Nysted Wind Farm

Danish offshore wind farm

Nysted Wind Farm

Danish offshore wind farm

FieldValue
nameNysted Wind Farm
imageWindpark Nysted.jpg
countryDenmark
locationSouth of Lolland
coordinates
ownerØrsted, PensionDanmark
ps_units_operational162 × 2.3 MW (Siemens)
ps_units_manu_modelSiemens Wind Power
ps_electrical_capacity166 MW (Rødsand I)
207 MW (Rødsand II)
383MW total
ps_annual_generation1,370 GW·h
commissioned2003
costabout EUR 600 million

207 MW (Rødsand II) 383MW total

|frame-height=260 |frame-lat=54.5545 |frame-long=11.6283

Offshore turbine, used in Nysted Wind Farm

The Nysted Wind Farm (also known as Rødsand) is a Danish offshore wind farm close to the Rødsand sand bank near Lolland. Gravity base foundations are used rather than piles due to ice conditions.

Rødsand I

Rødsand I was built in 2003, with 72 turbines and a total capacity of 166 MW, and was the largest in the world until 2007. Turbines were installed by A2SEA.{{cite journal |archive-url = https://web.archive.org/web/20110719122708/http://www.ees.dk/db/files/a2seas_praesentation.pdf |archive-date = 2011-07-19 |url-status = dead

Rødsand I was out for 4 months in 2007 when the main transformer suffered a malfunction, causing a production loss of 23 million DKK per month.

In September 2010, DONG bought E.ON's 20% share and sold half of the entire project to pension fund PensionDanmark for 700 million kroner (€94 million / US$120 million) — almost half the DKK1,600 million cost. Stadtwerke Lübeck also owns a share.

it has an availability of 97 percent.

Rødsand II

In 2010, a 207 MW extension of the existing wind farm was installed by E.ON at a stated cost of EUR450m and a power purchase agreement at DKK 0.629 per kW·h (US$0.12/kW·h). It was originally scheduled to be completed in 2011, but installation happened faster than projected, and on 15 July 2010, E.ON reported that all turbines had been installed and the majority were supplying power to the Danish grid. On 3 August, E.ON reported that the wind farm was ready and went into operation, three months ahead of schedule. Rødsand 2 was inaugurated on 12 October.

In November 2013, local power company SEAS-NVE bought 80% of Rødsand 2 for a price of DKK 2.8 billion and thus valuating the wind farm at DKK 3.5 billion.

References

References

  1. Wittrup, Sanne. [http://ing.dk/artikel/111827-pensionskasse-bliver-havmoelle-ejer Pension fund becomes wind farm owner] (in Danish) ''[[Ingeniøren]]'', 9 September 2010. Retrieved: 17 April 2011.
  2. [http://www.4coffshore.com/windfarms/nysted-denmark-dk07.html Rødsand 1] ''4C'' . Retrieved: 31 July 2010.
  3. "Ørsted - Love your home".
  4. Sanne Wittrup. "[http://ing.dk/artikel/oestersoe-havmoellepark-har-leveret-varen-i-ti-aar-165025 Østersø-havmøllepark har leveret varen i ti år]" (in Danish) ''[[Ingeniøren]]'', 13 December 2013. Accessed: 13 December 2013.
  5. Sanne Wittrup. "[http://ing.dk/artikel/havvindmoller-i-nysted-lammet-af-transformerhavari-80136 Havvindmøller i Nysted lammet af transformerhavari]" (in Danish) ''[[Ingeniøren]]'', 31 July 2007. Accessed: 13 December 2013.
  6. [http://www.4coffshore.com/windfarms/rodsand-ii-denmark-dk11.html Rødsand 2] ''4C'' . Retrieved: 31 July 2010.
  7. Pia C. Jensen & Steen Hartvig Jacobsen. "[http://www.ens.dk/sites/ens.dk/files/supply/renewable-energy/wind-power/Vindturbines%20in%20DK%20eng.pdf Wind turbines in Denmark] {{webarchive. link. (2013-10-23 ", page 26. ''[[Danish Energy Agency]]'', November 2009. Accessed: 4 September 2013.)
  8. [http://www.power-technology.com/projects/rodsand/ Rødsand II Wind Farm, Denmark]
  9. [http://www.maritimedanmark.dk/?Id=8264 Rødsand 2 to finish ahead of schedule] ''Maritime Danmark'', 18 June 2010. Retrieved: 19 June 2010.
  10. [http://www.oilpubs.com/oso/article.asp?v1=9774 E.ON completes turbine installation at Roedsand windfarm] ''Offshore Shipping Online'', 15 July 2010. Retrieved: 31 July 2010.
  11. [http://www.eon.se/templates/Eon2TextPage.aspx?id=70482&epslanguage=DK Vindkraftparken Rødsand 2 er nu klar] ''(Wind farm Rødsand 2 is now ready) Press release in Danish'', 3 August 2010. Retrieved: 13 September 2010.
  12. (13 October 2010). "Rødsand 2 wind farm online". [[The Copenhagen Post]].
  13. Wittrup, Sanne. "[http://ing.dk/artikel/lokalt-elselskab-koeber-roedsand-havmoellepark-i-historisk-milliardhandel-164217 Lokalt elselskab køber Rødsand havmøllepark i historisk milliardhandel]" (in Danish) ''[[Ingeniøren]]'', 13 November 2013. Accessed: 13 November 2013.
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Nysted Wind Farm — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report