From Surf Wiki (app.surf) — the open knowledge base
Riverside South, Manhattan
Building complex in New York City
Building complex in New York City
| Field | Value |
|---|---|
| name | Riverside South |
| image | Trump Place from mid-Hudson jeh.jpg |
| caption | A view of the complex from the Hudson River |
| other_names | Freedom Place and Riverside Center (for parts) |
| location | Manhattan, New York City, New York |
| coordinates | |
| status | All buildings complete; highway relocation begun, but incomplete. |
| groundbreaking | 1997 |
| proposed | 1989 (current plan) |
| 1961 (first plan) | |
| constructed | 1997–2020 |
| use | Residential |
| architect | Daniel Gutman and Paul Willen; Marilyn Taylor and David Childs, SOM |
| developer | The Trump Organization, Hudson Waterfront Associates, Extell Development Company |
| owner | Extell Development and The Carlyle Group |
| planner | Riverside South Planning Corporation |
| cost | |
| buildings | 19 |
| size | 8.4 e6ft2 |
| website | ExtellDev |
1961 (first plan)
Riverside South is an urban development project in the Lincoln Square neighborhood of the Upper West Side of Manhattan, New York City, United States. Developed by the businessman and later U.S. president Donald Trump in collaboration with a group of Asian investors, the largely residential complex is on 57 acre of land along the Hudson River between 59th Street and 72nd Street. The $3 billion project, which replaced a New York Central Railroad yard known as the 60th Street Yard, includes multiple residential towers and an extension of Riverside Park.
There were several proposals for the site in the late 20th century. These included the Litho City plan in the 1960s, Trump's 1970s plan, and the Lincoln West plan of the early 1980s. The current proposal stems from Trump's late-1980s proposal for Television City. Television City was originally designed to include 16 apartment buildings, 1.8 e6sqft of studio space, 300000 sqft of office space, ancillary retail space, and 75 acre of park land, mostly on the roof of a vast shopping mall. Trump later abandoned his plan and adopted a substantially reduced proposal put forward by a coalition of civic groups. Trump sold Riverside South to investors from Hong Kong and mainland China, which built seven structures starting in 1997. In 2005, the investors sold the remaining unfinished portions to the Carlyle Group and the Extell Development Company, which developed three more buildings. In turn, Extell sold off some of the southernmost plots in the 2010s; these sites became Waterline Square.
60th Street Rail Yard
Before Riverside South was developed, the site was a rail freight yard owned by the New York Central Railroad, located between 59th and 72nd streets. By 1849 an embankment near West End Avenue, with a span over a tidal lagoon, carried the Hudson River Railroad, later part of New York Central. At the time, much of the current site of Riverside South was still under water. By 1880, what had been river was transformed by landfill into the New York Central Railroad's vast 60th Street Yard. Within the 60th Street Yard, a set of 400 ft piers extended into the Hudson River, where barges carried railcars across the river to New Jersey. The piers protruded at a 55-degree angle and each contained tracks.
In the 1930s, New York City parks commissioner Robert Moses covered New York Central's rail track north of 72nd Street as part of the West Side Improvement, which also moved rail lines below grade south of 60th Street. The Moses project was bigger than Hoover Dam and created the Henry Hudson Parkway. The adjacent Riverside Park was expanded to the Hudson River.
Until the 1970s, the rail yard area was generally industrial. The area was home to a printing plant for The New York Times between 1959 and 1975, as well as ABC television studios. At the same time, public housing extended to West End Avenue (across the street from the printing plant and the TV studios), and the Lincoln Towers redevelopment project extended to the rail yard boundary along Freedom Place. New York Central merged with the Pennsylvania Railroad to form Penn Central in 1968 as the rail lines were suffering severe financial difficulties. The railroad went bankrupt in 1970, and its assets were sold off in federal court.
Early redevelopment plans{{Anchor|Redevelopment plans}}
In the late 20th century, there had been several proposals to develop structures over the rail yard. These included the Litho City plan in 1965 and various plans by New York City's Educational Construction Fund in the late 1960s. In his book New York 2000, Robert A. M. Stern described the site as "one of the city's most coveted and contested parcels of open land". The site was hard to develop in part because it did not have roads or utilities, and because any potential redevelopment would have had to be built over the train yard. With Penn Central's bankruptcy in 1975, the ground level became available as well, increasing the potential for development. This led to the businessman Donald Trump's late 1970s plans; the Lincoln West plan of the early 1980s; and Trump's Television City plan of the late 1980s.
1960s plans
.jpg)
In 1961, the railroad proposed a partnership with the Amalgamated Lithographers Union to build 'Litho City''''', a mixed-use development over the tracks. There would be six 47-story buildings and three 41-story buildings, all designed by Kelly & Gruzen. The development would have included 200 artists' studios that faced north; the rest of the units would be structured as rental apartments or housing cooperatives. Sources variously cited Litho City as being built to accommodate 12,500 or 25,000 people. The New York City Planning Commission (CPC) deferred action on the Litho City proposal for a year while it reviewed Litho City's effects on traffic in the neighborhood, and the consulting firm of Day & Zimmerman warned that the development might worsen traffic. Nonetheless, the union's president Edward Swayduck and the city's traffic commissioner Henry A. Barnes both endorsed the Litho City plan.
The CPC designated the West Side rail yard as an urban renewal site in October 1962, allowing the plans for Litho City to proceed. Shortly afterward, the Amalgamated Lithographers Union announced plans for a $15 million dormitory in the development, which would house 1,000 foreign students. Plans also called for a promenade linking to Lincoln Center, in addition to a park on the Hudson River shoreline. A scale model of Litho City was unveiled at Grand Central Terminal in 1963. By then, the project was being planned as a high-income development, rather than a middle-income development; the cost of Litho City was estimated at $175 million. There were to be 6,000 apartments, and a new street, running parallel to the yard between 66th and 70th streets, was also proposed. Moses also planned to build an exit from the West Side Highway to Litho City, prompting objections that the street grid could not handle the additional traffic.
The plans for Litho City were formally dropped in January 1966 due to disputes over the air rights; the railroad had terminated the union's lease of the site two months prior. In the late 1960s, there were various proposals by the city's Educational Construction Fund for mixed residential and school projects, also partly on landfill. This development would have included several athletic fields and between 6,000 and 12,000 apartments. In the early 1970s, Robert Moses proposed relocating the highway between 59th and 72nd streets inland to facilitate an extension of Riverside Park, but he failed to convince the state Department of Transportation. The state rejected that proposal because of the presumed negative effect on development opportunities and because it would violate the Blumenthal Amendment, which prohibited any highway construction that would alter Riverside Park.
First Trump proposal and sale
In July 1974, Trump Enterprises Inc., a company controlled by Trump, offered to buy an option on the 100 acre 60th Street Yard and the 44 acre 30th Street Yard for a combined $100 million. Trump did not make a down payment. Penn Central, which at the time was under trusteeship due to its insolvency, petitioned its trustees to approve the sale. Though both of the yards were still being used by freight trains, the only structures on the sites were storage buildings and train tracks. Following a private meeting with Trump, his father Fred, and Mayor Abraham Beame, Penn Central's trustees gave the option to Trump because he "seemed best positioned [...] to get rezoning and government financing". A U.S. federal court approved Penn Central's sale of the option to Trump in March 1975.
Initially, Trump wanted to build up to 20,000 housing units on the site. At the time, he had never completed a major real-estate development before. Local politicians including U.S. Representative Bella Abzug expressed concerns about the fact that the 60th Street redevelopment would cater mostly to middle- and upper-class families. Trump presented plans for the development to local residents in April 1976. As part of the proposal, designed by Gruzen & Partners, the site would be divided into three residential clusters with at least four buildings each; about 40 percent of the development would be open space, and there would be one or two schools and a central shopping mall. Trump's plan called for the West Side Highway to be relocated inward to provide more space near the river, which the Department of City Planning endorsed in concept. There would have been 14,500 apartments on the site, funded with federal subsidies. Manhattan Community Board 7, representing the neighborhood that included the rail yard, opposed the plan. The state had previously examined the idea of moving the highway inland, but had rejected it, in part because of the presumed negative effect on potential development. Trump apparently never got far enough with his plan to persuade them otherwise.
Trump's proposal was dependent on public financing that never materialized. He tried various architectural schemes and twice downsized his plans for the yards. In May 1979, Trump exercised his option on the site, agreeing to buy the yard for $28 million. Had Trump finalized the acquisition, he would have been required to make payments over 18–30 months, after which he could take title to the site. However, Trump never finalized his purchase, and his father's longtime friend Abe Hirschfeld agreed to take over the option instead. By then, the city government was contemplating building a freight yard for piggyback trains on the site. Penn Central signed a sale contract in March 1980, agreeing to sell Hirschfeld and his son Elie the site for $28 million. Under the terms of the contract, the Hirschfelds made a $400,000 down payment and were required to spend $700,000 on planning over the next year. Trump later said that his decision to let his option expire was "the toughest business decision in my life."
Lincoln West
Abe Hirschfeld and the Argentine astrophysicist Carlos Varsavsky acquired the 60th Street Yard site in late 1980. Varsavsky's company, the Macri Group, became the project's majority partner, with a 65% ownership stake; the Hirschfelds held the remaining 35% stake.
Initial plan
Hirschfeld and Varsavsky formed a partnership named Lincoln West Associates to develop a project known as Lincoln West on the 60th Street Yard site. Macri hired Gruzen & Partners to draw up plans for the project, and he hired former deputy mayor John Zuccotti and lawyer Judah Gribetz to consult on the project. Rafael Viñoly assisted Gruzen with the plans. The initial plans, announced in January 1981, called for 16 residential towers with a total of 4,850 apartments, arranged around a new avenue called Lincoln Boulevard. There would also be a 500-room hotel, one or two office towers, and 42 acre of open space. A 4,000-space parking garage would have been located underneath the development. Due to the topography of the site, the buildings at both the northern and southern ends would have been located on a platform, and Lincoln Boulevard would have been built with two levels. The first apartments would have begun construction in 1982, while the rest of the development would have been built in phases over a decade.
Lincoln West Associates submitted a formal proposal for the site in November 1981. In late 1981, Lincoln West Associates offered to give $10,000 to Community Board 7 for a study of the project's impacts. The plans had to undergo community review. Opponents claimed that the development would overload the area's infrastructure, and other critics took issue with the development's size and the lack of affordable housing. The firm of McKeown & Franz conducted an environmental impact statement (EIS) for the site. The EIS found that the project would create 7,000 jobs, but that it would also overload existing transit infrastructure due to the presence of 9,200 additional commuters. Community Board 7 refused to support the project unless it was downscaled to include fewer than 4,000 residential units. Ultimately, Hirschfeld and Varsavsky agreed to pay for infrastructure improvements in the neighborhood. The New York Times architecture critic Paul Goldberger wrote that, while he preferred a design that "look[ed] like the tightly woven cityscape of Riverside Drive or Central Park West," he hoped that the project was not "studied and debated and talked out of existence" by too much public review.
Macri sent the plans to the CPC for review in March 1982 but, despite the concerns over Lincoln West's size, initially refused to scale down the plans. The same month, the city asked Lincoln West Associates to postpone its plans so the city could decide whether to build a new freight terminal there, and Lincoln West Associates agreed to restart the community review process. Additionally, part of the parking garage was replaced with space for trucking company, and the number of apartments was reduced to 4,700. Manhattan borough president Andrew Stein wanted the project to be further reduced to 3,700 apartments, which Varsavsky refused. The engineering firm Tippetts Abbett McCarthy Stratton conducted a feasibility study of the proposed freight-rail center, finding that it was feasible to build it under Lincoln West, though Varsavsky opposed the freight center.
Approval, lawsuits, and modifications
The CPC approved the Lincoln West plans in July 1982, disregarding most of the opponents' objections to the project, although it asked the developers to reduce the project's size. The New York City Board of Estimate also gave its approval that September. The plans called for 1,100 rental apartments (of which one-fifth would be affordable housing), in addition to 3,200 luxury co-ops or condos. In addition, the developers agreed to add several amenities such as a swimming pool, a park, and upgrades to two nearby subway stops. Lincoln West Associates paid $13 million for the northern five blocks shortly after the plans were approved, and it paid $21.6 million that December for the southern eight blocks. The developers had planned to begin construction in April 1983, but the plans were delayed after Varsavsky's sudden death in early 1983. Francisco Macri took over Varsavsky's 65% interest in the project.
