From Surf Wiki (app.surf) — the open knowledge base
Houston Energy Corridor
| Field | Value |
|---|---|
| name | Energy Corridor |
| settlement_type | Business district of Greater Houston |
| image_skyline | File:BPAmericasHQ.JPG |
| imagesize | 250px |
| image_caption | Westlake Park, which contains the BP Americas headquarters |
| coordinates | |
| subdivision_type | Country |
| subdivision_name | United States United States |
| subdivision_type1 | State |
| subdivision_type2 | County |
| subdivision_name1 | Texas Texas |
| subdivision_name2 | Harris |
| government_footnotes | |
| government_type | County Improvement District |
| governing_body | Harris County Improvement District #4 (Energy Corridor Management District) |
| population_footnotes | |
| population_est | 22034 |
| pop_est_as_of | 2016 |
| website | energycorridor.org |
The Energy Corridor is a business district in Houston, Texas, located on the west side of the metropolitan area between Beltway 8 and the Grand Parkway. The district straddles a 7 mi stretch of Interstate 10 (the Katy Freeway) from Kirkwood Road westward to Barker Cypress Road and extends south along Eldridge Parkway to Briar Forest Drive. Parts of the district overlap with the Memorial area of Houston. The district is located north of Westchase, another major business district of Houston, and east of Greater Katy.
Many energy sector companies have major operations in the Energy Corridor, including BP America, Citgo, ConocoPhillips, Nouryon and Shell Oil Company. Non-energy firms also have a presence; Sysco and Gulf States Toyota Distributors are both headquartered in the district. The Energy Corridor contains over 26 e6ft2 of office space, with an employment capacity of over 105,000.
Over 26,000 acres of urban park area borders the Energy Corridor, including George Bush Park and Bear Creek Pioneers Park. These parks are located within Barker Reservoir and Addicks Reservoir, respectively, which comprise a major flood control system for Buffalo Bayou.
History
Energy industry corporations began moving to west Houston in the 1970s, seeking land for suburban office campuses and proximity to new housing developments.
Browning-Ferris Industries (BFI) had its headquarters in the district until its acquisition by Allied Waste in 2000.
In 2001, the Texas Legislature created the 1700 acre Energy Corridor Management District. In Texas, management districts are special government entities empowered to levy commercial taxes within their boundaries to support investments in infrastructure, urban planning, district branding and advertising, and public safety. Since then, the district has been actively involved in the creation of new infrastructure in the area, including road widening and the addition of bicycle lanes and sidewalks, and operates an extensive tree-planting and beautification program.
Between 2001 and 2013, the district more than tripled its total property value, from $600 million to over $2 billion. The amount of new office space added to the Energy Corridor between 2005 and 2015 is equivalent to the amount added during the preceding three decades. However, the 2010s oil glut put a damper on this growth, causing office and apartment vacancy rates in the area to rise significantly. Despite this slowdown, the district saw a significant increase in hospital construction during the mid-2010s, including new facilities for Texas Children's Hospital, Houston Methodist Hospital, and the M.D. Anderson Cancer Center.
ExxonMobil operated a large chemical facility in the district until 2013, when it consolidated operations in its new corporate campus in Spring.
The Energy Corridor experienced extensive inland flooding from Hurricane Harvey in August and September 2017 after historic rainfall exceeded the retention capacity of the Addicks and Barker reservoirs. The United States Army Corps of Engineers was forced to maximize discharge out of the reservoirs into Buffalo Bayou to protect the structural integrity of the dams, causing extensive downstream flooding of residential and commercial areas throughout the district, particularly along the Eldridge Parkway corridor.
Economy
| Company | Employment |
|---|---|
| Wood Group | 10,960 |
| BP | 9,537 |
| Technip USA, Inc. | 4,300 |
| ConocoPhillips | 3,000 |
| Shell Oil Company | 3,000 |
| Baker Hughes | 3,000 |
| Endbridge | 3,000 |
| Flour Daniels | 3,000 |
Historically, the Energy Corridor has been one of Houston's strongest office markets.
The district is the second-largest employment center in the region with more than 94,000 employees and over 300 companies.
The Energy Corridor is home to the national or international headquarters of the following companies:
- Becks Prime
- BP America at Westlake Park
- ConocoPhillips
- Citgo
- Equinor
- Foster Wheeler
- Gulf States Toyota
- McDermott International
- PCL Construction
- SBM Offshore USA
- Sysco
- Technip USA
- Wood Group
- WorleyParsons
- Kiewit Corporation
- Enbridge Energy US [Relocated US corporate office in July 2022]
Shell Oil Company, the fifth-largest employer in the Energy Corridor, operates a large campus in the district. Dow Chemical Company and Sonangol USA have offices in the area.
Transportation

The Metropolitan Transit Authority of Harris County, Texas (METRO) provides public transportation to the area. Line 75, originally known as the Energy Corridor Connector, operates during weekdays. Commuters from Downtown Houston and Midtown Houston can connect to the 75 connector via 228 Addicks and 229 Kingsland/Addicks through the Addicks Park and Ride. The 75 connector also connects with routes along Westheimer Road and Memorial Drive. In January 2011, the name of the route was changed to 75 Eldridge Crosstown, and the southern terminus of the line was extended to Mission Bend Park and Ride, enabling more convenient connections with the Westchase district and the New Chinatown area.

