Purple Line (Maryland)

Under-construction light rail line in the US

Purple Line (Maryland)

Summary

Under-construction light rail line in the US

FieldValue
box_widthauto
namePurple Line
color612c95
logoMTA Purple Line logo.svg
logo_width200px
imageFile:Long Branch Station 122025.jpg
image_width300px
captionPurple Line construction in Silver Spring, Maryland, in December 2025
typeLight rail
systemMaryland Transit Administration
statusUnder construction
87.4% complete (December 2025)
localeMontgomery County, Maryland
Prince George's County, Maryland, U.S.
start(West)
end(East)
stations21
website
daily_ridership64,800 (2030 projection)
planopenLate 2027
ownerMaryland Transit Administration
characterAt-grade, elevated, and underground
stock28 CAF LRVs
speed_mph55
tracklength_mi16.2
gauge
electrification
map{{switcher
{{maplink-roadfromPurple Line (Maryland).map}} Purple Line highlighted in purple
{{Purple Line (Maryland)inlineyes}}

87.4% complete (December 2025) Prince George's County, Maryland, U.S. | Purple Line highlighted in purple | Show interactive map | | Show route diagram

The Purple Line is a 16.2 mi light rail line being built to link several Maryland suburbs of Washington, D.C.: Bethesda, Silver Spring, College Park, and New Carrollton. Currently slated to open in late 2027, the line will also enable riders to move between the Maryland branches of the Red, Green, Yellow, Silver, and Orange lines of the Washington Metro without riding into central Washington, and between all three lines of the MARC commuter rail system. The project is administered by the Maryland Transit Administration (MTA), an agency of the Maryland Department of Transportation (MDOT), and not the Washington Metropolitan Area Transit Authority (WMATA), which operates Metro.

Throughout its decades-long planning process, the project was dogged by resistance, particularly from residents of the upscale community of Chevy Chase and members of the Columbia Country Club. From 2003 to 2006, Maryland Governor Robert Ehrlich changed the proposed mode of transportation from light rail to bus rapid transit. Legal attempts to thwart the line continued even after construction had begun; but in December 2017, the U.S. Court of Appeals for the D.C. Circuit ruled that Purple Line construction could continue despite these objections.

In 2016, a consortium headed by Fluor Enterprises won the $5.6 billion contract to design and build the Purple Line, then to operate and maintain it for 36 years. Construction began in August 2017. Work halted in September 2020, when the consortium withdrew from the contract, citing mounting delays and disputes with the state government. The project had already consumed $1.1 billion of the anticipated $2 billion construction cost.

A new general contractor was selected in November 2021, and a new contract was signed in April 2022. This new agreement added $3.7 billion to the total cost of building, running, and maintaining the Purple Line for 30 years, bringing it to $9.3 billion. Construction costs alone rose $1.46 billion, bringing the total to $3.4 billion. Full-scale construction activity resumed in summer 2022.

Costs rose and the opening date receded again in 2023 and 2024. As of March 2024, the estimated cost to build the line and operate it through 2057 was $9.53 billion, some $4 billion over the initial 2016 budget of $5.6 billion. Train service is expected to begin in December 2027.

History

Early studies, public debate, design

[[Topological map]] of the Washington Metro system with the Purple Line

The "Purple Line" has been the name of two different transit proposals. In 1994, John J. Corley Jr., an architect with Harry Weese Associates (which designed the Washington Metro system) proposed a multibillion-dollar Metro line around the 64 mi Capital Beltway. This would have served as a "ring" line, connecting suburb to suburb and complementing the existing Metro lines, which radiate from Washington. (See .) In 1998, the Beltway Purple Line received considerable political support from Montgomery County Executive Douglas M. Duncan and Governor Parris Glendening, which was a $10 billion, 30 mi line from National Harbor to Montgomery Mall.

In 1987, after CSX expressed a desire to abandon the Georgetown Branch rail line, Maryland leaders immediately started planning to repurpose it for transit and a hiking trail. The idea of adapting the railroad for a transit line dated back at least as far as 1970, when such a use was included in the October 1970 Master Plan for the Bethesda-Chevy Chase Planning Area. Montgomery County purchased its portion of the railroad right-of-way from CSX in 1988 and in 1989 budgeted $107 million to build a trolley between Bethesda and Silver Spring and a pair of trails between Silver Spring and the District.