Delays also arose from various lawsuits. Opponents sued in the New York Supreme Court in February 1983, alleging that the EIS had been done improperly. The EIS was invalidated the next month, though the city government successfully appealed the ruling. The New York Court of Appeals, the state's highest court, ruled in October 1983 that the EIS had been prepared properly. In addition, Harry Helmsley, who owned an option on a superblock from 61st to 65th streets, sued the city and Lincoln West Associates, claiming that the city wanted to build three streets through his property.
Though work had still not begun by early 1984, Lincoln West's developers were already revising the plans significantly, prompting its chairman to resign. Additionally, in July 1984, Chase Manhattan Bank moved to foreclose on two mortgages that had been placed on the site. The city government would have canceled the development if the street grid had not received final approval by that September, but the Board of Estimate voted to extend the deadline by one month. That October, the Board of Estimate approved plans for Lincoln West's street grid and voted to give Lincoln West Associates four additional months to obtain financing. By then, public officials doubted that Lincoln West would ever be completed, amid continued opposition to the project. Lincoln West Associates ultimately could not receive financing for the development, partly because of Macri's concessions to the city and partly because Trump was trying to retake control of the site.
Television City
Trump negotiated to repurchase Lincoln West in mid-1984; he initially decided against it but ultimately made an offer for the site that November. Trump announced in December 1984 that he would pay $95 million for the Lincoln West site; this was part of a $115 million transaction that gave him control of the rail yard. Under the agreement, he controlled 80% of the project, Elie Hirschfeld retained a 20% stake, and Francisco Macri gave up his interest in the project. Trump initially anticipated constructing towers as tall as 60 stories, rather than a variety of low-rise buildings, as Lincoln West Associates had been proposed. He hired the Chicago–based architect Helmut Jahn in January 1985 to design the as-yet-unnamed development on the site. Trump, who called the Lincoln West tract "one of the best pieces of real estate in the country," contemplated erecting up to 8,000 apartments there. He also wanted to build a supertall skyscraper, following two unsuccessful approvals to build such a tower at the New York Coliseum site and on Wall Street.
Initial plan

Crain's New York called Trump's plan "the most ambitious development project ever in New York". Goldberger wrote that Television City was "woefully simplistic" and that the towers' designs had only a tenuous relationship with the street grid. New York Magazine architecture critic Carter Wiseman agreed, writing "isolated towers", such as those proposed in Television City, "survive in most of the world's major cities as reminders to planners that this brand of angst-inducing exclusivity is nasty to live with". Wiseman also said the development would cause overcrowding at the 72nd Street/Broadway station of the New York City Subway. A writer for the New York Daily News described the buildings as "intimidating and psychologically disturbing, dwarfing everything that's human in scale".
The proposal needed both a new EIS and a public review, and Trump hired McKeown & Franz to conduct the EIS. As such, construction could not start until 1987; Trump predicted that it would take five years to complete. The project soon received large amounts of opposition. Local residents expressed skepticism to the project, citing its size and the fact that it targeted the upper middle class. The Coalition Against Lincoln West called Television City "doubly excessive", dubbing it as even more extreme than the Lincoln West plan, while other opponents were specifically against the 150-story tower. Opponents ranged from small associations to the Westpride group, the latter of which enlisted notable neighborhood residents and raised hundreds of thousands of dollars to fund the effort. Trump was initially reluctant to acquiesce to opponents' demands, fearing that doing so would endanger the development. Trump tentatively agreed to sell Kumagai Gumi a 25% ownership stake in the development in 1986, but the agreement was rescinded due to disagreements over how much Kumagai Gumi was to pay.
Changes in plans
When it became clear that Helmut Jahn's plan would not be approved by the City Planning Commission, Trump decided to replace Jahn as Television City's master planner. In June 1986, he appointed Alexander Cooper as the site's new master planner; Jahn remained the architect for the proposed supertall tower. Newsday described Cooper as having a "sensitivity to scale" that contrasted with Trump's bold style. Trump and Cooper announced revised plans for Television City in October 1986. Justifying the World's Tallest Building, which would still have 136 stories rather than 150 stories, Cooper claimed that the supertall tower would include less office floor area than the Sears Tower or either of the World Trade Center's twin towers. The modified project still contained roughly the same amount of space, including 1.5 e6ft2 each of studio and retail space as well as 7,600 housing units. The six 72-story towers were replaced with slightly smaller, 45- to 57-story skyscrapers, which line one side of an avenue that would run north-south through most of the development. The plan included fewer parking spaces and more parkland as well.
Cooper's version of Television City still received criticism.
By early 1987, Trump was negotiating to lease the entirety of the supertall skyscraper's office space to General Electric (GE), which at the time owned NBC. Trump offered to sell the site to the New York State Urban Development Corporation and lease it back for 99 years. In exchange, Trump would have received a 20-year or 30-year tax abatement for Television City, which would have been the highest-valued abatement ever granted in New York City. Trump also offered to give the city government a portion of Television City's profits. Despite widespread public support for Trump's tax abatement, the city rejected Trump's proposal, and Mayor Ed Koch offered the tax breaks directly to NBC instead of to Trump. Negotiations between Trump and Koch devolved into name-calling; Trump called on Koch to resign, and Koch compared Trump to "a stuck pig". The plans called for 11 residential buildings, about 2 e6ft2 of office space, several parks, and a 152-story tower by mid-1987. The department store chain Bloomingdale's negotiated to lease space in Television City as well.
The project continued to face major opposition; for example, Westpride raised over $20,000 at a late-1987 fundraiser opposing Television City. Trump indicated that September that he wanted to sell NBC part of the Television City parcel for $20 million, and he also tried to entice financial services firms to move there. The Trump Organization also conducted a new EIS to appease opponents' concerns about Television City. The new EIS, published in October 1987, found that the development would cast shadows on the neighborhood, overload local transportation infrastructure, and interfere with television broadcasts. New Yorkers for Parks, then known as The Parks Council, commissioned a scale model of Television City, which it used to demonstrate shadows that the development would create on Riverside Park and the high winds the tall tower would create on its own parks.
Renaming and further revisions
At the end of October 1987, NBC decided against moving to Television City, even as Trump Organization officials claimed that the EIS was close to being approved. Politico reporter Michael Kruse wrote that the CPC likely would never have approved Trump City, though David W. Dunlap of The New York Times wrote that much of the project might have indeed been approved. Afterward, Trump initially planned to replace the television studio with a park or movie theater, even while preserving other aspects of the plans. In February 1988, Trump announced a revised plan for the project, which was renamed Trump City. The TV studio space was replaced with parkland, two small office buildings were added, and 760 of the apartments were designated as affordable housing for the elderly. The 150-story tower was retained, and there were to be 13 smaller towers. Goldberger wrote that Trump had added the affordable housing units to increase the likelihood of getting community approval, a sentiment shared by the project's opponents. By October 1988, Trump fueled speculation that he might sell the site. Despite receiving five offers, all for hundreds of millions of dollars, if his claims can be believed, Trump ultimately decided to keep the site.
Westpride, which had 4,200 members at the end of 1988, continued to fight Trump City, and local civic groups promised to sue the city government if Trump City were approved. A main target would be Trump's suggested air rights transfer of 4.5 e6ft2 from a 19 acre tract under the Hudson River to the rest of Trump City. Meanwhile, Community Board 7 and the Municipal Art Society jointly sponsored a "West Side Futures" study that recommended extending Riverside Park and the Manhattan street grid through the site, and limiting building density to a moderate level.
Furthermore, delays arose in 1989 when the city government investigated complaints that the Trump Organization was relocating possibly-contaminated dirt from Trump City to Fresh Kills Landfill. Trump alleged that Koch's administration was delaying the review of the project's EIS. In early 1990, Trump submitted a draft EIS to the New York City Council, which called for the structures to be built in several phases. Trump had spent nearly $200 million to date, even though construction had not started. Trump was paying tens of millions of dollars a year just to maintain the site.
The New York chapter of the American Institute of Architects issued a detailed critique of Trump City. Goldberger wrote that Trump City had turned into "a national symbol both of massive, overreaching development and of diehard community opposition to it". In response, Trump hired an advertiser to promote the development to residents in the New York metropolitan area. By that August, routine scaled-down plans for the site required by environmental review procedures fueled speculation that the Trump City proposal would collapse. However environmental review continued and was completed around February 1991.
Manhattan West and ABC proposals
In 1985, the developer Daniel Brodsky acquired the land just east of the yard between 61st and 64th streets. He proposed a development known as Manhattan West, which initially called for 1,375 apartments, and he also wanted NBC to relocate to the site. By 1987, his plans called for 1,200 affordable and luxury apartments across more than 1 e6ft2, in addition to 2.5 acre of parkland. The apartments would have been located in an L-shaped building with several roofs measuring up to 39 stories high, as well as 28-story building to the south. The CPC forced Manhattan West to conform to Television City's site plan, which included a block-wide park between 63rd and 64th streets extending east to West End Avenue. A new version of the plan, with 1,000 apartments and only 600000 ft2, was proposed in 1989. The Board of Estimate approved the revision in February 1990, and work on Manhattan West began in 1994.
Meanwhile, Brodsky had sold off the northernmost 2 acre of the Manhattan West site to Capital Cities/ABC in 1986. By the 1990s, Capital Cities/ABC was planning to erect three 39-story residential buildings and several television studios. The residential buildings, with a combined 930 units, would have been located from 64th to 65th streets, while the studios would have been located to the north. Capital Cities/ABC's proposal was submitted for public review in 1992, but Community Board 7 rejected the original plans. Capital Cities/ABC then canceled one of the towers and downsized the project to 500 apartments.
Riverside South{{anchor|Progress|Construction}}
Civic organizations' proposal
Initial plan

At the end of 1989, three civic organizations—the Municipal Art Society, New Yorkers for Parks (then known as The Parks Council), and the Regional Plan Association—proposed an alternative plan for the site based on relocating the elevated highway inland and to grade to make room for a 25-acre extension of Riverside Park. Building on that concept, a more complete plan devised by environmental planner Daniel Gutman and the architect Paul Willen called for an exclusively residential project of 7.3 e6sqft set on an extension of the Manhattan street grid
First, civic groups had filed a lawsuit in June 1990 to reverse changes to zoning rules for large-scale developments that would have eased approval of Trump City. In November 1990, a New York Supreme Court judge invalidated the zoning changes. Second, emboldened by the civic alternative, local politicians called on the city government to buy the site from Trump. Third, financial pressure on Trump was reaching the bursting point. Chase Manhattan Bank, which had given Trump a mortgage loan on the site, was concerned that the loan might not be repaid, and loans on his Atlantic City casinos were also in deep trouble.
By the beginning of 1991, Trump was negotiating his capitulation with the six civic groups. He formally abandoned plans for Trump City in March 1991. The negotiated compromise was to have 8.3 e6ft2 of space in total. These plans called for 5,500 apartments and up to 1.8 e6ft2 for television studios.
Trump and the six civic groups formed the Riverside South Planning Corporation (RSPC) to design the project, which they called Riverside South. Chase Manhattan Bank, which still held more than $200 million in mortgages on the site, initially paid all of RSPC's expenses. In April 1991, the RSPC hired David Childs of SOM, along with Paul Willen, to oversee Riverside South's design. At the request of Manhattan borough president Ruth Messinger, the American Institute of Architects convened a delegation of planners and architects, who, after an intense weekend of study, endorsed the overall concept, but recommended that the floor area be limited to somewhat less than the 7.3 e6sqft previously approved for Lincoln West. The RSPC unveiled a scale model of its proposal in August 1991, which showed a curved line of buildings with the tallest residential buildings, 40-50 stories, clustered near either end of the site. There were to be 16 residential buildings, all but three lining the new Riverside Boulevard, and two office buildings on Eleventh Avenue. Trump had not pledged funds to improve nearby subway stations, as local residents had requested and also did not want to add affordable housing units, saying it would be unprofitable to do so.
