From Surf Wiki (app.surf) — the open knowledge base
High-speed rail in India
none
none
, India does not have any operational high-speed rail lines capable of supporting more than 200 kph. Currently, the highest speed is achieved by the Bhopal Shatabdi Express, Gatiman Express, Bhopal Vande Bharat Express and Khajuraho Vande Bharat Express on the TughlakabadAgra section and the regional Namo Bharat services with peak operational speed of 160 kph.
Indian Railways operates India's railway system and comes under the purview of the Ministry of Railways of Government of India. , it maintains over 108,706 km of tracks and operates over 13,000 trains daily. According to the Ministry of Railways, a route capable of supporting trains operating at more than 160 kph is considered as a higher speed or semi-high speed rail line.
Earlier steam locomotive operated trains largely operated below 100 kph. With the introduction of electric locomotives in the later 1920s and newer steam locomotives, speeds of 100 kph were achieved. With the movement to AC traction in the late 1950s and introduction of diesel locomotives, commercial speeds of up to 120 kph was achieved in the late 1960s. With the introduction of high power electric locomotives in the 1990s, operating speeds of 130 kph was achieved with further developments leading to speeds of maximum speeds of 160 kph being realized in the early 2010s. Vande Bharat, an Electric Multiple Unit (EMU), introduced in 2018, is the fastest operational train-set and is capable of reaching 183 kph.
.jpg)
The first high-speed railway corridor between Mumbai and Ahmedabad of about 508 km is currently under construction with a designed maximum operational speed of 350 kph and is expected to be operational fully by 2028-29. As of 2023, eight such corridors have also been proposed.
History

The history of the Indian Railway began in 1832 with the proposal to construct the first railway line in India at Madras. In 1837, the first train ran on Red Hill railway line between Red Hills and Chintadripet in Madras and was hauled by a rotary steam engine imported from England. In 1853, the first passenger train ran between Bombay and Thane which covered a distance of 54 km in 57 minutes, averaging a speed of 57 kph. Earlier trains ran using steam locomotives, where barely reached speeds of 90 kph. With the introduction of WP class locomotives in 1947, speeds of 100 kph were operated commercially. While the first electric train ran in Bombay in 1925 on DC traction, WCP-1 class electric locomotives were introduced in 1928, capable of speeds of up to 137 kph, though trains operated at lower speed. WDM-1, the first diesel locomotive introduced in 1957 was capable of speeds of up to 104 kph. In 1957, Indian Railways adopted 25 kV 50 Hz AC traction with the first runs beginning in December 1959 with the WAM-1 locomotives, capable of reaching speeds of up to 112 kph.

In 1960, the Railway Board of India commissioned a study to increase the speed of its trains, which was restricted to 96 kph on the existent broad gauge lines. A target of 160 kph with an intermediate stage of 120 kph was set for passenger trains. Research Design and Standards Organisation (RDSO) started work on the same in 1962 with field trials commencing in 1967. The coaches were manufactured by the Integral Coach Factory at Madras and hauled by diesel locomotives. On 19 February 1969, the Government of India announced the introduction of a new express train capable of reaching speeds of up to 120 kph in the railway budget. On 1 March 1969, the first Rajdhani Express was flagged off from New Delhi to Howrah, which reached a maximum speed of 120 kph and completed the 1450 km trip in 17 hours 20 minutes at an average speed of 84 kph.
In 1980, the WAP-1 electric locomotives reached a speed of 130 kph. Shatabdi Express introduced in 1988, were capable of running at a maximum speed of 130 kph. WAP-5 class locomotives, initially imported from ABB in 1995 and later manufactured at Chittaranjan Locomotive Works in India, reached 184 kph in trials. The locomotive later set an Indian speed record by hauling a train between Delhi and Agra at a speed of 160 kph in 2014. In December 2009, the Ministry of Railways of Government of India envisaged the implementation of regional high-speed rail projects to provide services at 250–350 kph, and planning for corridors connecting commercial, tourist, and pilgrimage hubs. On 25 July 2013, Government of India established the High Speed Rail Corporation under Rail Vikas Nigam (RVNL) for the implementation of high-speed rail corridor projects. In 2014, the Diamond Quadrilateral high speed rail project, which would connect the cities of Chennai, Delhi, Kolkata and Mumbai via high-speed rail was approved by the government.

