Delhi Metro

Rapid transit system in India serving Delhi NCR

Delhi Metro

Rapid transit system in India serving Delhi NCR

FieldValue
nameDelhi Metro
imageDelhi Metro full logo.svg
imagesize125px
image2DelhiMetroYellowLine.JPG
imagesize2300px
caption2A Yellow Line train at Patel Chowk metro station
caption3Delhi Metro coming from Noida
alt2See caption
ownerDelhi Metro Rail Corporation
localeNational Capital Region (NCR)
transit_typeRapid transit
lines10
stations257
ridership46.3 lakh (4.63 million, 2022–23)
key_peopleKatikithala Srinivas (Chairman)
Vikas Kumar (Managing Director)
top_speed120 km/h
average_speed45 km/h
headquartersMetro Bhawan, Barakhamba Road, New Delhi
website
began_operation
operatorDelhi Metro Rail Corporation
vehicles350 trains
train_length4/6/8 coaches
headway2 minutes
system_length352.2 km
track_gauge{{plainlist
* {{Track gauge1676mmlkon}} broad gauge (Red, Blue and Yellow lines)
* {{Track gaugesgallkon}} (Other lines)
eloverhead catenary
map[[File:Rapid Transit Map of Delhi.jpg350px]]
line_number{{plainlist
annual_ridership203 crore (2.03 billion, 2023)

Vikas Kumar (Managing Director)

  • broad gauge (Red, Blue and Yellow lines)
  • (Other lines)

The Delhi Metro is a rapid transit system that serves Delhi and the adjoining satellite cities of Faridabad, Gurugram, Ghaziabad, Noida, Bahadurgarh, and Ballabhgarh in the National Capital Region of India. The system consists of 10 colour-coded lines serving 257 stations, with a total length of 352.2 km. It is India's largest and busiest metro rail system. The metro has a mix of underground, at-grade, and elevated stations using broad-gauge and standard-gauge tracks. The metro makes over 4,300 trips daily.

Construction began in 1998, and the first elevated section (Shahdara to Tis Hazari) on the Red Line opened on 25 December 2002. The first underground section (Vishwa Vidyalaya – Kashmere Gate) on the Yellow Line opened on 20 December 2004. The network was developed in phases. Phase I was completed by 2006, followed by Phase II in 2011. Phase III was mostly complete in 2021, except for a small extension of the Airport Line which opened in 2023. Work on Phase IV began on 30 December 2019.

The Delhi Metro Rail Corporation (DMRC), a joint venture between the Government of India and Delhi, built and operates the Delhi Metro. The DMRC was certified by the United Nations in 2011 as the first metro rail and rail-based system in the world to receive carbon credits for reducing greenhouse-gas emissions, reducing annual carbon emission levels in the city by 630,000 tonnes.

The Delhi Metro has interchanges with the Rapid Metro Gurgaon (with a shared ticketing system) and Noida Metro. On 22 October 2019, DMRC took over operations of the financially troubled Rapid Metro Gurgaon. The Delhi Metro's annual ridership was 203.23 crore (2.03 billion) in 2023. The system also has interchanges with the Delhi-Meerut RRTS, India's fastest urban regional transit system.

History

Background

Non-Animated timeline of the metro
Evolution of the Delhi Metro from 2003 to 2018

The concept of mass rapid transit for New Delhi first emerged from a 1969 traffic and travel characteristics study in the city. Over the next several years, committees in a number of government departments were commissioned to examine issues related to technology, route alignment, and governmental jurisdiction. In 1984, the Urban Arts Commission proposed the development of a multi-modal transport system which would build three underground mass rapid transit corridors and augmenting the city's suburban railway and road transport networks.