Park design
A primary motivation for the Riverside South plan was the 25 acre extension of Riverside Park now known as Riverside Park South. The twenty-foot elevation difference between Riverside Boulevard and the rail yard below allows for the same kind of slopes and grades as in the landmarked Riverside Park to the north. Four artists and Michael Van Valkenburgh, a landscape architect were hired to design the public park, but they failed to coalesce and Van Valkenburgh quit. He was replaced by new landscape architect, Thomas Balsley. The artists later quit, as well, when their "ecological design" was not totally accepted by the city's parks department. Balsley completed two park designs—one an interim design with the elevated highway in place and a final design with the highway moved to the east side of the park. The final design featured a flat extension of Riverside Park between 72nd and 68th streets, culminating in an amphitheater build into a constructed hill at 67th Street, and an arc of land echoing the arc of the highway from there to 63rd Street, featuring a broad lawn gently sloping toward the waterfront. The waterfront would have a rebuilt 750-foot pier, an undulating network of walkways, and an old rail transfer bridge. The decaying hulks of two collapsed piers would remain as picturesque ruins.
During the review process, the two picturesque ruins, remnants of the artists' vision, became controversial and were removed from the approved plan. Also the amphitheater was reduced in size and the seating was transformed into grass-covered terraces.
Approval process and objections
In May 1992, the CPC granted the Riverside South project a certification, allowing the public review process to commence. However, the project faced opposition because of its size, traffic issues, lack of affordable housing, and its association with Trump. Some residents of Lincoln Towers, which adjoined the rail yard, opposed any development on the site. Residents of 71st Street, a dead end street, objected to the fact that their street would be extended to Riverside Boulevard. A report commissioned for Community Board 7 found that Riverside South would overwhelm the neighborhood's transit infrastructure unless it was reduced to 4,300 apartments, and the community board voted in July 1992 to recommend that the project not proceed. Additionally, Messinger said she would not support the plans without further alterations.
Following these objections, Trump agreed to slightly reduce the project's size, remove the office space, provide funds for the 72nd Street subway station, reserve 12% of the apartments for affordable housing, and build and maintain the new public park. The RSPC agreed to extend 71st Street for pedestrians while preventing through vehicular traffic, and setbacks were increased on each of the buildings. but other critics still strongly opposed the project. U.S. Representative Jerry Nadler described the planned public park as a 10 e6$/acre "private backyard for the people who live in these buildings". Amid the opposition, Trump denied that he planned to sell the site. To convince the CPC to approve his plans, Trump agreed to provide even more money for the 72nd Street subway station and designate up to 20% of the apartments as affordable housing. The CPC approved the Riverside South plan in October 1992. A New York City Council subcommittee approved the plan that November after Trump agreed to delay the television studios' development, and the full City Council approved Riverside South the next month.
The final project size was 6.1 e6sqft—with an option for 1.8 e6sqft of television studios on the two southern blocks—as well as a park and improvements to the existing Freedom Place. Goldberger wrote that the final plan "stands a real chance of being a cause for celebration rather than embarrassment." The media estimated that Riverside South. Manhattan West, and the Capital Cities/ABC project would collectively house between 15,000 and 20,000 residents. There was to be a 1 acre park at the confluence of the three developments. The first phase of Riverside South called for four 18-to-40-story towers between 65th and 69th streets, with about 1,600 apartments. Ultimately, the development was planned to include 16 buildings with 5,700 apartments, in addition to a 23 acre park and 1.8 million square feet of retail.
By March 1993, Trump was applying for tax abatements and funding from the New York state government; at the time, he owed the city $4.4 million in back taxes. Along with Costas Kondylis, Philip Johnson was hired as one of the development's architects that November. Opponents sought to deny the highway project any funding, thinking that would stop the development.
Partnership with Asian investors

Meanwhile, during the mid-1990s, Chase Manhattan was pressuring Trump to repay the loan on the site, and Trump wanted to refinance the project to pay the debt. Colony Capital offered to buy the debt on Riverside South's loan in late 1993, but these negotiations were unsuccessful. Additional attempts at obtaining funding from American financiers were also unsuccessful, and Trump said in early 1994 that he would apply for a loan from the United States Department of Housing and Urban Development. He subsequently went to Hong Kong to negotiate with the businessman Henry Cheng. The project was also involved in two lawsuits during this time, one of which claimed that the project did not conform to Lincoln West's EIS. The other lawsuit centered around sewage disposal; at the time, Trump estimated that the development would generate 5 e6gal of sewage a day, but he had not received permission to connect the development's sewage lines to the North River Wastewater Treatment Plant.
Trump sold a controlling interest in the project in June 1994, and a group of four developers from Hong Kong and mainland China, including New World Organization and Polylinks International, bought the controlling stake. Polylinks paid Chase $90 million to settle the project's debt, plus $20 million in back taxes and other fees. The group also committed to spending $2.5 billion on the project itself. Cheng became Riverside South's primary financier and developer, while Trump remained Riverside South's chief promoter. Trump retained a 30% ownership stake in Riverside South, which could be increased if he sold or rented a certain number of apartments. The project was jointly developed by the Trump Organization and Hudson Waterfront Associates, the latter of which represented the Asian investors; they hired feng shui consultants to provide advice on Riverside South's design.
Though Riverside South's financial issues had been resolved, the lawsuits over the development were still pending. Construction was delayed as the lawsuits were resolved and the economy recovered. In February 1995, the city government resolved one of the legal disputes by allowing Trump to connect Riverside South's sewage line to the North River plant. That June, the New York Court of Appeals ruled that the EIS for Riverside South had been conducted properly. There was another controversy over the RSPC's plans to build a temporary playground between 70th and 72nd streets. In the meantime, the new investors sought public financing. Trump applied for a $355 million mortgage for Riverside South from the federal government; if the mortgage were approved, up to 20% of the apartments would have been reserved for low-income or middle-income residents. Trump was accused of paying off New York State Senate majority leader Joseph Bruno for approval, and the project's opponents accused Trump of colluding with Mayor Rudy Giuliani on the mortgage application. Nadler asked the Federal Housing Administration not to give a mortgage to Riverside South.
Start of construction
First structures

Trump and New World Organization hired Lehrer McGovern Bovis as Riverside South's construction manager in April 1995; the firm went on to build eight of Riverside South's towers. Work was delayed for two more years. In December 1996, the New York City Department of Environmental Protection granted Trump permission to connect the development's first structure to the treatment plant, and Trump received private financing for that building. After the city granted a construction permit in January 1997, a shanty town nearby was removed the next month.
By mid-1997, Lehrer McGovern Bovis and HRH Construction were erecting the first two towers at 180 and 200 Riverside Boulevard, which had a combined 990 apartments. One hundred and four units at 180 Riverside were set aside for low-income households. Trump was also negotiating to install a massive statue of the explorer Christopher Columbus at Riverside South. Residents of Lincoln Towers continued to oppose the project, saying it would block their views of the Hudson River. Another group of opponents sued to force Trump to construct Riverside Park South.
During the construction of 200 Riverside Boulevard, a subcontractor used substandard concrete to construct columns supporting the fifth floor, ignoring warnings from the building's structural engineer. The New York City Department of Buildings (DOB) halted construction of the tower that November, after that tower had reached its 20th floor. In addition, the first seven towers were exempt from the city's new seismic code due to a grandfather clause, and two of the towers were also exempt from sprinkler regulations because they were shorter than 300 ft. Work on 200 Riverside Boulevard resumed in January 1998 after the defective concrete was replaced. By the middle of the year, the TV network CBS was negotiating to occupy studio space in Riverside South, and New World was attempting to sell Riverside South's first two buildings. The developers also rented out apartments at 180 Riverside Boulevard, while Pace Advertising Agency was hired to market the apartments. CBS ultimately decided against moving to Riverside South.
By early 1999, several retailers were negotiating to move into the first two buildings, and many of the condos and rental apartments were being leased out. The first structures were initially branded as Trump Place. New World and Trump placed a 9 acre tract between 59th and 61st streets for sale that May, but they were unable to find a buyer.
Highway Relocation

After the first two buildings were started, the highway became a pressing issue. In the next phase of construction, south of 70th Street, the relocated highway would have to start slipping under Riverside Boulevard, which was to be built by the developer. In the absence of an approved highway plan, it would be risky to construct supports for Riverside Boulevard because the exact alignment of the relocated highway had not been fixed. And the city had insisted, partly through animus, that the next part of Riverside Boulevard be constructed on fill. Congressman Jerry Nadler also succeeded in removing funding for the highway relocation from transportation bills. The highway design process was eventually restarted and in 2001 the Federal Highway Administration approved the highway relocation.
Second Phase
Work commenced on a third building: a 33-story tower at 160 Riverside Boulevard in 1999. Other developments, such as Tishman Speyer's 101 West End Avenue rental building, were also being built nearby. The M72 bus was rerouted to serve the complex, prompting complaints from neighborhood residents.

By early 2000, work was about to begin on a fourth Trump Place building, a condo tower. Later that year, Columbia University began negotiating to construct a satellite campus at the southern end of Trump Place. While Goldman Sachs advised the university that the land's fair value was $65–90 million, Trump was insistent on a $400 million price, leading Columbia to expand in Manhattanville instead. Simultaneously, Trump developed a waterfront public park known as Riverside Park South. Trump was required to expand the park as additional buildings were erected, and he also had to preserve the 69th Street Transfer Bridge. During the park's construction, complaints of sewage smells prompted the Trump Organization to replace 180 Riverside's pipes. The park's first phase, which cost $14 million, unofficially opened in January 2001 and was dedicated that April. Trump Place's real estate brokers, the Corcoran Group, reported higher-than-anticipated interest in the apartments, despite the development's relatively remote location. Despite a slight downturn caused by the September 11 attacks later the same year, the apartments remained in high demand. Also in 2001, Community Board 7 approved the addition of another park on Riverside Boulevard.
Although Trump ceased his active involvement in the development in 2001, he retained his 30% limited partnership. The first retailer at Trump Place, a wine shop, opened in 2002, four years after Trump had begun looking for retail tenants. Trump planned to begin constructing the complex's sixth structure, 240 Riverside Boulevard, the same year, which would have required the closure of the West Side Highway's 72nd Street exit ramp. Work on 240 Riverside was delayed by opposition from residents of the neighboring Chatsworth Apartments, who feared the building would obstruct their windows, as well as objections from local residents who wanted to re-litigate the plan to close the 72nd Street highway exit ramp. Despite the opposition, 240 Riverside was under construction by 2003. A second segment of Riverside Park South opened that June. Nostalgia for the two ruined piers again arose, but was quickly dismissed and they were finally ordered removed. The city government agreed in early 2004 to close the 72nd Street exit ramp; a state judge placed an injunction preventing the ramp's closure, but an appeals court upheld the plans. By the end of 2004, a seventh building at 120 Riverside Boulevard was being completed. The 72nd Street exit ramp was finally closed three years later.
Site resale and completion
Carlyle and Extell takeover
Trump and his partners sold Riverside South, excluding the finished condominiums, to the Carlyle Group and the Extell Development Company for $1.76 billion in June 2005. The syndicate had beat out several other bidders including the Related Companies, Vornado Realty Trust, and the Durst Organization. Carlyle obtained a 50% ownership stake in the project, while Extell took a 25% stake and sold the remaining 25% to an Irish development consortium. Shortly afterward, Carlyle and Extell resold three rental apartment buildings to Equity Residential for $816 million. Trump, who contended that the sale price was just over half what the property was worth, sued his partners, but he lost. The Corcoran Group also sued Trump, claiming that he had failed to pay sales commissions for apartments sold there. Carlyle and Extell also attempted to sell the land between 59th and 61st streets before withdrawing their plans in December 2005. The seventh structure, 120 Riverside Boulevard, opened in early 2006. The third phase of Riverside Park South opened that August, and the development's first supermarket also opened in 2006.
Also, in 2006 the developers began erecting a tunnel between 61st and 65th streets for the eventual relocation of the West Side Highway (see External Images at right). An agreement called for the developer to construct the northbound tunnel as the support for Riverside Boulevard and the state Department of Transportation to construct the adjacent southbound tunnel.