In April 2016, the WAP-5 hauled Gatimaan Express became the fastest commercial train in India, with a maximum operational speed of 160 kph. In 2018, a modified WAP-5A locomotive, capable of speeds up to 200 kph was rolled out. HSRC was renamed as National High Speed Rail Corporation (NHSRC) in 2016. NHSRC identified eight corridors for the development of high speed railway. Construction of the Mumbai–Ahmedabad high-speed rail corridor, India's first high-speed rail corridor started in 2021 and is expected to be operational by 2028.
In 2018, Integral Coach Factory in Chennai, rolled out a semi-high-speed EMU train-set, capable of reaching 180 kph. In 2019, the first Vande Bharat Express entered commercial service with a maximum operational speed of 160 kph. The actual operating speed was much lower due to track restrictions and congestion with top speeds restricted to 130 kph for most trains. In October 2023, Namo Bharat, built for RapidX by Alstom was launched and is capable of reaching speeds of up to 180 kph. In December 2023, two modified WAP-5 locomotives were used to haul the Amrit Bharat train-set in a push-pull configuration, capable of reaching speeds of up to 160 kph.
In June 2024, the Indian Government announced that rather than purchase the now legacy E5 Series Shinkansen sets, contracted, in 2016, for the Mumbai-Ahmedabad High-Speed Rail corridor, its own, government owned, Integral Coach Factory and BEML, would produce a pair of standard gauge trains, capable of a maximum operational speed of 250 kph, for the line. The first prototype is expected to be delivered in December 2026.
In April 2025, it was reported that Japan will gift India two retired engineering train sets, one, 2011, E5 - (Doctor Yellow), and the, 2001, E3 - Class E926 Shinkansen, to help test and inspect the under-construction Mumbai-Ahmedabad High-Speed Rail corridor. The two train sets are to be delivered in 2026, to aid the 2027-2028 commissioning of the line. The gifted Doctor Yellow will have a maximum operational speed of 285 kph. It was also reported that the Indian Government has a desire to purchase E10 Series Shinkansen for the corridor.
Definition
According to the Ministry of Railways, a route where train can operate between 160-200 kph is considered as a higher speed or semi-high speed rail line, while the routes operating at less than 160 kph are considered to be conventional rail lines. According to the International Union of Railways (IUC), a commercial speed of over 250 kph for a newly built line or 200 kph for an upgraded line is considered to be high-speed.
| Speed | Type | Length | ||
|---|---|---|---|---|
| 200 kph | High-speed | 508 km | ||
| 160-200 kph | Semi-high-speed | {{sum | 174 | 55}} km |
| 130-160 kph | Group A | 67869 km | ||
| 110-130 kph | Group B | |||
| Group C/D/E |
Network and infrastructure
High-speed rail
As of 2026, India does not have any operational high-speed tracks. In 2016, Ministry of Railways envisaged to have top speeds of 300–350 kph with trains running on elevated corridors to isolate high-speed train tracks to prevent trespassing. Multiple feasibility studies have been done and probable routes have been identified. In 2017, a 508 km standard gauge line between Mumbai and Ahmedabad was approved for construction and is expected to be operational by 2028.
