From Surf Wiki (app.surf) — the open knowledge base
London Aquatics Centre
Public aquatic sports facility in London, England
Public aquatic sports facility in London, England
| Field | Value |
|---|---|
| name | London Aquatics Centre |
| image | File:London, England (15513446165).jpg |
| image_size | 300px |
| caption | The Aquatics Centre, in 2014 |
| location | Queen Elizabeth Olympic Park |
| London Borough of Newham | |
| United Kingdom | |
| coordinates | |
| public_transit | |
| broke_ground | July 2008 |
| built | 27 July 2011 |
| operator | Greenwich Leisure Limited (1st March 2014 - 29th February 2024) |
| construction_cost | £269 million |
| architect | Zaha Hadid Architects |
| structural_engineer | Ove Arup & Partners |
| general_contractor | Balfour Beatty |
| tenants | 2012 Summer Olympics |
| 2012 Summer Paralympics | |
| 2016 European Aquatics Championships | |
| seating_capacity | 17,500 (2,500 post-Olympics) |
| title | Construction Starts Early on Major Venues |
| publisher | London 2012 HQ |
| url | http://www.london2012.com/news/archive/2008-07/construction-starts-early-on-major-venue.php |
| access-date | 17 July 2008 |
| url-status | dead |
| archive-url | https://web.archive.org/web/20080829142530/http://www.london2012.com/news/archive/2008-07/construction-starts-early-on-major-venue.php |
| archive-date | 29 August 2008}} |
London Borough of Newham United Kingdom
Everyone Active (1st March 2024 - Present) 2012 Summer Paralympics 2016 European Aquatics Championships |access-date = 17 July 2008 |url-status = dead |archive-url = https://web.archive.org/web/20080829142530/http://www.london2012.com/news/archive/2008-07/construction-starts-early-on-major-venue.php |archive-date = 29 August 2008}} The London Aquatics Centre is an indoor facility with two 50 m swimming pools and a 25 m diving pool in Queen Elizabeth Olympic Park in Stratford, London. The centre, designed by architect Zaha Hadid as one of the main venues of the 2012 Summer Olympics and Paralympics, was used for the swimming, diving and synchronised swimming events. After significant modification, the centre opened to the public in March 2014.
Design
The centre was designed by Pritzker Prize-winning architect Zaha Hadid in 2004 before London won the bid for the 2012 Summer Olympics. It was built alongside the Water Polo Arena and opposite the Olympic Stadium on the opposite bank of the Waterworks River. The site is 45 m high, 160 m long, and 80 m wide. The wave-like roof is stated to be 11200 sqft, a reduction from the previously stated 35000 sqft.
The complex has a 50-m competition pool, a 25-m competition diving pool and a 50-m warm-up pool. The 50-m pool is 3 metres deep, like the one in the Beijing National Aquatics Center. Its floor can be moved to reduce its depth. There are also moveable booms that allow its size to be changed.
Because the centre was designed before the Olympic bid was completed, the spectator wings were not part of the original design. They were later added to fit the estimated audience.
Jacques Rogge, IOC President, described the centre as a "masterpiece".
Construction
On 1 December 2005, Hadid was instructed to revise her designs after a specification change led to a doubling of the £75-million estimated cost. The new plans were unveiled on 27 November 2006. Although the same general design was kept, with capacity for 17,500 spectators, the revised design was much smaller and was expected to cost much less than the previous estimate. However, subsequent cost increases were reported to Parliament in 2008.
The construction contract was awarded to Balfour Beatty in April 2008. At the same time, it was reported that the centre would cost about three times as much as originally estimated, totalling about £242 million. The cost increases were attributed to construction inflation and VAT increases, and also included the estimated cost of converting the facility for public use after the Olympic and Paralympic Games. The centre was completed in July 2011 at a final cost of £269 million.
