I-35W Mississippi River bridge
Bridge in Minneapolis, Minn., US
Bridge in Minneapolis, Minn., US
| Field | Value |
|---|---|
| bridge_name | I-35W Mississippi River bridge |
| image | I35W Bridge.jpgborder |
| alt | picture of the bridge painted green and surrounded by green foliage seen from the Mississippi bank |
| image_size | 325px |
| caption | Bridge 9340 in May 2006, one year prior to collapse |
| official_name | Bridge 9340 |
| crosses | Mississippi River |
| carries | 8 lanes of |
| locale | Minneapolis, Minnesota, U.S. |
| design | Continuous truss bridge |
| mainspan | 456 ft |
| length | 1907 ft |
| width | 113.3 ft |
| height | 115 ft |
| below | 64 ft |
| begin | 1964 |
| open | November 1967 |
| collapsed | August 1, 2007 |
| maint | Minnesota Department of Transportation (Mn/DOT) |
| id | 9340 |
| coordinates | |
| traffic | 140,000 |
Bridge 9340, which collapsed in 2007
The I-35W Mississippi River bridge (officially known as Bridge 9340) was an eight-lane, steel truss arch bridge that carried Interstate 35W across the Mississippi River one-half mile (875 m) downstream from the Saint Anthony Falls in Minneapolis, Minnesota, United States. The bridge opened in 1967, and was Minnesota's third busiest, carrying 140,000 vehicles daily. After 39 years in service, it experienced a catastrophic failure during the evening rush hour on August 1, 2007, killing 13 people and injuring 145. The National Transportation Safety Board (NTSB) cited a design flaw as the likely cause of the collapse, noting that an excessively thin gusset plate ripped along a line of rivets. The amount of weight on the bridge at the time of failure was also cited by the NTSB as a contributing factor.
Help came immediately from mutual aid in the seven-county Minneapolis–Saint Paul metropolitan area and emergency response personnel, charities, and volunteers. Within a few days of the collapse, the Minnesota Department of Transportation (MnDOT) planned its replacement with the I-35W Saint Anthony Falls Bridge. The construction of the replacement bridge was completed quickly, and the new bridge officially opened on September 18, 2008.
Location and site history
The bridge was located in Minneapolis, Minnesota's largest city, and connected the neighborhoods of Downtown East and Marcy-Holmes. The south abutment was northeast of the Hubert H. Humphrey Metrodome, and the north abutment was northwest of the University of Minnesota East Bank campus. The bridge was the southeastern boundary of the "Mississippi Mile" downtown riverfront parkland. Downstream is the 10th Avenue Bridge, once known as the Cedar Avenue Bridge. Immediately upstream is the Saint Anthony Falls lower lock and dam. The first bridge upstream is the historic Stone Arch Bridge, built for the Great Northern Railway and now used for bicycle and pedestrian traffic.
The north foundation pier of the bridge was near a hydroelectric plant that was razed in 1988. The south abutment was in an area polluted by a coal gas processing plant and a facility for storing and processing petroleum products. These uses effectively created a toxic waste site under the bridge, leading to a lawsuit and the removal of the contaminated soil. No relationship has been claimed between these previous uses and the bridge failure.
Design and construction

The bridge, officially designated "Bridge 9340", was designed by Sverdrup & Parcel to 1961 AASHTO (American Association of State Highway Officials, now American Association of State Highway and Transportation Officials) standard specifications. The construction contracts, worth in total more than $5.2 million at the time, were initially offered to HurCon Inc. and Industrial Construction Company.
Construction on the bridge began in 1964 and the structure was completed and opened to traffic in 1967 during an era of large-scale projects to build the Twin Cities freeway system. When the bridge fell, it was still the most recent river crossing built on a new site in Minneapolis. After the building boom ebbed during the 1970s, infrastructure management shifted toward inspection and maintenance.
The bridge's fourteen spans extended 1,907 ft long. The three main spans were of deck truss construction while all but two of the eleven approach spans were steel multi-girder construction, the two exceptions being concrete slab construction. The piers were not built in the navigation channel; instead, the center span of the bridge consisted of a single 458 ft steel arched truss over the 390 ft channel. The two support piers for the main trusses, each with two load-bearing concrete pylons at either side of the center main span, were located on opposite banks of the river. The center span was connected to the north and south approaches by shorter spans formed by the same main trusses. Each was 266 ft in length, and was connected to the approach spans by a 38 ft cantilever. The deck was 113 ft in breadth and was split longitudinally. It had transverse expansion joints at the centers and ends of each of the three main spans. The roadway deck was approximately 115 ft above the water level.
Black ice prevention system
On December 19, 1985, the temperature reached -30 °F. Vehicles coming across the bridge experienced black ice and there was a major pile-up on the bridge on the northbound side. In February and December 1996, the bridge was identified as the single most treacherous cold-weather spot in the Twin Cities freeway system, because of the almost frictionless thin layer of black ice that regularly formed when temperatures dropped below freezing. The bridge's proximity to Saint Anthony Falls contributed significantly to the icing problem and the site was noted for frequent spinouts and collisions.
By January 1999, Minnesota DOT began testing magnesium chloride solutions and a mixture of magnesium chloride and a corn-processing byproduct to see whether either would reduce the black ice that appeared on the bridge during the winter months. In October 1999, the state embedded temperature-activated nozzles in the bridge deck to spray the bridge with potassium acetate solution to keep the area free of winter black ice. The system came into operation in 2000.
Although there were no additional major multi-vehicle collisions after the automated de-icing system was installed, it was raised as a possibility that the potassium acetate may have contributed to the collapse of the bridge by corroding the structural supports, though the NTSB's final report found that corrosion was not a contributing factor.
Maintenance and inspection

Since 1993, the bridge was inspected annually by MnDOT, with the exception of 2007 due to the construction work. In the years prior to the collapse, several reports cited problems with the bridge structure. In 1990, the federal government gave the I-35W bridge a rating of "structurally deficient", citing significant corrosion in its bearings. Approximately 75,000 other U.S. bridges had this classification in 2007.
According to a 2001 study by the civil engineering department of the University of Minnesota, no cracking had been previously discovered in the cross girders at the end of the approach spans. The main trusses connected to these cross girders and resistance to motion at the connection point bearings was leading to unanticipated out-of-plane distortion of the cross girders and subsequent stress cracking. The situation was addressed prior to the study by drilling the cracks to prevent further propagation and adding support struts to the cross girder to prevent further distortion. The report also noted a concern about lack of redundancy in the main truss system, which meant the bridge had a greater risk of collapse in the event of any single structural failure. Although the report concluded that the bridge should not have any problems with fatigue cracking in the foreseeable future, regular inspection, structural health monitoring, and use of strain gauges had been suggested.