| Corridor | Speed | Length | Gauge | Status | Year | Ref. | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Mumbai–Ahmedabad | 320 kph | 508.18 km | Standard | Under Construction | 2028 | |||||||
| Delhi–Ahmedabad | 320 kph | 886 km | Awaiting Approval | 2031 | url=https://www.business-standard.com/article/current-affairs/delhi-likely-to-get-2-stations-under-3-proposed-bullet-train-projects-121013100106_1.html | title=Delhi likely to get 2 stations under 3 proposed Bullet train projects | first=Anshu | last=Agarwal | newspaper=Business Standard India | date=31 January 2021 | access-date=1 December 2023}} | |
| Pune–Nashik | 200 kph | 235.15 km | Awaiting Approval | TBD | ||||||||
| Mumbai–Hyderabad | 350 kph | 711 km | Awaiting Approval | 2051 | ||||||||
| Mumbai–Nagpur | 320 kph | 736 km | Awaiting Approval | 2051 | ||||||||
| Thiruvananthapuram–Kannur | 200 kph | 430 km | Awaiting Approval | 2031 | ||||||||
| Delhi-Varanasi | 320 kph | 865 km | DPR Prepared | 2041 | ||||||||
| Varanasi–Howrah | 320 kph | 711 km | DPR under preparation | 2031 | ||||||||
| Delhi–Amritsar | 320 kph | 480 km | DPR under preparation | 2051 | ||||||||
| Chennai–Mysuru | 320 kph | 435 km | DPR under preparation | 2051 | ||||||||
| Chennai–Hyderabd | 350 kph | 744.57 km | DPR under preparation | TBD | ||||||||
| Hyderabad–Bengaluru | 320 kph | 618 km | Proposed | 2041 | ||||||||
| Nagpur-Varanasi | 320 kph | 855 km | Proposed | 2041 | ||||||||
| Amritsar–Jammu | 320 kph | 190 km | Proposed | 2051 | ||||||||
| Patna–Guwahati | 320 kph | 850 km | Proposed | 2051 | ||||||||
| Ahmedabad–Rajkot | 220 kph | 225 km | Proposed | TBD | ||||||||
| Mumbai–Pune | Announced in Budget 2026–27 | TBD | ||||||||||
| Pune–Hyderabad | ||||||||||||
| Chennai–Bengaluru | ||||||||||||
| Varanasi–Siliguri |
;Diamond Quadrilateral
In 2014, the Diamond Quadrilateral high-speed rail network project was launched by Government of India and is envisioned to connect the four major metro cities of India namely: Chennai, Delhi, Kolkata and Mumbai.
| Corridor | Speed | Length | Status | Year |
|---|---|---|---|---|
| Delhi–Kolkata | 320 kph | 1576 km | DPR under preparation | 2031 |
| Kolkata–Chennai | 320 kph | 1500 km | TBD | TBD |
| Mumbai–Chennai | 320 kph | 1200 km | TBD | TBD |
| Delhi–Mumbai | 320 kph | 1394 km | Under construction | 2031 |
| Delhi–Chennai | 320 kph | 1900 km | TBD | TBD |
| Mumbai–Kolkata | 320 kph | 1800 km | TBD | TBD |
;Super high-speed rail In 2016, Indian Railways explored the possibility of maglev trains to implement an over-500 km/h speed rail system. In February 2019, a train model based upon the same was unveiled by Raja Ramanna Centre for Advanced Technology capable of speeds of up to 600 kph. In September 2020, Bharat Heavy Electricals Limited signed a pact with SwissRapide AG for the implementation of MagLev metro systems in India.
While there are no operational hyperloop systems in the world, testing has been done and a few routes have been proposed. Hyperloop One submitted a detailed project report in January 2018 for Mumbai to Pune. Virgin Hyperloop signed a MoU with Government of Punjab in 2019 for building a rail to cover total 226 km distance between Amritsar and Chandigarh. Hyperloop One signed a MoU with Government of Karnataka to conduct a feasibility study on the Bengaluru-Chennai route in 2017. Zeleros proposed a vision for a hyperloop network in India by 2050, connecting main cities.
Semi-high speed rail
A 174 km segment of track in the TughlakabadAgra Cantonment section supports semi-high speeds of up to 160 kph. , the maximum operational speed of 160 kph is achieved by Gatimaan Express and Vande Bharat Express on the above section.
;Track upgrades (Broad gauge) In 2009, Indian Railways envisioned a plan to increase the speed of passenger trains to 160-200 kph on dedicated conventional tracks and improve the existing conventional lines on Broad gauge to handle speeds of up to 160 kph. Dedicated Freight Corridor Corporation of India has built dedicated freight corridors across India to divert cargo traffic from the passenger railway tracks, thus helping increase the operational speed of the passenger trains to 160 kph.
