From Surf Wiki (app.surf) — the open knowledge base
HaYovel Tower
| Field | Value |
|---|---|
| name | HaYovel Tower |
| native_name | מגדל היובל |
| image | Hadmo2006 0603 112930.JPG |
| image_size | 200px |
| caption | HaYovel Tower in June 2006 |
| location | Tel Aviv, Israel |
| coordinates | |
| status | Completed |
| start_date | 2001 |
| opening | 2005 |
| building_type | Offices |
| roof | 158 m |
| floor_count | 42 |
| cost | $450 million |
| floor_area | 110,000 m2 |
| architect | Peleg Architects |
| developer | Africa-Israel, |
| Minrav | |
| architectural_style | Postmodern |
| map_type | Tel Aviv |
| map_caption | HaYovel Tower within Tel Aviv |
Minrav
HaYovel Tower () also known as Kiryat HaMemshala Tower () is a skyscraper in Tel Aviv, Israel. At 158 m (42 floors), it is the 20th tallest building in Israel. Construction was completed in 2005 on land previously belonging to the IDF HaKirya base. The tower is located near the Tel Aviv's tallest skyscraper cluster, the Azrieli Center complex, and is occupied largely by government offices. The consolidation of many of these offices in the tower, which were previously spread out all over the Tel Aviv district, allowed the release of a considerable amount of high-value government land to private development, as well as introducing efficiencies from housing many government functions under one roof. The tower has a helipad on its roof. It was originally planned to have 28 floors for government functions only, with the additional 14 floors being approved during construction. 13 of these top floors were approved for use by private sector offices, and the top 11 floors have floor-to ceiling windows. An external elevator serves the uppermost floors, and an underpass connects the building with the tower's underground parking. The rent being paid by the government is $16/square metre per month for the next 20 years.
Design

The design of the building, which used postmodern architecture, was led by Peleg Architects. The building is mostly made of concrete, however its facade consists of such materials as granite, glass and aluminium, which were colored in dark green. The exterior walls of floors above 31 are fully glazed from floor to ceiling.
References
References
- (2 April 2019). "REIT 1, Africa Israel Properties resolve Hayovel Tower dispute". Globes.
- "HaYovel Tower - The Skyscraper Center".
- "FPS Israel Representative Office opening in the Hayovel Tower, Tel-Aviv - FPS. Legal advice. Made for you.".
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about HaYovel Tower — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report