In 2005, the bridge was again rated as "structurally deficient" and in possible need of replacement, according to the U.S. Department of Transportation's National Bridge Inventory database. Problems were noted in two subsequent inspection reports. The inspection carried out June 15, 2006 found problems of cracking and fatigue. On August 2, 2007 (the day after the collapse) Governor Tim Pawlenty stated that the bridge had been scheduled to be replaced in 2020.
The I-35W bridge ranked near the bottom of federal inspection ratings nationwide. Bridge inspectors use a sufficiency rating that ranges from the highest score, 100, to the lowest score, zero. In 2005, they rated the bridge at 50, indicating that replacement may have been in order. Out of over 100,000 heavily used bridges, only about 4% scored below 50. On a separate measure, the I-35W bridge was rated "structurally deficient", but was deemed to have met "minimum tolerable limits to be left in place as it is".
In December 2006, a steel reinforcement project was planned for the bridge. However, the project was canceled in January 2007 in favor of periodic safety inspections, after engineers realized that drilling for the retrofitting would, in fact, weaken the bridge. In internal Mn/DOT documents, bridge officials talked about the possibility of the bridge collapsing, and worried that they might have to condemn it.
The construction taking place in the weeks prior to the collapse included joint work and replacing lighting, concrete and guard rails. At the time of the collapse, four of the eight lanes were closed for resurfacing, and there were 575,000 lb of construction supplies and equipment on the bridge.
Collapse

_edit.jpg)
At 6:05 p.m. CDT on August 1, 2007, with rush hour bridge traffic moving slowly through the limited number of lanes, the central span of the bridge suddenly gave way, followed by the adjoining spans. The structure and deck collapsed into the river and onto the riverbanks below, the south part toppling 81 ft eastward in the process. A total of 111 vehicles were involved, sending their occupants and 18 construction workers as far as 115 ft
Sequential images of the collapse were taken by an outdoor security camera located at the parking lot entrance of the control facility for the Lower Saint Anthony Falls Lock and Dam. The immediate aftermath of the collapse was also captured by a Mn/DOT traffic camera that was facing away from the bridge during the collapse itself.
Mayor R. T. Rybak and Governor Tim Pawlenty declared a state of emergency for the city of Minneapolis and for the State of Minnesota on August 2. Rybak's declaration was approved and extended indefinitely by the Minneapolis City Council the next day. As of the morning following the collapse, according to White House Press Secretary Tony Snow, Minnesota had not requested a federal disaster declaration. President Bush pledged support during a visit to the site on August 4 with Minnesota elected officials and announced that United States Secretary of Transportation (USDOT) Mary Peters would lead the rebuilding effort. Rybak and Pawlenty gave the president detailed requests for aid during a closed-door meeting. Local authorities were assisted by the Federal Bureau of Investigation (FBI) evidence team, and by United States Navy divers who began arriving on August 5.
Victims
Thirteen people were killed. Triage centers at the ends of the bridge routed 50 victims to area hospitals, some in trucks, as ambulances were in short supply. Many of the injured had blunt trauma injuries. Those near the south end were taken to Hennepin County Medical Center (HCMC) — those near the north end, to the Fairview University Medical Center and other hospitals. At least 22 or 24 children were injured. Thirteen children were treated at Children's Hospitals and Clinics of Minnesota, During the first 40 hours, 11 area hospitals treated 98 victims.
Only a few of the vehicles were submerged, but many people were stranded on the collapsed sections of the bridge. Several vehicles caught fire, including a semi-trailer truck, from which the driver's body was later recovered. When fire crews arrived, they had to route hoses from several blocks away.
A school bus carrying 63 children ended up resting precariously against the guardrail of the collapsed structure, near the burning semi-trailer truck. The children were returning from a field trip to a water park as part of the Waite House Neighborhood Center Day Camp based in the Phillips community. Jeremy Hernandez, a 20-year-old staff member on the bus, assisted many of the children by kicking out the rear emergency exit and escorting or carrying them to safety. One youth worker was severely injured.
Rescue
Civilians immediately took part in the rescue efforts. Minneapolis and Hennepin County received mutual aid from neighboring cities and counties throughout the metropolitan area. The Minneapolis Fire Department (MFD) arrived in six minutes and responded quickly, helping people who were trapped in their vehicles. They took 81 minutes to triage and transport 145 patients with the help of Hennepin County Medical Center (HCMC), North Memorial and Allina paramedics. By the next morning, they had shifted their focus to the recovery of bodies, with several vehicles known to be trapped under the debris and several people still unaccounted for. Twenty divers organized by the Hennepin County Sheriff's Office (HCSO) used side-scan sonar to locate vehicles submerged in the murky water. Their efforts were hampered by debris and challenging currents. The United States Army Corps of Engineers (USACE) lowered the river level by 2 ft downriver at Ford Dam to allow easier access to vehicles in the water.
The Minneapolis Fire Department The city provided 75 firefighters and 75 law enforcement units.
Rescue of victims stranded on the bridge was complete in three hours. City, metropolitan area, county and state employees at all levels knew their roles and had practiced them since the city received FEMA emergency management training the year following the September 11, 2001 attacks. Their rapid response time is also credited to the Minnesota and United States Department of Homeland Security (DHS) investment in 800 MHz mobile radio communications that were operating in Minneapolis and three of the responding counties, the city of Minneapolis collapsed-structures rescue and dive team, and the Emergency Operations Center established at 6:20 p.m. in Minneapolis City Hall.
Recovery
Recovery of deceased victims took over three weeks. At the request of the NTSB Chairman Mark Rosenker, the U.S. Navy sent 17 divers and a five-person command-and-control element from its Mobile Diving and Salvage Unit Two.
The Navy Dive team started diving operations in the river at 2 a.m., within hours of arriving, and conducted operations around the clock for the next three weeks, until the recovery portion of the mission was completed. The FBI teams had planned to search with an unmanned submarine, but had to abandon this plan after they found it was too big to maneuver in the debris field and cloudy water. Minneapolis Police Captain Mike Martin stated that, "The public safety divers are trained up to a level where they can kind of pick the low-hanging fruit. They can do the stuff that's easy. The bodies that are in the areas where they can sweep shore to shore, the vehicles that they can get into and search that weren't crushed. They were able to remove some of those. Now what we're looking at is the vehicles that are under the bridge deck and the structural pieces."
Seventy-five local, state and federal agencies Federal assistance came from the United States Department of Defense, DHS, USACE and the United States Coast Guard. Adventure Divers of Minot, North Dakota, is a private firm that assisted local authorities.