| Route | Speed | Length | Year | Status | Reference | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Tughlakabad–Agra | 160 kph | 174 km | 2016 | Operational | ||||||||||
| Delhi–Mumbai | 160 kph | 1384 km | 2024 | Under upgradation | ||||||||||
| New Delhi–Howrah | 160 kph | 1446 km | TBD | Approved | ||||||||||
| Chennai–Gudur | 160 kph | 134.3 km | TBD | DPR submitted | last=Nandi | first=Tamal | date=1 December 2022 | title=Journey to Bengaluru to get quicker! Chennai-Bengaluru train to run at 160 kph | url=https://www.livemint.com/news/india/indian-railways-train-journey-on-chennai-bengaluru-to-get-quicker-southern-railway-submits-dpr-to-increase-speed-to-160-kmph-11669865050957.html | access-date=4 May 2023 | work=mint | archive-date=4 May 2023 | archive-url=https://web.archive.org/web/20230504060536/https://www.livemint.com/news/india/indian-railways-train-journey-on-chennai-bengaluru-to-get-quicker-southern-railway-submits-dpr-to-increase-speed-to-160-kmph-11669865050957.html | url-status=live}} |
| Chennai–Renigunta | 160 kph | 134.78 km | TBD | DPR submitted | ||||||||||
| Mumbai–Howrah | 160 kph | 1965 km | TBD | DPR submitted | date=10 November 2021 | title=160 Kmph Upgrade: Indian Railways Tells Zones To Prepare DPR For Important Routes | url=https://www.railpost.in/160-kmph-upgrade-indian-railways-tells-zones-to-prepare-dpr-for-major-routes/ | access-date=11 November 2021 | archive-date=10 November 2021 | archive-url=https://web.archive.org/web/20211110040804/https://www.railpost.in/160-kmph-upgrade-indian-railways-tells-zones-to-prepare-dpr-for-major-routes/ | url-status=live}} | |||
| Mumbai–Chennai | 160 kph | 1276 km | TBD | DPR submitted | ||||||||||
| Chennai–Howrah | 160 kph | 1652 km | TBD | DPR submitted | ||||||||||
| Bengaluru–Chennai | 160 kph | 362 km | TBD | DPR submitted | ||||||||||
| Chennai–New Delhi | 160 kph | 2164 km | TBD | DPR submitted | ||||||||||
| Bengaluru–Hyderabad | 160 kph | 632 km | TBD | DPR submitted | ||||||||||
| Chennai–Hyderabad | 160 kph | 715 km | TBD | DPR submitted | ||||||||||
| Howrah–Puri | 160 kph | 502 km | TBD | DPR submitted |
;New tracks RapidX system operating on 1,435 mm (4 ft 8+1⁄2 in) Standard gauge tracks and capable of supporting speeds of up to 180 kph, became operational with the partial opening of Delhi–Meerut line in 2023.
| Route | Speed | Length | Status | Reference | |||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Delhi–Meerut | 160 kph | 82 km | Partially operational | ||||||||
| Delhi–Alwar | 180 kph | 164 km | Under construction | ||||||||
| Delhi–Panipat | 180 kph | 103 km | Approved | ||||||||
| Delhi–Rohtak | 180 kph | 70 km | Proposed | title=Delhi-NCR RRTS–Information, Route Maps, Fares, Tenders & Updates | url=https://themetrorailguy.com/delhi-ncr-regional-rapid-transit-system-information-map-updates/ | access-date=1 December 2023 | date=20 December 2021 | work=The Metro Rail Guy}} | |||
| Delhi–Palwal | 180 kph | 60 km | Proposed | ||||||||
| Delhi–Baraut | 180 kph | 54 km | Proposed | ||||||||
| Ghaziabad–Khurja | 180 kph | 83 km | Proposed | ||||||||
| Ghaziabad–Hapur | 180 kph | 57 km | Proposed | ||||||||
| Delhi–Jewar | 180 kph | 67 km | Proposed | ||||||||
| Hyderabad–Warangal | 180 kph | 146 km | Proposed | title=Telangana to take up Regional Rapid Transit System | url=https://www.newindianexpress.com/states/telangana/2022/feb/18/telanganato-take-up-regional-rapid-transit-system-2420902.html | newspaper=New Indian Express | date=18 February 2022 | access-date=1 December 2023 | archive-date=19 January 2023 | archive-url=https://web.archive.org/web/20230119230125/https://www.newindianexpress.com/states/telangana/2022/feb/18/telanganato-take-up-regional-rapid-transit-system-2420902.html | url-status=live}} |
| Hyderabad–Vijayawada | 180 kph | 281 km | Proposed | ||||||||
