From Surf Wiki (app.surf) — the open knowledge base
Pukbunaeryuk Line
Railway line in North Korea
Railway line in North Korea
| Field | Value | ||||
|---|---|---|---|---|---|
| box_width | auto | ||||
| name | Pukbunaeryuk Line | ||||
| other_name | Hyesan–Manp'o Ch'ŏngnyŏn Line | ||||
| 혜산만포청년선(惠山滿浦靑年線) | |||||
| native_name | 북부내륙선(北部內陸線) | ||||
| native_name_lang | ko | ||||
| image | Samsu Cheongnyeon Railway Station.jpg | ||||
| image_width | 360px | ||||
| image_alt | Samsu Ch'ŏngnyŏn Station on the Pukpu Line | ||||
| caption | Samsu Ch'ŏngnyŏn Station on the Pukpu Line | ||||
| type | heavy rail, Regional rail | ||||
| locale | Chagang | ||||
| Ryanggang | |||||
| start | Manp'o Ch'ŏngnyŏn | ||||
| end | Hyesan Ch'ŏngnyŏn | ||||
| Hoeryŏng Ch'ŏngnyŏn - planned/unrealised | |||||
| stations | 42 | ||||
| open | Unbong Line (Manp'o–Unbong): | ||||
| Unbong–Hyesan: 1987– | |||||
| owner | Korean State Railway | ||||
| operator | Korean State Railway | ||||
| depot | Manp'o, Hyesan; | ||||
| P'op'yŏng | |||||
| linelength | 249.2 km | ||||
| tracks | Single track | ||||
| gauge | |||||
| electrification | 3000 V DC Catenary | ||||
| map | [[Image:DPRK-Pukpu Line2.png | 360px]] | |||
| inline | 1 | ||||
| BL\\\\SKRZ-G1o\\WASSER\\~~ ~~ ~~<small>(bridge appx {{convert | 290 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\\WASSER\\~~ ~~ ~~<small>(tunnel appx {{convert | 230 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\\WASSERl\WASSER+r\~~ ~~ ~~<small>(tunnel appx {{convert | 200 | m | ft | abbr | on}}) |
| BL\\\STR\\\\WASSER\~~ ~~ ~~<small>(main tunnel appx {{convert | 810 | m | ft | abbr | on}}) |
| BL\\\STR\\\\WASSER\~~ ~~ ~~<small>(branch tunnel appx {{convert | 920 | m | ft | abbr | on}}) |
| BL\WASSERq\WASSERq\hKRZWae\WASSERq\WASSERq\WASSERq\WASSERr!~WASSER\~~ ~~ ~~<small>(bridge appx {{convert | 60 | m | ft | abbr | on}}) |
| BL\WASSERq\WASSERq\WASSERq\WASSERq\hKRZWae\WASSERr!~WASSER\\~~ ~~ ~~<small>(bridge appx {{convert | 150 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\\WASSERl\WASSERq\WASSER+r~~ ~~ ~~<small>(bridge appx {{convert | 285 | m | ft | abbr | on}}) |
| BL\\STR\WASSER+l\WASSERq\WASSER+r\TUNNEL1\STR\WASSER~~ ~~ ~~<small>(tunnel appx {{convert | 120 | m | ft | abbr | on}}) |
| BL\\TUNNEL1\WASSER\\WASSER\STR\STR\WASSER~~ ~~ ~~<small>(bridge appx {{convert | 270 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\\\\~~ ~~ ~~<small>(tunnel appx {{convert | 1305 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\\\\~~ ~~ ~~<small>(tunnel appx {{convert | 215 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\\\\~~ ~~ ~~<small>(tunnel appx {{convert | 2685 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\\\\~~ ~~ ~~<small>(tunnel appx {{convert | 560 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\\\\~~ ~~ ~~<small>(tunnel appx {{convert | 1050 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\\\\~~ ~~ ~~<small>(tunnel appx {{convert | 475 | m | ft | abbr | on}}) |