Local businesses donated wireless Internet, ice, drinks and meals for first responders. The Salvation Army canteens served food and water to rescue workers. Teams of officers were sent to hospitals to follow up with the injured, who had been transported to eight different medical facilities.
The Minneapolis Police Chaplain Corps Chaplain Director, Dr. Jeffrey Stewart, arrived and was asked to set up and manage a Family Assistance Center (FAC) for the victims' families. He coordinated site location and staffing arrangements with the city's Department of Health and Family support and relevant Hennepin County offices. When Chaplain Supervisor John LeMay and Lead Chaplain Linda Koelman arrived on the scene, they assisted in setting up the FAC at the Holiday Inn by 8 p.m. As additional Minneapolis Police Chaplains arrived, they began providing services to the victim families, assisting them in locating family members, and providing a calm presence. On August 20, the last victim was recovered from the river.
A Mayo Clinic transport helicopter was standing by at Flying Cloud Airport. The Minnesota National Guard launched a MEDEVAC helicopter and had up to 10,000 guard members ready to help.
As of August 8, 2007, more than 500 Red Cross volunteers and staff persons counseled 2,000 people with grief, trauma, missing persons, and medical issues, and served 7,000 meals to first responders.
Following the initial rescue, Mn/DOT retained Carl Bolander & Sons, an earthworks and demolition contractor of Saint Paul, Minnesota, to remove the collapsed bridge and demolish the remaining spans that did not fall. Divers left the water briefly on August 18 while the company's crew used cranes, excavation drills and cutting torches to remove parts of the bridge deck, beams and girders, hoping to improve access for the divers.
After the last person's remains were removed from the wreckage on August 21, the company's crews began dismantling the bridge's remnants. Crews first removed the vehicles stranded on the bridge. By August 18, 80 of the 88 stranded cars and trucks had been moved to the MPD impound lot where owners could claim their vehicles. Then workers shifted to removing the bridge deck using cranes and excavators equipped with hoe rams to break the concrete. Structural steel was then disassembled by cranes, and the concrete piers were removed by excavators. National Transportation Safety Board (NTSB) officials asked demolition crews to use extreme care in removing the bridge remnants to preserve as much of the bridge materials as possible for later analysis.
By the end of October 2007, the demolition operation was substantially complete, enabling construction to begin on the new I-35W bridge on November 1, 2007. Much of the bridge debris was temporarily stored at the nearby Bohemian Flats as part of the ongoing investigation of the collapse; it was removed to a storage facility in Afton, Minnesota, in fall 2010. Federal officials planned to bring some of the bridge steel and concrete to the NTSB Material Laboratory in Washington, D.C., for analysis toward determining the cause of the collapse on behalf of FHWA, Mn/DOT and Progressive Construction, Inc. NTSB also interviewed eyewitnesses.
Peters announced that USDOT had granted Minnesota $5 million the day following the collapse. On August 10, Peters announced an additional $5 million "for Minneapolis", or "the state", "to reimburse Minneapolis for increased transit operations to serve commuters in the wake of last week's bridge collapse". U.S. Congress removed the $100 million per-incident cap on emergency appropriations. The United States House of Representatives and United States Senate each voted unanimously for $250 million in emergency funding for Minnesota that President Bush signed into law on August 6. On August 10, 2007, Peters announced $50 million in immediate emergency relief, a portion of the overall $250 million, which was given to enable "clean-up and recovery work, including clearing debris and re-routing traffic, as well as for design work on a new bridge".
Investigation

The National Transportation Safety Board immediately began a comprehensive investigation that was expected to take up to eighteen months. Immediately following the collapse, Governor Pawlenty and Mn/DOT announced that the Illinois-based engineering firm of Wiss, Janney, Elstner Associates, Inc. had also been selected to provide essential analysis that would parallel the investigation being conducted by the NTSB. One week after the collapse, workers were just beginning to move debris and vehicles to further the process of recovering victims. Cameras and motion detectors were added to the site around the bridge to ward off intruders who, officials said, were hindering the investigation. Hennepin County Sheriff Richard W. Stanek stated, "We are treating this as a crime scene at this point. There's no indication there was any foul play involved, [but] it's a crime scene until we can determine what was the cause of the collapse."
The Federal Highway Administration (FHWA) built a computer model of the bridge at the Turner Fairbank Highway Research Center in McLean, Virginia. NTSB investigators were particularly interested in learning why a part of the bridge's southern end shifted eastward as it collapsed, but this particular phenomenon was not germane to the ultimate cause of the collapse.
FHWA advised states to inspect the 700 U.S. bridges of similar construction after identifying a possible design flaw related to large steel sheets called gusset plates, which connect girders in the truss structure. The flaw was first discovered by Wiss, Janney, Elstner Associates, Inc., an independent consulting firm hired by Mn/DOT to investigate the cause of the collapse.
On January 15, 2008, the NTSB announced it had determined that the bridge's design specified steel gusset plates that were undersized and inadequate to support the intended load of the bridge, This assertion was based on an interim report that calculated the demand-to-capacity ratio for the gusset plates. The NTSB recommended that similar bridge designs be reviewed for this problem. NTSB Chairman Mark Rosenker said:
On March 17, 2008, the NTSB announced an update on the investigation relating to load capacity, design issues, computer analysis and modeling, digital image analysis and analysis of the undersized and corroded gusset plates. The investigation revealed that photos from a June 2003 inspection of the bridge showed gusset-plate bowing.
On November 13, 2008, the NTSB released the findings of its investigation. The primary cause of the collapse was the undersized gusset plates, at 0.5 in thick. Contributing to that design or construction error was the fact that 2 in of concrete had been added to the road surface over the years, increasing the static load by 20%. Another factor was the extraordinary weight of construction equipment and material resting on the bridge just above its weakest point at the time of the collapse. That load was estimated at 578000 lb, consisting of sand, water and vehicles. The NTSB determined that corrosion was not a significant contributor, but that inspectors did not routinely check that safety features were functional.
Claims for compensation
Pawlenty and his office, during the last week of November, announced a "$1 million plan" for the victims. State law has limits that may restrict awards to below that amount. No legislative action was needed for this step. "The administration wanted approval from the Joint House–Senate Subcommittee on Claims as a sign of bipartisan support"—which it received. On May 2, 2008, the state of Minnesota reached a $38 million agreement to compensate victims of the bridge collapse.
In August 2010, the last of the lawsuits against URS Corporation were settled for $52.4 million to avoid prolonged litigation. The cases were handled via a novel consortium of legal entities that worked on a pro-bono basis.