| Chengannur–Pamba (Sabarimala Temple) | 200 kph | 59.23 km | DPR Submitted, Wating for final approval | title=Final location survey submitted for Chengannur-Pampa rail project in Kerala for Sabarimala Pilgrimage | url=https://www.newindianexpress.com/states/kerala/2024/Sep/17/final-location-survey-submitted-for-chengannur-pampa-rail-project-3.html | newspaper=New Indian Express | date=17 September 2024 | access-date=1 December 2024}} |
Rolling stock
For high-speed rail, the Indian railways will construct bullet train assembly facilities on a public-private participation (PPP) model. As per NHSRCL, Japanese companies will set up manufacturing facilities in India to build the parts for bullet train sets. For semi-high speed rail, Indian Railways had already rolled out Train 18 in 2018. These self-propelled EMU train sets manufactured by Integral Coach Factory are capable of reaching 180 km/h. These trains have eight or sixteen coaches with driver cabins on both ends, which eliminates the time needed for turnaround at the terminal station with faster acceleration and deceleration, enabling the train to travel at a top speed for longer distance.
| Name | Image | Origin | Manufacturer | Trainsets | Lines | Type | Gauge size | Gauge type | Traction | Max speed (km/h) | Status | Year | Potential | Operational | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Semi-high-speed | ||||||||||||||||||
| Vande Bharat (Prototype) | [[File:Vande Bharat express for Katra IMG 20200131 054006.jpg | 100x100px]] | India | ICF | 2 | 1 | EMU | 1676mm | Broad-gauge | Electric | 180 | 130 | In service | 2019 | ||||
| Vande Bharat | [[File:Thiruvananthapuram Kasaragod Vande Bharat Express (via Alappuzha) - 1st Rake.jpg | 100x100px]] | India | ICF | 53 | 51 | EMU | 1676mm | Broad-gauge | Electric | 180 | 160 | In service | 2022 | ||||
| Namo Bharat | [[File:Namo_Bharat_Train_closeup.jpg | 100x100px]] | India | Alstom | 210 | 1 | EMU | 1435mm | Standard-gauge | Electric | 180 | 160 | In service | 2023 | ||||
| High-speed | ||||||||||||||||||
| E5 Series Shinkansen | [[File:Shinkansen (bullet train) : The Hayabusa super express (Series E5 train).JPG | 100x100px]] | Japan | Hitachi Rail & | ||||||||||||||
| Kawasaki | date=7 March 2024 | title=India's first bullet train run likely in June-July 2026: Report | url=https://www.hindustantimes.com/india-news/indias-first-bullet-train-run-likely-in-june-july-2026-report-101709751936880.html | access-date=8 March 2024 | newspaper=Hindustan Times | archive-date=7 March 2024 | archive-url=https://web.archive.org/web/20240307160122/https://www.hindustantimes.com/india-news/indias-first-bullet-train-run-likely-in-june-july-2026-report-101709751936880.html | url-status=live}} | N/A | EMU | 1435mm | Standard-gauge | Electric (25 kV 50 Hz AC) | 320 | N/A | Planned | 2026 |
Construction
Mega carrier and launcher machines or transporter, gantry, and full span launcher machines are machines used to construct viaducts (elevated structures) for bullet train corridors in China. These vehicles carry an entire girder by traveling on already launched girders to place the next one. The speed was several times faster compared to India's conventional girder launching mechanism, with the Chinese machine laying two girders a day on an average compared to one and a half girders in a week by the Indian counterpart. NHSRCL then asked L&T which was constructing the 325 km stretch of Mumbai-Ahmedabad line to build such machines. The machine costs around and 30 such machines were required to construct the 465 km elevated stretch. On 9 September 2021, India joined four other countries, to possess Full Span Launching Methodology (FSLM) technology after L&T was able to develop the machine successfully. NHSRCL planned to acquire 20 such machines initially for the Mumbai-Ahmedabad high-speed rail project in order to speed up construction. These machines could be later deployed to build viaducts for elevated roads and rapid transit systems across India.
