From Surf Wiki (app.surf) — the open knowledge base
Elektroprivreda Srbije
Serbian energy company
Serbian energy company
| Field | Value |
|---|---|
| name | Elektroprivreda Srbije |
| logo | Logo of Elektroprivreda Srbije.svg |
| logo_size | 100px |
| trading_name | |
| native_name | Електропривреда Србије |
| native_name_lang | sr |
| type | Joint-stock company |
| predecessor | Električno preduzeće Srbije |
| (1945–1965) | |
| Združeno Elektroprivredno preduzeće Srbije | |
| (1965–1991) | |
| foundation | (current form) |
| (founded) | |
| location_city | Belgrade |
| location_country | Serbia |
| area_served | Serbia |
| key_people | Oluf Ulseth (Supervisory Board Chairman) |
| Dušan Živković (acting director) | |
| industry | Electric utility |
| products | Electric power |
| Coal | |
| production | 36.461 TWh (2016) |
| services | Electricity generation and distribution, electricity retailing, mining |
| revenue | €4.250 billion (2023) |
| net_income | €959.66 million (2023) |
| assets | €9.096 billion (2023) |
| equity | €5.394 billion (2023) |
| owner | Government of Serbia (100%) |
| num_employees | 19,595 (2023) |
| subsid | EPS Distribucija Belgrade |
| EPS Trgovanje Ljubljana | |
| homepage | |
| footnotes | Business ID: 20053658 |
| Tax ID: 103920327 |
(1945–1965) Združeno Elektroprivredno preduzeće Srbije (1965–1991) (founded) Dušan Živković (acting director) Coal EPS Trgovanje Ljubljana Tax ID: 103920327
Elektroprivreda Srbije (EPS; Електропривреда Србије, ЕПС; full legal name: Javno preduzeće Elektroprivreda Srbije Beograd) is a joint-stock electric utility power company fully owned by the Government of Serbia, with headquarters in Belgrade, Serbia. It was founded in 1991 and it has 19,595 employees (as of 2023), making it the largest enterprise in the country.
The company has an installed capacity of 7,326 MW and generates 36.461 TWh of electricity per year. EPS also operates three power plants of total capacity 461 MW which are not in the ownership of the company.
EPS is also the largest producer of lignite in Serbia operating in the Kolubara and Kostolac basins, producing around 37 million tonnes per year.
History

Since 1870, the coal production has begun in Serbia. Fourteen years later, the first electric lighting in Serbia was furnished in the military office building in Kragujevac. On 6 October 1893, the first Serbian power plant in Belgrade started with the production of electricity.
In 1900, the first alternating current hydroelectric power plant Pod gradom in Užice on the river Đetinja went online. This power plant is still operating. The first alternating current transmission line from hydroelectric power plant Vučje to Leskovac, with the length of 17 km, went online three years later. In 1909, hydroelectric plants Gamzigrad in Zaječar and Sveta Petka in Niš began to build. Two years later, the hydroelectric power station on the river Moravica in Ivanjica was put in the operation.
In Belgrade, the power plant Snaga i Svetlost was built in 1933, being one of the largest in the Balkans at that time.
;1945–1991 The establishment of the Električno preduzeće Srbije followed in 1945. Between 1947 and 1950, the hydroelectric power plant Sokolovica and coal power plants Mali Kostolac and Veliki Kostolac, the first power stations to be built in Serbia after the Second World War. In 1952, the underground mining of the coal field Kolubara had started. Four years later, coal power plant RB Kolubara went in operation. A year earlier, the hydroelectric power plants Vlasina and Zvornik have been connected to the power grid. In the period from 1960 to 1967, hydroelectric power plants Bistrica, Kokin Brod and Potpeć were under construction.
In 1965, Združeno elektroprivredno preduzeće Srbije was founded. The coal-fired power plant Bajina Bašta began with the production of electricity a year later. The two largest power plants in Serbia, the hydroelectric power plant HPP Đerdap I at the Danube river and the coal power plant TENT, went into operation in 1970. Twelve years later, the pumped storage plant Bajina Bašta was built, and in 1990 the hydroelectric power station Pirot was put into operation.
;1991–2005 In 1991, the company was reorganized and changed name to Elektroprivreda Srbije.
During the NATO bombing of Yugoslavia in 1999, many power plants have been severely damaged. With the establishment of the UNMIK administration in Kosovo on 1 July 1999, the company lost its access to the local coal mines and power plants, including Kosovo A and Kosovo B power plants.
Since then, government-owned Elektroprivreda Srbija by political decision continued to pay off earnings to all of Kosovo-based EPS companies - EPS Surface Mining Kosovo, EPS TPP Kosovo and EPS Elektrokosmet. However, all these employees are not working in Kosovo-based power plants, and are only occasionally and indirectly employed by EPS throughout the rest of Serbia. As of May 2009, there was a total of around 7,000 such employees which were working only on paper and receive regular earnings. As of June 2017, that number was cut to 4,539 employees. As of August 2022, a total of 3,300 employees worked for these three companies.
Following the stabilization of the country after war, in 2004 EPS was again a member of the European interconnected system UCTE.
;2005–2013 Company operates in the current form since 1 July 2005. Then, the electric power transmission division of EPS was split from the company and established as its own public enterprise, named Elektromreža Srbije (EMS).
Since 2007, EPS has prepared plans for the construction of new power plants and the expansion of existing plants to increase generating capacity and meet growing consumption demand.