Eventually, this proposal came to be known as the "Inner Purple Line" to distinguish it from the "Beltway Purple Line". By 2001, the "Beltway Purple Line" proposal had been abandoned as too costly and the name was attached to the Bethesda to line.

Robert Flanagan, the Maryland State Secretary of Transportation under Governor Robert Ehrlich, merged the Purple Line proposal with the Georgetown Branch Light Rail Transit (GBLRT) line. The GBLRT was proposed as a light rail transit line from westward, following the former Georgetown Branch of the Baltimore and Ohio Railroad, now a short CSX siding and the Capital Crescent Trail, to .

url-status=live }}</ref>

In March 2003, the Ehrlich administration renamed the project the "Bi-County Transitway", reflecting a proposal by Ehrlich and Flanagan to use bus rapid transit instead of light rail, and because the name "Purple Line" seemed to suggest a new heavy-rail system like the color-named lines of the Washington Metro system. The new name did not catch on; several media outlets and most citizens continued to refer to the "Purple Line". In 2007, Governor Martin O'Malley and Secretary of Transportation John Porcari reverted to "Purple Line".

In January 2008, the O'Malley administration allocated $100 million within a six-year capital budget to complete design documents for state approval and funding of the Purple Line. In May 2008, it was projected that the Purple Line would have about 68,000 daily trips. A draft environmental impact study was issued on October 20, 2008. On December 22, 2008, Montgomery County planners endorsed building a light rail line rather than a bus line. On January 15, 2009, the county planning board also endorsed the light rail option, and County Executive Isiah Leggett has also expressed support. On October 21, 2009, members of the National Capital Region Transportation Planning Board voted unanimously to approve the Purple Line light rail project for inclusion into the region's Constrained Long-Range Transportation Plan.

Planners proposed to use existing Washington Metro stations and to accept the WMATA's SmarTrip farecard. Metro's 2008 annual report envisioned that the Purple Line would be fully integrated with the existing Washington Metro transit system by 2030.

The proposed project drew support and opposition in the community:

Support for Purple Line

  • Purple Line Now is a non-profit organization that advocated for a Purple Line light rail line from Bethesda to New Carrollton to be integrated with a hiker/biker trail from Bethesda to Silver Spring.
  • The Action Committee for Transit is a community group that supports the Purple Line.
  • The Washington Post editorial board endorsed the Purple Line light rail option in 2008.
  • The Montgomery County Council and Prince George's County Council voted unanimously in favor of the light rail option for the Purple Line in January 2009.
  • Maryland state officials (including former Governor Martin O'Malley) are also strong Purple Line advocates. State officials say that a Purple Line, which is to run primarily above ground, "would provide better east–west transit service, particularly for lower-income workers who cannot afford cars."
  • The development firm Chevy Chase Land Company is a strong proponent of the construction of the Purple Line. The website for the pro-Purple umbrella group Purple Line NOW! lists CCLC president Edward Asher as a member of its board of directors. The Washington Post stated that the development firm would "no doubt profit from property it owns near at least one of the proposed stations."
  • The Sierra Club advocates a larger-scale rail system to parallel the Capital Beltway and link all existing Metro lines at their peripheries. This environmental group advocates rail transit over car use because carbon emissions are a major cause of climate change.
  • Some student leaders (the Student Government Association and Graduate Student Government) at the University of Maryland support transit alternatives to campus.
  • On January 27, 2009, the Montgomery County Council voted to support the light rail option. Governor O'Malley announced his own approval on August 4, 2009.
  • The vice president of trail development for the Rails-to-Trails Conservancy has said that with proper design, the trail-Purple Line combination can be "among the best in the nation."
  • Members of the Facebook group New Urbanist Memes for Transit-Oriented Teens were "irrationally excited for the forthcoming Maryland purple line."

Support for bus

  • A 2008 study by Sam Schwartz Engineering for the Town of Chevy Chase supported bus rapid transit using an alternate Jones Bridge Road alignment. The Chevy Chase study expressed concerns about the expected ridership numbers, carbon footprint, interruptions in recreation pathways, and the cost of bus and light rail proposals by the MTA involving a Capital Crescent Trail alignment. Although a Jones Bridge Road alignment was also proposed by the MTA, the study noted that features typical of bus rapid transit that were missing from the MTA proposal.