Research
National Academy of Indian Railways, Vadodara was established in 2018 with the aim of developing indigenously high-speed train manufacturing technology. Other institutions focused on Railway technology research and development are: IIT BHU Malviya Centre for Railway Technology, IIT Kharagpur Centre for Railways Research and Research Design and Standards Organization (RDSO). Integral Coach Factory(ICF) Chennai has been tasked with producing steel body trains capable of 280kmph and in service speed of 250kmph for the bullet train routes.
Records
| Year | Class | Type | Speed | Image | |
|---|---|---|---|---|---|
| 1947 | WP class | Steam | 100 kph | [[File:682 IndiaDelhiMuseum 19931226.jpg | 100px]] |
| 1969 | WDM-4 | Diesel | 120 kph | [[File:WDM-4 18001 locomotive.jpg | 100px]] |
| 1971 | 130 kph | ||||
| 1971 | WAM-2/3 | Electric | 140 kph | ||
| 1982 | WAM-4B | 145 kph | [[File:WAM-4 AJJ.jpg | 100px]] | |
| 1988 | WAP-1 | 160 kph | [[File:WAP1 ^22076 Aastha of GZB waiting for its scheduled departure with Agra bound ICE at LJN - Flickr - Dr. Santulan Mahanta.jpg | 100px]] | |
| 1996 | WAP-4 | 169 kph | [[File:BRC's new hot babe waiting till the dark to elope with Awadh Express - The eternal philanderer... - Flickr - Dr. Santulan Mahanta.jpg | 100px]] | |
| 1997 | WAP-5 | 184 kph | [[File:Ghaziabad WAP 5.jpg | 100px]] |
Notes
References
References
- "Understanding Indian Railway Heritage". [[Indian Railways]].
- (16 April 2018). "Chennai: The track record". [[New Indian Express]].
- (25 April 2013). "When India's first train blew steam". [[The Times of India]].
- (2015). "Evolution of High-Speed Haulage on Indian Railways". IRFCA.
- "Evolution of Electric Locomotives". [[Indian Railways]].
- Buchli, Jakob. (1927). "Universal-Antrieb "Winterthur" für elektrische Lokomotiven". Schweizerische Bauzeitung.
- "Loco classes". IRFCA.
- "Electrification history". [[Indian Railways]].
- (9 March 2019). "Railways golden girl: 50 years of the Rajdhani story". [[Hindustan Times]].
- "Railway Budget of 1969–70". [[Indian Railways]].
- (22 May 2016). "Kolkata loses last connect to first Rajdhani". [[The Times of India]].
- (9 October 1989). "WAP-1 locomotive". [[Government of India]].
- (30 May 2014). "'Shatabdi is the heart of Indian railways'". [[The Times of India]].
- (23 January 2018). "Trains faster than Rajdhani, Shatabdi on the cards". [[The Economic Times]].
- (3 July 2014). "200 km in 90 mins: Delhi-Agra high speed train sets new speed record". [[The Economic Times]].
- (18 December 2009). "Indian Railways: Vision 2020". [[Indian Railways]].
- (18 December 2009). "India getting ready for bullet trains". Central Chronicle.
- (27 January 2013). "Indian Railways finally moving on its dream project – high-speed trains". [[The Economic Times]].
- (10 June 2014). "Diamond quadrilateral of high-speed trains". [[Indian Express]].
- (5 April 2016). "Train to be named Gatimaan Express". [[The Hindu]].
- (6 November 2018). "'Make in India' speed boost for Indian Railways! Gets first 200 kmph capable aerodynamic electric locomotive". Financial Express.
- "Journey of High speed rail". [[National High Speed Rail Corporation Limited]].
- (21 September 2020). "Wow! Indian Railways eyes 7 more bullet train corridors; all will be open to PPP investments". The Financial Express.
- (20 February 2017). "Indian Railways to roll out 'Make in India' 160 kmph self-propelled 'world-class' train sets at half the cost of import!". The Financial Express.