Two general aviation airports serve the Energy Corridor: West Houston Airport, near Addicks Reservoir, and Houston Executive Airport in unincorporated Waller County. The latter was built to serve employees of firms in the Energy Corridor.
Two-thirds of the district's employees live within a "commute zone" spread across northern Fort Bend County, western Harris County, and southern Waller County.
Education
Public schools
The southern, western and eastern areas of the Energy Corridor are served by Houston Independent School District, Katy Independent School District, and Spring Branch Independent School District, respectively.
Houston ISD residents are zoned to Ray K. Daily Elementary School, West Briar Middle School (with Revere Middle School, a STEM Magnet, as an option), and Westside High School. Residents zoned to Westside may transfer to Lamar High School.
Katy ISD residents are zoned to Wolfe Elementary School, Mayde Creek Junior High School, Mayde Creek High School, Memorial Parkway Junior High School, and James E. Taylor High School.
Spring Branch ISD residents are zoned to Nottingham Elementary School, Spring Forest Middle School, and Stratford High School.
Private schools
The Village School is near the Energy Corridor. In 2016, the British International School of Houston opened in Greater Katy to serve the district's large population of British expatriates.
Public libraries
The Houston Public Library operates the Kendall Neighborhood Library on Eldridge Parkway.
Of all HPL branches the Kendall Library received the most severe damage during Hurricane Harvey in 2017; the damage, which affected the electronic system and elevator, but not most of the books as the majority were on the library's second floor, included mold and was so severe that HPL employees re-entered the branch several days after the flood. The total level of water ranged from 4.5 ft to 5 ft. The library afterward enacted a $4 million project post-Harvey renovation program with a tentative 2019 opening.
Parks and recreation
The Energy Corridor is intersected by Terry Hershey Park, a linear park which runs east to west along Buffalo Bayou from Beltway 8 to Barker Reservoir. The district is connected to a wider trail system by trailheads at the intersection of Eldridge and Enclave and at Mayde Creek as it passes under Interstate 10. These trails connect the district to George Bush Park to the southwest.
Ray Miller Park, a neighborhood park, is located at the southern end of the district on Eldridge Parkway.
In 2015 Energy Corridor Cricket, a children's cricket club, was established.
Notes
References
- (2016). "The Energy Corridor District: Land Use and Demographics". The Energy Corridor District.
- Begley, Dug. (2014-10-03). "Energy Corridor a hotbed of car-free transportation planning".
- "Parks and Recreation in the Energy Corridor".
- "History of the Houston Energy Corridor".
- "[https://web.archive.org/web/19990428042302/http://www.bfi.com/ Welcome to BFI]." Browning-Ferris Industries. April 28, 1999. Retrieved on February 8, 2010.
- Jones, Allen. (5 August 2014). "Extensive tree program gets kudos for Energy Corridor". Houston Chronicle.
- (23 May 2001). "SB 1226".
- "Municipal Management Districts". Allen Boone Humpheries Robinson LLP.
- Meeks, Flori. (2 April 2013). "Construction powers Energy Corridor". Houston Chronicle.
- Baird, Annette. (3 January 2014). "Corridor booming as it expands west". Houston Chronicle.
- Herrera, Sebastian. (1 March 2016). "Oil crisis to increasingly affect non-energy markets in West Houston". Houston Chronicle.
- Asgarian, Roxanna. (28 August 2015). "The Energy Corridor's hurting, but there's one bright spot for commercial development".
- Sarnoff, Nancy. (17 April 2013). "Exxon takes Energy Corridor property to market". Houston Chronicle.
- "Flood Waters Could Continue to Cover Memorial for Weeks". Houstonia.
- Sarnoff, Nancy. "[http://houston.bizjournals.com/houston/stories/2000/10/23/story6.html Atlanta REIT buys former BFI buildings]." ''[[Houston Business Journal]]''. Friday October 20, 2000. Retrieved on February 8, 2010.
- "Business Development".
- "[http://www.energycorridor.org/maps/documents/locations-listing.pdf Locations Listing] {{webarchive. link. (2009-02-27 ." Energy Corridor. Page 2/3. Retrieved on April 5, 2010.)
- "[http://www.window.state.tx.us/filelib/stp09-21.csv stp09-21.csv] {{Webarchive. link. (2011-09-28 ." [[Texas Comptroller of Public Accounts]]. Retrieved on April 5, 2010.)
- Smith, Cara. (29 November 2016). "ConocoPhillips scraps sublease plans; will relocate Houston HQ to Energy Center 4".
- Sarnoff, Nancy. (8 June 2004). "Citgo chooses west Houston Energy Corridor digs". Houston Chronicle.
- "Foster Wheeler USA Corporation: Private Company Information".