Opposition to rail

Opponents argued that the Purple Line would hurt the [[Capital Crescent Trail]] (pictured).
Rock Creek]] during the construction pause in February 2021
  • A not-for-profit local organization, Friends of the Capital Crescent Trail, began collecting signatures on a petition opposing the MTA's Purple Line proposals in 2003; in 2014, it filed a lawsuit in the U.S. District Court in the District of Columbia asserting that the Federal Transit Administration had not complied with federal environmental laws when it approved a grant to help build the Purple Line. In 2008, the organization's website asserted that the MTA's light rail and bus rapid transit proposals would undermine the environment and safety on the Capital Crescent Trail, and endorsed running bus rapid transit on Jones Bridge Road, as recommended by the Chevy Chase study. But the petition called for yet a different option because the Jones Bridge Road route would affect the trail.
  • A leading opponent of the Purple Line was the Columbia Country Club, a private club whose golf course occupies both sides of the planned route between Bethesda and Silver Spring. The club, "long viewed as one of the most well-financed and politically connected Purple Line foes", spent thousands of dollars over a decade lobbying state and federal officials, hosting fundraisers for sympathetic politicians, and organizing "grassroots" opposition. In 2013, newly elected leaders of the Club signed an agreement not to oppose the Purple Line if its route were adjusted by 12 feet and other concessions were granted.
  • Opponents in the Town of Chevy Chase cited the town's study of bus rapid transit alternatives. The study estimated a cost of less than $1 billion for a bus rapid transit system, compared with an estimated cost of $1.8 billion for light rail. A 2011 news report placed the cost of the rail line at .
  • In 2010, residents around the Dale Wayne stop worried that doubling the size of the road, along with the county's "smart growth" policy around transit stops, would encourage commercial development in a residential neighborhood. They wondered about the accuracy of the MTA's prediction that the Dale station would see 1,427 daily boardings.

Approval

Baltimore Red Line]] in August 2017.
Paul S. Sarbanes Transit Center]] in [[Silver Spring, Maryland]] in May 2020
The [[Northeast Branch Anacostia River]] crossing during the construction pause in May 2021

In June 2015, the Purple Line was approved by Governor Larry Hogan, who opposed the project while campaigning in 2014. Hogan cancelled its sister project, the Baltimore Red Line, citing excessive costs, and reduced the state's contribution to the Purple Line from $700 million to $168 million, putting the difference toward highway construction. To make up the difference, Prince George's and Montgomery counties would contribute more money and the frequency of train service would be reduced.

The Purple Line was procured as a full design-build-finance-operate-maintain public–private partnership. On December 7, 2015, four teams composed of major American and international firms submitted their bids to realize the project:

  • Maryland Purple Line Partners: Vinci Concessions, Walsh Investors, InfraRed Capital, Alstom and Keolis
  • Maryland Transit Connectors: John Laing Investments, Kiewit Development Company, Edgemoor Infrastructure & Real Estate and RATP Dev
  • Purple Line Transit Partners: Meridiam, Fluor Corporation, Star America, CAF and Alternate Concepts
  • Purple Plus Alliance: Macquarie Capital Group, Skanska, Kinki Sharyo and Transdev.

On March 2, 2016, Hogan announced that the state had chosen Purple Line Transit Partners to build, operate, and maintain the Purple Line for $3.3 billion over 36 years, with service to start in late 2022.

On April 6, 2016, the Maryland Board of Public Works (composed of Hogan, State Treasurer Nancy K. Kopp, and State Comptroller Peter Franchot) unanimously approved the contract. The $5.6 billion contract is 876 pages long and, according to The Washington Post is "believed to be the most expensive government contract ever in Maryland" and "one of the largest public-private partnerships on a U.S. transportation project" ever. The contract approval allowed the MTA to finalize $900 million in federal construction grants.

In August 2016, U.S. District Court Judge Richard J. Leon vacated the Purple Line's federal approval, ruling that the MTA and the Federal Transit Administration did not properly study whether Metro's maintenance issues and ridership decline would affect the Purple Line. Hogan responded that Leon's residence at the Columbia Country Club, a leading opponent of the line, represented a conflict of interest. A federal funding agreement cannot be signed without the reinstatement of the environmental approval, and Maryland had said it could not afford to build the Purple Line without sufficient federal funding. On August 21, 2017, despite the ongoing court case over the environmental analysis, $900 million of federal funding was granted for the light rail project. On December 19, 2017, the U.S. Court of Appeals for the D.C. Circuit ruled in favor of the Purple Line, stating that declining ridership on the Washington Metro system does not require Maryland to complete a new environmental study for the Purple Line. This federal appeals court ruling allowed for construction to continue and effectively ended the three-year legal battle surrounding the light-rail line project.