The city expanded significantly while technical studies and financing the project underway, doubling its population and increasing the number of vehicles five-fold between 1981 and 1998. Traffic congestion and pollution soared as an increasing number of commuters used private vehicles, and the existing bus system was unable to bear the load. A 1992 attempt to privatise the bus transport system compounded the problem, with inexperienced operators plying poorly maintained, noisy and polluting buses on lengthy routes; this resulted in long waiting times, unreliable service, overcrowding, unqualified drivers, speeding and reckless driving which led to road accidents. The Government of India under Prime Minister H.D. Deve Gowda and the Government of Delhi set up the Delhi Metro Rail Corporation (DMRC) on 3 May 1995, with Elattuvalapil Sreedharan its managing director. Mangu Singh succeeded Sreedharan as DMRC managing director on 31 December 2011.

Initial construction

When the project was originally approved by the Union Cabinet in September 1996, it had three corridors. In 1997, official development assistance loans from Japan were granted to finance and conduct the first phase of the system.

Construction of the Delhi Metro began on 1 October 1998. To avoid problems experienced by the Kolkata Metro, which witnessed substantial delays and ran 12 times over budget due to "political meddling, technical problems and bureaucratic delays", the DMRC was created as a special-purpose vehicle vested with autonomy and power to execute the large project which involved many technical complexities in a difficult urban environment within a limited time frame. Putting the central and state governments on an equal footing gave an unprecedented level of autonomy and freedom to the company, which had full powers to hire people, decide on tenders, and control funds. The DMRC hired the Hong Kong MTRC as a technical consultant on rapid-transit operation and construction techniques. Construction proceeded smoothly except for a major disagreement in 2000, when the Ministry of Railways forced the system to use broad gauge despite the DMRC's preference for standard gauge. This decision led to an additional capital expenditure of .

The Delhi Metro's first line, the Red Line, was inaugurated by Prime Minister Atal Bihari Vajpayee on 24 December 2002. The metro became India's second underground rapid transit system, after the Kolkata Metro, when the Vishwa Vidyalaya–Kashmere Gate section of the Yellow Line opened on 20 December 2004. The underground line was inaugurated by Prime Minister Manmohan Singh. The project's first phase was completed in 2006, on budget and almost three years ahead of schedule, an achievement described by Business Week as "nothing short of a miracle".

Phase I

A 64.75 kilometer (40.23 miles) network of 59 stations was constructed in Delhi, encompassing the initial sections of the Red, Yellow, and Blue Lines. The stations were opened to the public between 25 December 2002 and 11 November 2006.

Phase 1 NetworkNo.LineStationsLength (km)Terminalsdate=title=Economic Survey of Delhi 2014-15url=https://delhiplanning.delhi.gov.in/sites/default/files/Planning/2016-17/2014-15/esd_2014-15_ch-12.pdfarchive-url=https://web.archive.org/web/20231020222834/https://delhiplanning.delhi.gov.in/sites/default/files/Planning/2016-17/2014-15/esd_2014-15_ch-12.pdfarchive-date=20 October 2023access-date=}}123Total5964.75
Delhi MetroRed}}; text-align: center;"Red Line68.35ShahdaraTis Hazaridate=2019-05-07title=25 years of DMRC! How Delhi Metro has become a lifeline for the national capital – from 1995 to 2019url=https://www.financialexpress.com/business/infrastructure/25-years-of-dmrc-how-delhi-metro-has-become-a-lifeline-for-the-national-capital-from-1995-to-2019/1569685/access-date=2024-04-30website=Financialexpresslanguage=enarchive-date=12 January 2024archive-url=https://web.archive.org/web/20240112160417/https://www.financialexpress.com/business/infrastructure/25-years-of-dmrc-how-delhi-metro-has-become-a-lifeline-for-the-national-capital-from-1995-to-2019/1569685/url-status=live }}
44.87Tis HazariInderlok3 October 2003
88.84InderlokRithala31 March 2004
Delhi Metroyellow}};text-align:center; "Yellow Line44.06Vishwa VidyalayaKashmere Gate20 December 2004
66.62Kashmere GateCentral Secretariat3 July 2005
Delhi Metroblue}};text-align:center; "Blue Line2222.74DwarkaBarakhamba Roaddate=2005-12-30title=PM inaugurates Barakhamba-Dwarka Metro lineurl=https://timesofindia.indiatimes.com/india/pm-inaugurates-barakhamba-dwarka-metro-line/articleshow/1351999.cmsaccess-date=2024-04-30work=The Times of Indiaissn=0971-8257archive-date=30 April 2024archive-url=https://web.archive.org/web/20240430220130/https://timesofindia.indiatimes.com/india/pm-inaugurates-barakhamba-dwarka-metro-line/articleshow/1351999.cmsurl-status=live }}
66.47Dwarka Sector 91 April 2006
32.80Barakhamba RoadIndraprastha11 November 2006

