, Frederik. (2009-10-08). "The Caucasus - An Introduction". Taylor & Francis.
  2. [http://www.eco.gov.az/hid-chay-gol-suanbar.php Ministry of Ecology of Azerbaijan: Azərbaycanın çayları, gölləri və su anbarları] {{webarchive. link. (2014-10-17 Retrieved on 14 October 2010)
  3. link. (2011-07-10 Retrieved on 14 October)
  4. [http://mst.gov.az/MST/SA_2.html AZƏRBAYCAN RESPUBLİKASI MELİORASİYA VƏ SU TƏSƏRRÜFATI AÇIQ SƏHMDAR CƏMİYYƏTİ: SU ANBARLARI] {{webarchive. link. (2011-01-19 Retrieved on 14 October)
  5. [http://www.ebrdrenewables.com/sites/renew/Lists/Projects/DispForm.aspx?ID=268&Source=http%3A%2F%2Fwww%2Eebrdrenewables%2Ecom%2Fsites%2Frenew%2Fcountries%2FAzerbaijan%2Fdefault%2Easpx Shamkir Hydro Power Plant]
  6. Ilham Aliyev attended the opening of Shamkirchay water reservoir[http://en.president.az/articles/13409]
  7. link. (2012-03-11 Retrieved on 14 October)
  8. 28 January 2010, Kapaz TV [http://www.kepeztv.az/arxiv/2010/yanvar/iqtisadi/28/su_anbari.html 3 ildən sonra Şəmkirdə su problemi olmayacaq] {{webarchive. link. (2010-11-01)
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Shamkir reservoir — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report