Skip to content
Surf Wiki
Save to docs
geography/italy

From Surf Wiki (app.surf) — the open knowledge base

Italian aircraft carrier Cavour

Italian aircraft carrier


Italian aircraft carrier

FieldValue
section1{{Infobox ship/image
imageCavour (550).jpg
section2{{Infobox ship/career
countryItaly
flag
nameCavour
namesakeCamillo Benso, conte di Cavour
ordered22 November 2000
builderFincantieri
original_cost*€1.39 billion (2010)
laid_down17 July 2001
launched20 July 2004
commissioned27 March 2008
in_service10 June 2009
homeportTaranto
mottoIn arduis servare mentem To keep the mind in the arduous (latin)
identificationPennant number: 550
statusActive
section3{{Infobox ship/characteristics
typeAircraft carrier
displacement*27,100 MT (30,000 MT full load)
length*– 244 m LOA
beam*– 29.1 m
* – {{convert39mftinabbron}} moulded breadth
draught8.7 m
propulsion*– COGAG scheme
* – 4 × General Electric/Avio LM2500+ gas turbines providing {{convert88,000kWbhpabbron}}
* – 6 × diesel generators Wärtsila CW 12V200 {{convert13,200kWbhpabbron}}
speed29 kn (Max sustained speed, 85% MCR)
range7000 nmi at 16 kn
complement*– 1,202 (90 more on option) of which:
sensors*– Selex RAN-40L 3D L-band long-range radar
* – Selex ES RAN-30X/I RASS (SPS-791) surface radar<ref namefinnmeccanicaran40L/
* – PALS (Precision Approach and Landing System) Telephonics AN/SPN-41A <ref>{{cite weburlhttp://www.businesswire.com/news/home/20040913005707/en/Griffon-Subsidiary-Announces-3.6-Million-Contract-Awardtitle=Griffon Subsidiary Announces $3.6 Million Contract Award from Italian Navy for Aircraft Carrier Landing System; Telephonics Continues Expansion into European Marketspublisher=Business Wiredate=13 September 2004access-date=12 December 2016}}
* – Selex ES SIR-R/S IFF system<ref namefinnmeccanicaran40L/
EW*– Elettronica Spa NETTUNO-4100 ECM System
armament*4 × 8-cell A-43 Sylver launchers carrying the MBDA Aster 15 surface-to-air missile
aircraft*– flight deck: 232.60 m × 34.5 m
* – 20–30<ref nament1
* – {{convert134.2mftinabbron}} × 21.0 m
notes4 LCVP
  • – 39 m moulded breadth
  • – 2 × shafts
  • – 4 × General Electric/Avio LM2500+ gas turbines providing 88,000 kW
  • – 6 × diesel generators Wärtsila CW 12V200 13,200 kW
  • – 5 Flag Officers and VIPs
  • – 486 crew
  • – 211 embarked air wing
  • – 140 C4 staff
  • – 360 troops (90 more on option)
  • – Selex ES EMPAR (SPY-790) multifunction radar
  • – Selex ES RAN-30X/I RASS (SPS-791) surface radar
  • – 2 × SELEX ES RTN-25X Orion, fire direction radars
  • – PAR (Precision Approach Radar) Selex ES MM/SPN-720
  • – PALS (Precision Approach and Landing System) Telephonics AN/SPN-41A
  • – 2 × GEM Elettronica MM/SPN-753(v)10 navigation radars
  • – Selex ES SIR-R/S IFF system
  • – TACAN SRN-15 A
  • – WASS SNA-2000 Mine Avoidance Sonar (Leonardo Thesan)
  • – 2 × Selex ES IRST SASS (Silent Acquisition and Surveillance System)
  • – GEM Elettronica IRST EOSS-100
  • – underwater telephone
  • – EW System (RESM/CESM, RECM)
  • 2 × OTO Melara 76/62 mm Strales guns
  • 3 × OTO Melara 25/80 gun with Oerlikon KBA 25mm
  • 2 × ODLS-H/ODLS OTO Melara decoy launching systems
  • – 20–30
  • hangar capacity:
  • – 134.2 m × 21.0 m
  • – 10 × F-35B Lightning II
  • – 12 × AgustaWestland AW101

Cavour () is an Italian aircraft carrier launched in 2004. It is the flagship of the Italian Navy.

Design

''Cavour'' maneuvering in the [[Gulf of Naples

The ship is designed to combine fixed-wing V/STOL and helicopter air operations, command and control operations, and the transport of military or civil personnel and heavy vehicles. The 134 m, 2,800 m2 hangar space can double as a vehicle hold capable of holding up to 24 main battle tanks (typically Ariete) or many more lighter vehicles (50 Dardo IFV, 100+ Iveco LMV), and is fitted aft with access ramps rated to 70 tons, as well as two elevators rated up to 30 tons for aircraft. Cavour can also operate as landing platform helicopter, accommodating heavy transport helicopters (AgustaWestland UH-101A ASH) and 325 marines (91 more, on option). The Cavour has a displacement of 27,900 tons but can reach more than 30,000 tons at full military capacity.

It complemented the Italian Navy's other aircraft carrier, the , before the older ship was decommissioned in 2024.

The Italian Navy will replace its 16 Harriers with 15 (originally 22) Lockheed Martin F-35B Lightning IIs. By May 2020, the modernization to allow Cavour to support the F-35B was completed, and the carrier was ready for subsequent integration trials. Cavour will have room for ten F-35Bs in the hangar, and six more parked on deck.

Name

The ship was named in honor of Camillo Benso, Count of Cavour (after proposals such as Luigi Einaudi and Andrea Doria were discarded) and became the NUM (New Major Unit) of the Italian Navy, joining the aircraft carrier Giuseppe Garibaldi. Its name holds historical significance for the Italian Navy, as a tribute to the strong impetus that Count of Cavour gave to the expansion and development of the Italian Navy, born from the fusion of the pre-unification navies, in the aftermath of Italy's unification.

