Skip to content
Surf Wiki
Save to docs
general/buildings-and-structures-in-pitkin-county-colorado

From Surf Wiki (app.surf) — the open knowledge base

Ruedi Reservoir


FieldValue
nameRuedi Reservoir
imageRuedi Reservoir, dam and the Fryingpan River corridor near Basalt, Colo..JPG
captionLooking eastward, upstream, on the Fryingpan River to Ruedi Dam and Reservoir
locationPitkin and Eagle counties
coordinates
typereservoir
part_ofColorado River Basin
inflowFryingpan River
outflowFryingpan River
agencyUnited States Bureau of Reclamation
date-built1968
date-flooded
area997 acre
volume101280 acre.ft
elevation2369 m
pushpin_mapColorado
pushpin_label_positionbottom
pushpin_map_captionLocation in Colorado

| date-built = 1968 | date-flooded = | max-depth =

Ruedi Reservoir is a reservoir on the Western Slope of the Continental Divide on the Fryingpan River. It sits about 15 mi upstream of the town of Basalt, Colorado, near Aspen. The reservoir is located within the White River National Forest, and straddles the county line between Pitkin County and Eagle County.

The reservoir and the Ruedi Dam were built from 1964 to 1968 and are both owned and operated by the United States Bureau of Reclamation. One purpose of the reservoir is to help compensate for diversions to Colorado's East Slope, taken further up in the Fryingpan Basin as part of Reclamation's federal Fryingpan-Arkansas Project. Another purpose of the reservoir is to provide water for West Slope interests. The dam is located in Eagle County.

Ruedi stores approximately 102000 acre.ft of water. Water in the reservoir is released through Ruedi Dam down the Fryingpan primarily for municipal, industrial, and agricultural interests. A side benefit of the reservoir is recreation. Boating, fishing and camping are popular at the reservoir itself, while the downstream portion of the Fryingpan River has become well regarded as a Gold Medal fishery.

Typically, releases from Ruedi follow a seasonal pattern. The USGS page for streamflow below Ruedi Dam provides up-to-date information for water released to the Lower Fryingpan in cubic-feet-per-second measurements.

Hydroelectric power plant

A hydroelectric power plant that sits at the base of the dam produces 5.0 megawatts of electricity. Built in 1985, the plant supplies electricity to the City of Aspen and is owned by the city.

References

References

  1. {{cite gnis
  2. . ["Facts & Figures"](https://rwapa.org/facts/). *Ruedi Water and Power Authority*.
  3. U.S Department of the Interior: "Water and Power resources Service, Project Data." U.S. Government Printing Office, 1981
  4. https://nwis.waterdata.usgs.gov/nwis/uv?09080400 USGS gauge page
Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Ruedi Reservoir — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report