Osagyefo Barge
Power generating station in Effasu, Ghana
Power generating station in Effasu, Ghana
| Field | Value |
|---|---|
| name | Osagyefo Barge |
| coordinates | |
| country | Ghana |
| location | Effasu |
| status | Existing; never operated |
| th_fuel_primary | Natural gas |
| th_fuel_secondary | Diesel |
| ps_electrical_capacity | 125 MW |
The Osagyefo Barge is a 125 MW barge-mounted gas turbine electric power generating station located at Effasu in the Western Region of Ghana.
The 77 m long barge is equipped with a pair of single-cycle heavy-duty gas turbine units built by Ansaldo that have a combined generating capacity of 125 MW. It is designed to burn either natural gas or diesel fuel.
The 125 MW power barge was ordered by the Ghanaian government in 1995 with financial assistance from the Overseas Economic Cooperation Fund of Japan. The offshore oil and gas fields did not develop as quickly as expected, so the power barge sat idle and its condition deteriorated. During this period, there was little maintenance conducted on the power barge or on the site, resulting in the deterioration of many of the systems.
The power barge project was initially under the management of Western Power, a subsidiary of GNPC the Ghana National Petroleum Corporation; responsibility was transferred to the Volta River Authority in 2003. In July 2007, the government of Ghana entered an unsolicited 20-year lease agreement with the company Balkan Energy Ghana to refurbish and operate the power barge, initially using diesel fuel and later using gas to be delivered by the West African Gas Pipeline. Ghana sought additional electricity supplies from the barge to alleviate electricity shortages resulting from reduced water levels at the Akosombo Dam hydroelectric project. The company promised to begin operations within 90 days. Also, plans were announced to increase the barge's generating capacity by 60 MW, bringing it from its current capacity of 125 MW up to 185 MW. The government of Ghana sued in Ghanaian court, seeking to nullify the contract with Balkan Energy. Balkan Energy blamed ProEnergy, a U.S. company with which it had contracted, for Balkan's inability to bring the generating station online when promised.
The name "Osagyefo" commemorates Kwame Nkrumah, the first president of Ghana.
References
References
- (10 March 2005). "Power barge arrives at Effasu Mangyea mini harbour". modernghana.com.
- (4 March 2008). "Energy From Osagyefo Barge". modernghana.com.
- Nehemia Owusu Achiaw. (4 March 2008). "More Power From Osagyefo Barge Soon". modernghana.com.
- (7 September 2007). "Gov`t decision to stay Osagyefo barge at Effasu". modernghana.com.
- (15 October 2003). "Volta River Authority Takes Over Effasu Power Project". AllAfrica.com.
- J. Ato Kobbie. (23 May 2012). "‘Osagyefo Barge’, Balkan Energy: Fraudulent Claims & A PPA That Never Was". modernghana.com.
- Stephen Kwabena Effah. (22 March 2012). "Court To Give Ruling On Ghana And Balkan Energy Case". Ghanaian Times.
- (30 July 2007). "Ghana signs agreement for more electricity". AfricaNews.com.
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Osagyefo Barge — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report