In the mid-2000s, Extell developed the Avery condominium building at 100 Riverside Boulevard, as well as the Rushmore nearby at 80 Riverside Boulevard. The West Side Highway's 72nd Street exit finally closed in June 2007, though the connection from Riverside Boulevard to Riverside Drive did not open for another four years. A fourth section of Riverside Park South opened in 2008. Thomas Balsley subsequently designed three more sections of the park. In addition, Extell began developing the Aldyn condominium and a rental tower between 62nd and 63rd streets in early 2008, and it received a $613 million loan to develop the towers. The Avery was finished in 2008, followed by the Rushmore in 2009 and the Aldyn in 2010. Amid weakening demand for condos at the Aldyn, Avery, and Rushmore, several prospective condo buyers sought to cancel their purchases. Multiple would-be buyers at the Rushmore sued Carlyle and Extell in 2009 after the developers refused to refund their apartment deposits; they received a $15 million refund after three years of litigation. Extell filed plans for 40 Riverside Boulevard (later One Riverside Park), just north of Riverside Center, in 2009, and Hill West Architects was hired to design a 33-story building on that site.
Riverside Center and Waterline Square
.jpg)
The southernmost section of Riverside South, which had been set aside for television studios, needed to be rezoned before residential structures could be built there. In October 2008, Extell proposed constructing Riverside Center, a set of five mostly residential towers between 59th and 61st streets, to complete the development. Originally, Christian de Portzamparc was hired to design the buildings. Riverside Center, covering 3.1 e6ft2, was modeled on the design of Battery Park City, with 2,500 residential units, retail, a cinema, a K-5 school, a hotel, and open space. The first site, known as site 2, would have contained 616 apartments and a school. Local residents quickly organized in opposition to the plans; among other things, they objected to the presence of 1,800 parking spaces and an automobile dealership. In mid-2010, Community Board 7 voted to recommend that the city government disapprove the plans for Riverside Center, and Manhattan borough president Scott Stringer also refused to accept the plans. In response, two lawyers and three lobbyists from Extell began negotiating with the city government. Extell agreed to add a school and affordable housing, cancel plans for a department store, and improve parks in the area.
The City Council approved Riverside Center's towers in December 2010 following a protracted dispute over the zoning. Extell hired Dattner Architects to design Riverside Center's school in 2011, Community Board 7 approved plans for the first Riverside Center building, occupying site 2, in August 2012. The Carlyle Group subsequently solicited bids for the development of the Riverside Center sites, inviting Extell to submit a bid. Dermot Realty Management Company won the bid to develop site 2, and the company bought the site in December 2012 for $70 million. Dermot also hired SLCE Architects to design the building at site 2, replacing de Portzamparc as the architect there. Silverstein Properties and El-Ad Group paid $160 million in 2013 for One West End Avenue, one of the five sites in the Riverside Center project. Silverstein and El-Ad's site became the One West End condominium building, while Dermot's site became the 21 West End Avenue rental building.
In 2014, Extell announced plans for the remaining three sites in Riverside Center. Extell never developed the remaining Riverside Center sites. General Investment and Development Companies (GID) bought the site at 400 West 61st Street in May 2015, and GID bought additional land at 20 Riverside Boulevard that November. GID bought the remaining tract at Riverside Center in December 2015. The project became Waterline Square, which was completed in 2020; the Waterline Square project includes three towers with 1,132 total units. Richard Meier & Partners, Kohn Pedersen Fox, and Rafael Viñoly designed the three Waterline Square towers.
2010s to present
The Collegiate School agreed to move to Riverside South in 2013 and announced plans for a 10-story campus building at 301 Freedom Place South the next year. Extell began selling units at One Riverside Park in late 2013, and it subsequently opened a housing lottery for that building's affordable apartments. Silverstein and El Ad began selling the condos at One West End in 2015, and they also launched an affordable-housing lottery for that building. Dermot also began renting out units at 21 West End Avenue in 2016.
The first seven Riverside South buildings were originally known as Trump Place, and six of these buildings (excluding 240 Riverside Boulevard) contained large signs with that name on their facades. After Trump won the 2016 United States presidential election, the residents of 140, 160, and 180 Riverside Boulevard voted to remove the Trump Place signage from their respective structures. Many of these residents had been politically opposed to Trump and had signed petitions in favor of the removal of the Trump name. The Trump signage was removed from 200 Riverside Boulevard in October 2018 after that building's residents also voted to remove the signs. The Trump signage was also removed from the facade of 120 Riverside Boulevard in 2019; this was followed shortly afterward by the removal of Trump signage on 220 Riverside Boulevard, the final building in the complex that still bore the Trump Place name.
Riverside Park South's fifth phase opened in 2020. A&E Real Estate bought 140 Riverside Boulevard in 2022 for $266 million, and that firm paid another $415 million for 160 Riverside Boulevard the same year.
Parks
Riverside Park South

Park construction is funded by fees paid by Riverside South's residents. Phase 1, a 7 acre section from 72nd to 68th streets, was opened in April 2001. Pier I at 70th Street, part of the railyard, was rebuilt; it maintains its original length of 795 ft, but is narrower than originally, at 55 ft. Phase 2 comprises a waterfront section from 70th to 65th streets and opened in June 2003. It has two plazas at 66th and 68th streets, as well as a jagged waterfront. Phase 3, opened in August 2006, stretches from 65th to 62nd streets on the waterfront. Phase 4 opened in 2008 along the waterfront, extending from 63rd to 59th streets (overlapping with phase 3). A new mixed-use bikeway and walkway was also built under the highway, linking Hudson River Park with Riverside Park.
The design of phases 5 and 6, located east of the elevated highway viaduct, was tied to the fate of the highway relocation. The city had required that the first half of Riverside Boulevard be constructed on fill, while the second half was constructed on top of a new highway tunnel, changing park contours. Also there was pressure to add more recreational space. The park was subsequently redesigned so that the gently sloping broad lawn, that had been the centerpiece of the park,

Relocating the highway will require some reconstruction of the park. A fifth phase of Riverside Park South opened in October 2020, encompassing the land east of the West Side Highway from 65th to 68th streets. The city plans to expand the park with new baseball and soccer fields, bikeways, lawns, picnic areas, and restrooms.
The park contains site-specific sculptures; railway ruins, gardens; a waterfront promenade; a walkway; and "Linda's Lawn" honoring Linda Davidoff, former president of The Parks Council, who organized the civic coalition that formulated the Riverside South plan. Portions of the former rail yard were incorporated into the new park. These include the New York Central Railroad 69th Street Transfer Bridge, which is listed on the National Register of Historic Places. As a reminder of the location's history, New York Central Railroad logos are engraved onto park benches. A wooden pier named Pier D was originally preserved as part of the park, but it was demolished in 2011 due to extreme deterioration.
Other parks
On West End Avenue, a privately owned park has a remnant of a stone wall as a remaining part of the embankment that dated to 1847. Construction workers had unearthed the stones during construction in 1994; some stones were salvaged for the new park during the four-day construction hiatus for archaeological excavation. There is also a private 3 acre park at One West End.
Buildings
Overall, the development consists of 19 apartment buildings, condominiums, and lease properties. , the buildings housed a combined 8,000 people; the area was collectively called "Riverside Boulevard" after its main street, or "The Strip" after its long, narrow shape. Six more towers with a combined 3,000 units, as well as a school, a hotel, retail and restaurant space, and space for a movie theater, had yet to be completed. A 3.4 acre park between the buildings was in the planning stages. The towers were constructed as green buildings. Each structure's facade has a setback no higher than 125 to from the street; this was intended to reduce the buildings' visual impact.
Most living units in Riverside South are high-end housing, costing at least $2,000 /ft2. Per-foot real estate prices for Riverside South housing rose 66% from 2004 to 2014, compared with a 43% increase in real estate on the Upper West Side overall. For instance, baseball player Alex Rodriguez bought a 39th-floor Rushmore condominium for $5.5 million in March 2011, then sold it for $8 million in January 2012. At the same time, 12% to 20% of the units are designated as affordable, as required by the CPC approval of the project. Some buildings in the development, such as One Riverside Park, were controversial having separate entrances for affordable-housing residents, despite the legality of such "poor doors" in mixed-housing buildings.
Notable structures
| AddressName | Completion date | Height (ft/m) | Stories | Apartments | Notes/references | |||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 40 Riverside BoulevardOne Riverside Park | 2015 | 375 ft | 33 | 219 | ||||||||
| 60 Riverside BoulevardThe Aldyn | 2011 | 395 ft | 38 | 136 | ||||||||
| 80 Riverside BoulevardThe Rushmore | 2008 | 425 ft | 41 | 271 | ||||||||
| 100 Riverside BoulevardThe Avery | 2008 | 344 ft | 30 | 274 | title=Avery, 100 Riverside Boulevard, NYC | website=CityRealty | date=October 28, 2024 | url=https://www.cityrealty.com/nyc/riverside-dr-west-end-ave/avery-100-riverside-boulevard/33841 | access-date=October 28, 2024 | postscript=none}}; | ||
| 120 Riverside Boulevard | 2004 | 230 ft | 18 | 275 | ||||||||
| 140 Riverside Boulevard | 2003 | 338 ft | 26 | 354 | last=Rizzi | first=Nicholas | title=Sam Zell Offloads Former Trump Place to A&E for $266M | website=Commercial Observer | date=April 8, 2022 | url=https://commercialobserver.com/2022/04/sam-zell-offloads-former-trump-place-to-ae-for-266m/ | access-date=October 28, 2024 | postscript=none}}; |
| 160 Riverside Boulevard | 2001 | 354 ft | 33 | 459 | title=160 Riverside Boulevard at Trump Place – The Skyscraper Center | website=Council on Tall Buildings and Urban Habitat – CTBUH | url=https://www.skyscrapercenter.com/building/160-riverside-boulevard-at-trump-place/11891 | access-date=October 28, 2024}} | ||||
| 180 Riverside Boulevard | 1999 | 422 ft | 40 | 516 | title=180 Riverside Boulevard at Trump Place – The Skyscraper Center | website=Council on Tall Buildings and Urban Habitat – CTBUH | url=https://www.skyscrapercenter.com/building/180-riverside-boulevard-at-trump-place/11644 | access-date=October 28, 2024}} | ||||
| 200 Riverside Boulevard | 2000 | 492 ft | 46 | 377 | title=200 Riverside Boulevard At Trump Place – The Skyscraper Center | website=Council on Tall Buildings and Urban Habitat – CTBUH | url=https://www.skyscrapercenter.com/building/200-riverside-boulevard-at-trump-place/3992 | access-date=October 28, 2024}} | ||||
| 220 Riverside Boulevard | 2003 | 542 ft | 49 | 430 | ||||||||
| 240 Riverside BoulevardThe Heritage | 2004 | 362 ft | 31 | 170 | title=The Heritage At Trump Place, Upper West Side, New York, NY 10069 | url=https://www.brownstoner.com/building/BUILDING-07f71d9467f69560f08fd821e7875bfc/240-riverside-boulevard-upper-west-side-ny-10069/ | access-date=October 28, 2024 | website=Brownstoner | postscript=none}}; | |||
| 1 Waterline Square | 2019 | 429 ft | 36 | 272 | title=One Waterline Square – The Skyscraper Center | website=Council on Tall Buildings and Urban Habitat – CTBUH | url=https://www.skyscrapercenter.com/building/one-waterline-square/27898 | access-date=October 28, 2024}} | ||||
| 2 Waterline Square | 2019 | 397 ft | 38 | 646 | title=Two Waterline Square – The Skyscraper Center | website=Council on Tall Buildings and Urban Habitat – CTBUH | url=https://www.skyscrapercenter.com/building/two-waterline-square/27897 | access-date=October 28, 2024}} | ||||
| 3 Waterline Square | 2019 | 391 ft | 34 | 244 | title=Three Waterline Square – The Skyscraper Center | website=Council on Tall Buildings and Urban Habitat – CTBUH | url=https://www.skyscrapercenter.com/building/three-waterline-square/27899 | access-date=October 28, 2024}} | ||||
| 400 West 63rd StreetThe Ashley | 2010 | 23 | 209 | |||||||||
| 1 West End AvenueRiverside Center Building 5 | 2017 | 513 ft | 43 | 246 | ||||||||
| 21 West End AvenueRiverside Center Building 2 | 2016 | 529 ft | 45 | 616 | ||||||||
| 75 West End AvenueWest End Towers | 1995 | 404 ft | 39 | 1,000 | ||||||||
| 101 West End AvenueArchstone | 2000 | 370 ft | 33 | 503 |
Trump and Hudson Waterfront Associates built the first seven buildings at Riverside South. Three additional buildings were completed by Extell: the Avery, the Rushmore, and the Aldyn. To attract families, Extell added various amenities to these three buildings, including playrooms, a bowling alley, a basketball court, and other sports facilities. The southern end of the development includes the 362-unit One West End condominium building, which includes amenities such as a cantilevered swimming pool. Next to One West End is a 616-unit rental building at 21 West End Avenue, which has a fitness center and basement pool.