| BL\\\\hKRZWae\\\\~~ ~~ ~~<small>(bridge appx {{convert | 115 | m | ft | abbr | on}}) |
| BL\\\\hKRZWae\\\\~~ ~~ ~~<small>(bridge appx {{convert | 180 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\\\\~~ ~~ ~~<small>(tunnel appx {{convert | 605 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\\\\~~ ~~ ~~<small>(tunnel appx {{convert | 495 | m | ft | abbr | on}}) |
| BL\\\\hKRZWae\\\\~~ ~~ ~~<small>(bridge appx {{convert | 210 | m | ft | abbr | on}}) |
| BL\\\\hKRZWae\\\\~~ ~~ ~~<small>(bridge appx {{convert | 235 | m | ft | abbr | on}}) |
| BL\\\\hKRZWae\\\\~~ ~~ ~~<small>(bridge appx {{convert | 150 | m | ft | abbr | on}}) |
| BL\\hKRZWae\\\\\\~~ ~~ ~~<small>(bridge appx {{convert | 130 | m | ft | abbr | on}}) |
| BL\\hKRZWae\\\\\\~~ ~~ ~~<small>(bridge appx {{convert | 150 | m | ft | abbr | on}}) |
| BL\\hKRZWae\\\\\\~~ ~~ ~~<small>(bridge appx {{convert | 105 | m | ft | abbr | on}}) |
| BL\\hKRZWae\\\\\\~~ ~~ ~~<small>(bridge appx {{convert | 220 | m | ft | abbr | on}}) |
| BL\\TUNNEL1\\\\\\~~ ~~ ~~<small>(tunnel appx {{convert | 2650 | m | ft | abbr | on}}) |
| BL\\\\hKRZWae\\\\~~ ~~ ~~<small>(bridge appx {{convert | 180 | m | ft | abbr | on}}) |
| BL\\\\hKRZWae\\\\~~ ~~ ~~<small>(bridge appx {{convert | 100 | m | ft | abbr | on}}) |
| BL\\\\hKRZWae\\\\~~ ~~ ~~<small>(bridge appx {{convert | 120 | m | ft | abbr | on}}) |
| BL\\\\hKRZWae\\\\~~ ~~ ~~<small>(bridge appx {{convert | 130 | m | ft | abbr | on}}) |
| BL\\\\hKRZWae\\\\~~ ~~ ~~<small>(bridge appx {{convert | 100 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\WASSER\\\~~ ~~ ~~<small>(tunnel appx {{convert | 440 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\WASSER\\\~~ ~~ ~~<small>(tunnel appx {{convert | 305 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\WASSER\\\~~ ~~ ~~<small>(tunnel appx {{convert | 650 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\WASSER\\\~~ ~~ ~~<small>(tunnel appx {{convert | 335 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\WASSER\\\~~ ~~ ~~<small>(tunnel appx {{convert | 340 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\WASSER\\\~~ ~~ ~~<small>(tunnel appx {{convert | 470 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\WASSER\\\~~ ~~ ~~<small>(tunnel appx {{convert | 225 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\WASSER\\\~~ ~~ ~~<small>(tunnel appx {{convert | 100 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\WASSER\\\~~ ~~ ~~<small>(tunnel appx {{convert | 135 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\WASSER\\\~~ ~~ ~~<small>(tunnel appx {{convert | 190 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\WASSER\\\~~ ~~ ~~<small>(tunnel appx {{convert | 215 | m | ft | abbr | on}}) |
