Skip to content
Surf Wiki
Save to docs
general/central-line-london-underground-stations

From Surf Wiki (app.surf) — the open knowledge base

Hanger Lane tube station

London Underground station


London Underground station

FieldValue
nameHanger Lane
image_nameHanger Lane stn building.JPG
captionStation building
managerLondon Underground
fare_zone3
localeHanger Hill
boroughLondon Borough of Ealing
years130 June 1947
events1Opened
platforms2
<!--tubeexits062.573
tubeexits072.94
tubeexits082.92
tubeexits093.151 --
coordinates
interchangePark Royal
interchange_note

Hanger Lane () is a London Underground station in Hanger Hill, Ealing. It is located on the border between west and north-west London. The station is on the West Ruislip branch of the Central line, between Perivale and North Acton stations. It is in London fare zone 3.

Hanger Lane is within walking distance from Park Royal tube station on the Piccadilly line. The two lines cross a little east of the station.

History

The Great Western Railway (GWR) opened Twyford Abbey Halt just east of the site on 1 May 1904 as part of the GWR and Great Central Railway Joint Railway project (the New North Main Line) towards High Wycombe. It was closed on 1 May 1911, replaced by Brentham station to the west of the present location. That station was closed between 1915 and 1920 due to World War I economies. Brentham and most main-line stations between North Acton and West Ruislip were finally closed in 1947 when the Central line was extended from North Acton on electrified tracks built under the LPTB New Works Programme of 1935; the delay was due to World War II.

The Central line station opened on 30 June 1947 as "Hanger Lane" as it was near that road.

The entrance and roof of the subsurface ticket hall form the centre of the Hanger Lane Gyratory System, a complex roundabout in West London where the A40 Western Avenue crosses the A406 North Circular Road in an underpass. Passengers must use pedestrian subways under the gyratory to access the station, which is itself above ground.

In 2012 the station building exterior was repainted, refurbished and given new London Underground roundels.

In 2018, it was announced that the station would gain step-free access by 2022, as part of a £200m investment to increase the number of accessible stations on the Tube. Work on the scheme began in March 2025, with upgrades including a new footbridge, lift access to the platforms, and a refurbished accessible toilet. The project is scheduled for completion in summer 2026.

Development

In 2004 the multinational Diageo company agreed to build platforms to the east for an interchange with Park Royal on the Piccadilly line, as part of its First Central business park, built on the site of the (now demolished) Guinness brewery. As of June 2022, this has not happened.

Connections

London Buses routes 95, 112, 226, 483 and 487 serve the station.

References

References

  1. {{Citation London station interchange June 2020
  2. (19 January 2018). "Huge boost for accessibility as further 13 stations to go step-free".
  3. (2025). "Northolt station step-free access".
  4. [https://web.archive.org/web/20040705144616/http://www.alwaystouchout.com/project/33 alwaystouchout] Park Royal Central line platforms
  5. (July 2024)
  6. [http://www.firstcentral.co.uk/firstcentral_map.pdf First Central business park] {{Webarchive. link. (16 January 2016 Map of Park Royal Central line platforms)
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Hanger Lane tube station — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report