In 2019, the Purple Line Transit Partners said the opening date would slip to 2023 or 2024.

On April 13, 2020, U.S. District Judge James Bredar dismissed the third and final lawsuit brought by opponents of the Purple Line.

Builder consortium quits

By 2020, the project had accrued over $800 million in change orders from Purple Line Transit Partners and the opening date had slipped 32 months. On May 1, the consortium declared their intent to cease work on the line and withdraw from their contract. and PLTP began packing up construction sites the following week. In November, MDOT announced that MTA had assumed many of the Purple Line's contracts, including the manufacturing of light-rail cars, operations, and maintenance, as well as design and construction contracts. On November 24, MDOT agreed to pay $250 million to PLTP to settle the costs of overruns, a move approved unanimously in mid-December by Maryland's Board of Public Works (BPW). Officials aimed to restart construction within nine months—i.e., fall 2021.

Work resumes

College Park-UMD]] Purple Line station in March 2025

On November 5, 2021, Purple Line officials announced that the contract to finish construction would go to Maryland Transit Solutions: a joint venture of Dragados USA and OHL USA, both American subsidiaries of major Spanish construction firms. The contract was ultimately set at $2.3 billion, bringing total construction costs to $3.4 billion, some $1.46 billion over the 2016 plan.

As 2022 opened, state officials said the line would open in fall 2026. The new construction contract was approved by BPW on January 26, 2022, and signed in April 2022. Full-scale construction activity resumed in summer 2022. In June 2022, MTA said that 77% of the necessary utility relocations had been completed, and that the Glenridge Operations and Maintenance Facility was complete and in operation.

In January 2023, the estimated cost to build and operate the line for 36 years was $9.28 billion. In July 2023, MTA officials added $148 million to their construction-costs estimate, pushing the build-and-operate cost to $9.4 billion. The expected opening date was delayed to May 2027, more than five years later than first planned. The officials said the changes were due to the change of contractor, to inflation, and to labor shortages.

In March 2024, MTA officials asked the state's Board of Public Works to approve another $425 million for the project. The extra money would go toward construction costs and also extend the contract to operate the line to 2057. The request would boost the total cost to build and operate the line to about $9.53 billion, about $4 billion over the initial 2016 budget of $5.6 billion. It was the second-largest request for extra funds, after the 2022 addition. They also moved the opening date to late 2027. In December 2024 it was reported that construction of the new mezzanine at the Bethesda station, a complex design, has led to extensive cost overruns. The construction process at Bethesda included extensive blasting operations.

A March 2025 report by the Maryland comptroller’s office found that permitting and legal fees for the project, originally budgeted at $6 million, had actually consumed roughly $800 million, thanks to two lawsuits and the contract renegotiations. In September 2025, officials said the Prince George's County portion of the line was finished, while track work in Montgomery County was about 79% done and expected to wrap up in spring 2026. The final 28th rail car was delivered in November 2025.

Route and station locations

The Silver Spring Library, with the space under the overhang set aside for the future Purple Line station
Roughly geographical map of the proposed Purple Line routes including alternative alignments

The planned rail line will connect the existing Metro, MARC commuter rail, and Amtrak stations at:

  • (Metro Red Line)
  • (Metro Red Line, MARC Brunswick Line)
  • (Metro Yellow Line, Metro Green Line, MARC Camden Line)
  • (Metro Orange Line, Metro Silver Line, MARC Penn Line, Amtrak Northeast Regional, Amtrak Palmetto, Amtrak Vermonter)

The following stations are part of the "Locally Preferred Alternative" route approved by Governor Martin O'Malley on August 9, 2009:

Station NameLocationConnections
7450 Wisconsin Avenue
Bethesda, MarylandMetrorail: Red Line
Metrobus: D96, M22, M70
Ride On: 29, 30, 32, 34, 36, 47, 70
Bethesda Circulator
Capital Crescent Trail
Capital Crescent Trail & Connecticut Avenue
Chevy Chase, MD 20815Metrobus: M22
Lyttonsville Place, Lyttonsville
Silver Spring, MD 20910Ride On: 2
16th Street, Woodside
Silver Spring, MD 20910Metrobus: M70
Ride On: 1, 2, 11, 18
8400 Colesville Road
Silver Spring, MD 20910Metrorail: Red Line
MARC Train:
Metrobus: C87, D40, D4X, D60, D6X, M20, M52, M54, M70, P30
Ride On: 1, 2, 4, 5, 8, 9, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 28, Flash BRT (Blue, Orange)
MTA Maryland Bus: 915, 929
Shuttle-UM: 111
Peter Pan Bus
900 Wayne Avenue
Silver Spring, MD 20910Metrobus: P30
Ride On: 15, 16, 17, 19, 20, 28
Shuttle-UM: 111
Dale Drive & Wayne Avenue
Silver Spring, MD 20910Ride On: 12, 15, 19
Wayne Avenue & Plymouth Street
Silver Spring, MD 20910Ride On: 12, 13, 19
8736 Arliss Street
Silver Spring, MD 20901Ride On: 14, 15, 16, 20, 24
Piney Branch Road & University Boulevard
Silver Spring, MD 20903Metrobus: M12
Ride On: 14, 15, 16, 20, 24
Takoma–Langley7900 New Hampshire Ave
Langley Park, MDMetrobus: M12, M60, M6X, P31
Ride On: 15, 16, 17, 18, 25
TheBus: P43
Shuttle-UM: 111
Riggs Road & University Boulevard
Langley Park/Hyattsville, MD 20903Metrobus: M12, P15, P16, P31
TheBus: P43
Adelphi Road & Campus Drive
Adelphi/Hyattsville, MD 20903Metrobus: P31, P32
TheBus: P37
Shuttle-UM
Campus Drive & Library Lane
College Park, MD 20742Metrobus: P31, P32
TheBus: P37
Shuttle-UM
Baltimore Avenue & Rossborough Lane
College Park, MD 20742Metrobus: M44, P10, P1X
Shuttle-UM
4931 Calvert Road & 7202 Bowdoin Avenue
College Park, MarylandMetrorail: Yellow Line, Green Line
MARC Train:
Metrobus: M42, P10, P14, P31
RTA: 302/G
TheBus: P37
Shuttle-UM: 104, 109
MTA Maryland: 204
River Road & Haig Drive
Riverdale Park, MD 20737Metrobus: P14, P31
East West Highway & Kenilworth Avenue
Riverdale Park, MD 20737Metrobus: P14, P30, P35, P42
Riverdale Road & 67th Avenue
Riverdale Park, MD 20737Metrobus: P30, P31, P35, P42
Veterans Parkway & Annapolis Road
Hyattsville/Landover Hills, MD 20784Metrobus: P40
TheBus: P22
4300–4700 Garden City Drive
New Carrollton, MDMetrorail: Orange Line, Silver Line
MARC Train:
Amtrak: Northeast Regional, Palmetto, Vermonter
Metrobus: P20, P21, P24, P30, P31, P35, P40, P42, P60, P61
MTA Maryland Commuter Bus
TheBus: P22, P23, P2X, P44, P52, P5X, P71
Greyhound

Potential expansion

There have been several proposals to expand the 16-mile (28.8-km) line further into Maryland or to mirror the Capital Beltway as a loop around the Washington, D.C., metropolitan area. In 2015, the Sierra Club has argued for a Purple Line that would "encircle Washington, D.C." and "connect existing suburban metro lines." Maryland Lieutenant Governor Anthony Brown, while campaigning in 2006, said he would "like to see the Purple Line go from Bethesda to across the Woodrow Wilson Bridge," adding, "Let's swing that boy all the way around”—that is, have the Purple Line circle through Virginia and back to the line's Bethesda terminus.