| BL\\\\hKRZWae\WABZg+r\\\~~ ~~ ~~<small>(bridge appx {{convert | 130 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\WASSER\\\~~ ~~ ~~<small>(tunnel appx {{convert | 355 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\WASSER\\\~~ ~~ ~~<small>(tunnel appx {{convert | 145 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\WASSER\\\~~ ~~ ~~<small>(tunnel appx {{convert | 595 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\WASSER\\\~~ ~~ ~~<small>(tunnel appx {{convert | 1230 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\WASSER\\\~~ ~~ ~~<small>(tunnel appx {{convert | 835 | m | ft | abbr | on}}) |
| BL\\\\TUNNEL1\WASSER\\\~~ ~~ ~~<small>(tunnel appx {{convert | 465 | m | ft | abbr | on}}) |
| BL\\\\STR\\WASSER\\~~ ~~ ~~<small>(bridge appx {{convert | 285 | m | ft | abbr | on}}) |
| BL\\\\\TUNNEL1\WASSER\\~~ ~~ ~~<small>(tunnel appx {{convert | 200 | m | ft | abbr | on}}) |
| BL\\\\\TUNNEL1\WASSER\\~~ ~~ ~~<small>(tunnel appx {{convert | 580 | m | ft | abbr | on}}) |
| BL\\\\\TUNNEL1\WASSER\\~~ ~~ ~~<small>(tunnel appx {{convert | 280 | m | ft | abbr | on}}) |
| BL\\\\\TUNNEL1\WASSER\\~~ ~~ ~~<small>(tunnel appx {{convert | 1565 | m | ft | abbr | on}}) |
| BL\\\\\TUNNEL1\WASSER\\~~ ~~ ~~<small>(tunnel appx {{convert | 645 | m | ft | abbr | on}}) |
| BL\\\\\TUNNEL1\WASSER\\~~ ~~ ~~<small>(tunnel appx {{convert | 210 | m | ft | abbr | on}}) |
| BL\\\\\TUNNEL1\WASSER\\~~ ~~ ~~<small>(tunnel appx {{convert | 220 | m | ft | abbr | on}}) |
| BL\\\\\TUNNEL1\WASSER\\~~ ~~ ~~<small>(tunnel appx {{convert | 920 | m | ft | abbr | on}}) |
| BL\\\\\STR\WASSER\\~~ ~~ ~~<small>(bridge appx {{convert | 160 | m | ft | abbr | on}}) |
혜산만포청년선(惠山滿浦靑年線)
Ryanggang
Hoeryŏng Ch'ŏngnyŏn - planned/unrealised
Unbong–Hyesan: 1987–
P'op'yŏng
| speed_km/h =
\\\fCONTg\WCONTg\~~ ~~ Unha LineYalu River
\\uSTR+l\uSTR+r\fSTR!lELC\WASSER\CONTg_yellow~ ~~ CR Meiji Railway
\\uSTRl\uTUNNEL1q!~uSTR\fSTRr!~uSTRq\uhKRZWaeq!~STRq_yellow!Ch'agap'yŏng~~mine loading
BL\\STR\\WASSER~~ ~~ ~~(main tunnel appx 810 m)
BL\\STR\\WASSER~~ ~~ ~~(branch tunnel appx 920 m)
BL\WASSERq\WASSERq\hKRZWae\WASSERq\WASSERq\WASSERq\WASSERr!uKSTReq! ~~ lZOLL\STRr_yellow~ ~~ DPRK← →China
ELCa\\KSTRa!~lDRH\uSTR!~KBHFa\WASSER\ ~~ 0.0Manp'o Ch'ŏngnyŏn
BL\\STRl\ABZg+r\WASSER\
BL\uCONTgq\uSTRq!~lELC\uSTRr!~STR\WASSER\Manp'o Line
BL\\SKRZ-G1o\WASSER\ ~~ (bridge appx 290 m)
BL\\TUNNEL1\WASSER\ ~~ ~~(tunnel appx 230 m)
BL\\TUNNEL1\WASSERl\WASSER+r~(tunnel appx 200 m)
BL\\STR\KBSTaq\v-STR+r\WASSER\WORKS ~~ Ch'agap'yŏng Cement Factory
BL\\STRl\STRq\v-STR!~vSTR+r-\WASSER4.6
BL\\STR+l\SPLaq!~lhSTRae+L!~lvHST-\tvSTRe@fq\vSTRr\WASSER\WORKSWASSER~ ~~ ~~(bridge appx 60 m)
BL\CONTgq_orange\STR+r_orange!STR\\WASSER~ ~~ ~~An'gol Line
BL\\BHF\\WASSER~~8.3~~Munak
BL\\STRl\HSTq\STR+r\WASSER+l\WASSERr~~17.7Yŏnp'o
BL\WASSERq\WASSERq\WASSERq\WASSERq\hKRZWae\WASSERr!~WASSER\ ~~ (bridge appx 150 m)
BL\\\HST\WASSER\ ~~ 23.4Rimt'o
BL\\\pHST\WASSER\25.8Ch'anggol
BL\\STR+l\STRr\WASSER\
BL\\TUNNEL1\WASSERl\WASSERq\WASSER+r(bridge appx 285 m)
BL\\STRl\STRq\STRq\STR+r\WASSER
BL\\\\HST\WASSER28.6Simridong
BL\STR+l\STRq\STRq\STRq\STR+r\STR\WASSER
BL\STR\WASSER+l\WASSERq\WASSER+r\TUNNEL1\STR\WASSER ~~ (tunnel appx 120 m)
BL\pHST\WASSER\WASSER\STR\STR\WASSER41.0Songsam
