Skip to content
Surf Wiki
Save to docs
general/mir

From Surf Wiki (app.surf) — the open knowledge base

Mir EO-2

Second expedition to Mir space station

Mir EO-2

Second expedition to Mir space station

FieldValue
nameMir EO-2
insigniaSoyuz TM-2 mission patch.jpg
mission_typeMir expedition
mission_duration326 days (Romanenko) (launch to landing)
crew_sizeTwo
crew_membersYuri Romanenko
Aleksandr Laveykin
Aleksandr Aleksandrov
crew_callsignTamyr
space_stationMir
start_dateUTC
end_dateUTC
arrival_craftSoyuz TM-2
Alexandrov: Soyuz TM-3
departure_craftSoyuz TM-3
Laveykin: Soyuz TM-2
previous_missionEO-1
next_missionEO-3
programmeLong-term Mir expeditions

Aleksandr Laveykin Aleksandr Aleksandrov

Alexandrov: Soyuz TM-3 Laveykin: Soyuz TM-2

Mir EO-2 (also called Mir Principal Expedition 2) was the second long duration expedition to the Soviet space station Mir, and it lasted from February to December 1987. The mission was divided into two parts (sometimes called (a) and (b)), the division occurring when one of the two crew members, Aleksandr Laveykin, was replaced part way through the mission by Aleksandr Aleksandrov. Laveykin was replaced because ground-based doctors had diagnosed him with minor heart problems.

Background

The core module or Mir had been launched into orbit on 19 February 1986. It had been visited twice by the crew of Soyuz T-15, between March and July 1986, who transferred equipment from the previous Soviet space station Salyut 7. Prior to the arrival of EO-2, Mir was also visited by three Progress spacecraft, numbered 25, 26, and 27, as well as an uncrewed Soyuz-TM spacecraft, designated TM-1. From July 1986 to the arrival of EO-2 in February, Mir remained uncrewed. During this time an associated relay satellite ceased operation, and computers on Mir were malfunctioning.

Progress 27 docked with the station on 18 January, and was still there when the EO-2 crew arrived. On 26 January, the Progress spacecraft boosted the station's mean altitude by 16 km to 345 km.

Crew

The crew from February to July 1987, consisted of Commander Yuri Romanenko, and Flight Engineer Aleksandr Laveykin. From July to December 1987 the crew consisted of Romanenko and Aleksandr Aleksandrov.

Mir EO-2NameSpaceflightLaunchLandingDurationNotes
Flight EngineerSoviet Union Aleksandr LaveykinFirst5 February 1987
Soyuz TM-230 July 1987
Soyuz TM-2174 days
CommanderSoviet Union Yuri RomanenkoThird29 December 1987
Soyuz TM-3326 daysRecord spaceflight
duration
Flight EngineerSoviet Union Aleksandr AleksandrovSecond22 July 1987
Soyuz TM-3160 days

EO-2 was originally planned to consist of Aleksandr Serebrov and Vladimir Titov, but shortly before the launch of Soyuz TM-2 to start the expedition, the crew was changed to Romanenko and Laveykin, possibly due to illness. Titov and Serebrov were listed as the backup crew for the mission.

Mission highlights

The launch of Romanenko and Laveykin aboard TM-2 was broadcast live on TV; it was a night launch which occurred at about 1:30am local time. It was the first crewed launch of the new Soyuz-TM spacecraft.

Kvant docking

Main article: Kvant-1

Drawing
A drawing of the Kvant-1 module (without the Functional Service Module).

On 30 March 1987, the module Kvant-1 was launched; it was the second module of the space station Mir, and would add 40 m3 of pressurized volume to Mir, bringing the total to about 130 m3. The automatic docking system was unable to dock the module completely with Mir on the first attempt. On April 5, the crew of EO-2 retreated to their lifeboat, Soyuz TM-2, in case the module lost control.

The module drifted 400 km from the station before it was guided back of a second docking attempt, and on April 9 a partial docking between Kvant and Mir occurred.

To determine the problem with the Kvant docking, both Romanenko and Laveykin took part in an emergency spacewalk on April 11. On the spacewalk they discovered some debris, probably a trash bag, was preventing the spacecraft from fully docking. The spacewalk lasted 3 hours and 40 minutes. With the problem fixed, on April 11 Kvant achieved a complete docking to Mir. The next day the FSM was undocked from Kvant, as it was no longer needed, and it was placed in a parking orbit 41 km above Mir; over a year later it underwent uncontrolled reentry.

April to July 1987

The crew first entered the Kvant-1 module on 13 April, when they began unloading equipment. On 23 April the next Progress spacecraft docked with the station via Kvant's rear docking port, where the FSM used to be. Progress 29 had a mass of 7,100 kg, and undocked from the station on 11 May. During this time Mir was short on electricity, so for most of May the EO-2 crew performed activities that used little electricity, such as medical experiments or Earth observations. On 22 May the next resupply craft arrived, Progress 30, which had a mass of 7,249 kg. It remained docked until 19 July.

During June the EO-2 crew performed two spacewalks (EVAs) to install a new set of solar arrays, which would boost the electrical capacity of the station to 11.4 kW.

Mir EP-1

The first visitors the EO-2 crew had come in July 1987 aboard the spacecraft Soyuz TM-3. The three person crew launched by TM-3 included the first Syrian astronaut, Muhammed Faris. The crew had originally been scheduled to visit Salyut 7 in 1985, but it was reassigned to Mir. On July 24, the spacecraft automatically docked to the Kvant-1 port, but they had to use a lever to break the hatch's seal. Shortly after the new arrivals floated into the station, it was publicly announced that Aleksandr Aleksandrov would replace Aleksandr Laveykin as one of the EO-2 long term crew members, and Laveykin would return to Earth a week later with the EP-1 crew.

The desire to have favourable daylight conditions during passes over Syria was the primary motivation for the timing of the mission. Several experiments were conducted with Faris on board, and Syria was observed from space.

On July 29, Soyuz TM-2 undocked from the station, and carried Faris, Viktorenko, and Laveykin. Once on the ground, Laveykin was flown to Moscow to be examined by heart specialists. They determined that he was fit to fly after all.

August to December 1987

Of the six Progress spacecraft which docked with the station during EO-3, three of them arrived during the second segment:

  • Progress 31 - Docked 5 August, undocked 21 September
  • Progress 32 - Docked 26 September, undocked 10 November
  • Progress 33 - Docked 23 November, undocked 19 December

Handover to Mir EO-3

The spacecraft Soyuz TM-4 docked with Mir, via the rear port of Kvant, on 23 December. It brought to the station Vladimir Titov and Musa Manarov of the next long-duration expedition EO-3. Also brought to the station was potential Buran space shuttle pilot, Anatoli Levchenko, who returned to Earth with the EO-2 crew. Levchenko's spaceflight, which lasted for the duration of the EO-2/EO-3 crew handover, is known as Mir LII-1.

References

  • http://www.spacefacts.de/mir/english/mir-2.htm

References

  1. "Mir EO-2". [[Encyclopedia Astronautica]].
  2. "Soyuz TM-3". Encyclopedia Astronautica.
  3. D.S.F. Portree. (1995). "Mir Hardware Heritage". NASA.
  4. (2007). "Manned spaceflight log 1961-2006". Praxis Publishing.
  5. "Kvant-1". [[Encyclopedia Astronautica]].
  6. Harland, David Michael. (2005). "The story of Space Station Mir". [[Praxis Publishing]].
  7. "Mir LD-1". Encyclopedia Astronautica.
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Mir EO-2 — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report