Musselroe Wind Farm

Wind farm in Tasmania, Australia


Summary

Wind farm in Tasmania, Australia

FieldValue
nameMusselroe Wind Farm
coordinates
countryAustralia
statusO
commissioned2013
cost$394 million
operatorHydro Tasmania
ps_units_operational56 × 3 MW
ps_units_manu_modelVestas V90
wind_hub_height80 m
wind_rotor_diameter90 m
wind_farm_typeOnshore
ps_electrical_capacity168 MW
ps_electrical_cap_fac38.39% (average 2014-2021)
ps_annual_generation564.9 GWh (average 2014-2021)
website

Musselroe Wind Farm is a wind farm at Cape Portland, Tasmania, Australia. It was the third wind farm built in the state, following the Bluff Point and Studland Bay Wind Farms (making up the larger Woolnorth Wind Farm).

While it is operated by Hydro Tasmania, which has a 25% stake in the farm, China-based Shenhua Clean Energy (SCE) owns a 75% stake in the farm. Guohua Energy Investment owns a 75% share in SCE, while its sister company, Shenhua Hong Kong, owning the remaining 25% share in SCE.

The farm consists of 56 Vestas V90-3MW wind turbines, with a generating capacity of 168 MW. The energy output from the Musselroe Wind Farm will be sufficient to supply electricity to around 50,000 households and abate 450,000 tonnes of emissions annually.

The first 37 turbines were connected to the grid in 2013, and the full farm was completed in January 2014.

Operations

The generation table uses eljmkt nemlog to obtain generation values for each month. Grid connection started in March 2013, and was fully commissioned during September 2013.

YearTotalJanFebMarAprMayJunJulAugSepOctNovDec
2013295,995N/AN/A32*241*945*7,468*30,983*48,784*51,220*68,99735,50051,825
2014484,47434,71327,85231,91734,20444,23339,25840,53834,29946,34153,86247,68549,572
2015510,36845,19029,88553,41724,11348,26945,13652,41143,93925,60236,78256,51449,110
2016612,76242,71735,00032,51338,43554,39766,58574,10052,27240,05065,20761,27150,215
2017552,31458,31745,09135,29223,03437,76742,74547,55947,32369,99951,90132,72460,562
2018581,50541,02536,25243,94652,60260,14241,88367,29961,37459,15232,44040,36545,025
2019654,55550,71753,24641,24149,79055,56640,34274,39159,07255,46550,40870,40453,913
2020555,97252,82558,58630,64756,36447,48637,66836,36046,90950,26645,18139,04754,633
2021567,38049,59434,50750,76657,48847,51830,72950,82962,70659,43452,99131,72539,093

Note: Asterisk indicates power output was limited during the month.

Note: From 2018, the wind farm participated in the FCAS market; this generally reduces the amount of power provided to the grid in order to allow a ramp up when required. The wind farm now has an apparent limit of ≈153 MW, rarely returning to its previous maximum output of around ≈166 MW when the grid demands it.

References

References

  1. Alan Copeland. ''[http://www.abareconomics.com/publications_html/energy/energy_09/EG09_Oct.pdf Electricity Generation Major Development Projects -- October 2009 Listing] {{Webarchive. link. (7 July 2011 '', [[Australian Bureau of Agricultural & Resource Economics]], November 2009, p. 9.)
  2. "Hydro Tasmania, Shenhua Clean Energy to build Musselroe Wind Farm in Australia".
  3. Alison Andrews: [http://www.examiner.com.au/story/1175169/musselroe-wind-farm-to-light-up-tasmania-from-february/ "Musselroe wind farm to light up Tasmania from February "] {{Webarchive. link. (12 December 2012 in The Examiner, 10 December 2012)
  4. Tim Walker and Leon Compton: [http://www.abc.net.au/local/audio/2013/04/23/3743684.htm "Musselroe Windfarm online"] {{Webarchive. link. (25 April 2013 [[ABC News (Australia)). ABC News]] 23 April 2013
  5. [http://web.archive.org/web/20220821083524/https://engineersaustralia.org.au/sites/default/files/2022-06/eha-magazine-v1-6.pdf The Hydro after 100 Years] ''[[EHA Magazine]]'' March 2015 page 19
  6. Mounster, Bruce: [http://www.themercury.com.au/news/tasmania/energy-future-lies-in-the-wind-as-tasmania-is-urged-to-embrace-a-world-class-resource/story-fnj4f7k1-1226805037613 "Energy future lies in the wind as Tasmania is urged to embrace a 'world-class resource'"] {{Webarchive. link. (5 March 2014 in ''[[The Mercury (Hobart)). The Mercury]]'', 19 January 2014
  7. "Musselroe Wind Farm FCAS Trial - Australian Renewable Energy Agency (ARENA)".
  8. (September 2021). "Musselroe Wind Farm Provision of FCAS".
Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Musselroe Wind Farm — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report