BL\TUNNEL1\WASSER\WASSER\STR\STR\WASSER ~~ (bridge appx 270 m)
BL\STR\WASSER\exSTR+l_yellow\exhKRZWaeq!~exSTRq_yellow!~exENDEaq!~exlZOLL\xABZql!~lHST~L\STRr!~lHST~R\WASSER35.8Chagang Samgang
BL\STR\WASSER\exSTR_yellow\WASSERl\WASSERq\WASSERq\WASSERr ~~ yellow: former line on PRC side for
BL\STR\WASSER\exSTR_yellow\\ ~~ ~~dam construction
BL\HST\WASSER\exSTRl_yellow\exCONTfq_yellow\~~44.9Sangp'unggang
BL\STR\WASSERl\WASSERq\WASSERq\WASSERq\WASSERq\WCONTfq ~~ ~~Yalu River
BL\STRl\uSTRq!STR+r\uSTRq\uCONTfq\~ ~~ ~~Unbong Line
BL\\BHF\\~~45.6Unbong
BL\STR+l\STRr\\ ~~
BL\BHF\\\53.4Kujung
BL\STRl\STRq\STR+r\\
BL\\TUNNEL1\\(tunnel appx 1305 m)
BL\\TUNNEL1\\ ~~ (tunnel appx 215 m)
BL\\TUNNEL1\\ ~~ (tunnel appx 2685 m)
BL\\TUNNEL1\\ ~~ (tunnel appx 560 m)
BL\\BHF\\WORKS63.5Chasŏng
BL\\TUNNEL1\\ ~~ (tunnel appx 1050 m)
BL\\TUNNEL1\\ ~~ (tunnel appx 475 m)
BL\\HST\\ ~~ 68.8Sahyang
BL\\hKRZWae\\(bridge appx 115 m)
BL\\pHST\\ ~~ 74.3Kwi'in
BL\\hKRZWae\\(bridge appx 180 m)
BL\\TUNNEL1\\ ~~ (tunnel appx 605 m)
BL\\TUNNEL1\\ ~~ (tunnel appx 495 m)
BL\\hKRZWae\\ ~~ (bridge appx 210 m)
BL\\pHST\\ ~~ 80.8Chŏnp'yŏng
BL\\HST\\83.2Rip'yŏng
BL\\hKRZWae\\(bridge appx 235 m)
BL\\hKRZWae\\ ~~ (bridge appx 150 m)
BL\STR+l\HSTq\STRr\\ ~~ 87.8Hwap'yŏng
BL\hKRZWae\\\(bridge appx 130 m)
BL\HST\\\ ~~ 94.8Hoejung
BL\hKRZWae\\\(bridge appx 150 m)
BL\hKRZWae\\\ ~~ (bridge appx 105 m)
BL\pHST\\\ ~~ 100.5Ryongch'ul
BL\hKRZWae\\\(bridge appx 220 m)
BL\TUNNEL1\\\ ~~ (tunnel appx 2650 m)
BL\STRl\HSTq\STR+r\\ ~~ 108.1Wŏlt'an
BL\\hKRZWae\\(bridge appx 180 m)
BL\\hKRZWae\\ ~~ (bridge appx 100 m)
BL\\tSTReq\ABZgr\\ ~~ underground facility
BL\\HST\\ ~~ 113.7Hoeyang
BL\\hKRZWae\\(bridge appx 120 m)
BL\\hKRZWae\\ ~~ (bridge appx 130 m)
BL\\BHF\\WORKS121.4Rot'an
BL\\hKRZWae\\ ~~ ~~(bridge appx 100 m)
BL\\HST\WASSER+l\WASSERq\WASSERq~~126.8~~Ogubi
BL\\TUNNEL1\WASSER\~~ ~~ ~~(tunnel appx 440 m)
BL\\TUNNEL1\WASSER\~~ ~~ ~~(tunnel appx 305 m)
BL\\pHST\WASSER\~~134.7Tuji
BL\\BHF\WASSER\\WORKS138.2~~P'op'yŏng Ch'ŏngnyŏn
BL\\TUNNEL1\WASSER\~~ ~~ ~~(tunnel appx 650 m)
BL\\TUNNEL1\WASSER\~~ ~~ ~~(tunnel appx 335 m)
BL\\TUNNEL1\WASSER\~~ ~~ ~~(tunnel appx 340 m)
BL\\HST\WASSER\~~145.9~~Much'ang
BL\\TUNNEL1\WASSER\~~ ~~ ~~(tunnel appx 470 m)
BL\\TUNNEL1\WASSER\~~ ~~ ~~(tunnel appx 225 m)
BL\\pHST\WASSER\~~151.5~~Rajuk
BL\\TUNNEL1\WASSER\~~ ~~ ~~(tunnel appx 100 m)
BL\\HST\WASSER\~~155.8~~Taeŭng
BL\\TUNNEL1\WASSER\~~ ~~ ~~(tunnel appx 135 m)
BL\\TUNNEL1\WASSER\~~ ~~ ~~(tunnel appx 190 m)
BL\\TUNNEL1\WASSER\~~ ~~ ~~(tunnel appx 215 m)
BL\\BHF\WASSER\~~166.0~~Huju Ch'ŏngnyŏn
BL\\hKRZWae\WABZg+r\~~ ~~ ~~(bridge appx 130 m)
BL\\TUNNEL1\WASSER\~~ ~~ ~~(tunnel appx 355 m)
BL\\HST\WASSER\~~178.7~~Songjŏn
BL\\TUNNEL1\WASSER\~~ ~~ ~~(tunnel appx 145 m)
BL\\TUNNEL1\WASSER\~~ ~~ ~~(tunnel appx 595 m)
BL\\TUNNEL1\WASSER\~~ ~~ ~~(tunnel appx 1230 m)
BL\\HST\WASSER\~~187.0~~Kangha
BL\\TUNNEL1\WASSER\~~ ~~ ~~(tunnel appx 835 m)
BL\\TUNNEL1\WASSER\~~ ~~ ~~(tunnel appx 465 m)
BL\\HST\WASSER\~~194.6Sinp'a Ch'ŏngnyŏn