- (29 October 2018). "Train 18: Country's first engine-less train rolled out; Train 20 next". [[The Economic Times]].
- (7 February 2019). "Train 18: PM Modi to flag off Vande Bharat Express on February 15 from New Delhi". Business Today.
- (20 October 2023). "PM Modi flags off 'RapidX', India's first regional rapid rail service; all you need to know". Business Today.
- Nigam, Saumya. (27 December 2023). "Amrit Bharat Express to launch with Push-Pull technology and other exciting features". India TV.
- (30 October 2023). "Vande Sadharan train: All you need to know; How it is different from Vande Bharat train?". Business Today.
- Taparia, Vidhi. (2024-10-15). "BEML to make India's first indigenous bullet trains; delivery by 2026".
- "India's First Bullet Train Prototype To Be Built At BEML's Bengaluru Plant".
- Mukherjee, Vasudha. (16 April 2025). "Japan to gift Shinkansen E5, E3 series for India's bullet train project".
- MANDAL, VISHNU. (2025-04-16). "India-Japan Deal: Free Shinkansen Trains, E10 Bullet Trains to Power Mumbai-Ahmedabad Rail by 2030s".
- "Railway Minister Launches High Speed Rail Corporation of India Limited (HSRC)". [[Indian Railways]].
- (29 October 2023). "Railway Minister Launches High Speed Rail Corporation of India Limited (HSRC)". [[Government of India]].
- "Definition of High-Speed Rail". [[International Union of Railways]].
- (9 October 2013). "India, Japan sign MoU for feasibility study of high speed railway system in India". Nationalturk.
- (16 September 2014). "Mumbai-Ahmedabad bullet train? Chinese team visits CST". [[Indian Express]].
- (23 January 2021). "Railway Budget 2021: Indian Railways to focus on new bullet train networks in coming years?". [[The Times of India]].
- (13 September 2017). "Japan Is Selling Bullet Trains to India". Bloomberg News.
- Agarwal, Anshu. (31 January 2021). "Delhi likely to get 2 stations under 3 proposed Bullet train projects". Business Standard India.
- (5 February 2023). "Big boost for city as Pune-Nashik high-speed rail project gets Centre's in-principle approval". [[Hindustan Times]].
- (31 January 2020). "High speed rail corridor: Travel time from Mumbai to Hyderabad and Nagpur to reduce by 50 percent". Mumbai Mirror.
- Shah, Narendra. (23 December 2022). "A Silverline Project to connect entire Kerala".
- (9 April 2021). "Growever Wins Varanasi – Howrah design". Metrorail.
- "How Hyderabad To Chennai, Bangalore High-Speed Rail Corridors Will Transform Travel In Telugu States".
- (19 December 2020). "Ahmedabad-Rajkot new rail link approved; to help Saurashtra region avail Bullet Train services". The Financial Express.
- (2026-02-01). "Highlights of Union Budget 2026-27". [[Press Information Bureau]].
- (12 June 2014). "Focus on diamond quadrilateral". [[The Hindu]].
- "Address by The President of India to the Joint sitting of Parliament 2014". [[Government of India]].
- (2 January 2017). "Mission 350 Plus: Railways To Explore Levitation Technology". [[NDTV]].
- Lohumi, Manasi. (28 November 2016). "Indian Railways moves ahead on Maglev trains project". Mint.
- Sharma, Pramod. (25 February 2019). "RRCAT scientists develop model of Maglev Train which runs at 600 km/h". Zee News.
- (16 September 2020). "BHEL, SwissRapide AG in pact to bring Maglev trains to India". The Tribune.
- Brandom, Russell. (2 August 2017). "A real hyperloop is almost here – and it's not what Elon Musk envisioned". The Verge.
- (9 January 2018). "Pune-Mumbai in 14 minutes: Firm's project report says Hyperloop transport system feasible". [[Hindustan Times]].
- "Virgin Hyperloop Punjab". [[Virgin Hyperloop]].
- (16 November 2017). "Bengaluru to Chennai in 20 mins? Karnataka ropes in Hyperloop One for feasibility study". Moneycontrol.
- (4 October 2021). "Vision for hyperloop in India 2050". Zeleros.