By exposing the concrete finish rather than painting or cladding, the design demonstrates the precast-concrete skills provided by Peri. The precast floor terracing was manufactured by Bell & Webster Concrete in Lincolnshire, England. The terracing units were delivered and positioned to accelerate the speed of construction. The unique six-board diving platform is made from 462 tonnes of concrete. The aluminium roof covering was provided by Kalzip. The steel structure was built in cooperation with Rowecord Engineering, of Newport, Wales. The ceiling was built with 30,000 sections of Red Louro timber. The steel roof weighs 3,200 tonnes. The three pools hold around 10 million litres (2.2 million imperial gallons; 2.6 million US gallons) of water.
During the Games the venue had a capacity of 17,500. The two temporary "wings" have been removed, reducing the capacity to a regular 2,800 with an additional 1,000 seats available for major events. Of all the swimming venues built for the 2012 Summer Olympics, the Aquatics Centre is the only one that remains afterwards, albeit in a downsized form.
After the Paralympic Games, the Aquatic Centre was deconstructed to reduce its space. The frame wings on either side of the central space were removed, unbolted, and sold. The PVC wrap that temporarily enclosed the space was also sold, while the seats and toilets were reused elsewhere. As certain parts of the building were no longer needed, they were recycled via Vinyloop. This allowed the standards of the Olympic Delivery Authority concerning environmental protection to be met.
Legacy

Since the Olympic Games the venue has been modified, especially by removing the temporary seating that flanked the centre during the Games. It opened to the public on 1 March 2014. Admission prices are in line with local leisure centres.
The adjacent Water Polo Arena was dismantled after the Olympic Games, which left the Aquatics Centre as the sole swimming venue at the park. The centre hosted the 2014 FINA/NVC Diving World Series and the 2016 European Aquatics Championships. It continues to be used for swimming, water polo, synchronised swimming and diving training.
Comparable venues in England
- Crystal Palace National Sports Centre, London
- Ponds Forge, Sheffield
- John Charles Centre for Sport, Leeds
- Manchester Aquatics Centre
- Sunderland Aquatic Centre
References
References
- "Aquatics Centre". london2012.com.
- Gardner, Jasmine. (27 July 2011). "The Standard makes a splash in £269m Olympic pool". London Evening Standard.
- (6 August 2012). "Filming the Games from every angle (video)". BBC.
- (29 May 2012). "Venue profile for London 2012: Aquatics Centre". BBC.
- [https://news.bbc.co.uk/sport2/hi/other_sports/olympics_2012/4488368.stm "Olympic Pool Plans To Be Revised"]. [[BBC Sport]]. 1 December 2005. Retrieved 9 June 2012.
- [https://news.bbc.co.uk/sport2/hi/other_sports/olympics_2012/6187774.stm "London Scales Down 2012 Pool Plan"]. [[BBC Sport]]. 17 November 2006. Retrieved 9 June 2012.
- (27 November 2006). "Swimmers praise Aquatics Centre design". london2012.com.
- Bloomberg]]. Retrieved 7 August 2012.
- [http://www.london2012.com/news/2008/04/uk-firms-sign-venue-contracts.php "UK Firms Sign Venue Contracts"] {{webarchive. link. (6 August 2011 . london2012.com. 8 April 2008. Retrieved 9 June 2012.)
- (9 June 2012). "Cost of 2012 Olympic Pool Triples". [[BBC News]].
- (27 July 2011). "London 2012: Inside the Olympic Aquatics Centre (slideshow)". BBC News.
- "Project: London Aquatics Centre - 2012-07-19 20:07:07 | Interior Design".
- [https://archive.today/20121208155043/http://www.wasterecyclingnews.com/article/20120801/NEWS02/120809998/pvc-at-olympics-destined-for-reuse-or-recycling PVC at Olympics destined for reuse or recycling]
- (26 February 2014). "London Aquatics Centre opens to the public".
- "London Aquatics Centre | Better Swimming Pool, Diving Pool and Gym".
- (10 February 2014). "FINA/NVC Diving World Series 2014 - London (GBR)".
- "London lands European Championships". BBC Sport.
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about London Aquatics Centre — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report