BL\WASSERq\WASSERq\WASSERq\hKRZWae\WABZql\WASSER+r\ ~~ Changjin River
BL\\STR\WASSER\ ~~ (bridge appx 285 m)
BL\\HST\WASSER\ ~~ 200.0Mint'ang
BL\\STRl\STR+r\WASSER\
BL\\\pHST\WASSER\205.3Ryanggang Sinsang
BL\\\TUNNEL1\WASSER\(tunnel appx 200 m)
BL\\\TUNNEL1\WASSER\ ~~ (tunnel appx 580 m)
BL\\\HST\WASSER\ ~~ 212.5P'ungyang
BL\\\TUNNEL1\WASSER\(tunnel appx 280 m)
BL\\\TUNNEL1\WASSER\ ~~ (tunnel appx 1565 m)
BL\\\HST\WASSER\ ~~ 220.1Sangdae
BL\\\HST\WASSER\224.0Insan
BL\\\TUNNEL1\WASSER\(tunnel appx 645 m)
BL\\\TUNNEL1\WASSER\ ~~ (tunnel appx 210 m)
BL\\\BHF\WASSER\WORKS232.8Samsu Ch'ŏngnyŏn
BL\\\TUNNEL1\WASSER\ ~~ (tunnel appx 220 m)
BL\\\TUNNEL1\WASSER\ ~~ (tunnel appx 920 m)
BL\\\HST\WASSER\ ~~ 240.3Nŭpp'yŏng
BL\\\HST\WASSER\245.1Kangu
BL\WASSERq\WASSERq\WASSERq\WASSERq\hKRZWae\WABZg+r\Hoch'ŏn River
BL\\\STR\WASSER\ ~~ (bridge appx 160 m)
BL\\\DST\WASSER\WORKS ~~ Hyesan Textile Factory
ELCe\\\STR_orange!~KBHFe\WASSER\WORKS249.2Hyesan Ch'ŏngnyŏn
\\\STR_orange\WASSER\ ~~ Paektusan Ch'ŏngnyŏn Line
\\\STR_orange\WASSER\ ~~ Hyesan–Wiyŏn section to have
\\\STR_orange\WASSER\ ~~ ~~ become part of Pukpu Line
\\\BHF_orange\WASSER\~~ Wiyŏn
\\CONTgq_orange\STRq_orange!~lELC\uSTR!~STRr_orange\WASSER\ ~~ Paektusan Ch'ŏngnyŏn Line
\\\uSTR\WASSER\ ~~ Samjiyŏn Line
\\\uSTR\WASSER\ ~~ Wiyŏn–Karim section
\\\uSTR\WASSER\ ~~ ~~to have become part of Pukpu Line
\\\uHST\WASSERl\WCONTfq~~ Karim
\\\STR_black!~uSTRl\uCONTfq\ ~~ ~~Samjiyŏn Line
\\\STR_black\~~ ~~ ~~Poch'ŏn Line
\\\STR_black\~~ ~~ ~~Karim–Poch'ŏn section
\\\STR_black\~~ ~~ ~~to have become part of Pukpu Line
\\\BHF_black\~~ ~~Poch'ŏn
\\CONTgq_black\exSTR!STRr_black\~ ~~ ~~Poch'ŏn Line
\\\exSTR\~~ ~~ planned new line
\\\exSTR!~uSTR+l\uCONTfq\ ~~ ~~Samjiyŏn Line
\\\uBHF\~~ ~~Samjiyŏn
\\\uSTR\~~ ~~ ~~Samjiyŏn–Motka section
\\\uSTR\~~ ~~ ~~to have become part of Pukpu Line
\\\exSTR!uKHSTe\~ ~~Motka
\\\exBHF\~~ Taehongdanplanned new line
\\\exBHF\~~ Nongsaplanned new line
\\\exBHF\~~ Samjangplanned new line
\\fCONTgq\exSTR!fSTR+r\~ ~~ ~~Paengmu Line
\\\fHST\~~ ~~Hŭngam
\\\fSTR\~~ ~~ ~~Hŭngam–Musan section to have
\\\fSTR\~~ ~~ ~~become part of Pukpu Line
\\\STR_orange!fKBHFe\~ ~~Musan
\\CONTgq_orange\exSTR!STRr_orange\~ ~~ ~~Musan Line
\\\exBHF\~~ Ch'ilsŏngriplanned new line
\\\exBHF\~~ Saegŏlliplanned new line
\\\exSTR!uKBHFa\~ ~~Yusŏn
\\\uSTR\~~ ~~ ~~Hoeryŏng Colliery Line to have
\\\uSTR\~~ ~~ ~~become part of Pukpu Line
\\\fSTR!uKBHFe\~ ~~Hoeryŏng Ch'ŏngnyŏn
\\\fCONTf\~~ ~~ ~~Hambuk Line
The Pukbunaeryuk Line, also called the Hyesan–Manp'o Ch'ŏngnyŏn Line after the only completed stage of three planned stages, is an electrified standard-gauge secondary trunk line of the Korean State Railway in Chagang and Ryanggang Provinces, North Korea, connecting the Manp'o Line at Manp'o to the Paektusan Ch'ŏngnyŏn Line at Hyesan. It also connects to the China Railway Meiji Railway via the Ji'an Yalu River Border Railway Bridge between Manp'o and Meihekou, China.