Construction

Cavour was laid down by Fincantieri in June 2001, and was launched from the Riva Trigoso shipyard at Sestri Levante, on 20 July 2004. Sea trials began in December 2006, and she was officially commissioned on 27 March 2008. Full operational capability (FOC) was reached on 10 June 2009.

Service history

''Cavour'' docked at Civitavecchia (near Rome) with frigate ''Carlo Bergamini'' and a full cast of cruise ships on 30 October 2023

On 19 January 2010, Cavour was dispatched to Haiti as part of Operation White Crane, Italy's operation for 2010 Haiti earthquake relief. This was the first mission of the aircraft carrier, where it supplemented international efforts to provide relief for the victims of the 2010 Haiti earthquake.

In 2013 Cavour, an active warship, was used for a Pirelli press presentation for the new Angel GT motorcycle tires. At that commercial event the guests stayed overnight on the ship and rode motorcycles on the flight deck.

It was reported that modernization works on Cavour has been completed. In May 2020, it was announced the Italian aircraft carrier would undertake a preparatory training before sailing to the U.S. where the ship would conduct trials with the F-35B STOVL. In February 2021, Cavour deployed to the United States for its initial period of flying trials with the F-35B. This saw the ship engage in four weeks of verification to determine the performance envelope of the aircraft when operating from the flight deck, using a pair of aircraft from VX-23, the US Navy's Test and Evaluation Squadron. Once these trials were completed, and the ship was passed for operation of the F-35B, it would move to the next phase of fixed-wing flying trials, which would see Italy's own aircraft begin operating from the carrier. On 9 March 2021, replenished her in the western Atlantic Ocean. Then on 20 March, she operated alongside in the Atlantic Ocean. On 26 March, she was in Norfolk, Virginia when the F-35B trial was completed. She left Norfolk on 16 April and returned to homeport Taranto on 30 April. Initial operating capability for the F-35s is expected for 2024.

In February 2022, she was part of interoperability training operations with the American carrier and the French carrier in the lead up to the Russo-Ukrainian War.

In June 2024, the Cavour Strike Group began a five-month deployment to the Indo-Pacific. On 5 and 6 October, carrier strike groups of the Indian Navy and the Italian Navy led by and Cavour and accompanied by and participated in a bilateral maritime exercise in the Arabian Sea. The exercise included aircraft like MiG-29K, F-35B and AV-8B Harrier II and integral helicopters. Operations in the sea phase included intense flight operations with fighter jets and helicopters for combined large force engagements, air combat missions, helicopter operations and search and rescue missions as well as co-ordinated weapon firings and joint manoeuvres to enhance joint operations, command and control capabilities and interoperability. The exercise also saw the participation of the Indian Air Force. During the harbour phase from 1 to 4 October, the exercise saw subject matter expert exchanges and other key interactions as well as a pre-sail planning conference.

References

Sources

References

  1. "Cavour – Marina Militare". Marina.difesa.it.
  2. (23 March 2015). "The world's largest and most powerful aircraft carriers, in pictures".
  3. (5 July 2017). "The 10 biggest aircraft carriers – Naval Technology".
  4. "Cavour Class". Fincantieri.com.
  5. "Finmeccanica on board of Cavour – Detail – Finmeccanica Naval Capabilities". finmeccanica.com.
  6. (13 September 2004). "Griffon Subsidiary Announces $3.6 Million Contract Award from Italian Navy for Aircraft Carrier Landing System; Telephonics Continues Expansion into European Markets". Business Wire.
  7. "Cavour Aircraft Carrier, Italy". Naval-technology.com.
  8. Michele Cosentino. (2010). "Dal Garibaldi al Cavour". Rivista Marittima-Luglio.
  9. (5 April 2012). "Navies Worldwide Invest In Sea-Based Airpower". Aviation Week.
  10. "Italian Navy Cavour Aircraft Carrier ready for F-35B integration tests".
  11. (1 September 2004). "Italian Navy Launches Conte di Cavour-Class Carrier". Sea Power.
  12. (4 February 2010). "Photostory: Portaerei Cavour, gli aiuti per Haiti". ANSA.
  13. (16 January 2010). "La portaerei Cavour pronta a partire per Haiti". La Repubblica.
  14. (3 March 2021). "The aircraft carrier ITS Cavour started Sea Trials to achieve her "Ready For Operation" certification". Marina Militaire.
  15. "Italian Navy Capt. Giancarlo Ciappina, commanding officer, Italian aircraft carrier ITS Cavour (CVH 550)".
  16. (2021-03-22). "USS Gerald R. Ford Completes another Independent Steaming Event – Shock Trials are Next".
  17. Reim, Garrett. (2021-03-26). "F-35B completes sea trials on Italian aircraft carrier ITS Cavour".
  18. (2 May 2021). "Italian Navy Cavour aircraft carrier is back in Italy ready for operational deployment with F-35B".
  19. (4 March 2021). "F-35B lands on Italian carrier for the first time". UK Defence Journal.
  20. (6 February 2022). "NATO Allies Exercise Interoperability In The Mediterranean Sea".
  21. Peruzzi, Luca. (2024-06-05). "Italian Carrier Strike Group starts five-month deployment to the Indo-Pacific".
  22. "India's MiG-29s Fly With F-35, Harrier Jets In Exercise With Italian Navy".
  23. Ray, Kalyan. "India-Italy maiden Carrier Strike Groups exercise off the West Coast".
  24. (2024-10-07). "Historic bilateral #maritime engagement b/n #IndianNavy & @ItalianNavy...".
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Italian aircraft carrier Cavour — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report