Other structures
Manhattan Community Board 7 members blamed Trump for failing to build the proposed enhancement and monument at Freedom Place, though the Riverside South Planning Corporation said that the Freedom Place plan was merely a concept for an arts program that was not included in the final project. A street called Freedom Place South, along the same axis as Freedom Place, runs southward from 64th to 59th streets. In addition, there is a tunnel underneath a portion of Riverside Boulevard between 61st and 65th streets, which is intended to carry traffic from the West Side Highway. The tunnel measures approximately 0.8 mi long and 40 ft wide. The Metro-North Railroad sought a station on the West Side Line at Riverside South as part of the Penn Station Access project. However, the idea was abandoned in 2010 because the foundations of Riverside South's buildings had been built too close to the tracks and because demand at that location was uncertain.
The IRT Powerhouse, located just south of Riverside South, was designed by Stanford White for the Interborough Rapid Transit Company and is a New York City designated landmark. Adjacent to the Powerhouse is a tetrahedron-shaped building known as VIA 57 West, which was designed by Bjarke Ingels Group. In addition, the Abraham Joshua Heschel School is located on West End Avenue next to Riverside South.
References
Citations
Sources
References
- {{harvnb. Stern. Fishman. Tilove. 2006
- City Planning Commission, "Riverside South Final Environmental Impact Statement (FEIS)," October 11, 1992, [https://www.scribd.com/document/42688816/Riverside-South-FEIS-1 pp. II-H-3, II-H-18]
- Schneider, Daniel B.. (July 6, 1997). "F.Y.I.".
- Dunlap, David W.. (January 18, 2001). "Design Notebook; Skyline Views From Midstream".
- Robbins, L.H.. (June 3, 1934). "Transforming the West Side: A Huge Project Marches On". The New York Times.
- {{harvnb. Stern. Gilmartin. Mellins. 1987
- {{harvnb. Stern. Gilmartin. Mellins. 1987
- (July 29, 1959). "Times Begins Printing At New West Side Plant". The New York Times.
- "Litho City Master Plan (aerial view)".
- (1999). "The Wreck of the Penn Central". Beard Books.
- (June 22, 1970). "$200 Million Rescue Attempt Fails". The Vancouver Sun.
- Lipman, Joanne. (September 26, 1984). "Delayed New York Housing Project Shows Problems of Urban Ventures". The Wall Street Journal.
- (August 18, 1961). "West Side Housing to Straddle Central Tracks".
- (October 18, 1962). "Board Boosts Idea of a City Over the Rails". Daily News.
- (September 30, 1962). "Warn Center Over Traffic". Daily News.
- Ingraham, Joseph C.. (October 8, 1962). "City Planners Set to Approve Site for Litho City Development; Project Housing 12,500 Will Dominate Hudson Shore From 60th to 70th Mayor and Aides Back Plan".
- Madden, Richard L.. (October 18, 1962). "Litho City Area Ruled Suitable for Renewal". New York Herald Tribune.
- (October 20, 1962). "Foreign Student Residence Included in Litho City Plan". New York Herald Tribune.
- (November 21, 1963). "Model of $200 Million Litho City Goes on Display".
- Huxtable, Ada Louise. (June 21, 1963). "Litho City: Hit or Flop?; Union Housing Plan Meets Snag in Bid for 'Greatness' Star Architect Sought Above Middle Income Architects Recommended Financing a Mystery".
- Fowler, Glenn. (February 28, 1965). "Lincoln Sq. Area is Still Building". The New York Times.
- Ingraham, Joseph C.. (February 14, 1964). "One-Way Routing at Lincoln Center Is to Be Reversed".
- (September 10, 1965). "Moses Has 3 Bees in His Various Bonnets". Daily News.
- O'Kane, Lawrence. (January 21, 1966). "Litho City Plans Dropped by Union; Railroad Held Obstructive on Air Rights Proposal".
- New York City Department of City Planning, "Lincoln Square and its Waterfront," NYC DCP 76-27, October 1976.
- [https://web.archive.org/web/20160304121014/http://home.jps.net/~riversidesouth/Moses.jpg Moses' Proposal, 1974.]
- "Robert Moses' Proposal, 1974".
- Prial, Frank J.. (March 30, 1973). "West Side Studies 6 Highway Plans". The New York Times.
- Fried, Joseph P.. (July 30, 1974). "Penn Central Trustees Petition To Sell Property: Court Asked to Clear Sale Of New York City Land For Over $100 Million". The Wall Street Journal.
- Bagli, Charles V.. (June 1, 2005). "Trump Group Selling West Side Parcel for $1.8 Billion".
- Barrett, Wayne. (January 22, 1979). "Behind the Seventies-Era Deals That Made Donald Trump".
- McFadden, Robert D.. (March 11, 1975). "Penn Central Agrees to Sell 2 Inactive Yards: Trump Enterprises to Pay Minimum of $62 Million, Plus Option for Stake". The Wall Street Journal.
- Kruse, Michael. (June 29, 2018). "The Lost City of Trump".
- Fried, Joseph P.. (March 12, 1975). "West Side Leaders Skeptical Of Plan to Develop Rail Yards".
- Demick, Barbara. (May 27, 1990). "Trump City, or Trump's Folly?: a New York Neighborhood Has Organized to Fight Donald Trump's Most Ambitious Vision Yet.". Philadelphia Inquirer.
- Swertlow, Eleanor. (April 30, 1976). "Says W. Siders Oppose a 'Co-op City on Hudson'". Daily News.
- Fowler, Glenn. (November 30, 1976). "A River Park West of Lincoln Sq. Endorsed by City Planning Study". The New York Times.
- Klemesrud, Judy. (November 1, 1976). "Donald Trump, Real Estate Promoter, Builds Image as He Buys Buildings".
- New York State DOT and FHWA, [https://www.google.com/books/edition/_/orM2AQAAMAAJ?hl=en&gl=us&gbpv=1 "West Side Highway Project: Final Environmental Impact Statement, Section 6"] June 4, 1977, pp. 7-8.
- Vitullo-Martin, Julia. (January 19, 2004). "The West Side Rethinks Donald Trump's Riverside South".
- Penolope Green, [https://www.nytimes.com/2022/02/21/obituaries/paul-willen-dead.html "Paul Willen, Architect of Manhattan’s Waterfront, Dies at 93,"] New York Times, February 21, 2022.
- Moritz, Owen. (May 7, 1979). "Penn Central Corp. Posts Operating Profit For the First Quarter". The Wall Street Journal.
- (May 7, 1979). "Penn Central Corp. Posts Operating Profit For the First Quarter". The Wall Street Journal.
- Barrett, Wayne. (1992). "Trump: The Deals and the Downfall". HarperCollins Publishers.
- Smith, Randy. (November 1, 1980). "Latin maps $1B W. Side Complex". Daily News.
- (July 8, 1980). "New York's Plan for the Future; Total Cost at Least $180 Million New Link Instead of Zigzag Yard for Manhattan Industries".
- (March 24, 1980). "Penn Central to Sell Manhattan Rail Yard For Total $28 Million". The Wall Street Journal.
- Blair, William G.. (November 2, 1980). "Argentines Back New Effort To Build on Old Penn Rail Yards; Argentines Back New Effort to Develop Penn Yards".
- Postal, Bernard. (November 30, 1980). "Postal Card". The New York Jewish Week.
- Daniels, Lee A.. (January 28, 1981). "Metropolitan Desk".
- Oser, Alan S.. (August 8, 1982). "Perspectives: Lincoln West; Betting a Billion Dollars on the Upper West Side".
- (February 1, 1981). "It's toot-toot time for rail yard plan". Daily News.
- Chadwick, Bruce. (January 6, 1982). "Dr. Varsavsky's incredible city". Daily News.
- Chadwick, Bruce. (October 8, 1981). "Community board eyes private money for study". Daily News.
- Purnick, Joyce. (March 28, 1982). "West Side Waterfront Project is Facing a Series of Obstacles".
- (September 17, 1982). "Lincoln West Plan Before City Board". Newsday.
- (August 20, 1982). "Hearing on West Side Project Draws Backers, Opponents". Newsday.
- Bernstein, Nina. (March 25, 1987). "Trump He Plays for Keeps; It's Dream vs. Nightmare for Some Barren West Side Land". Newsday.
- Gottlieb, Martin. (November 20, 1985). "Trump's Plan for 150-story Tower on West Side Faces a Strenuous Review".
- Chadwick, Bruce. (February 26, 1982). "Board asks scaling down of Lincoln West". Daily News.
- Moritz, Owen. (September 19, 1982). "1B Lincoln West: a real blockbuster". Daily News.
- Goldberger, Paul. (August 29, 1982). "Architecture View; is the Lincoln West Project Right for the City?".
- Chadwick, Bruce. (March 23, 1982). "Unchanged Lincoln West plan goes before planning body". Daily News.
- Purnick, Joyce. (March 24, 1982). "City Asks Lincoln West to Defer Current Plans".
- Chadwick, Bruce. (March 31, 1982). "More modest proposal for W. 60th". Daily News.
- Lake, Katharine. (September 15, 1982). "On eve of vote, Stein says no to Lincoln West". Daily News.
- Chadwick, Bruce. (June 17, 1982). "Rail-Freight Center Study is Completed". Daily News.
- Burggraf, Helen. (August 13, 1982). "Plan For Housing Complex Riles Sa: Lincoln West : The Freight Debate".
- Chadwick, Bruce. (July 19, 1982). "Lincoln West planner flatly bars freight center". Daily News.
- Purnick, Joyce. (July 20, 1982). "Luxury Housing Given Approval by City Planners". Daily News.
- (August 19, 1982). "For Lincoln West, today's the big day". Daily News.
- Lake, Katharine. (September 18, 1982). "Mull suit to best Lincoln West". Daily News.
- Purnick, Joyce. (September 17, 1982). "Estimate Board Gives Approval to Lincoln West". The New York Times.
- DePalma, Anthony. (February 20, 1983). "Town Quandary: 20 Acres, Riv Vu".
- (December 9, 1982). "The City; Last Acres Bought For Lincoln West".
- Fowler, Glenn. (April 3, 1983). "Lincoln West Sponsor is Confident Despite Setback".
- Dunlap, David W.. (February 26, 1983). "Lincoln West Opponents Seek Ruling to Halt Plan". Daily News.
- Purnick, Joyce. (March 22, 1983). "New Impact Study Ordered For Lincoln West Complex". Daily News.
- Rosenfeld, Neill S.. (July 8, 1983). "Court Clears Way For Lincoln West". The New York Times.
- Rosenfeld, Neill S.. (October 28, 1983). "Appeals Court Says Lincoln West Study Was Properly Made". The New York Times.
- La Rosa, Paul. (September 8, 1983). "Helmsley suing city". Daily News.
- (March 28, 1984). "New York Day by Day; Changes at Lincoln West".
- Henry, John. (July 20, 1984). "Begins foreclosure against Lincoln West". Daily News.
- Arena, Salvatore. (August 18, 1984). "Map change deadline". Daily News.
- Dunlap, David W.. (September 14, 1984). "Lincoln West is Given More Time".
- Rangel, Jesus. (October 5, 1984). "Estimate Board Gives Extension to Lincoln West".
- Dunlap, David W.. (October 2, 1984). "Persistent Doubts Cloud the Future of the Lincoln West Proposal".
- Lipman, Joanne. (November 20, 1984). "Developer to Buy Site in Manhattan For $95 Million". The Wall Street Journal.
- Moritz, Owen. (December 2, 1984). "Trump has pact to buy tract for $95 million". Tarrytown Daily News.
- (December 19, 1984). "New York Day by Day; A Hint of Trump's Vision Of the West Side's Future".
- Moritz, Owen. (January 23, 1985). "New York Day by Day; an Architect is Named for Trump City". Daily News.
- Lyons, Richard D.. (September 22, 1985). "Developers Zero in on Columbus Circle".
- Moritz, Owen. (November 18, 1985). "Trump deals ace: He'll scrape sky". Daily News.
- Lipman, Joanne. (November 19, 1985). "Trump Plans Complex in Manhattan With TV Studios and 150-Story Tower". The Wall Street Journal.