The Pukbunaeryuk Line was to have been a northern east–west trunk line of 450 km on the Manp'o–Hyesan–Musan–Hoeryŏng route, but this plan has not been realised.
There are 42 stations on the line, of which Chasŏng, Hwap'yŏng, P'op'yŏng Ch'ŏngnyŏn, and Mint'ang are dedicated freight consolidation points; the stations of Chŏnp'yŏng, Tuji, Sinp'a Ch'ŏngnyŏn, Ryanggang Sinsang, and Insan are served only by passenger trains. The line has 76 tunnels totalling over 26 km in length, and 116 bridges with a total length of over 6.3 km - bridges make up 3.3% of the total length of the line, whilst tunnels account for 12.8% of the total route length.
There are locomotive facilities at Manp'o and Hyesan, and formerly at P'op'yŏng; Hyesan also has shops for maintenance of passenger and freight cars.
History
Having been the only major east–west trunk line at the time, the P'yŏngra Line had become overly congested by the 1970s, as all east–west traffic - even that moving between the northwest and the northeast - had to travel via the P'yŏngra Line. To alleviate the burden, President Kim Il Sung ordered the construction of a new, northern east–west transversal line in August 1980. This line, which was to have made use of parts of existing lines where possible, in addition to newly built trackage, was to have connected Manp'o in the west with Hoeryŏng in the east. This would have resulted in the creation of a direct connections between the Manp'o Line in the northwest and the Hambuk Line in the northeast of the country, allowing traffic between these two areas to avoid the P'yŏngra Line. This would also have significantly shortened the travelled distances.
The Pukbunaeryuk Line, as the planned line was called (북부, pukpu, means "northern"), was to have been built in three stages: Manp'o to Hyesan, Hyesan to Musan, and Musan to Hoeryŏng.
Stage 1: Hyesan–Manp'o
In 1959, the Korean State Railway opened the Unbong Line, a 45.6 km line from Manp'o to Unbong, to assist with the construction of the Unbong Dam on the Yalu River which had begun in October of that year. The first stage of the northern trunk line, from Manp'o to Hyesan, made use of the entirety of the Unbong Line. A new passenger-friendly station was built at Unbong, called Sinunbong Station (="New Unbong Station") (the previous Unbong Station, which had been the terminus of the Unbong Line and, after the construction of the new line, became the terminus of the truncated Unbong Line, was later renamed Kuunbong Station - that is, "Old Unbong Station", and Sinunbong Station became simply Unbong Station). Work on the first stage was started at both ends in 1981; construction went slowly, with the 17.9 km from Sinunbong to Chasŏng and the 83.2 km from Hyesan to Huju being completed only on 27 November 1987. Kim Jong Il ordered the formation of youth work brigades who, moving over 10,000,000 m3 of earth and blasting millions of cubic metres of rock, completed construction of the final 102.5 km section between Chasŏng and Huju in 1988.