"The Inner Purple Line Campaign” advocacy group proposed in 2009 that the Purple Line be extended westward to Tysons Corner and eastward to Largo, and that it could eventually cross the new Wilson Bridge from Suitland through Oxon Hill to Alexandria, eventually forming a rail line that encircles the city. The Woodrow Wilson Bridge (I-495's southern crossing over the Potomac River) is built to carry a heavy or light rail line. Suggested stops along this proposed Purple Line expansion include:

  • Oxon Hill (potentially near Rosecroft Raceway, at which Metro has at times had plans to build a stop since 1980)
  • National Harbor
  • Alexandria, potentially the Metro station
  • Springfield
  • Annandale
  • Tysons Corner

Rolling stock

The light rail vehicles designed to run on the Purple Line are the CAF Urbos 3 built by CAF at their Elmira, New York, facility. Each train is 140 ft long, consists of 5 modules, and can carry up to 431 passengers (seated plus standing). CAF began testing the cars in 2020. Fabrication of all 130 modular car shells at the CAF facility in Spain was completed in June 2021. 26 of the 28 trains had been assembled as of February 2023. When the light rail vehicles were presented in summer 2024, they were the longest in the U.S.

MTA announced the start of dynamic testing of the light rail vehicles in April 2025. Testing will occur on the one-mile test track located adjacent to the project’s Operations and Maintenance (O&M) Facility along Veterans Parkway in Glenridge, Maryland. As of November 2025, all 28 vehicles have been delivered and are undergoing testing at the O&M facility.