The state of Minnesota brought a lawsuit against Jacobs Engineering Group, the successor of Sverdrup & Parcel, the firm that designed the bridge. Jacobs argued too much time had passed since the 1960s design work, but in May 2012, the United States Supreme Court turned down its appeal, allowing the state of Minnesota suit to proceed. Jacobs paid $8.9 million in November 2012 to settle the suit without admitting wrongdoing.
Impacts on business, traffic, and transportation funding

The collapse of the bridge affected river, rail, road, bicycle and pedestrian, and air transit. Pool 1, created by Ford Dam, was closed to river navigation between mile markers 847 and 854.5. A rail spur switched by the Minnesota Commercial Railway was blocked by the collapse. The Grand Rounds National Scenic Byway bike path was disrupted as well as two roads, West River Parkway and 2nd Street SE. The 10th Avenue Bridge, which parallels this bridge about a block downstream, as well as the Stone Arch Bridge, located upstream, were closed to both vehicle and pedestrian traffic until August 31.{{cite web
Thirty-five people lost their jobs when Aggregate Industries of Leicestershire, UK, a company that delivered construction materials by barge, cut production in the area.

Small businesses in metropolitan area counties that were harmed by the bridge collapse could apply beginning August 27, 2007 for loans of up to $1.5 million, at a 4% interest rate for up to a 30-year length, from the U.S. Small Business Administration. The agency's disaster declaration for Hennepin and contiguous counties came two days after Pawlenty's request to the SBA on August 20, 2007. Open for business and unsure they could repay loans, owners near the collapse in some cases lost 25% or 50% of their income. Large retailers in a mall of chain stores lost about the same. As of early January 2008, at least one business closed, one announced it was closing, seven of eight SBA applications had not been approved and merchants continued to explain how they are unable to shoulder more debt.
Seventy percent of the traffic served by the bridge was downtown-bound.
Extra Metro Transit buses were added from park-and-ride locations in the northern suburbs during the rush hours. Abandoned vehicles on I-35W and 280 were towed immediately. On August 6, I-35W was opened to local traffic at the access ramps on each side of the missing section; some on-ramps remained closed.
In the aftermath, pressure was exerted on the state legislature to increase the state fuel tax to provide adequate maintenance funding for Mn/DOT. Ultimately the tax was increased by $0.055 per gallon via an override of Governor Pawlenty's veto of the legislation.
Public events and media

The Minnesota Twins played their home game as scheduled, against the Kansas City Royals at the Hubert H. Humphrey Metrodome just west of I-35W, on the evening of the collapse. Public safety officials told the team that postponing the game could hamper rescue and recovery efforts, since a postponement would send up to 25,000 people back into traffic only blocks from the collapsed bridge. Before the game, a moment of silence was held for the victims of the collapse. The Twins postponed their August 2 game as well as groundbreaking ceremonies for Target Field also located in downtown Minneapolis. The Twins and Minnesota Vikings honored the victims of the collapse by placing a decal of a simulated I-35W shield sign with the date "8-1-07" on the backstop wall within the Metrodome, which was always visible in the typical behind-the-pitcher viewpoint on televised games. The decal remained for the rest of the 2007 season.
The collapse was of interest to national and international news organizations. On the evening of the collapse, CNN, MSNBC, and Fox News Channel stayed live with its coverage during the overnight hours, along with local stations WCCO-AM (830) and KSTP (1500), with most of the coverage in the opening hours coming via satellite from Twin Cities news operations WCCO-TV, KSTP-TV, KMSP-TV, KARE-TV and Minnesota Public Radio. National TV networks sent CBS anchor Katie Couric, NBC's Brian Williams and Matt Lauer, MSNBC's Contessa Brewer, ABC's Charles Gibson, CNN's Soledad O'Brien and Anderson Cooper, and Fox News Channel's Greta Van Susteren and Shepard Smith to broadcast from the Twin Cities. U.S. news organizations interested in national and local bridge safety made a record number of requests for bridge information from Investigative Reporters and Editors, an organization that maintains several databases of federal information. News media made more inquiries for National Bridge Inventory data in the first 24 hours after the Minneapolis bridge collapse than for any previous day in the past 20 years.
Disaster declarations
The Hennepin County Board of Commissioners voted on August 7, 2007, to request that Governor Pawlenty petition President George W. Bush to declare the city of Minneapolis and Hennepin County a major disaster area. About two weeks later, Pawlenty requested major disaster designation on August 20. In a subsequent press release for a separate disaster declaration that month, he said, "Ordinarily, preliminary damage assessments are completed before the emergency disaster declaration is requested." During a press conference and briefing with Bush at the Minneapolis/St.Paul Air Reserve Station base for the 934th Airlift Wing on Tuesday, August 21, Pawlenty estimated the total cost of emergency response at over $8 million including Hennepin County's cost at $7.3 million for rescue and recovery and $1.2 million for other state agencies. He estimated the cost of the collapse to the state at $400,000 to $1 million per day.
That day, Bush gave an emergency rather than major disaster declaration for the state of Minnesota, allowing local and state agencies to recover costs incurred August 1 to 15 from the Federal Emergency Management Agency (FEMA). FEMA can provide payment as required for emergency protective measures (part of FEMA Category B) at no less than 75% federal funding to Hennepin County, the designated county, up to the initial limit of $5 million. Pawlenty planned to ask that the date restriction and monetary cap be lifted.
Replacement bridge

Main article: I-35W Saint Anthony Falls Bridge
The replacement of the collapsed I-35W Mississippi River, bridge crosses the Mississippi River at the same location as the original bridge, and carries north–south traffic on I-35W. It was constructed on an accelerated schedule, because of the highway's function as a vital link for carrying commuters and truck freight.
Mn/DOT announced on September 19, 2007, that Flatiron Constructors and Manson Construction Co. would build the replacement bridge for $234 million. The I-35W Saint Anthony Falls Bridge was opened to the public on September 18, 2008, at 5 a.m. The bridge replacement project was awarded the "Best Overall Design-Build Project Award" for 2009 by the Design-Build Institute of America.
Memorials
Memorial services
About 1,400 people gathered for an interfaith service of healing held at St. Mark's Episcopal Cathedral on August 5, 2007, when many of the victims were still missing. Among the presenters were representatives of the Christian, Islamic, Jewish, Hindu, Native American and Hispanic communities, police, fire and emergency responders, the governor, the mayor, a choir and several musicians. Minnesotans held a minute of silence during National Night Out, on August 7, 2007, at 6:05 pm. On August 8, 2007, the Twin Cities chapter of the American Red Cross lowered the flags of the United States, the state of Minnesota and the American Red Cross in remembrance of the victims of the tragedy. During an address to the city council on August 15, 2007, Rybak remembered each of the victims and "the details of their lives".
