From Surf Wiki (app.surf) — the open knowledge base
Line 3 (Beijing Subway)
Rapid transit line in Beijing, China
Rapid transit line in Beijing, China
| Field | Value |
|---|---|
| other_name | M3 (planned name) |
| logo | BJS Line 3 icon.svg |
| logo_width | 100px |
| color | E20035 |
| image | 03 035 leaving Dongsi Shitiao (20241215175935).jpg |
| image_width | 300px |
| caption | A SFM86 type train leaving Dongsi Shitiao station of Line 3 |
| type | Rapid transit |
| system | Beijing Subway |
| status | Operational |
| start | |
| end | |
| stations | 10 (Phase I) |
| open | |
| character | Underground |
| stock | Type A, 4-car / 8-car |
| linelength | 14.7 km (Phase I) |
| gauge | |
| speed | 80 km/h |
| mapcolour | Red (#E20035) |
| map | |
| map_state | collapsed |
Line 3 of the Beijing Subway () is a rapid transit line in Beijing, China. It opened on December 15, 2024. It is colored rose red in system maps.
Description
;Phase 1 Phase 1 of Line 3 is 14.7 km with 10 stations. It is fully underground. Due to unstable planning east of Dongbabei station, line 3 will only open between Dongsi Shitiao and Dongbabei. It opened on December 15, 2024.
;Phase 1 East extension Phase 1 East extension from Dongbabei to Caogezhuangbei have been approved by NDRC in 2015. The extension will be 6.4 km in length with 5 stations. It will be fully underground.
Stations
| Station Name | Connections | Nearby Bus Stops | Distance | ||||
|---|---|---|---|---|---|---|---|
| km | Location | English | Chinese | ||||
| 3 4 44 75 113 115 118 142 200 406 431 通医专线3 夜3 夜20 夜34 | 0.000 | 0.000 | Dongcheng | ||||
| 3 4 39 110 113 115 117 118 120 403 406 431 夜3 夜24 夜34 | 1.269 | 1.269 | Chaoyang | ||||
| 4 39 95 113 115 117 302 405 406 431 499 650 675 687 690 快速直达专线78 快速直达专线195 快速直达专线196 夜3 夜30 夜34 专5 专114 | 0.934 | 2.203 | |||||
| 31 117 135 302 406 412 419 431 499 650 675 682 690 973 988 快速直达专线78 夜3 夜25 | 1.757 | 3.960 | |||||
| 140 406 408 412 431 451 486 499 640 650 675 989 991 夜3 夜25 | 1.669 | 5.629 | |||||
| {{nowrap | IFP | 413 418 911 夜13 专194 专195 | 1.218 | 6.847 | |||
| 专50 | 2.093 | 8.940 | |||||
| 350 406 553 571 640 650 672 989 | 2.362 | 11.302 | |||||
| 350 406 553 571 640 659 847 973 989 快速直达专线17 快速直达专线69 快速直达专线96 | 1.544 | 12.846 | |||||
| 专30 592 | 1.621 | 14.467 |
Rolling stock
.jpg)
Line 3 will initially use 4-car Type A rolling stock but platforms are designed to support expansion to 8-car trains.
History
.jpg)
Line 3's route has undergone substantial changes on the planners' drawing board. In the late 1990s, one draft of the subway plan showed Line 3 running from Xiaomeichang to Cuigezhuang. Half of that route was then folded into Line 6. In 2010 and 2011, Line 3 was mentioned in the development plans of other subway lines.
By January 2012, the Line 3's western section was slated to run east from Tiancun station in Haidian District under Fushi Road to Fuchengmen station. On March 15, 2012, Line 3 was reportedly planned to run from Tiancun station to the eastern suburbs of Beijing in Gaoxinzhuang and Pingfang and to be built by 2020.
In June 2012, Beijing media reported the station plan of Line 3.
In January 2013, subway planners were examining whether to extend the Line 3 through the city centre given the concentration of historic relics in the area. In January 2014, it was reported that Line 3 will have 27 stations, with up to 16 transfer stations, including Ganjiakou station on Line 16 and Zhangzizhonglu on Line 5. The station plan for Ganjiakou had been released in 2013 by Beijing Municipal Commission of Urban Planning, which depicted the Line 3 platform built over that of Line 16. In February 2014, an official was quoted as saying that "Line 3 would run along Di'anmen Street, not Jingshan Front Street, with paralleling from Ping'anli to Nanluoguxiang."
On September 14, 2015, Line 3 (from Tiancun to Caogezhuangbei) was approved by NDRC. It will be 37.4 km in length with 27 stations. On April 19, 2016, the first phase of Line 3 started construction.
On May 1, 2024, the Beijing Municipal Commission of Planning and Natural Resources adopted station names of line 3 phase 1. On June 15, 2024, test run of line 3 has started.
On September 29, 2024, Beijing Infrastructure Investment (BII) company announced the planning scheme of line 3 eastern extension, a 6.4 km underground section with 5 new stations, but of which the potential termini Caogezhuangbei will only have reservation places for future plans. Once eastern extension completed, it will connect with line 20 (R4) at Guanzhuangluxikou, and line M101 at Gaoxinzhuang.
References
References
- "北京地铁3号线一期工程首站封顶".
- (July 6, 2022). "北京3号线首列车在河北京车智能制造基地下线".
- (2024-12-16). "北京新开3条(段)地铁线 主要火车站机场地铁全覆盖".
- (2024-12-12). "官宣!本周日北京新开3条(段)地铁线,朝阳站枢纽同步开通".
- (October 7, 2023). "《公共交通客运标志 第2部分:城市轨道交通(征求意见稿)》".
- (2024-10-10). "一体化规划方案公示 与R4、M101互联互通 地铁3号线一期将承接首都机场客流".
- "站间距信息".
- (January 18, 2024). "关于轨道交通3号线一期车站命名预案的公示". [[北京市规划和自然资源委员会]].
- (July 21, 2023). "关于轨道交通12号线车站命名预案的公示".
- (May 6, 2011). "北京地铁16号线设10个地下换乘站". [[Xinhua News Agency]].
- (January 15, 2009). "北京地铁西郊线确定设五站". [[Guangming Daily]].
- link. [[:zh:新京报. The Beijing News]]. (March 23, 2010)
- link. [[Beijing Daily]]. (January 13, 2012)
- (March 15, 2012). "首都第二机场地铁或达160公里/时 新设地铁新线3号线". [[People's Daily]].
- link. [[:zh:新京报. The Beijing News]]. (June 16, 2012)
- (January 4, 2013). "北京地铁3号线东段将延伸至东坝". [[Xinhua News Agency]].
- link. (February 14, 2013)
- link. [[:zh:新京报. The Beijing News]]. (January 11, 2014)
- link. (April 25, 2013)
- (March 5, 2006). "北京地铁17号线年内开工 2017年通到望京". [[Legal Daily]].
- (2015-09-14). "国家发展改革委关于北京市城市轨道交通第二期建设规划(2015~2021年)的批复". 中华人民共和国国家发展和改革委员会.
- (2015-09-14). "国家发展改革委关于北京市城市轨道交通第二期建设规划(2015~2021年)的批复(pdf)". 中华人民共和国国家发展和改革委员会.
- (April 20, 2016). "地铁3号线开工 拟2020年通车". [[Ifeng.com]].
- "地名公告". [[北京市规划和自然资源委员会]].
- "地铁3号线,开始空载试运行!". [[北京日报]].
- (2024-09-29). "北京轨道交通3号线一期(管庄路西口站-曹各庄北站[预留])线路一体化规划方案公示".
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Line 3 (Beijing Subway) — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report