References

References

  1. (December 19, 2025). "Purple Line Newsletter - December 2025". Maryland Transit Administration (MTA).
  2. (August 4, 2009). "Governor O'Malley Announces Purple Line Locally Preferred Alternative". Maryland Department of Transportation (MDOT).
  3. (2023-02-28). "Community Advisory Team Meeting #10 (Lyttonsville)". MTA.
  4. "Maryland LRV". Construcciones y Auxiliar de Ferrocarriles, S.A. (CAF).
  5. "Request For Proposals Technical Provisions Part 2B, Design Build Requirements". MDOT/MTA.
  6. "Presale: Purple Line Transit Partners LLC". S&P Global Ratings.
  7. "Project Overview". MTA.
  8. Metcalf, Andrew. (December 19, 2016). "Transit Agencies Say Metro's Woes Won't Impact Purple Line". Bethesda Magazine.
  9. Shaver, Katherine. (December 19, 2017). "Federal appeals court ruling allows Purple Line construction to continue". The Washington Post.
  10. Cloherty, Megan. (December 19, 2017). "US appeals court clears a legal hurdle for Purple Line". WTOP Radio.
  11. (March 2, 2016). "Purple Line Contract Receives Green Light From Governor Larry Hogan". Montgomery Community Media.
  12. Freed, Benjamin. (March 2, 2016). "Purple Line Construction to Start Later This Year".
  13. Shaver, Katherine. (September 27, 2018). "Purple Line set to open in fall of 2022, despite year-long delay in construction start, Maryland official says". The Washington Post.
  14. Shaver, Katherine. (2020-10-09). "Maryland takes over contracts on Purple Line construction after contractor quits". The Washington Post.
  15. Shaver, Katherine. (2022-01-12). "Purple Line will open 4½ years late and cost $1.4 billion more to complete, state says". The Washington Post.
  16. Shaver, Katherine. (2021-11-05). "New Purple Line contractors selected to resume full construction this spring". The Washington Post.
  17. (2022-04-14). "New construction contract for Maryland's Purple Line signed". The Washington Post.
  18. Shaver, Katherine. (2022-09-30). "As Purple Line construction resumes, the fight against gentrification is on". The Washington Post.
  19. Cox, Erin. (July 14, 2023). "Purple Line further delayed, another $148M over budget". The Washington Post.
  20. Nguyen, Danny. (2024-03-04). "Purple Line, delayed until 2027, needs another $425 million infusion". The Washington Post.
  21. Sears, Bryan P.. (2024-03-01). "Cost of Purple line increases yet again, completion pushed back".
  22. (December 18, 1994). "A Palette of Proposals for Metro". The Washington Post.
  23. (October 18, 1998). "A Governor's Purple Vision". The Washington Post.
  24. (June 13, 1987). "Study Favorable to CSX Rail Plans". The Washington Post.
  25. (July 1975). "Bethesda : Central Business District Sector Plan".
  26. (December 9, 1988). "Rail Spur Purchase 'Priceless'; Montgomery Weighs Hiking, Trolley Line". The Washington Post.
  27. (4 December 1989). "Trolley Blazes A Trail for Hikers, Bikers". The Washington Post.
  28. (March 31, 2001). "Glendening Gives Pro-Metro Pep Talk". The Washington Post.
  29. "What is the Purple Line". MTA.
  30. Metcalf, Andrew. (2017-08-28). "Officials Break Ground on Long-Awaited Purple Line Project; Construction Immediately Starts". Bethesda Magazine.
  31. "Project History". MTA.
  32. Davis, Janel. (January 18, 2008). "O'Malley allocates $100M for Purple Line planning". The Gazette.
  33. Shaver, Katherine. (May 30, 2008). "Trips on Purple Line Rail Projected at 68,000 Daily". The Washington Post.
  34. "Studies & Reports Maryland Purple Line". MTA.
  35. Spivak, Miranda S.. (January 16, 2009). "Montgomery Planners Back Rail". The Washington Post.
  36. Shaver, Katherine. (January 23, 2009). "Leggett Endorses Light-Rail Plan". The Washington Post.
  37. (November 2009). "TPB Gives Final Approval to Purple Line Project". National Capital Region Transportation Planning Board; Metropolitan Washington Council of Governments.
  38. (June 6, 2007). "Public Meeting on the Purple Line". Town of Chevy Chase, Maryland.
  39. "2008 Annual Report". Washington Metropolitan Area Transit Authority (WMATA).
  40. (May 22, 2008). "Metro preparing for more people to shift to transit if gasoline prices continue to skyrocket". WMATA.
  41. "Purple Line Now: Who We Are". Purple Line Now.
  42. (November 16, 2008). "Full Speed Ahead". The Washington Post.
  43. "News & Events". Purple Line Now.
  44. Shaver, Katherine. (July 13, 2008). "Purple Line Foes Offer No Ideas, And No Names". The Washington Post.
  45. Shaver, Katherine. (May 13, 2007). "Students Urge Stronger Backing of Purple Line". The Washington Post.
  46. "Letter from student leaders to UMD President".
  47. Shaver, Katherine. (January 23, 2009). "Leggett Endorses Light-Rail Plan". The Washington Post.
  48. Maynard, Patrick. (June 8, 2011). "Rails to Trails VP on Purple Line". The Baltimore Sun.
  49. Hunt, Elle. (July 5, 2018). "Meet the Numtots: the millennials who find fixing public transit sexy". The Guardian.
  50. (April 23, 2008). "Analysis of MTA Purple Line". Sam Schwartz Engineering.
  51. "Save the Trail".
  52. [http://www.savethetrailpetition.org/Alternatives.html Save the Trail Petition: Alternatives] {{Webarchive. link. (December 22, 2008 Studies of alternatives to a Capital Crescent Trail alignment, retrieved December 2, 2009)
  53. Shaver, Katherine. (January 16, 2005). "Fortunes Shift for East-West Rail Plan". The Washington Post.