Stage 2: Hyesan–Musan
A second stage, a 74 km long line from Hyesan to Musan on the Musan Line via Poch'ŏn, Samjiyŏn, Taehongdan and Musan counties was planned and construction was started, but was subsequently suspended. The line was to have shared the track of the Paektusan Ch'ŏngnyŏn Line from Hyesan to Wiyŏn; from there, the Wiyŏn–Karim section of the narrow-gauge Samjiyŏn Line and the Karim–Poch'ŏn section of the Poch'ŏn Line were to have been converted to standard gauge; from Poch'ŏn a new line would have been built to Rimyŏngsu, and from there, the Rimyŏngsu–Samjiyŏn–Motka section of narrow-gauge line was to have been regauged. From Samjiyŏn there was to be a new line built via Taehongdan town, Nongsa-rodongjagu, and Samjang-rodongjagu to Hŭngam on the Paengmu Line, from where the existing narrow-gauge line to Musan was to have been regauged.
Stage 3: Musan–Hoeryŏng
The third stage of the Pukbunaeryuk Line project was to have been the construction of a new 61 km line from Musan to Hoeryŏng on the Hambuk Line. From Musan, the line was to have run through Musan County along the Tumen River via Ch'ilsŏng-ri and Saegŏl-li, continuing from there along a newly built line to Yusŏn, the terminus of the Hoeryŏng Colliery Line; this line would have been absorbed into the Pukpu Line.
Present
The first stage had been completed at the end of 1988; by then, some works had begun on the second stage, but due to the DPRK's economic crisis of the 1990s, construction was eventually abandoned. Electrification of the existing portion of the line was begun in 1991 with the goal of completing it in time for Kim Il Sung's 80th birthday on 15 April 1992; however, it wasn't until 1993 that the electrification of the entire Manp'o–Hyesan line was completed.
By the end of the 2000s, the line was in such poor condition that the operation of trains was nearly impossible; citing this, in April 2011 Kim Jong Il once again mobilised work brigades of the Kim Il-sung Socialist Youth League to undertake the reconstruction of the line; the refurbishment work was completed in November 2013.
Services

It is one of the lightest-travelled of all trunk lines in the DPRK. There are a number of passenger trains on the line, including commuter trains serving Rimt'o. Most of the freight traffic on the line is military, but logs are also transported along the line from the Kamae Plateau. Ore from the March 5 Youth Mine is delivered to Chasŏng Station for loading onto trains by means of a ropeway conveyor.
Route
A yellow background in the "Distance" box indicates that section of the line is not electrified.
| Distance (km) | Station Name | Former Name | Total | S2S | Transcribed | Chosŏn'gŭl (Hanja) | Transcribed | Chosŏn'gŭl (Hanja) | Connections |
|---|---|---|---|---|---|---|---|---|---|
| 0.0 | 0.0 | Manp'o Ch'ŏngnyŏn | 만포청년 (滿浦靑年) | Manp'o | 만포 (滿浦) | Manp'o Line, Unha Line, | |||
| China Railway Meiji Railway | |||||||||
| 4.6 | 4.6 | Ch'agap'yŏng | 차가평 (車家坪) | ||||||
| 8.3 | 3.7 | Mun'ak | 문악 (文岳) | An'gol Line | |||||
| 17.7 | 9.4 | Yŏnp'o | 연포 (煙浦) | ||||||
| 23.4 | 5.7 | Rimt'o | 림토 (林土) | ||||||