Memorial garden
The 35W Bridge Remembrance Garden commemorates the victims and survivors of the I-35W bridge collapse. It is located off West River Parkway in Minneapolis. The memorial was revealed to the public on August 1, 2011, the four-year anniversary of the collapse. Minnesota Governor, Mark Dayton and Minneapolis Mayor R. T. Rybak were present, and both spoke at the reveal. The ceremony included reading the names of the 13 victims, followed by a moment of silence held at exactly 6:05 p.m., the time of the collapse four years prior. Afterwards, there was the release of 13 doves in memory of the people who died.
This $900,000 memorial was funded by the Minneapolis Foundation, and the park land was provided by the Minneapolis Park and Recreation Board. The design of the remembrance garden was created by Tom Oslund, alongside survivors and relatives of the victims.
The design was meant to incorporate symbolic natural elements, including:
- Stone, for stability and immortality
- Arborvitae trees, for strength and to live for centuries
- Water, able to purify and regenerate
- Darkness and Light, the transition between tragedy and new life
A prime feature in the garden includes 13 steel I-beam and opaque glass columns. Each column has a name engraved of someone lost, along with their story, some even written in their native language. These 13 columns' linear length totals 81 ft, signifying the date of the collapse (08/01/07). Behind the 13 columns is a black granite water wall. On the wall, stainless steel words form the quote, "Our lives are not only defined by what happens, but by how we act in the face of it, not only by what life brings us, but by what we bring to life. Selfless actions and compassion create enduring community out of tragic events." Along with the quote, the names of the 171 survivors are etched into the black stone. Another part of the memorial includes a path leading to the bluff, overlooking the Mississippi River and the new I-35W Bridge. At night, the columns, pathway and water wall are illuminated by LED lights.
Musical homage
In May 2008, an orchestral piece composed by Osmo Vänskä titled "The Bridge" was premiered by the Metropolitan Symphony Orchestra, led by William Schrickel, assistant-principal bassist of the Minnesota Orchestra. Vänskä himself attended the world premiere.
In La Dispute's third studio album, Rooms of the House, several references are made to the disaster, but song "35" describes the event.
Local record label Electro-Voice released a three-disc benefit CD, Musicians for Minneapolis, which raised money for the victims of the bridge collapse. Musicians included Deke Dickerson, Los Lobos, Steve Vai, Dick Dale, Les Claypool, Calexico, DJ Spooky, and M. Ward, as well as local bands such as the Vibro Champs.
2012 memorial
In 2012, installation artist Todd Boss prepared a memorial to the bridge collapse in collaboration with Swedish artist Maja Spasova. The installation was paired with a cycle of 35 poems: "Fragments for the 35W Bridge".
References
Footnotes
Works cited
References
- (1965). "BR9340 Construction Plan". [[Minnesota Department of Transportation]].
- (August 3, 2007). "I-35W bridge Fact Sheet". [[Minnesota Public Radio]].
- (2006). "2006 Traffic Volumes". Minnesota Department of Transportation.
- (2006). "Metro Area Street Series Index". Minnesota Department of Transportation.
- Weeks, John A. III. (August 2014). "I-35W Bridge Collapse Myths and Conspiracies". John A. Weeks III.
- Frommer, Frederic J.. (November 13, 2008). "NTSB: Design Errors Factor in 2007 Bridge Collapse". [[USA Today]].
- Schneier, Bruce. (August 23, 2007). "Time to Close Gaps in Emergency Communications". Wired News.
- (August 15, 2007). "Response to I-35W Bridge Collapse Showed Minneapolis is a City that Works". City of Minneapolis.
- (2008). "I-35W St. Anthony Falls Bridge Mississippi River Crossing in Downtown Minneapolis". Minnesota Department of Transportation.
- (August 7, 2007). "35W Bridge Project". Minnesota Department of Transportation.
- Flanagan, Barbara. "Sheba the donkey is off Nicollet Island, but on pictorial map of it", ''[[Star Tribune]]'', August 26, 1988, Section:News; page 3B
- "History & Heritage of Civil Engineering". American Society of Civil Engineers.
- Meersman, Tom. (April 28, 1993). "Citizens Board OKs NSP Plan to Burn Tainted Soil". [[Star Tribune]].
- Rebuffoni, Dean. (December 16, 1991). "Old Plant Site Spawns Environmental, Legal Mess". Star Tribune.
- Meersman, Tom. (March 23, 1993). "Minnegasco Has a Legacy of Waste—to Burn". Star Tribune.
- Kane, Lucile M.. (August 2014). "The Falls of St. Anthony: The Waterfall that Built Minneapolis". [[Minnesota Historical Society]]}}{{page needed.
- Meersman, Tom. (July 7, 1993). "Minnegasco Starts Cleaning Up Riverside Waste Today". Star Tribune.
- Meersman, Tom. (March 21, 1996). "The Environment, Digging Up a New Riverside: Minnegasco's Cleanup of Contaminants along the Mississippi Will Clear the Way for a North–South Parkway Link". Star Tribune.
- Ison, Chris. (March 21, 1999). "New Pollution-Agency Chief Was at Center of Cleanup Flap". Star Tribune.
- (March 3, 2013). "A Disaster Brought Awareness but Little Action on Infrastructure". The New York Times.
- "I-35W bridge had problems during initial construction". Roads & Bridges.
- Cavanaugh, Patricia. (October 2006). "Politics and Freeways: Building the Twin Cities Interstate System". Center for Urban and Regional Affairs and Center for Transportation Studies, [[University of Minnesota]].
- Brandt, Steve. (August 7, 2007). "Rangers Describe Bridge Collapse Scene this Afternoon". Star Tribune.
- Petroski, Henry. (August 4, 2007). "Learning from Bridge Failure: Collapses Such as the I-35W in Minneapolis Give Engineers the Best Clues about What Not to Do. Let's Hope the Lessons Are Remembered". [[Los Angeles Times]].
- Costello, Mary Charlotte. (2002). "Climbing the Mississippi River Bridge by Bridge, Volume Two: Minnesota". Adventure Publications.
- (August 1, 2007). "At Least 7 Dead in I-35 Bridge Collapse". [[WCCO-TV]].
- (August 2, 2007). "U.S. Officials Urge Quick Inspections of Bridges Similar to Minneapolis Span". [[CJAD]]-AM.
- (August 2, 2007). "Interstate 35W Mississippi River Bridge Fact Sheet". Minnesota Department of Transportation.
- (2006). "Fatigue Evaluation and Redundancy Analysis, Bridge 9340 I-35W over Mississippi River". Minnesota Department of Transportation.
