Skip to content
Surf Wiki
Save to docs
engineering

From Surf Wiki (app.surf) — the open knowledge base

Operations and Checkout Building

Historic American spaceflight facility in Cape Canaveral, Florida


Historic American spaceflight facility in Cape Canaveral, Florida

FieldValue
nameOperations and Checkout Building
imageOperations and Checkout Bldg.jpg
captionAerial view of the Operations and Checkout building at KSC, c. 2017
locationBrevard County, Florida, USA
nearest_cityTitusville, Florida
coordinates
locmapinFlorida#USA
architectCharles Luckman
architectureInternational
built1964
addedJanuary 21, 2000
visitation_numOpen, requires sponsorship by NASA employee
refnum99001636
mpsubJohn F. Kennedy Space Center MPS

The Neil Armstrong Operations and Checkout Building (O&C) (previously known as the Manned Spacecraft Operations Building) is a historic building on Merritt Island, Florida, United States. The five-story structure is in the Industrial Area of NASA's Kennedy Space Center. It has twin-block facilities that include the crew quarter dormitories for astronauts, suit-up preparations prior to their flights, and the other is a large spacecraft workshop used for manufacturing and checking activities on crewed spacecraft. On January 21, 2000, it was added to the U.S. National Register of Historic Places.

Apollo program

During planning and construction, it was known as the Operations and Checkout Building. When it was finished in 1964, it was renamed the Manned Spacecraft Operations Building and was used to process spacecraft in the Gemini and Apollo era. It was reverted back to the Operations and Checkout Building during the Shuttle program, known informally as the O&C.

Altitude test chambers

In 1965, a pair of altitude chambers were installed in the High Bay for testing the environmental and life support systems of both the Apollo Command/Service Module and Lunar Module at simulated altitudes of up to 250,000 ft. Each chamber is 58 ft high (with a clear working height of 28 ft) and an interior diameter of 33 ft, were human-rated, and capable of reaching the maximum altitude (minimum pressure) in one hour. These were used by the prime and backup crews of all crewed missions, from the ill-fated Apollo 1 in October 1966, through to the Apollo-Soyuz Test Project in July 1975.

Post-Apollo use

During the 1980s and 90s the O&C building was used to house and test Spacelab science modules before their flights aboard the Space Shuttle.

In the late 1990s and 2000s, some modules and trusses for the International Space Station were checked out in the building.

Artemis Program

On January 30, 2007, NASA held a ceremony to mark the transition of the building's high bay for use by the Constellation program. The building would serve as the final assembly facility for the Orion crew exploration vehicle. In preparation for the transition, the state of Florida provided funds to clear the facility of about 50 ST of steel stands, structures and equipment. Renovations totaling $55 million took place from June 2007 through January 2009, at which point Lockheed Martin became the operator of the facility for Orion production. The Orion spacecraft for Artemis 1 completed its assembly in this location and was moved to the Multi-Payload Processing Facility on January 16, 2021. The Orion spacecraft for Artemis 2 is under final testing in the building as of July, 2024.

The building was renamed to the Neil Armstrong Operations and Checkout Building in a ceremony on the 45th anniversary of Apollo 11 (2014).

Notes

References

  1. {{NRISref
  2. "Image-STS-26 crewmembers leave KSC O&C Bldg on their way to the launch pad". NASA.
  3. Craig, Kay. (2011-06-14). "KSC Technical Capabilities: O&C Altitude Chambers". NASA.gov.
  4. Slovinac, Patricia. (December 2009). "Cape Canaveral Air Force Station, Launch Complex 39, Altitude Chambers". Library of Congress.
  5. Young, Tracy. (2007-01-24). "NASA Invites Media to Ceremony Marking Transition to Constellation". NASA.gov.
  6. Marconi, Elaine. (2007-02-09). "NASA's next step to prepare for a new era of exploration". NASA.
  7. (February 4, 2009). "Operations and Checkout Building High Bay Ready for Orion Processing". NASA.
  8. "KENNEDY SPACE CENTER'S ANNUAL REPORT FY2008". NASA's Kennedy Space Center.
  9. (January 16, 2021). "Artemis I Orion Moves For Fueling, Next Step in Launch Preparations". NASA.
  10. (February 12, 2021). "Cabin Checks Underway to Keep Crew Breathing Easy on Artemis II".
  11. "Orion on the Rise - NASA".
  12. (July 22, 2014). "Neil Armstrong Legacy Adds Honor". Florida Today.
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Operations and Checkout Building — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report