| 25.8 | 2.4 | Ch'anggol | 창골 (倉골) | Flag stop. | |||||
| 28.6 | 2.8 | Simridong | 십리동 (十里洞) | Oktong | 옥동 (玉洞) | ||||
| 35.8 | 7.2 | Chagang Samgang | 자강삼강 (慈江三江) | ||||||
| 41.0 | 5.2 | Songsam | 송삼 (松三) | Flag stop. | |||||
| 44.9 | 3.9 | Sangp'unggang | 상풍강 (上豊江) | Unbong Line | |||||
| 45.6 | 0.7 | Unbong | 운봉 (雲峰) | Sinunbong | 신운봉 (新雲峰) | ||||
| 53.4 | 7.8 | Kujung | 구중 (舊中) | ||||||
| 63.5 | 10.1 | Chasŏng | 자성 (慈城) | ||||||
| 68.8 | 5.3 | Sahyang | 사향 (麝香) | Chagang Sangp'yŏng | 자강상평 (慈江常坪) | ||||
| 74.3 | 5.5 | Kwi'in | 귀인 (貴仁) | Flag stop. | |||||
| 80.8 | 6.5 | Chŏnp'yŏng | 전평 (錢坪) | Flag stop. | |||||
| 83.2 | 2.4 | Rip'yŏng | 리평 (梨坪) | ||||||
| 87.8 | 4.6 | Hwap'yŏng | 화평 (和坪) | Chinsong | 진송 (榛松) | ||||
| Songdŏk | 송덕 (松德) | Closed. | |||||||
| 94.8 | 7.0 | Hoejung | 회중 (檜中) | distance from Hwap'yŏng | |||||
| 100.5 | 5.7 | Ryongch'ul | 룡출 (龍出) | Chagang Unjung | 자강운중 (慈江雲中) | ||||
| 108.1 | 7.6 | Wŏlt'an | 월탄 (月灘) | Unjung Huch'ang | 운중후창 (雲中厚昌) | ||||
| 113.7 | 5.6 | Hoeyang | 회양 (檜陽) | ||||||
| 121.4 | 7.7 | Rot'an | 로탄 (蘆灘) | ||||||
| 126.8 | 5.4 | Ogubi | 오구비 (五구비) | ||||||
| 134.7 | 7.9 | Tuji | 두지 (杜芝) | Flag stop. | |||||
| 138.2 | 3.5 | P'op'yŏng Ch'ŏngnyŏn | 포평청년 (葡坪靑年) | Huch'ang | 후창 (厚昌) | ||||
| 145.9 | 7.7 | Much'ang | 무창 (茂昌) | ||||||
| 151.5 | 5.6 | Rajuk | 라죽 (羅竹) | Flag stop. | |||||
| 155.8 | 4.3 | Taeŭng | 대응 (大鷹) | ||||||
| 166.0 | 10.2 | Huju Ch'ŏngnyŏn | 후주청년 (厚州靑年) | Huju | 후주 (厚州) | ||||
| 178.7 | 12.7 | Songjŏn | 송전 (松田) | ||||||
| 187.0 | 8.3 | Kangha | 강하 (江下) | ||||||
| 194.6 | 7.6 | Sinp'a Ch'ŏngnyŏn | 신파청년 (新坡靑年) | Sinp'a | 신파 (新坡) | ||||
| 200.0 | 5.4 | Mint'ang | 민탕 (珉湯) | ||||||
| 205.3 | 5.3 | Ryanggang Sinsang | 량강신상 (両江新上) | Flag stop. | |||||
| 212.5 | 7.2 | P'ungyang | 풍양 (豊陽) | ||||||
| 220.1 | 7.6 | Sangdae | 상대 (上臺) | ||||||
| 224.0 | 3.9 | Insan | 인산 (仁山) | Flag stop. | |||||
| 232.8 | 8.8 | Samsu Ch'ŏngnyŏn | 삼수청년 (三水靑年) | Samsu | 삼수 (三水) | ||||
| 240.3 | 7.5 | Nŭpp'yŏng | 늪평 (늪坪) | ||||||
| 245.1 | 4.8 | Kanggu | 강구 (江口) | ||||||
| 249.2 | 4.1 | Hyesan Ch'ŏngnyŏn | 혜산청년 (惠山青年) | Hyesan | 혜산 (惠山) | Paektusan Ch'ŏngnyŏn Line |
References
References
- Kokubu, Hayato, 将軍様の鉄道 (Shōgun-sama no Tetsudō), {{ISBN. 978-4-10-303731-6
- [http://newslibrary.naver.com/viewer/index.nhn?articleId=1992013000209215009&edtNo=2&printCount=1&publishDate=1992-01-30&officeId=00020&pageNo=15&printNo=21723&publishType=00020 북부철길 전철화, 동아일보], 1992 January 30
- [http://terms.naver.com/entry.nhn?docId=2090718&cid=44454&categoryId=44461 북부 철길 건설]
- [http://www.tongilnews.com/news/articleView.html?idxno=105655 북한 북부철길 개건사업 마감단계.. ‘제2의 마식령속도’ 창조]
- [http://newslibrary.naver.com/viewer/index.nhn?articleId=1988081000329212004&editNo=3&printCount=1&publishDate=1988-08-10&officeId=00032&pageNo=12&printNo=13190&publishType=00020 북부철길 1단계공사완료], [[Kyunghyang Shinmun]], 10 August 1988
- [http://weekly1.chosun.com/site/data/html_dir/2008/12/17/2008121701205.html 북한 철도 유라시아 철도의 ‘끊어진 고리’ 北, 12개 주요 노선 어떤 상태인가]
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Pukbunaeryuk Line — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report