- "[https://www.forbes.com/lists/2010/21/private-companies-10_Gulf-States-Toyota_5FC5.html #76 Gulf States Toyota]." ''[[Forbes]]''. Retrieved on April 30, 2014. "1375 Enclave Parkway Houston TX 77077"
- "[http://www.energycorridor.org/sites/ecd/media/Energy-Corridor-MD-2013_Report.pdf 2013 Inventory and Database CDS Market Research]" ([https://web.archive.org/web/20131227195239/http://www.energycorridor.org/sites/ecd/media/Energy-Corridor-MD-2013_Report.pdf Archive]). Energy Corridor. p. 1 (Boundary Map). Retrieved on April 30, 2014.
- "Corporate Offices". McDermott International.
- "Houston – Industrial Construction". PCL Construction.
- "Largest Employers: SBM Offshore USA".
- "Sysco Corporation Headquarters". Hines.
- "Technip USA profile".
- "Wood Group Mustang (Westgate III) Headquarters Building".
- (March 2009). "WorleyParsons Moves Headquarters to Energy Corridor".
- (March 2009). "Engineering co.'s oil and gas division leases half of Energy Corridor building".
- [https://web.archive.org/web/20090227011629/http://www.energycorridor.org/maps/documents/locations-listing.pdf Map] (). ''Energy Corridor''. Retrieved on February 5, 2009.
- "[http://www.energycorridor.org/business/documents/2009ECDFinalReport.pdf Land Use and Demographics]{{Dead link. (September 2018)
- Dawson, Jennifer. (9 January 2008). "Dow Center to relocate to Energy Corridor". Houston Business Journal.
- "[http://www.sonangol-usa.com/contact_en.shtml Contact Information] {{webarchive. link. (2011-07-20 ." [[Sonangol USA]]. Retrieved on August 6, 2011. "1177 Enclave Parkway 2nd floor Suite 200 Houston, TX 77077 ")
- "[http://www.ridemetro.org/SchedulesMaps/Pdfs/Schedule%20Changes/075energycorridor.pdf 75 Energy Corridor Connector] {{Webarchive. link. (2011-07-20 ." [[Metropolitan Transit Authority of Harris County, Texas]]. Retrieved on January 23, 2010.)
- "[http://www.bizjournals.com/houston/stories/2010/01/18/daily40.html?ana=tt3245 New Metro line to serve Energy Corridor]." ''[[Houston Business Journal]]''. January 22, 2010. Retrieved on January 23, 2010.
- Lee, Renée C., Helen Eriksen, Eric Hanson, Ruth Rendon, Harvey Rice, and Richard Stewart. "[http://www.chron.com/CDA/archives/archive.mpl?id=2007_4367300 TRANSPORTATION / A flurry of airport expansions in the Houston region can serve corporate customers who don't like the hassles of airline travel]." ''[[Houston Chronicle]]''. Sunday June 17, 2008. Business 1. Retrieved on October 18, 2009.
- (March 2009). "Land Use and Demographics". Energy Corridor District.
- "About Houston Energy Corridor".
- "[http://dept.houstonisd.org/ab/schoolboundarymaps/DailyES.pdf Daily Elementary Attendance Zone] {{Webarchive. link. (2009-02-06 ." ''[[Houston Independent School District]]''.)
- "[http://dept.houstonisd.org/ab/schoolboundarymaps/WestBriarMS.pdf West Briar Middle Attendance Zone] {{webarchive. link. (2012-02-08 ." ''[[Houston Independent School District]]''. Retrieved on February 5, 2009.)
- "[http://dept.houstonisd.org/ab/schoolboundarymaps/WestsideHS.pdf Westside High School Attendance Zone] {{Webarchive. link. (2017-12-17 ." ''[[Houston Independent School District]]''. Retrieved on February 5, 2009.)
- link. (2017-07-06 ." [[Houston Independent School District]]. Retrieved on July 6, 2017. "Students zoned to this campus are eligible to apply for a Boundary Option Transfer to Lamar High School")
- (2016). "Katy ISD Schools and Facilities 2016–2017".
- "Campus Attendance Maps".
- "About Our Boarding School". [[The Village School (Houston).
- Kirk, Bryan. "[http://www.houstonchronicle.com/neighborhood/katy/news/article/Katy-area-campus-set-to-open-in-fall-16-6316361.php#photo-8122390 Katy-area campus set to open in fall '16]." ''[[Houston Chronicle]]''. June 9, 2015. Retrieved on September 11, 2015.
- (March 2009). "Energy Corridor to get a Kendall Neighborhood Library and Community Center". Energy Corridor District.
- Ward, Alyson. (2018-07-19). "Nearly a year after Harvey's floods, six Houston libraries remain shuttered — some indefinitely". [[Houston Chronicle]].
- "Energy Corridor Bikeways Map".
- Jones, Allen. (5 May 2015). "The Energy Corridor proposes 'Central Park' project". [[Houston Chronicle]].
- Kadifa, Margaret. (2016-03-22). "'Cricket' isn't a bug to this group of youngsters". [[Houston Chronicle]].
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Houston Energy Corridor — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report