Kent Hills Wind Farm

Kent Hills Wind Farm is a wind farm located southeast from Prosser Brook, New Brunswick. The wind farm was completed in three phases between 2008 and 2018. The farm was the first in New Brunswick. It is owned and operated by TransAlta and the power is purchased by NB Power for supply to consumers.
As of 2021, the farm consisted of forty-nine 3-megawatt (MW) wind turbines and 5 3.45-MW turbines, for a total capacity of 167 MW. The project produces 580,000 megawatt hours per year. The turbines used are Vestas V90-3MW model, which have a rotor diameter of 90 m and sit atop an 80 m tower.
In October 2021, a tower, in phase two of the project, collapsed because of a bad foundation. Initially all WTG were taken off line as a precaution. TransAlta Renewables have found deficiencies in the design of all of the windmill foundations. Costs to replace them are quoted to be 75-100 million dollars.
It is the largest wind farm in Atlantic Canada.
References
References
- "Kent Hills". TransAlta Corporation.
- (2008). "Kent Hills Transmission Line". [[NB Power]].
- (2007-07-17). "TransAlta expands Kent Hills wind power project". [[TransAlta]].
- "TransAlta wind farm in N.B. Temporarily taken offline after tower collapse".
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Kent Hills Wind Farm — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report