- (2007). "35W bridge collapse: fact sheet". Science Museum of Minnesota.
- (June 18, 1965). "Construction Plan for Bridge No. 9340". Minnesota Department of Transportation.
- Blake, Laurie. (February 3, 1996). "February Deep Freeze: Black Ice Makes I-35W Bridge Treacherous". Star Tribune.
- von Sternberg, Bob. (December 27, 1996). "Minnesota Is One Big Deep Freeze: What Is the Sound of a Cold Record Shattering? It's the Sound of Silence from Dead Motors, of Crumpling Metal on Icy Roads, of Resigned Grumbling. But Take Heart—It Will Warm Up". Star Tribune.
- Blake, Laurie. (January 21, 1999). "State Hopes to Speed Up North-Metro Lane Project: But It Clashes with Met Council over Whether Addition to Interstate Should Be for Car Pools". Star Tribune.
- Blake, Laurie. (October 19, 1999). "I-35W Bridge Getting De-Icer System: Unit Will Target Ice Before It Can Form". Star Tribune.
- "I-35W & Mississippi River Bridge Anti-Icing Project". Minnesota Department of Transportation.
- Blake, Laurie. (January 13, 2000). "Met Council Will Survey Our Citizens' Travel Habits: Study Will Include Trip Numbers and Times, Speed of Drivers and Waits at Ramp Meters". Star Tribune.
- Blake, Laurie. (February 3, 2000). "Richfield May Face Traffic Challenges: How Will I-494 Accommodate Best Buy's 5,000 Commuters?". Star Tribune.
- "De-Icing Chemical May Have Corroded 35W Bridge". WCCO-TV.
- (August 9, 2007). "Falling Down". City Pages.
- When a crack forms in a metal structure, holes (called "drill stops", "stop holes", or "crack arrest holes") are sometimes drilled at the ends of the crack in order to spread the stress that is causing the crack and thus prevent the crack from spreading. See, for example: Sanati, Laurence (2015) "Improved guidelines for the drill stop-hole retrofit method of steel structures," M.S. thesis (Civil Engineering: Structural engineering), California State University (Sacramento, California). Available on-line at: [http://csus-dspace.calstate.edu/handle/10211.3/139504 Sacramento State Scholarworks]
- (March 2001). "Fatigue Evaluation of the Deck Truss of Bridge 9340". Minnesota Department of Transportation.
- (August 2, 2007). "Hopes Dim in Minneapolis for Survivors". MyWay.
- "Bridge Inspection Report 06–10–05". Minnesota Department of Transportation.
- "Bridge Inspection Report 06–15–06". Minnesota Department of Transportation.
- Pawlenty, Tim. "Interview With Minn. Gov Pawlenty". [[Fox News]].
- Dedman, Bill. (August 3, 2007). "I-35 Bridge Was Rated among the Nation's Worst". [[NBC News]].
- (August 20, 2007). "Phone Call Put Brakes on Bridge Repair". Star Tribune.
- (August 1, 2007). "35W Bridge Collapses". [[KARE-TV]].
- (July 31, 2007). "I-35W Will Narrow to One Lane in Minneapolis over Two Nights, July 31 and August 1". Minnesota Department of Transportation.
- (August 3, 2007). "Fifth Body Recovered After Bridge Collapse". ABC News.
- Van Hampton, Tudor. (August 6, 2007). "NTSB: Bridge Contractor Had Prior I-35W Experience". Engineering News Record.
- Hoppin, Jason. (August 23, 2007). "Bridge Probe Turns to Anti-Ice System". Pioneer Press.
- Stachura, Sue. (August 5, 2007). "Northern End of I-35W Bridge Is Now Focus of Probe". Minnesota Public Radio.
- (November 14, 2008). "Highway Accident Report: Executive Summary". [[National Transportation Safety Board]].
- (August 2, 2007). "Survivors Describe Terror as Bridge Collapsed". [[CNN]].
- (August 1, 2007). "I-35W Bridge Collapses". Star Tribune.
- (August 1, 2007). "35W Bridge over Mississippi Collapsed". [[KSTP-TV]].
- (August 2, 2007 }}{{full citation needed). "Investigators in Bridge Collapse Focus on Chilling Video". [[Chicago Tribune]].
- (2007-08-02). "Corps adjusts river level to ease recovery efforts". [[Star Tribune]].
- (August 2, 2007). "Video Captures Bridge Collapse". CNN.
- (August 2, 2007). "CNN Gets Beat on Video of Collapse". [[WTOP-FM]].
- (December 2011). "Camera Captures Bridge Moments after Collapse". KARE-TV }}{{dead link.
- (August 7, 2007). "Minneapolis Responds". City of Minneapolis.
- "Governor Pawlenty Declares Peacetime Emergency, Activates State Emergency Operations Center". Office of the Governor of Minnesota.
- (August 3, 2007). "Minneapolis City Council Official Proceedings (Resolution 2007R-418)". City of Minneapolis.
- (August 2, 2007). "Latest on Deadly Minneapolis Bridge Collapse". USA Today.
- Williams, Brandt. (August 4, 2007). "Bush Surveys Collapsed Minnesota Bridge, Pledges to Help Cut Red Tape in Rebuilding". Minnesota Public Radio.
- (August 7, 2007). "Transcripts". CNN.
- "Remembering the Dead". Minnesota Public Radio.
- Pelsuo, Paul. (August 24, 2007). "Minneapolis Assistant Chief Speaks about Bridge Collapse at FRI". Firehouse.com News.
- (March 2023}} five at HCMC and four or five at North Memorial Medical Center in [[Robbinsdale, Minnesota]].{{cite news). "Governor Orders Inspection of All Minn. Bridges". [[KCBS-TV]].
- Thompson, Cheryl A.. (August 17, 2007). "Calm, Steady Hospital Care Shines During Bridge Disaster". Minnesota Hospital Association.
- (August 2, 2007). "Freeway Bridge Collapses into River During Rush Hour in Minneapolis". Star Tribune.
- (August 1, 2007). "Minneapolis Bridge Collapses, Seven Dead". [[The Age]].
- Peiken, Matt. (August 7, 2007). "Paul Eickstadt". Minnesota Public Radio.
- Barry, Ellen. (August 3, 2007). "Stunned Victim Turns Hero". [[The New York Times]].
- (August 2, 2007). "School Kids on Crashed Bus Reunited with Families". Star Tribune.
- (August 2, 2007). "Vignettes from Minn. Bridge Collapse". Hennepin County, Minnesota.