  54. (2002-12-03). "Plan to extend Washington's Metro tees off golfers and users of trail (Baltimore Sun, Dec. 3, 2002)". The Baltimore Sun.
  55. McNamara, J. Paul. (March 24, 2008). "Letter: "Dear Fellow Columbia Members"".
  56. Shaver, Katherine. (2013-09-25). "Purple Line route changed to spare part of country club golf course". The Washington Post.
  57. Shaver, Katherine. (July 7, 2008). "Chevy Chase Says Buses Beat Trains on Purple Line". The Washington Post.
  58. Lazo, Luz. (September 30, 2011). "In Langley Park, Purple Line brings promise, and fears, of change". The Washington Post.
  59. (May 12, 2010). "MTA pushing for additional Purple Line stop in Silver Spring". The Gazette.
  60. Purple Line study report. (August 2009). "An evaluation of the merits of an LRT station at Dale Drive and Wayne Avenue". MTA.
  61. (June 25, 2015). "Maryland Gov. Larry Hogan says Purple Line will move forward". The Washington Post.
  62. Shaver, Katherine. (2015-12-08). "Four teams of private companies submit bids to build, operate Purple Line". The Washington Post.
  63. (October 2020). "Shortlisted Proposers Purple Line P3 Revised Third Party Contact Points".
  64. Shaver, Katherine. (March 2, 2016). "Maryland chooses private team to build, operate light-rail Purple Line". The Washington Post.
  65. Shaver, Katherine. (April 6, 2016). "Maryland board approves $5.6 billion Purple Line contract". The Washington Post.
  66. Metcalf, Andrew. (November 29, 2016). "Purple Line Groundbreaking on Hold Until Transit Agencies Can Find Lawsuit Solution". Bethesda Magazine.
  67. Alpert, David. (April 19, 2017). "Governor Hogan says Purple Line-blocking judge Richard Leon has a conflict of interest".
  68. Shaver, Katherine. (March 16, 2017). "Federal money to build Purple Line in question under Trump budget plan". The Washington Post.
  69. (August 21, 2017). "Maryland to get $900-million federal full funding agreement for Purple Line". The Washington Post.
  70. Neibauer, Michael. (2019-01-10). "Report: Purple Line construction delays adding $215M to price tag". Washington Business Journal.
  71. Shaver, Katherine. (2020-04-14). "Judge dismisses third — and final — lawsuit against Purple Line project". The Washington Post.
  72. (24 June 2020). "Purple Line Group Threatens To Quit If There's No Deal With Maryland On Delays, Cost Overruns". WAMU Radio.
  73. (24 September 2020). "Joint venture walks away from Maryland's Purple Line project". Construction Dive.
  74. (18 July 2020). "Purple Line project delays, cost overruns reveal long-brewing problems". The Washington Post.
  75. (11 September 2020). "Court Ruling Clears P3 Team to Leave Disputed $2B Md. Purple Line Rail Project". Engineering News-Record.
  76. (24 September 2020). "Purple Line construction workers will be packed up and ready to leave by mid-October, contractor says". The Washington Post.
  77. (5 November 2020). "Pessoa Construction Performing Purple Line Utility Relocations Along Wayne Avenue". Source of the Spring.
  78. (24 November 2020). "Maryland, Purple Line firms reach $250 million deal to keep project moving". The Washington Post.
  79. (24 November 2020). "Maryland to pay $250 million to settle Purple Line disputes, replace construction contractor". The Baltimore Sun.
  80. Shaver, Katherine. (16 December 2020). "Maryland board approves $250 million legal deal to complete Purple Line construction". The Washington Post.
  81. Shaver, Katherine. (2022-01-26). "Md. board approves $3.4 billion contract to complete Purple Line". The Washington Post.
  82. (2022-06-07). "Community Advisory Team Meeting #9 (Bethesda/Chevy Chase)". MTA.
  83. Weiner, Rachel. (2024-12-30). "On Purple Line, a mezzanine 20 times as expensive as planned". The Washington Post.
  84. Zawodny, Daniel. (2025-09-22). "Between boon and boondoggle, the Purple Line winds toward completion".
  85. Pollak, Suzanne. (2025-09-22). "Purple Line Track Work Expected to Finish in Spring 2026".
  86. Pollak, Suzanne. (2025-11-26). "Final Final Purple Line Rail Car Delivered as Project Reaches 85% Completion".
  87. "Stations". MTA.
  88. (October 21, 2015). "Transportation (and how it relates to Smart Growth)". Sierra Club.
  89. (October 4, 2006). "Brown's 'lofty' Purple Line plans draw fire from transportation officials". The Gazette.
  90. [http://www.actfortransit.org/purple_line.html What is the Purple Line?] {{Webarchive. link. (July 24, 2011 , ''The Inner Purple Line Campaign'', a project of the Action Committee for Transit (ACT), retrieved December 4, 2009.)
  91. (February 25, 2009). "Woodrow Wilson Bridge (I-495 and I-95)". Roads to the Future.
  92. "Sierra Club Purple Line Map".
  93. (January 23, 2001). "Metrorail Branch Avenue Route Completion". Roads to the Future.
  94. "Operations". MTA.
  95. (2020-04-28). "Silver Spring Community Advisory Team Meeting #6". Purple Line Transit Partners.
  96. (2021-06-22). "College Park Community Advisory Team Meeting #8". MTA.
  97. (19 July 2024). "Maryland Transit Administration Showcases First Purple Line Light Rail Vehicle". American Public Transportation Association.
  98. "All 28 Purple Line Light Rail Vehicles are now in Maryland! 🎉 From New Carrollton to Bethesda, 21 stations will make travel easier, strengthen neighborhoods, and promote a greener, more connected community.".
Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Purple Line (Maryland) — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report