- Goldberger, Paul. (November 19, 1985). "Trump Announces Plan to Construct World's Tallest Building". The New York Times.
- (November 25, 1985). "Programing: Donald Trump unveils plans for TV towers".
- Holmberg, David. (November 19, 1985). "Tall Order: Trump's Plan for West Side: a Record 150-story Building". Newsday.
- Bernstein, Nina. (March 25, 1987). "Trump He Plays for Keeps". Newsday.
- {{harvnb. Dixon. 1993
- Henry, John. (November 16, 1986). "New plan, old fight at Trump's TV City". Daily News.
- Frostig, Richard. (December 11, 1985). "New York Entertainment: Trump s Lofty Plan For TV City On West Side Has NBC Talking, But Neighbors Take A Dim View".
- Abramson, Dan. (December 7, 1985). "US News: NBC & Trump in preliminary development discussions".
- Holmberg, David. (February 2, 1986). "Squaring Off Over Trump; Many Oppose TV City, But It's Not Unanimous". Newsday.
- Sommerfield, Frank. (April 20, 1987). "They Deal for Donald".
- Goldberger, Paul. (December 22, 1985). "Is Trump's Latest Proposal Just a Castle in the Air?".
- Wiseman, Carter. (January 20, 1986). "Donald Trump's Fantasy Island". New York Media, LLC.
- Herbert, Bob. (November 21, 1985). "Trump overshadows the West Side...". Daily News.
- (November 22, 1985). "Trump Blows Hot For "Television City" Project".
- Bressi, Todd W.. (May 1995). "New York holds the trump card".
- Saxon, Wolfgang. (November 19, 1985). "West Siders Voice Concern on Plan".
- Goldberger, Paul. (April 26, 1987). "Reinventing the City".
- (November 27, 1985). "Inside New York". Newsday.
- Leuck, Thomas J.. (September 30, 1987). "Celebrities Open Wallets to Fight Trump's Project". The New York Times.
- Sommerfield, Frank. (November 2, 1987). "Trump's West Side Finesse: Developer Deals, Trades – a Bit – to Gain Approval for Television City".
- Barsky, Neil. (November 8, 1987). "How Donald trumped self". Daily News.
- Guenther, Robert. (December 24, 1986). "California Initiatives Dampen Outlook for Building Projects". The Wall Street Journal.
- (June 25, 1986). "New York Day by Day; Architect for TV City".
- Moritz, Owen. (July 3, 1986). "N.J. carries torch". Daily News.
- Henry, John. (November 16, 1986). "Low-key vs. high profile". Daily News.
- Polsky, Carol. (October 26, 1986). "Trump's TV City Plan Called a Rerun". Newsday.
- Dunlap, David W.. (November 30, 1989). "Proposed West Side Project Attacked". The New York Times.
- Goldberger, Paul. (October 24, 1986). "Television City Project: Tempered, but Still Big".
- Goldberger, Paul. (December 28, 1986). "Architecture View; Developers Learned Some Lessons and Cut Back".
- Bernstein, Nina. (February 19, 1987). "Trump Brings GE Plan to Light". Newsday.
- Scardino, Albert. (May 6, 1987). "Trump Offers to Sell Tract to Keep NBC in New York".
- Polsky, Carol. (May 7, 1987). "Trump Pitches Plan To Sell Site for $1". Newsday.
- Freedman, Samuel G.. (July 6, 1987). "Trump Feud: Barbs Show Deeper Split".
- Malanga, Steve. (June 15, 1987). "City to Koch: Don't Lose NBC: Poll Backs Trump on Tax Incentives".
- Finder, Alan. (June 1, 1987). "The Koch-Trump Feud; the Mayor's Political Fortunes and Television City Could Be Affected by NBC's Possible Relocation".
- Lowenstein, Roger. (May 29, 1987). "Trump Fails in Bid To Get Tax Breaks For New York Site". The Wall Street Journal.
- Finder, Alan. (June 1, 1987). "The Koch-Trump Feud; The Mayor's Political Fortunes and Television City Could be Affected by NBC's Possible Relocation". The New York Times.
- (May 31, 1987). "The Region; Koch, Trump Slug It Out".
- Oser, Alan. (May 10, 1987). "Huge Projects that Shape the Landscape of the City". The New York Times.
- Barmash, Isadore. (October 3, 1986). "Bendel Sets Move to 5th Ave.". Daily News.
- Mangaliman, Jessie. (October 2, 1987). "Manhattan Neighborhoods Manhattan Closeup Westpride Wants to Shrink Tv City". Newsday.
- Selvin, Barbara W.. (September 19, 1987). "NBC Deal Said To Be Likely". Newsday.
- Barsky, Neil. (September 29, 1987). "TV city or not TV City, that is Don's question". Daily News.
- Lueck, Thomas J.. (September 22, 1987). "Opponents Seek Draft of Reports On Trump Plan".
- Polsky, Carol. (October 6, 1987). "Latest Static: Trump's TV City Could Hurt Picture on City TV". Newsday.
- Ladd, Scott. (December 10, 1987). "Manhattan Neighborhoods Manhattan Closeup Model Shows Effects of More Skyscrapers". Newsday.
- Sommerfield, Frank. (November 9, 1987). "Landlords Won't Give NBC the Moon – Yet". The New York Times.
- Lowenstein, Roger. (November 2, 1987). "Trump, NBC Drop Proposal On Firm's Move". The Wall Street Journal.
- Dunlap, David W.. (June 28, 1989). "Trump Offers Unusual Plan To Use 'Underwater Zoning'". The New York Times.
- Butterfield, Fox. (February 4, 1988). "Inside New York". Newsday.
- Rosen, Barbara. (August 26, 1989). "In New York, the Sky's Not the Limit; Complex Air-Rights Deals Help Developers Circumvent". The Washington Post.
- Goldberger, Paul. (January 31, 1988). "Architecture View; Trump: Symbol of a Gaudy, Impatient Time".
- (February 4, 1988). "Trump City? So, What's in a Name?". Newsday.
- Lowenstein, Roger. (October 13, 1988). "Trump City Not For Sale – Yet; Potential buyers talking". Newsday.
- Barron, James. (October 18, 1988). "Trump to Sell The St. Moritz At Big Profit".
- Lowenstein, Roger. (December 22, 1988). "Trump Will Keep Site in Manhattan, Plans Development". The Wall Street Journal.
- Kovaleski, Serge. (December 22, 1988). "Trump standing tall on West Side". Daily News.
- Waite, Thomas L.. (November 13, 1988). "Postings; Upper West Side Story: No Rest for the Wary".
- Lueck, Thomas J.. (September 30, 1989). "Metrotech Agrees to Pay $2 Million to Aid Tenants".
- Dunlap, David W.. (February 25, 1996). "Lawyers Who Mold The Shape of a City".
- Moss, Michael. (June 25, 1989). "Long Fight Looms Over Trump Digs". Newsday.
- Dunlap, David W.. (March 24, 1989). "Development Changes Urged for the West Side". The New York Times.
- New York City Department of City Planning, [https://www.nyc.gov/assets/planning/downloads/pdf/our-work/plans/manhattan/197a/manhattan_waterfront_197a.pdf Comprehensive Manhattan Waterfront Plan], 1997, p. 124.
- Selvin, Barbara. (December 28, 1989). "A Last Slap at Trump?". Newsday.
- Purdum, Todd S.. (March 12, 1990). "New Land Panel Has Trouble Gearing Up".
- [https://www.usmodernist.org/AIANY/AIANY-1990-06.pdf NYC/AIA to Trump City: Forget It], Occulus, June 1990, p. 10.
- Berkowitz, Harry. (July 28, 1990). "Architects Level Donald's Plans". Newsday.
- Enrico, Dottie. (July 10, 1990). "Trump City Hires Black-Owned Ad Agency". Newsday.
- Berkowitz, Harry. (August 6, 1990). "Potholes and Detours Dot the Road to Trump City Scaling down the project may be the only way to get it built". Newsday.
- Sommerfield, Frank. (February 18, 1991). "Tale of Trump Cities".
- Roberts, Sam. (October 25, 1990). "Metro Matters; Project Is Caught In a Crossfire Meant for Trump".
- Meislin, Richard J.. (November 16, 1985). "NBC Plans a Move From RCA Building".
- Polsky, Carol. (September 11, 1987). "TV City's Neighbor Gets Bit of Attention". Newsday.
- Dunlap, David W.. (November 30, 1989). "Proposed West Side Project Attacked".
- Jerold S. Kagan, The New York City Department of City Planning, and the Municipal Art Society of New York, [https://apops.mas.org/pops/727/ "Privately Owned Public Space: The New York City Experience,"] {{Webarchive. link. (July 2, 2018 John Wiley & Sons, 2000.)
- (March 27, 1994). "Postings: 1,000 Apartments; West Side Housing".
- Henry, David. (February 16, 1994). "Trumping Donald Understated builder gets the jump". Newsday.
- Oser, Alan S.. (August 16, 1992). "Perspectives: West Side Development; Capital Cities/ABC Plans New Studios".
- Dunlap, David W.. (February 16, 1992). "Plan Readied for a Smaller Trump City".
- Gordy, Molly. (January 6, 1993). "As Easy as ABC? Network seeks city's OK to build TV studios, apartments". Newsday.
- Dunlap, David W.. (March 28, 1993). "TV Industry Scrambles for Studio Space".
- Gordy, Molly. (January 7, 1993). "Board Rejects ABC Project". Newsday.
- [https://www.ny4p.org/who-we-are/history History of New Yorkers for Parks]
- Dunlap, David W.. (December 3, 1989). "Groups Propose Park at Highway". The New York Times.
- Selvin, Barbara. (November 30, 1989). "Move the West Side Hwy? Civic Groups Float Plans for Trump City". Newsday.
- Goldberger, Paul. (July 1, 1990). "Another Chance for a Prime Piece of Real Estate". The New York Times.
- (June 22, 1990). "City Is Sued Over Trump City Zoning". Newsday.
- Lueck, Thomas J.. (November 28, 1990). "Zoning Law Ruling to Delay 6 Large Real-Estate Projects". Newsday.
- Buder, Leonard. (July 12, 1990). "New York City Is Urged to Buy Big Trump Site". Daily News.
- Dorfman, Dan. (May 6, 1990). "The Trump Shuffle He's trying to sell assets to become king of cash, but the kingdom could be smaller than he imagined". Newsday.
- Finder, Alan. (February 19, 1991). "Trump Drops New Jersey Deal". Newsday.
- Berkowitz, Harry. (March 6, 1991). "Trump's Foes Now Sing Praises". Newsday.
- Grant, Peter. (July 13, 1992). "Trump Site Targeting Below-Market Housing".
- Dunlap, David W.. (April 14, 1991). "Trump and Civic Groups Team Up to Oversee Big Riverside Project".
- Fee, Walter. (May 18, 1992). "Trump Banks On City, State Boost". Newsday.
- Berkowitz, Harry. (April 13, 1991). "Trump City Project Gets Architect, Peacemaker". Newsday.
- Wright, Chapin. (July 1, 1991). "Panel Suggests Scale-down Of Trump Riverside Plan". Newsday.
- Goldberger, Paul. (August 11, 1991). "Lower Skyline, Higher Aspirations".
- Paul Willen and Daniel Gutman, [https://www.usmodernist.org/AIANY/AIANY-1990-10.pdf Dumping Trump: The Sequel], Oculus, October 1990, p. 6.
- Dunlap, David W.. (May 19, 1992). "Trump's West Side Project Declared Ready for Review". New York Daily News.
- Dunlap, David W.. (May 24, 1992). "A Blueprint of the Future Along the Hudson River".
- Weber, Bruce. (July 22, 1992). "Debate on Trump's West Side Proposal". The New York Times.
- Gray, Christopher. (December 13, 1992). "Streetscapes: The Chatsworth; Riverside South's Threat to a 1904 Apartment Tower". The New York Times.
- Gray, Christopher. (October 17, 2004). "The End of a Dead End, at Least for Pedestrians".
- Moritz, Owen. (July 20, 1992). "Report pans Trump plan for W. Side". New York Daily News.
- Barron, James. (July 24, 1992). "Board Rejects Trump's Waterfront Plan". New York Daily News.
- Dunlap, David W.. (July 26, 1992). "Messinger Is Urging Change In Trump's West Side Plan".