;2013–2023 EPS de facto holds a monopoly on the electricity market in Serbia. Since 1 January 2013, the Serbian electricity market has been open to other companies with the expectations to be completely liberalized in the coming years. Since then, EPS has continued with further reorganization for better company's effectiveness. In 2014, EPS was split into two subsidiaries - EPS Distribucija Belgrade and EPS Trgovanje Ljubljana. In June 2021, the distribution system section of the company "EPS Distribucija" was split from the company, and continued to operate as an independent company named "Elektrodistribucija Srbije d.o.o. Beograd".
;2023–present In April 2023, the Government of Serbia decided to transform the company from the state-owned enterprise to a joint-stock company – offering 36.5 million of shares, each worth 10 thousand dinars (at the time, 85.26 euros each), for a cumulative worth of stock at 3.112 billion euros.
Market and financial data
In 2011, company's total assets and the equity increased for nearly 100 percent.
According to the consolidated annual report in 2012, total assets of this company dropped from €12.049 billion to €9.446 billion, and the total company's equity dropped from €8.909 billion to €6.867 billion, with the negative net income of 108.51 million euros. In 2013, the company managed to become profitable for the second time since 2007, with annual net profit of €167.23 million. From 2013 to 2016, EPS has continued trend of posting positive annual net results. After years of posting positive net results, Elektroprivreda Srbije had negative net income of 11 million euros for 2018 calendar year.
Subsidiaries
- EPS Distribucija Belgrade
- EPS Trgovanje Ljubljana
Major power plants
- TPP "Nikola Tesla A" (Obrenovac)
- TPP "Nikola Tesla B" (Obrenovac)
- HPP "Đerdap I" (Kladovo)
- HPP "Đerdap II" (Kladovo)
- TPP "Kostolac" (Kostolac)
- HE "Bajina Bašta" (Bajina Bašta)
Allegations of corruption
In 2011 EPS was under the investigation by the police and the national anti-corruption body. Allegations were related to RB Kolubara (EPS's subsidiary) management which was found to be implicated in a number of different schemes involving equipment procurement and leasing and the sale of coal. In October 2011 authorities arrested 17 people, including two former directors of the Kolubara mine Dragan Tomic and Vladan Jovicic, eight executive managers and seven owners of private firms with which Kolubara conducted business. In April 2014 the Organized Crime Prosecutor has issued an official order for the police to look into the allegations about possible wrongdoings at the EPS. The allegations were based on the report of the Anti-Corruption Council which showed discrepancies in the quantities of electricity imported and exported by EPS from 2010 to 2012.
References
References
- "Organizaciona šema".
- "Izvršni odbor".
- "Производња електричне енергије". eps.rs.
- "СТО НАЈ... ПРИВРЕДНИХ ДРУШТАВА ПРЕМА ПОСЛОВНИМ ПРИХОДИМА У 2023. ГОДИНИ".
- (September 2025). "Основни подаци о привредном друштву". Serbian Business Registers Agency.
- "Производни капацитети".
- "About Us".
- "EPS". Energy Fundamentals.
- "120 godina elektrifikacije Srbije".
- "Hidroelektrana Vučje".
- "Vucje Power Plant – a World Heritage Gem".
- "Hidroelektrana "Gamzigrad"".
- "Nine decades of hydroelectric power station "Moravica" in Ivanjica". politika.rs.
- ""Oteta" elektrana – temelj buduće Elektroprivrede".
- (19 June 2017). "Koliko EPS plaća parolu "Kosovo je srce Srbije"". Insajder.
- (1 May 2010). "Sindikat EPS-a: Šta sutra i dokle ovako?". radiokim.net.
- (17 August 2022). "Koliko Elektroprivredu Srbije koštaju preduzeća sa Kosova?". slobodnaevropa.org.
- "Osnovano Javno preduzeće za prenos električne energije i upravljanje prenosnim sistemom "Elektromreža Srbije"".
- (28 September 2007). "Electric Power System of Serbia - Energy Community Priority Projects". Energy Community.
- (27 March 2013). "Forbes visits Electric Power Industry of Serbia". South-East-Europe Business.
- (17 June 2021). "EPS Distribucija nije više deo sistema EPS-a". seebiz.eu.
- (8 April 2023). "EPS zvanično postao akcionarsko društvo".
- "Основни подаци из годишњег финансијског извештаја за обвезника ревизије за 2011. годину". apr.gov.rs.
- "Vrednost EPS-a povećana za četiri milijarde evra". euractiv.rs.
- J., B. "Odakle u EPS gubitak od 290 miliona €!". ALO!.
- (6 July 2019). "EPS napravio gubitak od 11 miliona evra". danas.rs.
- "REORGANIZACIJA EPS Snabdevanje pripojeno je Elektroprivredi Srbije".
- [http://www.balkaninsight.com/en/article/investigation-at-kolubara. Balkan insight. Investigation at Serbia's Kolubara Mine. Retrieved 12 June 2014]
- "Regional anti-corruption initiative. INVESTIGATING SERBIA'S FRAUD OF THE CENTURY. Retrieved 12 June 2014".
- [http://www.b92.net/eng/news/crimes.php?yyyy=2014&mm=04&dd=30&nav_id=90157 B92. Police to investigate power company EPS. Retrieved 12 June 2014]
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Elektroprivreda Srbije — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report