Skip to content
Surf Wiki
Save to docs
history

From Surf Wiki (app.surf) — the open knowledge base

Northlander

Canadian passenger train in Northern Ontario

Northlander

Canadian passenger train in Northern Ontario

FieldValue
nameNorthlander
logoOntario Northland Northlander.svg
logo_width100
imageNorthlander_at_Englehart_2008_12_21.jpg
captionThe Northlander at Englehart station.
typeInter-city rail
systemOntario Northland Railway
statusUnder construction
localeOntario, Canada
startToronto Union Station
endCochrane
stations14
open
closeSeptember 28, 2012
reopen2026 (planned)
operatorOntario Northland Railway
stockEMD SD75 locomotives
EMD SD70 locomotives
Budd cars
Siemens Charger and Siemens Venture (Future)
tracklength776 km
gauge
map
map_stateshow

EMD SD70 locomotives Budd cars Siemens Charger and Siemens Venture (Future)

The Northlander is a passenger train operated by the provincially-owned Ontario Northland Railway in southern and northeastern Ontario, Canada, which was discontinued in 2012. Rail service will be reinstated in 2026 with an expanded route, greater frequency, new Siemens Venture trainsets manufactured by Siemens Mobility, and various track and station upgrades. The new bi-directional route will run up to seven days a week from Toronto Union Station to Timmins, with an additional new rail connection from Timmins to Cochrane (where passengers can then connect directly to the Polar Bear Express at Cochrane Station) and express bus service from Matheson to Cochrane Station.

Prior to 2012, the Northlander operated six days per week year-round in both directions and connected Cochrane with Toronto. The train typically consisted of one engine, an auxiliary power unit, two coaches and a cafeteria lounge car. It ran on ONR tracks from Cochrane to North Bay and on CN tracks south of North Bay to Toronto.

Plans to resume rail service

Prior to the 2018 Ontario general election, Doug Ford promised to restore the service. Ontario Northland prepared a business plan and submitted it to the Ministry of Transportation of Ontario in late 2019, and the resumption of the service was mentioned in the province's Draft Transportation Plan for Northern Ontario published in December 2020, although no timeline was provided.

In May 2021, the provincial government announced plans for Ontario Northland and Metrolinx to resume rail operations between Toronto and northeastern Ontario with a 13-stop route to begin service by the mid-2020s. The route would provide service from Toronto to Timmins or Cochrane and would be available between four and seven days a week, based on seasonal travel demands. Two of the proposed stations, Gormley and Langstaff, are not ONR stations from the original Northlander route but they are serving GO Transit Richmond Hill line. Stations south of North Bay to Washago and south of Cochrane would need to be restored as they have either become inactive or adapted for other uses.

In April 2022, Ontario's Progressive Conservative government announced it has earmarked $75 million to restore the Northlander passenger rail service to northeastern Ontario. President and CEO of Ontario Northland Corina Moore said the money will be split over the next three years. She said it will look after passenger coaches, infrastructure and stations. The province said it continues to eye an in-service date of 2025. They said that the service will be offered on seasonal travel demands and will range from four and seven days a week between northern Ontario and Toronto.

On December 15, 2022, the Government of Ontario announced that it had purchased three trainsets from Siemens Mobility for use on the Northlander, each comprising a Charger locomotive, two Venture coaches, and a cab car operating in a push-pull configuration on trains between Toronto and Timmins.

By December 2023, further details became known. The trip from Toronto to Cochrane on the restored Northlander is expected take 10 hours and 40 minutes. Trains would leave Cochrane in the evening, and return in the evening or overnight. Station along the route would be slightly different from the pre-2012 service; the 16 stops would be Union Station, Langstaff, Gormley, Washago, Gravenhurst, Bracebridge, Huntsville, South River, North Bay, Temagami, Temiskaming Shores, Englehart, Kirkland Lake/Swastika, Matheson, Timmins, and Cochrane. Cobalt was the only station from the original Northlander route that was not included as a new stop for the resumed service. Northbound trains would have a layover in Timmins before proceeding to Cochrane, but an optional express bus service would be available. Instead of a dining car, the new Northlander would have seat service for food and beverages. Ridership by 2041 is expected to be 60,000 per year.

Stations

The Northlander made scheduled stops at the following stations:

↓↓↓↓CITY / TOWN↑↑↑↑NOTES
08:40DPToronto (Union Station)AR
10:25Washago
10:50Gravenhurst
11:05Bracebridge
11:40Huntsville
12:35South River
13:50ARNorth BayDP
14:05DPNorth BayAR
15:35Temagami
16:20Cobalt
16:35New Liskeard
17:05Englehart
17:45Swastika
18:30Matheson
18:55Porquis Junction
19:25ARCochraneDP
Temagami railway station
Cochrane railway station

Former stations

Service to Barrie and Orillia ended in 1992 when the Northlander was rerouted to the Bala subdivision. Before the former TEE trainsets were retired, Barrie and Orillia were typically served in one direction only to avoid turning the train in Toronto; routing a giant loop around Lake Simcoe. Newer ex-GO Transit cars were bi-directional. That corresponding section of the Newmarket subdivision was abandoned, then tracks removed by the Canadian National Railway in 1996. The old line is now Oro-Medonte Rail Trail, Barrie North Shore Trail and Barrie Waterfront Heritage Trail.

StationLocationNotes
old Barrie StationLocated just north of Allandale Waterfront GO StationStation has been restored for non-transportation reuse.
Orillia station150 Front Street SouthRe-purposed for commercial space.

References

References

  1. (2023-01-09). "Trains will soon be running again between Toronto and Northern Ontario. But first, they're going in the freezer".
  2. "Northlander Passenger Rail Updates {{!}} Ontario Northland".
  3. (2022-12-15). "Ontario Advances Northlander Service Revival".
  4. (May 4, 2018). "Ford promises new Northlander to Nipissing voters". [[Metroland Media Group]].
  5. (December 10, 2020). "Draft Transportation Plan for Northern Ontario". Ministry of Transportation.
  6. (May 5, 2021). "Passenger rail service in northeastern Ontario to return by mid-2020s". CBC News.
  7. Sam Juric. (11 April 2022). "Return of Northlander train service could include new connection to Cochrane, Ont.".
  8. "Ontario Newsroom".
  9. Wroe, Darlene. (February 24, 2023). "Cobalt urged to lobby for Northlander passenger train stop". Bay Today.
  10. (2023-12-28). "Northlander trains are poised to make a return — and will offer travel to cottage country and beyond. Here's what you need to know". [[Toronto Star]].
  11. Exel, Deb. (2025-02-09). "THEN AND NOW: Barrie Station couldn’t avoid wrecking ball".
  12. (20 March 2021). "Former Orillia train station will become venue to showcase locomotive history".
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Northlander — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report