Nuneham Viaduct
Railway bridge in Oxfordshire, England
Railway bridge in Oxfordshire, England
| Field | Value |
|---|---|
| bridge_name | Nuneham Viaduct |
| image | NunehamRlyBridge01.JPG |
| caption | Nuneham Viaduct from downstream |
| carries | Cherwell Valley Line |
| crosses | River Thames |
| locale | Abingdon, Oxfordshire |
| maint | Network Rail |
| length | 99 yard |
| height | 15 ft |
| open | 1907 |
| coordinates |
Nuneham Viaduct, also known as Nuneham Railway Bridge and the Black Bridge is near the town of Abingdon-on-Thames in Oxfordshire, England. It is a two-span, bowstring truss bridge that carries the Didcot to Oxford section of the Cherwell Valley Line across the River Thames between Abingdon Lock and Sandford Lock. Its name is derived from the neighbouring Nuneham House. The total length is 99 yard; the southern and northern ends are respectively 57 mi and 57 mi from Paddington (via Didcot station).
As well as passenger trains, the line over the bridge carries freight from the Port of Southampton to distribution centres in the Midlands and North of England. By 2023, up to forty freight trains per day were using the route, which is part of the core UK intermodal freight network, and was to have been part of the proposed Electric Spine.
From March 2022, the bridge suffered a progressive failure with sinking of the southern end of the southern span. This led to its temporary closure to all rail traffic on 3 April 2023 and a major remedial project being undertaken; the line was reopened to traffic on 9 June 2023.
History
Nuneham Railway Bridge was built in the early years of the Great Western Railway. The company built a branch line from its main London to Bristol line to serve Oxford, and later Abingdon-on-Thames; this route became known as the Cherwell Valley Line. A bridge to cross the River Thames was required, and its design and alterations had to be approved by the Thames Navigation Commission. These works were supervised by the civil engineer George Treacher.

The original bridge, which opened to traffic in 1844, was constructed of timber but quickly proved to be inadequate, thus work on its replacement began a decade later. During 1856, the second bridge, distinguished from its predecessor by its iron structure, was completed. A third bridge was constructed between 1906 and 1907, consisting of a pair of steel bowstring spans with a single pier in the centre of the river. In 1929, a new three-arch brick built northern abutment was constructed.
2023 abutment replacement
During March 2022, sinking of the south abutment was detected and a temporary speed restriction of 50 mph was imposed on traffic. In January 2023, remote monitoring equipment was installed and the speed restriction reduced to 20 mph. An attempt to remedy the situation by injecting grout into the structure failed to solve the problem, and at the end of March the speed restriction was reduced to 5 mph. On 3 April 2023, the viaduct was closed to all rail traffic, with a bus replacement service operating between and stations. The Sunday Times claimed that penny-pinching in 1929 during work on the bridge was to blame; it stated that the abutment on the north bank was completely rebuilt with a brick structure, but that on the south bank had remained largely unchanged since Victorian times. No work was done on the south abutment, possibly caused by lack of funds at the time of the Great Depression.
On 5 April 2023, Network Rail tweeted that the viaduct would be closed for several weeks. They had already planned some remedial ground-strengthening work for March, and an access road had been built. However, they calculated that the temporary solution would take almost as long to complete as total replacement of the abutment, and on 10 April 2023 they specified the re-opening date as 10 June 2023.

The work involved closing the southern half of the river to build a temporary trestle on 24 piles driven into the river bed, which supported the southern span whilst a new abutment was constructed. This involved removing 3,000 m3 of material of the old abutment and embankment, and building new ones, requiring 5,500 t of new material and eight piles up to a depth of up to 25 metres. Much of the work was carried out by TMS Maritime Ltd under contract from Balfour Beatty. The line was reopened on 9 June, one day ahead of schedule.
References
References
- (January 2008). "Bridge heights on the River Thames". River Thames Alliance.
- (October 1908). "Nuneham Viaduct".
- Padgett, David. (June 2018). "Railway Track Diagrams 3: Western & Wales". Trackmaps.
- "The River Thames - Its Bridges". the-river-thames.co.uk.
- "Vital English freight route closed over bridge fears".
- (4 April 2023). "Didcot Parkway - Oxford rail line shut until 'late April' for viaduct checks". BBC News.
- "GWR Managing Director Mark Hopwood".
- (March 2021). "Freight UK Base Map Rail Freight Commodities".
- "Restoring Nuneham Viaduct, Oxfordshire". Balfour Beatty.
- (1852). "Elevation of Nuneham [railway] Bridge, for the Oxford branch of the Great Western Railway". discovery.nationalarchives.gov.uk.
- (October 1908). "Nuneham Viaduct".
- "Nuneham Railway Bridge: Where Thames smooth waters glide".
- Osbaldstone, Nicholas Hellen. "The crumbling viaduct causing commuter hell". The Sunday Times.
- Ford, Roger. (2023). "Nuneham viaduct repairs close Didcot to Oxford line".
- "Railway between Didcot Parkway and Oxford to remain closed until after Easter".
- "Oxfordshire: Rail disruption over viaduct stability fears". BBC News Online.
- Hellen, Nicholas. (16 April 2023). "The crumbling viaduct causing commuter hell". The Sunday Times.
- Network Rail Western. "We are working hard to get the railway open again between Didcot Parkway and Oxford. Nuneham Viaduct is unsafe for train traffic at this time and will be closed for some weeks - please check before you travel".
- Sholli, Sam. (4 April 2023). "Nuneham Viaduct 'safety concerns' lead to Oxfordshire rail line closure".
- "We're working round the clock to repair Nuneham Viaduct, so trains can safely run again by Saturday 10 June".
- Calvert, Stuart. (13 April 2023). "Stuart Calvert explains how we have been looking after the viaduct and what our permanent fix will look like". Network Rail.
- (23 May 2023). "Railway through Oxfordshire on track for return in June as Nuneham viaduct repairs pass key milestone". Network Rail.
- "News Emergency Works – TMS Maritime Ltd".
- (26 April 2023). "Engineers 'working round the clock' to fix Nuneham viaduct". Network Rail.
- Network Rail Western. (9 June 2023). "We are very pleased to be able to reopen the railway across Nuneham Viaduct a day early, on Friday 9 June, after safely completing our major project to replace the 160-year-old south bank abutment. Thank you to everyone for your patience and support over the last 10 weeks.".
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Nuneham Viaduct — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report