- (17 April 2023). "Vande Bharat Express trains running at average speed of 83 kph against permissible limit of 130 kph, reveals RTI reply filed in MP". Free Press Journal.
- (17 April 2023). "Vande Bharat Express trains running at average speed of 83 kph against permissible limit of 130 kph, reveals RTI reply filed in MP". Free Press Journal.
- Soni, Anusha. (4 July 2014). "Railways completes pilot project for semi-high-speed train". Business Standard India.
- (30 September 2022). "New Vande Bharat Express flagged off by PM. Know routes, timings, other details". Mint.
- "DFC as revolutionary as the Golden Quadrilateral". [[Indian Railways]].
- (5 April 2016). "Delhi-Agra at 160 kph: 10 points about Gatimaan, India's fastest train". [[Hindustan Times]].
- (12 April 2023). "Higher capacity lines to fuel semi-high-speed trains on Mumbai-Delhi route". [[Hindustan Times]].
- (29 June 2022). "Delhi-Howrah travel may be cut by 2.5 to 3 hours: Indian Railways". [[Hindustan Times]].
- Nandi, Tamal. (1 December 2022). "Journey to Bengaluru to get quicker! Chennai-Bengaluru train to run at 160 kph". mint.
- (10 November 2021). "160 Kmph Upgrade: Indian Railways Tells Zones To Prepare DPR For Important Routes".
- (20 October 2023). "PM launches India's first Regional Rapid Transit System (RRTS) in Ghaziabad, Uttar Pradesh". [[Government of India]].
- (20 October 2023). "PM launches India's first Regional Rapid Transit System (RRTS) in Ghaziabad, Uttar Pradesh". [[Government of India]].
- "Over Rs 30,000 Crore Cleared For Delhi-Meerut High-Speed Rail Corridor". [[NDTV]].
- (20 December 2021). "Delhi-NCR RRTS–Information, Route Maps, Fares, Tenders & Updates". The Metro Rail Guy.
- (18 February 2022). "Telangana to take up Regional Rapid Transit System". New Indian Express.
- (17 September 2024). "Final location survey submitted for Chengannur-Pampa rail project in Kerala for Sabarimala Pilgrimage". New Indian Express.
- (4 October 2018). "Make in India: Railways to pitch for building bullet train coaches locally". Hindustan Times.
- (23 January 2018). "Engine-less train: 160 kmph Train 18 to be out in June, Train 20 in 2020". [[The Indian Express]].
- (23 January 2018). "Ahead of Railway Budget 2018, Modi's Make in India gets boost with plans for 'world-class' Indian Railways trains". Financial Express.
- (23 January 2018). "Train 18: 2 new 'world class' trains to cut travel time by 20%". [[The Times of India]].
- Jain, Smriti. (2 December 2018). "Train 18 exclusive: Engine-less train becomes Indian Railways fastest at 180 km/h; truly remarkable feat!". [[The Express Group]].
- (3 December 2018). "Train 18: Top features and facilities of the country's 'fastest train'". [[The Hindu]].
- (15 February 2019). "Vande Bharat Express achieves 130 km/h speed during inaugural run". Business Standard India.
- (7 March 2024). "India's first bullet train run likely in June-July 2026: Report". [[Hindustan Times]].
- (7 March 2024). "Deal to procure 24 bullet trains from Japan to be concluded by month-end". [[The Times of India]].
- (30 November 2020). "Atmanirbhar push in bullet train: Industry told to build substitute for made-in-China tech". [[The Indian Express]].
- (9 September 2021). "Full span launching equipment, straddle carrier and girder transporter acquired for Ahmedabad-Mumbai bullet project". [[The Times of India]].
- (10 September 2021). "Mumbai-Ahmedabad Bullet Train: Indigenous Full Span Launching Equipment flagged off to expedite development". The Financial Express.
- (4 December 2014). "University of Railways – Why, What, How and Where?". Rail Electrica.
- (15 December 2018). "India's first railway university in Vadodara: Everything you need to know". The Indian Express.
- (21 August 2019). "Gujarat govt allots land for India's first Railway university". Business Standard India.
- "New dawn for Indian high-speed rail".
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about High-speed rail in India — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report