- Finder, Alan. (October 22, 1992). "Trump Yields to Demands on Housing". The New York Times.
- Moritz, Owen. (September 10, 1992). "Not so, sez Trump". New York Daily News.
- Walt, Vivienne. (September 10, 1992). "Activists, Politicians Pan Trump's Riverside South". Newsday.
- Dunlap, David W.. (February 25, 1997). "In Trump Revision, Highway Stays and Park Goes".
- Moritz, Owen. (October 27, 1992). "1M sweetener from Donald". New York Daily News.
- Henry, David. (November 24, 1992). "Trump Is Closer To Deal On Riverside". Newsday.
- McKinley, James C. Jr.. (November 24, 1992). "Trump Development Plan To Drop Giant TV Studio".
- Henry, David. (November 24, 1992). "Trump Is Closer To Deal On Riverside". Newsday.
- Collins, Gail. (December 18, 1992). "An Early Gift For The Donald". Newsday.
- Lee, Denny. (October 13, 2002). "NEIGHBORHOOD REPORT: UPPER WEST SIDE; Names Fade From a Street, But Not From Memories". The New York Times.
- Dunlap, David W.. (December 6, 1992). "What's in Store For the West Side".
- Oser, Alan S.. (November 19, 1995). "Perspectives; Mixed-Income Rentals as the Key to Housing Development".
- Grant, Peter. (May 28, 1996). "Trump tones down glitz". New York Daily News.
- Philippidis, Alex. (February 23, 2004). "Construction firm builds successes".
- Pacelle, Mitchell. (March 3, 1993). "Trump is seeking concessions to build long-delayed project in Manhattan". The Wall Street Journal.
- (March 11, 1993). "Trump Owes Back Taxes on Land for Tower". The Buffalo News.
- Dunlap, David W.. (November 3, 1993). "Real Estate; Philip Johnson, the renowned architect, joins the Trump team on the huge Riverside South project.".
- Perez-Pena, Richard. (July 26, 1995). "Highway Plan for West Side Appears Dead". The New York Times.
- Gold, Jacqueline S.. (August 29, 1994). "West Side Story with Unhappy Ending for Chase". American Banker.
- Pacelle, Mitchell. (June 8, 1994). "Trump seeks to revive New York project with financing by Hong Kong company". The Wall Street Journal.
- Pacelle, Mitchell. (December 16, 1993). "Trump may get Los Angeles investors to help finance project in Manhattan". The Wall Street Journal.
- Grant, Peter. (February 16, 1994). "Trump Seeks Partner To Help Fund Stalled Manhattan Project". The Wall Street Journal.
- Ravo, Nick. (April 17, 1994). "Trump to Seek Federal Help to Get Riverside South Under Way".
- Sender, Henny. (July 21, 1994). "Outward bound".
- (January 30, 1994). "Neighborhood Report: Upper West Side; Challenge to Trump Plan Loses".
- Lowry, Tom. (July 2, 1994). "Trump needs plunger". New York Daily News.
- Dunlap, David W.. (July 1, 1994). "Hong Kong Investors Finance a Trump Project".
- Grant, Peter. (June 20, 1994). "City spurs Trump deal for Riverside So. site".
- (July 1, 1994). "Trump Project At Riverside In Hands Of New Investors". Newsday.
- (July 11, 1994). "Manhattan plan stays afloat".
- Krischer Goodman, Cindy. (February 26, 1995). "Trump Tries to Bowl Over Asian Investors". Chicago Tribune.
- Henry, David. (July 18, 1994). "The Hong Kong Connection Overseas Chinese' Money Pours Into High Profile Manhattan Real Estate.". Newsday.
- O'Brien, Timothy L.. (January 27, 2016). "How Trump Bungled the Deal of a Lifetime". BloombergView.
- Sherman, Gabriel. (April 10, 2019). "Why Gary Barnett of Extell Corporation Is the Anti-Trump".
- Rozhon, Tracie. (January 26, 1997). "Money Tap Loosens, But Rules Tighten". New York Daily News.
- O'Brien, Joan. (January 24, 1997). "Feng Shui; Utahns Discovering Chinese Art of Directing Energy; Feng Shui: Everything in Its Proper Place". The Salt Lake Tribune.
- Lipsyte, Robert. (September 11, 1994). "Coping; Talking About What You're Thinking About". The New York Times.
- Barrett, Wayne. (April 11, 1995). "Ruth and Donald's artful deal". The Village Voice.
- Giordano, Rita. (July 5, 1995). "Trump set to build New York dream". South China Morning Post.
- Pogrebin, Robin. (May 28, 1995). "Neighborhood Report: Upper West Side; It's Temporary, but Is It Beaux-Arts?".
- Lueck, Thomas J.. (July 24, 1998). "Trump Project Loses Bid for U.S. Mortgage Insurance". The New York Times.
- Liff, Bob. (June 9, 1995). "Rudy Rapped on Trump". Newsday.
- Finnegan, Michael. (December 5, 1995). "Democrats rip Trump fund-raiser". New York Daily News.
- (December 15, 1995). "Democrats question Trump GOP fund-raiser". Salamanca Press.
- Fisher, Ian. (November 24, 1995). "Plan to Put Part of West Side Highway Underground Suffers Setback in Congress".
- (April 7, 1995). "Commercial Properties". Newsday.
- Shaver, Les. (May 2007). "The Construction Ceo".
- Lii, Jane H.. (December 22, 1996). "Trump Nears a Missing Link: A Sewage Hookup".
- Grant, Peter. (December 20, 1996). "Trump set for West Side". New York Daily News.
- Beck, Simon. (February 9, 1997). "Permit victory for Trump's dream". South China Morning Post.
- Kershaw, Sarah. (March 1, 1997). "Shantytown Bulldozed". Newsday.
- Lii, Jane H.. (May 25, 1997). "A Street of Promises and Protest".
- Rozhon, Tracie. (January 26, 1997). "Money Tap Loosens, But Rules Tighten".
- (February 21, 1999). "Q. & A.".
- (May 13, 1997). "Butts takes a malling over Harlem project". New York Daily News.
- Grant, Peter. (September 21, 1997). "Dismissing their views". New York Daily News.
- Bagli, Charles V.. (November 4, 1997). "Trump Project Went On Despite Warning About Concrete". The New York Times.
- Post, Nadine M.. (November 10, 1997). "Concrete Repair Gears up at Stalled Manhattan Tower". New York Daily News.
- Dwyer, Jim. (November 11, 1997). "Trump's folly shakes city". New York Daily News.
- Lobbia, J A.. (March 30, 1999). "Smoke-filled rooms". The Village Voice.
- Goldstein, Matthew. (January 26, 1998). "Winter forecast: Construction flurries". The New York Times.
- Croghan, Lore. (April 6, 1998). "Developers rush to build towers in Jersey City".
- Beck, Simon. (June 5, 1998). "Property; SAR Investors Seek Buyers for Trump Towers". South China Morning Post.
- Malbin, Peter. (July 26, 1998). "If You're Thinking of Living In/Lincoln Square; A Hub of Culture and Entertainment".
- Elliott, Stuart. (January 19, 1998). "The Media Business: Advertising – Addenda; Accounts".
- Bagli, Charles V.. (January 29, 1999). "CBS Granted More Tax Cuts to Stay Put".
- Rothstein, Mervyn. (March 3, 1999). "Residential Real Estate; Trump Place Is Coming Alive on Upper West Side".
- Pogrebin, Robin. (June 25, 1999). "Protests Supplanted By Praise; Trump Place Becomes Real, and Even Popular".
- Grant, Peter. (March 11, 1999). "New Trump Apts. Along H'way". New York Daily News.
- Kolbert, Elizabeth. (August 3, 1998). "Metro Matters; Trump's Loss Is a Victory For Taste".
- Grant, Peter. (May 27, 1999). "Trump Place Site is Up for Grabs". New York Daily News.
- Sandler, Linda. (January 19, 2000). "Donald's Wealth Estimates Trump Reality --- Several Billions Are Based On Profits That Are Far In the Developer's Future". The Wall Street Journal.
- Leonard, Devin. (September 29, 1997). "Is Trump Reneging On Massive Park Plan For Riverside South?".
- Fran Reiter, Deputy Mayor, [https://www.nytimes.com/1997/02/28/opinion/l-new-york-can-t-afford-riverfront-park-now-854336.html "New York Can't Afford Riverfront Park Now,"] New York Times, February 28, 1997.
- Horsley, Carter. (October 4, 1997). "Riverside South Travesty: Politicians kill park component at Trump Development on West Side". The City Review.
- Barron, James. (June 23, 2006). "The Surprise in This Box? A Highway, Some Assembly Required". The New York Times.
- "FHWA Record of Decision".
- Lewine, Edward. (August 29, 1999). "What's in All Those Big Holes? A Building Boom". New York Daily News.
- (November 18, 2002). "Busted Bosses Dump Palaces In Near-Panic". The New York Observer.
- Ramirez, Anthony. (August 16, 1998). "Neighborhood Report: West Side; 'Minor Change' in M72 Bus Route Provokes Major Anger".
- Houpt, Simon. (April 14, 2004). "Residents mobilize to fight Trump". The Globe and Mail.
- Reed, Danielle. (March 23, 2000). "New Trump Project's Neighbors". New York Daily News.
- Bagli, Charles V.. (September 15, 2000). "Columbia May Expand Onto Trump Riverfront Site".
- Marks, Andrew. (September 13, 2010). "Columbia leaps legal hurdles to push growth".
- (March 21, 2025). "Decades Ago, Columbia Refused to Pay Trump $400 Million. Note That Number.". The New York Times.
- Saltonstall, Dave. (September 12, 2000). "Trump Rolling Out the Green to Open Lush Path Along the Hudson for All New Yorkers". New York Daily News.
- Lee, Denny. (March 4, 2001). "Neighborhood Report: Upper West Side; Dreaming of a Little Riviera".
- Dunlap, David W.. (December 10, 2001). "Going Downtown, Downstream; Ferry at Riverfront Park Seen as Gateway to Wall St.".
- Crow, Kelly. (November 26, 2000). "Neighborhood Report: Upper West Side; That Distinctive New-Park Odor Turns Out to Be Leaking Sewage".
- Sokolov, Raymond. (January 19, 2001). "The Shoreline Belongs to the People". The Wall Street Journal.
- Colangelo, Lisa L.. (April 11, 2001). "New Park Pier Trump Triumph Waterside Haven Opens". New York Daily News.
- Herman, Eric. (March 12, 2001). "Trump Taking Slow Road on West Side". New York Daily News.
- Scherer, Ron. (August 27, 2004). "Republicans meet a New York in flux ; Yes, echoes of 9/11 linger – but conventioneers will find a resilience bred through time". The Christian Science Monitor.
- Crow, Kelly. (August 5, 2001). "Neighborhood Report: Upper West Side; As Plans for Marsh Dry Up, Park's Neighbors Complain".
- "The Story of Riverside South". Paul Willen Architect.
- Goff, Lisa. (September 9, 2002). "Telling Tales: Distilled Plan Gives Wine Shop Its Best Shot".
- Messina, Judith. (June 4, 2007). "Classy shops bring cachet".
- Herman, Eric. (March 5, 2003). "City May Give Lift to B'klyn High-rise". New York Daily News.
- Bagli, Charles V.. (October 21, 2002). "Blotting Out the Light: A New Tower by Trump; Neighbors Fight a High-Rise Inches Away".
- Lentz, Philip. (April 14, 2003). "Big projects losing steam in downturn".
- Healy, Patrick. (June 12, 2003). "New Park On Hudson Fills Gap In Greenery". The New York Times.
- Bernstein, Fred A.. (September 4, 2003). "Pierwise, One Person's Wreck Is Another's Art".
- Luo, Michael. (January 11, 2004). "N.Y. City OKs ramp closure for Trump building project".
- Saltonstall, David. (October 9, 2004). "Donald's Ramp Plan is Trumped". New York Daily News.
- Worth, Robert F.. (July 16, 2005). "New York Is Supported in Ruling on Exit Ramp".
- Croghan, Lore. (December 29, 2004). "Fertile ground on W. Side". New York Daily News.
- Mindlin, Alex. (June 24, 2007). "No Exit, but No Surrender".
- Satow, Julie. (September 12, 2005). "Extell's billion-dollar baby".