- Roy, Sandy Colvin. (August 20, 2007). "Guest Column: Planning Helped Minneapolis Respond to Bridge Collapse". Nation's Cities Weekly.
- Reichardt, Carson J. S.. (August 1, 2022). "Ankeny fire chief remembers Minneapolis bridge collapse on its 15th anniversary: James Clack started working for the Minneapolis Fire Department in 1986 before leaving in 2008.". [[WOI-DT.
- (August 1, 2007). "Divers Searching for Victims in Bridge Collapse". [[Orange County Register]].
- (August 3, 2007). "Difficult Conditions Hamper River Search". [[The Washington Post]].
- Horwich, Jeff. (August 2, 2007). "Recovery Effort Cautious, Deliberate". [[Minnesota Public Radio]].
- Kyle, Susan Nicol. (August 3, 2007). "With Minor Exceptions, System Worked". Firehouse.com News.
- (August 19, 2007). "Planning Paid Off in Bridge Rescues". [[St. Paul Pioneer Press.
- Belton, Sharon Sayles. (November 8, 2001). "Minneapolis 2002 Budget Address". City of Minneapolis.
- (September 14, 2004). "County Board Actions: Hennepin Accepts Grants for Emergency Equipment and Training, 800 MHz Radio Projects". Hennepin County, Minnesota.
- Merriam, Elizabeth. (August 8, 2007). "MDSU-2 Arrives in Minneapolis Prepared to Help". Fleet Public Affairs Center Atlantic, United States Navy.
- Zdechlik, Mark. (August 7, 2007). "Navy, FBI Divers Arrive to Boost Minn. Bridge Collapse Effort: Pause Planned to Honor Victims". Minnesota Public Radio.
- (August 7, 2007). "Navy Divers Join US Bridge Effort". [[BBC News]].
- (August 8, 2007). "Feds: Construction Equipment Weight May Be Factor". WCCO.
- (August 20, 2007). "Sheriff Announces Recovery of Last Known Victim, Cites Team Effort". Hennepin County, Minnesota.
- (August 3, 2007). "Rochester-Area Professionals, Residents Offer to Help". [[Post-Bulletin]].
- Nienaber, Dan. (August 2, 2007). "Locals Stand By to Assist in Bridge Disaster". [[Mankato Free Press]].
- Arnoldy, Ben. (August 20, 2007). "Lending a Hand". Downtown Journal.
- U.S. Fire Administration/Technical Report Series I-35W Bridge Collapse and Response Minneapolis, Minnesota USFA-TR-166/August 2007, page 18
- A Newsletter of the Police Executive Research Forum, Vol. 21, No. 10. October 2007, Minneapolis Area Police Officials Describe, "Lessons Learned" from Bridge Collapse
- (August 8, 2007). "Flags Lowered to Half Staff at Red Cross Headquarters". American Red Cross Twin Cities Area Chapter.
- (August 18, 2007). "Search Continues for Last Bridge Collapse Victims". Post-Bulletin.
- (August 21, 2007). "Bush Declares Emergency, Debris Removal Begins". WCCO-TV.
- "Recovering Vehicles and Property from 35W Bridge". City of Minneapolis.
- "Interstate 35W Bridge Collapse". Minnesota Department of Transportation.
- (2016-08-23). "35W Bridge Parts Moved From Bohemian Flats". KSTP-TV.
- Davey, Monica. (August 2, 2007). "U.S. Secretary of Transportation Mary Peters Announces US$5 Million in Immediate Funding During Visit to Downed I-35 Bridge in Minneapolis". [[Federal Highway Administration]].
- Echols, Sara. (August 10, 2007). "U.S. Secretary of Transportation Mary Peters Announces US$50 Million in Immediate Emergency Relief for Minneapolis; US$5 Million for Transit". [[United States Department of Transportation]].
- Diaz, Kevin. (August 3, 2007). "Congress Puts Finishing Touches on $250 Million Emergency Rebuild Package". Star Tribune.
- Horwath, Justin. (August 8, 2007). "Federal, State Politicians Hasten to Help". [[The Minnesota Daily]].
- (August 10, 2007). "Transportation Secretary Announces Release of Some Federal Money ...". [[KXMB-TV]].
- (August 10, 2007). "Update: Divers Recover Another Body from Bridge Rubble". The St. Cloud Times.
- "What Went Wrong? NTSB Begins Probe of Bridge Collapse". CNN.
- Moylan, Martin. (August 8, 2007). "NTSB Sleuths Responsible for Finding Out Why the Bridge Collapsed". Minnesota Public Radio.
- Kaszuba, Mike. (December 20, 2007). "MnDOT to face another inquiry". Star Tribune.
- (August 8, 2007). "Police Arrest Intruders near Fallen Bridge, Boost Security". CNN.
- Kress, Rory. (August 3, 2007). "'Their Entire World's Come Unhinged'". [[The Jerusalem Post]].
- "NTSB Continues to Investigate Minneapolis Bridge Collapse". Southwest Nebraska News.
- Jackson, Henry C.. "Minn. Bridge Toll Far Less than Feared". [[San Francisco Chronicle]].
- Grossman, Ian. "U.S. Secretary of Transportation Mary E. Peters Calls on States to Immediately Inspect All Steel Arch Truss Bridges". Federal Highway Administration.
- (August 8, 2007). "Update on NTSB Investigation of Collapse of I-35W Bride in Minneapolis". National Transportation Safety Board.
- (August 8, 2007). "Potential Flaw Is Found in Design of Fallen Bridge". The New York Times.
- Cambridge Systematics. (June 2006). "Minnesota Truck Size and Weight Project". Minnesota Department of Transportation.
- (January 11, 2008). "Adequacy of the U10 & L11 Gusset Plate Designs for the Minnesota Bridge No. 9340 (I-35W over the Mississippi River)". National Transportation Safety Board.
- (January 15, 2008). "Safety Recommendation H-08-1". National Transportation Safety Board.
- Williams, Terry. (March 17, 2008). "Fifth Update: Investigation into Collapse of I-35 Bridge". National Transportation Safety Board.
- Kennedy, Tony. (March 23, 2008). "Old Photos Show Flaws in Steel of I-35W bridge". Star Tribune.
- Stachura, Sea. (November 12, 2008). "Despite Final NTSB Report, Some Still Have Questions". Minnesota Public Radio.
- Lohn, Martiga. (November 29, 2007). "Emergency Aid Approved for Minnesota Bridge Collapse Victims". [[The Dickinson Press]].
- Lohn, Martiga. (May 2, 2008). "Minnesota Inks Deal with Bridge Victims". CBS News.
- Qualters, Sheri. (August 26, 2010). "Q&A: Pro Bono Consortium of 17 Firms Led to Settlement over Minneapolis Bridge Collapse". Law.com.
