Mashhad Urban Railway
Urban rail line in Iran
Urban rail line in Iran
| Field | Value | |
|---|---|---|
| name | Mashhad Urban Railway | |
| imagesize | 75px | |
| image2 | Mashhad Metro 1399082709555414321625154.jpg | |
| imagesize2 | 265 px | |
| image3 | Mashhad Metro (SIK 04-E1424-218).jpg | |
| imagesize3 | 265 px | |
| native_name | قطار شهری مشهد | |
| owner | Mashhad Municipality | |
| locale | Mashhad, Razavi Khorasan, Iran | |
| transit_type | Rapid transit | |
| lines | 4 (3 Active) | |
| stations | Total 82, active 40 | |
| ridership | 123,000 (Line 1), 63,000 (Line 2) | |
| website | ||
| began_operation | 12 March 2011 | |
| operator | Mashhad Urban Railway Operation Company (MUROC) | |
| vehicles | 160 | |
| headway | 5 minutes in peak hours, 7 minutes in off peak hours and 12 minutes in holidays (line 1), 10 minutes (line 2) | |
| system_length | Total 90.5 km, active 43.3 km | |
| track_gauge | ||
| map | [[File:Mashhad Metro map-geo.png | 280px]] |
Mashhad Urban Railway (, the literal translation of the name from Persian) is a rapid transit system in Mashhad, Iran. It is the second oldest rapid transit system in Iran. The system has been known by a number of terms, including "light rail" or "light metro" and "urban rail" or "metro", but while its lines are built to different standards the system features full-grade separation and the frequent headways generally associated with rapid transit. The Mashhad Urban Railway operates Line 1 from 6 to 22:00 daily.
As of 2025, the system operates 3 lines; Line 1, inaugurated in 2011, is an east-west light rail line connecting to the airport. Line 2, inaugurated in 2017, is a heavy rail route along the city's north-south axis. Line 3, in partial operation since 2025, is also built to heavy rail standards and serves the central area around Imam Reza shrine.
Network


Line 1
The 19.5 km, 22 station Line 1 was the first line to be built; construction began in 1999, with the inauguration of taking place on 24 April 2011. The line originally ran from Vakil Abad to Ghadir.
Line 1 currently runs between Hasheminejad Airport in the east and Vakil Abad in the southwest, with travel time of 41 minutes. Approximately half the route is in tunnels; the rest is at ground level.
Line 1 Expansion
Expansion of Line 1 added 4.5 km of underground railroads and 2 stations (Bustan-e Reyhaneh and Hasheminejad Airport), connecting Mashhad International Airport to the Mashhad Urban Railway. Line 1 reached a total of 24 stations (13 underground, 11 on-ground) along 24 km of track, as 15.5 km in tunnels plus 8.5 km on-ground, and a ridership capacity of 170,000 passengers per day, along with daily operation between 6 am and 10 pm. The extension made Mashhad the first city in Iran with a mass transit connection to the airport.
Line 2
Line 2 is a conventional metro, running north–south for 14.5 km between Shahid Fakouri and Tabarsi with 13 stations. Excavation was done by two Tunnel Boring Machines (TBMs). From February 2017 limited operation of the first phase of Line 2 began. The line connects to the inter-urban railway system at Raah Ahan. On 20 March 2018 pilot operation of Shariati, the first interchange station in the system, began. The station was officially inaugurated on 7 May 2018, in a ceremony attended by Iranian president Hassan Rouhani. On July 27, 2019, Shahid Kaveh was opened. The line was further extended to Shahid Fakouri on May 3, 2025.
Line 3

Line 3's construction began in 2015, with TBMs doing the excavation. By 2020, 8.5 km of tunnels had been excavated, with the full route expected to be 28.5 km long and serve 24 stations. The line's first phase entered partial operation on 8 May 2025, with an initial 3 station route between Shohada and Imam Reza Terminal.
Line 4
Another additional line is planned. Line 4 with 17.5 km length has been approved and it will have 15 stations. Tunnel Excavation of Line 4 in Summer 2021 was started and is currently underway.
Rolling stock
A fleet of 60 low-floor LRVs was ordered from Chinese Changchun Railway Vehicles for line 1. These mark the first time that light rail vehicles have been exported to a customer outside China.
A fleet of 100 metro trains has been ordered to CNR. 85 of them were assembled in Iran by TWM.
Network Map
| frame-lat = 36.293 | frame-long = 59.561 | frame-width = 750 | frame-height = 470
References
References
- "معرفی خطوط قطارشهری مشهد".
- "SmarterMail Login - SmarterMail". Murco.ir.
- "Toos Gostar".
- "Mashhad metro starts running".
- "Iran: mashhad metro project moves ahead". Goliath Business News.
- "Mashhad metro starts running". Railway Gazette.
- "جابهجایی حدود 51 میلیون مسافر توسط خط یک قطار شهری مشهد". Mashhad Urban & SubUrban Railway Operation Company.
- (2010-11-04). "UrbanRail.Net > Asia > Iran > Mashhad Metro".
- (January 2026). "Mashhad Urban Railway Corporation, Line 1".
- "مشهد نخستین شهر در کشور است که فرودگاه آن به خطوط مترو متصل شده است".
- "سرویسدهی به دو میلیون مسافر در خط یک و دو قطارشهری مشهد".
- "اتصال خط یک و دو قطارشهری مشهد با حضور رییس جمهور". MUROC.
- "قطارشهری مشهد به میدان شهید کاوه رسید".
- Al-Rasoul, Sayyid Muhammad. (3 May 2025). "مراسم افتتاح ایستگاه قطار شهری «شهید فکوری»".
- "Mashhad Urban Railway Corporation, Line 3".
- "ورود TBMبه لینک خط2و3".
- (9 March 2020). "Mashhad Metro Line 3 tunnel excavation complete".
- Moghaddisi, Negar. (2025-05-08). "مشهدشهر و شهرداریآغاز مسافرگیری فاز یک خط۳ مترو مشهد در سالروز ولادت امامرضا(ع) (۱۹ اردیبهشت ۱۴۰۴) + جزئیات و فیلم".
- "Iran Rail Transportation Corporation, Mashhad".
- "Mashad Light Rail".
- "Railway Gazette: First LRVs shipped to Mashhad". Railway Gazette.
- "China's first official shipment export light rail vehicles". China Daily.
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Mashhad Urban Railway — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report