- Bagli, Charles V.. (June 21, 2005). "Trump part of $1.76B property deal". Newsday.
- Beesley, Arthur. (July 9, 2005). "Irish group buys $440m stake in Trump Place". Irish Times.
- Satow, Julie. (December 19, 2005). "Extell retaining Riverside".
- Bary, Andrew. (August 8, 2005). "Pop!". The Wall Street Journal.
- Gearty, Robert. (July 12, 2005). "In the City. The Donald in Suit Over 1.7b Land Deal". New York Daily News.
- (September 17, 2009). "Figure in Property Sale in Trump Suit Is Indicted". The New York Times.
- Peterson, Helen. (December 15, 2005). "New York: Manhattan: Trump Sued Over Commissions". New York Daily News.
- Hughes, C. J.. (April 30, 2006). "Grand Buildings, but Also a Sense of Community".
- Collins, Glenn. (August 11, 2006). "A Chugger Floats to Stardom".
- Cho, Aileen. (November 13, 2006). "Manhattan Tunnel Structure Is Built for the Long Term".
- Hughes, C. J.. (March 26, 2006). "A Condo With a View (of the Opera)".
- Arak, Joey. (November 30, 2007). "Extell Has Too Much Glass for Angry Upper West Siders".
- Haughney, Christine. (November 28, 2011). "Debate Over Riverside Boulevard Meeting Drive on the Upper West Side".
- Chan, Sewell. (August 19, 2008). "Riverside Park South Ceremony". The New York Times.
- Kleege, Stephen. (October 22, 2012). "Parks translate to profits".
- Arak, Joey. (January 17, 2008). "Extell's Riverside South Will Rule the West Side".
- Arak, Joey. (July 1, 2008). "Extell's Riverside South gets $613M loan".
- Kusisto, Laura. (December 30, 2011). "Riverside South Sees Burst of Sales". The Wall Street Journal.
- (September 19, 2010). "Fall Preview: a Look at Top Properties Nationwide". The New York Times.
- O'Connor, Anahad. (April 10, 2010). "N.Y. Backs Remorseful Buyers at Rushmore Tower".
- Barbanel, Josh. (July 24, 2009). "Attack of the Fine Print".
- Budin, Jeremiah. (December 20, 2012). "Rushmore's $15 Million Typo Case Reaches Inevitable End".
- Polsky, Sara. (July 25, 2011). "Plans for 33-Story Riverside South Tower Finally Revealed".
- Fung, Amanda. (July 25, 2011). "Latest Riverside South tower to be glassiest".
- Chaban, Matt. (September 21, 2012). "Starchitect Switcheroo! Will the Upper West Side Get Any Pritzker-Worthy Buildings at Riverside Center?".
- Bagli, Charles V.. (December 20, 2010). "West Side Apartment Towers Approved".
- Brown, Eliot. (October 31, 2008). "Extell Steaming Ahead on Giant 'Riverside Center' Amid Early Dissent".
- Brown, Eliot. (September 23, 2012). "Architect Switch Irks City Officials". The Wall Street Journal.
- Forsythe, Jason. (September 20, 2009). "Luxury Homes & Estates: Fall Preview". The New York Times.
- Warerkar, Tanay. (December 4, 2015). "Extell Sells a Portion of Riverside Center For $265M". Curbed NY.
- Budin, Jeremiah. (August 14, 2012). "Riverside Center Reveals Affordable Housing Details".
- Li, Roland. (June 4, 2010). "Barnett on Riverside Center: 'There's Only So Much We Can Give Up'".
- (July 23, 2010). "Community Board Approves Its Disapproval of Riverside Center".
- Chaban, Matt. (August 31, 2010). "BP Stringer Throws Water on Riverside Center".
- Brown, Eliot. (December 6, 2010). "Property: Vote Could Mark End of Long Quest for Project". The Wall Street Journal.
- Brown, Eliot. (August 26, 2010). "Extell to add below-market rate housing at Riverside Center".
- Arak, Joey. (December 9, 2010). "Riverside Center Wins Another Round".
- Arak, Joey. (December 20, 2010). "Council Approves Five Towers of Fun at the UWS's Riverside Center". Curbed NY.
- Albrecht, Leslie. (December 15, 2011). "Plans Reveal Upper West Side's First New School Building in Decades".
- Frost, Emily. (August 15, 2012). "Riverside Center's Affordable Housing Plan Gets Nod from Community Board".
- (December 19, 2012). "Extell, liquidating assets ahead of new tower, sells Riverside Center development for $70M".
- Dailey, Jessica. (November 14, 2013). "Silverstein Properties, Elad Group Join Riverside Center Fun".
- Hughes, C. J.. (November 14, 2014). "Residential Towers Finish Project on Far West Side".
- Hylton, Ondel. (July 17, 2014). "Still Portzamparc-ish: New Images of Extell's Riverside Center Uncovered".
- Hofmann, Tess. (April 30, 2015). "GID Development buys part of Extell, Carlyle's Riverside Center for $410M".
- Mashayekhi, Rey. (December 4, 2015). "GID pays $265M for latest slice of Riverside Center site".
- Marcut, Adina. (December 22, 2020). "Behind the Megaproject That Completes the Riverside South Master Plan".
- Hughes, C.J.. (June 16, 2017). "The Last Piece of a Far West Side Project Gets Built". The New York Times.
- Schulz, Dana. (September 25, 2020). "Waterline Square's amenities include an indoor skate park, full tennis court, and a rock-climbing wall".
- Anderson, Jenny. (February 6, 2013). "Collegiate School, New York's Oldest Private School, Plans 17th Move".
- Bockmann, Rich. (December 29, 2014). "Collegiate School files plans for Riverside South building".
- Barbanel, Josh. (November 19, 2013). "Property: Riverside Makes Mark". The Wall Street Journal.
- Navarro, Mireya. (April 20, 2015). "88,000 Applicants and Counting for 55 Units in 'Poor Door' Building".
- Hofmann, Tess. (June 4, 2015). "Silverstein, Elad launch sales at One West End Avenue: PHOTOS".
- Sugar, Rachel. (August 30, 2016). "Affordable apartments in a luxe Upper West Side tower will rent from $833/month".
- Rosenberg, Zoe. (August 16, 2016). "Riverside Center rentals with over-the-top amenities ask from $3,140".
- Marantz, Andrew. (December 14, 2015). "Talking Politics at Trump Place".
- Fahrenthold, David A.. (February 23, 2019). "For the second time in two days, a building called Trump Place decides to take down the president's name". Washington Post.
- Hawkins, Derek. (November 16, 2016). "Donald Trump's name to be dropped from 3 NYC buildings after residents petition for removal". [[Winston-Salem Journal]].
- Bagli, Charles V.. (October 24, 2016). "What's in a Name? When It's 'Trump Place,' It's a Revolt".
- Bump, Philip. (October 19, 2018). "Onlookers cheer as 'Trump Place' is pried from condo building". Washington Post.
- Fahrenthold, David A.. (February 22, 2019). "Another group of people have voted to remove 'Trump Place' from their building".
- Nir, Sarah Maslin. (February 22, 2019). "The Upper West Side's Banishment of 'Trump' on Buildings Is Almost Complete".
- Schulz, Dana. (October 23, 2020). "Riverside Park opens new section with playgrounds, volleyball, lawns, and more".
- Steele, Jeffrey. (July 18, 2022). "A&E Real Estate Buys Manhattan Apartments for $415M".
- Williams, Timothy. (June 14, 2007). "Planned Parks May Cost City Too Much, Group Warns".
- (February 8, 2013). "Pier I".
- "Balsley Park Plans".
- (March 2001). "West Side Freight Yards".
- Compare interim and final park plans shown in External Images
- "Parks Department project information".
- New York City Parks Department, [https://www.nycgovparks.org/parks/riverside-park-south/history Riverside Park South history]
- New York City Parks Department, [https://www.nycgovparks.org/parks/riverside-park/highlights/19601 Linda's Lawn]
- [http://riversideparknyc.org/history-of-park/ Park history] {{Webarchive. link. (March 3, 2016, riversideparknyc.org. Retrieved August 26, 2014.)
- (August 19, 2015). "Transfer Bridge, Riverside Park".
- Pesce, Nicole Lyn. (April 27, 2014). "The Great Saunter hike around Manhattan reveals hidden gems".
- "National Register of Historic Places Listings July 11, 2003". nps.gov.
- Dunlap, David W.. (August 9, 2016). "Pier D Stands Out in the West Side's Industrial Past".
- Kilgannon, Corey. (January 21, 2011). "Remnant of an Industrial Past, Now Gone".
- Dunlap, David W.. (August 26, 2015). "Park's Stone Wall Is a Vestige of Manhattan's Rail History". The New York Times.
- Forsythe, Jason. (October 12, 2014). "Best of Luxury Homes & Estates". The New York Times.
- Gregor, Alison. (February 24, 2012). "All This Neighborhood Needs Is a Name".
- Denitto, Emily. (April 21, 1997). "Environmentally sound properties help owners seed greener fields".
- Spinola, Steven. (December 23, 2014). "Riverside South provides pathway to housing New Yorkers". [[Real Estate Weekly]].
- Moyer, Justin Wm.. (October 25, 2021). "NYC bans 'poor doors' — separate entrances for low-income tenants". Washington Post.
- Navarro, Mireya. (August 26, 2014). "'Poor Door' in a New York Tower Opens a Fight Over Affordable Housing". The New York Times.
- Smith-Mack, Mitzie. (May 1, 2015). "Thousands of applicants are willing to accept NYC "Poor Door" building". Ballard Spahr LLP.
- (October 28, 2024). "One Riverside Park, 50 Riverside Boulevard, NYC".
- (October 28, 2024). "The Aldyn, 60 Riverside Boulevard, NYC".
- (October 28, 2024). "The Rushmore, 80 Riverside Boulevard, NYC".
- (October 28, 2024). "Avery, 100 Riverside Boulevard, NYC".
- (October 28, 2024). "120 Riverside Boulevard, NYC".
- Rizzi, Nicholas. (April 8, 2022). "Sam Zell Offloads Former Trump Place to A&E for $266M".
- "140 Riverside Boulevard at Trump Place – The Skyscraper Center".
- "160 Riverside Boulevard at Trump Place – The Skyscraper Center".
- "180 Riverside Boulevard at Trump Place – The Skyscraper Center".
- "200 Riverside Boulevard At Trump Place – The Skyscraper Center".
- Clarke, Katherine. (July 13, 2011). "Bruce Willis sells Trump Place unit for $3.9M".
- "The Heritage At Trump Place, Upper West Side, New York, NY 10069".
- "One Waterline Square – The Skyscraper Center".
- "Two Waterline Square – The Skyscraper Center".
- "Three Waterline Square – The Skyscraper Center".
- (March 20, 2015). "CityRealty review of The Ashley, 400 West 63rd Street".
- (October 28, 2024). "1 West End Avenue, NYC".
- (October 28, 2024). "21 West End Avenue, NYC".
- (October 20, 2024). "West End Towers, 75 West End Avenue, NYC".
- (October 28, 2024). "101 West End Avenue, NYC".
- City Planning Commission, [http://www1.nyc.gov/assets/planning/download/pdf/about/cpc/100296a.pdf Report on Riverside Center] {{Webarchive. link. (February 15, 2017, October 27, 2010.)
- Barrionuevo, Alexei. (March 30, 2012). "Selling Condos? It's Child's Play".
- Anuta, Joe. (August 19, 2015). "First Riverside Center condo complex on the Upper West Side is a hit".
- Gorshin, Maria. (April 11, 2012). "New York's 'Temple of Power': the 59th Street Powerstation".
- Valenti, Ken. (March 22, 2010). "Metro-North looks for Upper West Side station site". The Journal News.
- Framberger, David J.. (1978). "Architectural Designs for New York's First Subway". Historic American Engineering Record.
- Warerkar, Tanay. (December 5, 2017). "Stanford White's Beaux Arts IRT powerhouse is now a NYC landmark". Curbed NY.
- Capps, Kriston. (May 1, 2015). "The Great Pyramids of Manhattan".
- Davidson, Justin. (April 10, 2019). "How Bjarke Ingels Is Reinventing the New York Apartment Building – New York Magazine".
- Barbanel, Josh. (June 27, 2014). "City News: Brearley School Considers a Move". The Wall Street Journal.
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Riverside South, Manhattan — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report