- James, Frank. (August 23, 2010). "Last Minneapolis Bridge Collapse Lawsuit Settled For $52.4 Million". NPR.
- Melo, Frederick. (August 1, 2011). "Four Years after I-35W Bridge Collapse, a Community Remembers Disaster's Victims". Pioneer Press.
- (May 29, 2012). "Supreme Court Lets State's Claims Go Forward Against Design Firm in Minn. Bridge Collapse". The Washington Post.
- (November 14, 2012). "Minn. Settles last case in I-35W bridge disaster".
- (August 1, 2007). "Coast Guard Responds to Minnesota Interstate Bridge Collapse". [[United States Coast Guard]].
- (August 3, 2007). "Verbal Confirmation of Correct Mile Markers from USCG Personnel". United States Coast Guard.
- Dulek, Amber. (August 3, 2007). "Bridge Collapse Unlikely to Affect River Traffic". [[Winona Daily News]].
- (August 2, 2007). "NOTAM Number: FDC 7/0805". [[Federal Aviation Administration]].
- Wyant, Carrissa. (September 10, 2007). "Bridge Collapse Forces Layoffs". [[Minneapolis/St. Paul Business Journal]].
- Wyant, Carissa. (August 24, 2007). "SBA Offers Loans for Businesses Affected by Bridge Collapse". Minneapolis/St. Paul Business Journal.
- Preston, Steven C.. (August 24, 2007). "SBA Offers Disaster Assistance to Minnesota Businesses Economically Affected by the Collapse of Interstate 35W Bridge". PRNewswire-USNewswire.
- Anderson, G.R. Jr.. (September 5, 2007). "Economy in Freefall". City Pages.
- Cormany, Diane L.. (January 4, 2008). "Small Retailers Struggle to Survive Bridge Collapse". [[MinnPost]].
- Stiles, Ed. (August 3, 2007). "UA Engineers to Help Ease Traffic Woes Following Minneapolis Interstate Bridge Collapse". [[University of Arizona]].
- (August 2, 2007). "Transit Alternatives to I-35W". WCCO-TV.
- (August 5, 2007). "Mn/DOT to Further Open Northbound, Southbound I-35W Openings to Improve Traffic Flow and Local Access". Minnesota Department of Transportation.
- Morrissey, Ed. (January 15, 2008). "Bridge Collapse Caused by Design Flaw, Not Maintenance". Captains's Quarters.
- Weber, Tom. (April 1, 2008). "State's Gas Tax Goes Up Today". Minnesota Public Radio.
- (August 1, 2007). "Twins Postpone Thursday's Game after Bridge Collapses near Metrodome". [[ESPN]].
- Campbell, Dave. (August 3, 2007). "Twins Back at It, with Bridge on Minds". USA Today.
- Ariens, Chris. (August 1, 2007). "Bridge Collapse: Cable Net Coverage". [[TV Newser]].
- Preston, Rohan. (August 2, 2007). "Disaster Draws Biggest Names in News Media to Twin Cities". Star Tribune.
- Strupp, Joe. (August 3, 2007). "IRE Gets Most Inquiries Ever for Bridge Data". [[Editor & Publisher]].
- (August 7, 2007). "County Board Asks Governor to Declare Hennepin a Disaster Area". Hennepin County, Minnesota.
- Condon, Patrick. (August 21, 2007). "Bush Approves More Bridge Collapse Aid". Philly Online.
- (August 23, 2007). "Governor Pawlenty, Homeland Security Secretary Chertoff Announce Presidential Disaster Declaration for Three Counties Impacted by Flooding". Office of the Governor of Minnesota.
- Feller, Ben. (August 21, 2007). "Bush Updated on Bridge Collapse". The Washington Post.
- Vezner, Tad. (August 21, 2007). "35W Bridge Collapse / 13th, Final Victim Recovered". Pioneer Press.
- Hoppin, Jason. (August 21, 2007). "Recovery Ends, Rebuilding Begins". Pioneer Press.
- (August 21, 2007). "Statement on Federal Disaster Assistance for Minnesota". The White House, Office of the Press Secretary.
- (August 21, 2007). "Federal Aid Programs for Minnesota Emergency Disaster Recovery". Federal Emergency Management Agency.
- Scheck, Tom. (August 7, 2007). "Rebuild May Begin in September". Minnesota Public Radio.
- Lohn, Martiga. (September 19, 2007). "Rich Contract Awarded for I-35W Bridge Replacement". Minnesota Public Radio.
- Gutknecht, Kevin. (September 15, 2008). "Mn/DOT to Open I-35W St. Anthony Falls Bridge to Traffic at 5 a.m. Thursday, Sept. 18". Minnesota Department of Transportation.
- "2009 Design-Build Award Competition Winners". Design-Build Institute of America.
- Martin, Rachel. (August 6, 2007). "Minneapolis Holds Prayer Service for Bridge Victims". [[NPR]].
- Hult, Karla. (August 8, 2007). "National Night Out Turns into Moment of Remembrance". KARE-TV.
- (March 2023}} [[Gold Medal Park]] near the [[Guthrie Theater]] was a gathering place for those who wished to leave flowers or remembrances for those who died.{{cite news). "Making Memorials". Downtown Journal.
- VanDerVeen, Kari. (August 20, 2007). "Mayor Calls for Special Legislative Session". Downtown Journal.
- "Interstate 35W Bridge in Minneapolis". Minnesota Department of Transportation.
- Stocks, Anissa. "Park Board Approves Site for I-35W Bridge Memorial". Minnesota Public Radio.
- "I-35W Bridge Collapse Memorial to Be Dedicated". StarTribune.
- "35W Remembrance Garden Fund". Minneapolis Foundation.
- "Work Begins on Remembrance Garden for I-35W Bridge Collapse Victims". City of Minneapolis.
- Berg, Steve. "In New Setting along the River, Remembrance Garden Will Command More Visibility, More Meaning". MinnPost.
- "I-35W Bridge Remembrance Garden". Oslund and Associates.
- Olson, Dan. "Hundreds Turn Out to Dedication of 35W Bridge Memorial". Minnesota Public Radio.
- (May 16, 2008). "Osmo Vanska composes a musical 'bridge'". MPR News.
- Riemenschneider, Chris. (2008-02-17). "Musicians band together for I-35W benefit CD". [[Star Tribune]].
- "[http://www.startribune.com/readers-i-35w-bridge-poems-inspire/164903976/ Readers' I-35W bridge poems inspire]". ''Minneapolis Star Tribune'', August 3, 2012.
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about I-35W Mississippi River bridge — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account