Musselroe Wind Farm
Wind farm in Tasmania, Australia
Wind farm in Tasmania, Australia
| Field | Value |
|---|---|
| name | Musselroe Wind Farm |
| coordinates | |
| country | Australia |
| status | O |
| commissioned | 2013 |
| cost | $394 million |
| operator | Hydro Tasmania |
| ps_units_operational | 56 × 3 MW |
| ps_units_manu_model | Vestas V90 |
| wind_hub_height | 80 m |
| wind_rotor_diameter | 90 m |
| wind_farm_type | Onshore |
| ps_electrical_capacity | 168 MW |
| ps_electrical_cap_fac | 38.39% (average 2014-2021) |
| ps_annual_generation | 564.9 GWh (average 2014-2021) |
| website |
Musselroe Wind Farm is a wind farm at Cape Portland, Tasmania, Australia. It was the third wind farm built in the state, following the Bluff Point and Studland Bay Wind Farms (making up the larger Woolnorth Wind Farm).
While it is operated by Hydro Tasmania, which has a 25% stake in the farm, China-based Shenhua Clean Energy (SCE) owns a 75% stake in the farm. Guohua Energy Investment owns a 75% share in SCE, while its sister company, Shenhua Hong Kong, owning the remaining 25% share in SCE.
The farm consists of 56 Vestas V90-3MW wind turbines, with a generating capacity of 168 MW. The energy output from the Musselroe Wind Farm will be sufficient to supply electricity to around 50,000 households and abate 450,000 tonnes of emissions annually.
The first 37 turbines were connected to the grid in 2013, and the full farm was completed in January 2014.
Operations
The generation table uses eljmkt nemlog to obtain generation values for each month. Grid connection started in March 2013, and was fully commissioned during September 2013.
| Year | Total | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2013 | 295,995 | N/A | N/A | 32* | 241* | 945* | 7,468* | 30,983* | 48,784* | 51,220* | 68,997 | 35,500 | 51,825 |
| 2014 | 484,474 | 34,713 | 27,852 | 31,917 | 34,204 | 44,233 | 39,258 | 40,538 | 34,299 | 46,341 | 53,862 | 47,685 | 49,572 |
| 2015 | 510,368 | 45,190 | 29,885 | 53,417 | 24,113 | 48,269 | 45,136 | 52,411 | 43,939 | 25,602 | 36,782 | 56,514 | 49,110 |
| 2016 | 612,762 | 42,717 | 35,000 | 32,513 | 38,435 | 54,397 | 66,585 | 74,100 | 52,272 | 40,050 | 65,207 | 61,271 | 50,215 |
| 2017 | 552,314 | 58,317 | 45,091 | 35,292 | 23,034 | 37,767 | 42,745 | 47,559 | 47,323 | 69,999 | 51,901 | 32,724 | 60,562 |
| 2018 | 581,505 | 41,025 | 36,252 | 43,946 | 52,602 | 60,142 | 41,883 | 67,299 | 61,374 | 59,152 | 32,440 | 40,365 | 45,025 |
| 2019 | 654,555 | 50,717 | 53,246 | 41,241 | 49,790 | 55,566 | 40,342 | 74,391 | 59,072 | 55,465 | 50,408 | 70,404 | 53,913 |
| 2020 | 555,972 | 52,825 | 58,586 | 30,647 | 56,364 | 47,486 | 37,668 | 36,360 | 46,909 | 50,266 | 45,181 | 39,047 | 54,633 |
| 2021 | 567,380 | 49,594 | 34,507 | 50,766 | 57,488 | 47,518 | 30,729 | 50,829 | 62,706 | 59,434 | 52,991 | 31,725 | 39,093 |
Note: Asterisk indicates power output was limited during the month.
Note: From 2018, the wind farm participated in the FCAS market; this generally reduces the amount of power provided to the grid in order to allow a ramp up when required. The wind farm now has an apparent limit of ≈153 MW, rarely returning to its previous maximum output of around ≈166 MW when the grid demands it.
References
References
- Alan Copeland. ''[http://www.abareconomics.com/publications_html/energy/energy_09/EG09_Oct.pdf Electricity Generation Major Development Projects -- October 2009 Listing] {{Webarchive. link. (7 July 2011 '', [[Australian Bureau of Agricultural & Resource Economics]], November 2009, p. 9.)
- "Hydro Tasmania, Shenhua Clean Energy to build Musselroe Wind Farm in Australia".
- Alison Andrews: [http://www.examiner.com.au/story/1175169/musselroe-wind-farm-to-light-up-tasmania-from-february/ "Musselroe wind farm to light up Tasmania from February "] {{Webarchive. link. (12 December 2012 in The Examiner, 10 December 2012)
- Tim Walker and Leon Compton: [http://www.abc.net.au/local/audio/2013/04/23/3743684.htm "Musselroe Windfarm online"] {{Webarchive. link. (25 April 2013 [[ABC News (Australia)). ABC News]] 23 April 2013
- [http://web.archive.org/web/20220821083524/https://engineersaustralia.org.au/sites/default/files/2022-06/eha-magazine-v1-6.pdf The Hydro after 100 Years] ''[[EHA Magazine]]'' March 2015 page 19
- Mounster, Bruce: [http://www.themercury.com.au/news/tasmania/energy-future-lies-in-the-wind-as-tasmania-is-urged-to-embrace-a-world-class-resource/story-fnj4f7k1-1226805037613 "Energy future lies in the wind as Tasmania is urged to embrace a 'world-class resource'"] {{Webarchive. link. (5 March 2014 in ''[[The Mercury (Hobart)). The Mercury]]'', 19 January 2014
- "Musselroe Wind Farm FCAS Trial - Australian Renewable Energy Agency (ARENA)".
- (September 2021). "Musselroe Wind Farm Provision of FCAS".
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Musselroe Wind Farm — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report