Phase II

A total of 123.3 km network of 86 stations and 10 routes and extensions was built. Seven routes were extensions of the Phase I network, three were new colour-coded lines, and three routes connect to other cities (the Yellow Line to Gurgaon and the Blue Line to Noida and Ghaziabad) of the national capital region in the states of Haryana and Uttar Pradesh. At the end of Phases I and II, the network's total length was 188.05 km and 145 stations became operational between 4 June 2008 and 27 August 2011.

Phase 2 networkNo.LineStationsLength (km)TerminalsOpening date123456-Total86123.30
Delhi MetroRed}}; text-align: center;"Red Line32.86ShahdaraDilshad Garden4 June 2008
Delhi Metroyellow}};text-align:center; "Yellow Line56.38VishwavidyalayaJahangirpuri4 February 2009
915.82Millenium City CentreQutab Minar21 June 2010
1Chhatarpur26 August 2010
911.76Qutab MinarCentral Secretariat3 September 2010
Delhi Metroblue}};text-align:center; "Blue Line12.17IndraprasthaYamuna Bank10 May 2009
1012.85Yamuna BankNoida City Centre12 November 2009
22.28Dwarka Sector 9Dwarka Sector 2130 October 2010
Delhi Metroblue}};text-align:center; "Blue Line Branch66.25Yamuna BankAnand Vihardate=2010-01-07title=Anand Vihar Metro line opens for publicurl=https://zeenews.india.com/news/delhi/anand-vihar-metro-line-opens-for-public_593434.htmlaccess-date=2024-04-30website=Zee Newslanguage=enarchive-date=2 May 2024archive-url=https://web.archive.org/web/20240502071553/https://zeenews.india.com/news/delhi/anand-vihar-metro-line-opens-for-public_593434.htmlurl-status=live }}
22.26Anand ViharVaishalidate=2011-07-14title=Delhi Metro begins service to Ghaziabadurl=https://www.indiatoday.in/india/north/story/delhi-metro-begins-trains-to-ghaziabad-137526-2011-07-13access-date=2024-04-27website=India Todaylanguage=enarchive-date=27 April 2024archive-url=https://web.archive.org/web/20240427213515/https://www.indiatoday.in/india/north/story/delhi-metro-begins-trains-to-ghaziabad-137526-2011-07-13url-status=live }}
Delhi Metrogreen}};text-align:center; "Green Line1414.19InderlokMundkadate=2010-04-02title=Metro's Green Line openedurl=https://www.thehindu.com/news/cities/Delhi/Metrorsquos-Green-Line-opened/article16350846.eceaccess-date=2024-04-26work=The Hindulanguage=en-INissn=0971-751Xarchive-date=26 April 2024archive-url=https://web.archive.org/web/20240426192131/https://www.thehindu.com/news/cities/Delhi/Metrorsquos-Green-Line-opened/article16350846.eceurl-status=live }}
23.41Ashok Park MainKirti Nagardate=2011-08-27title=Kirti Nagar-Ashok Park Metro opens to publicurl=https://zeenews.india.com/news/delhi/kirti-nagar-ashok-park-metro-opens-to-public_728679.htmlaccess-date=2024-04-27website=Zee Newslanguage=enarchive-date=27 April 2024archive-url=https://web.archive.org/web/20240427213517/https://zeenews.india.com/news/delhi/kirti-nagar-ashok-park-metro-opens-to-public_728679.htmlurl-status=live }}
Delhi Metroviolet}};text-align:center; "Violet Line1315.34Central SecretariatSarita Vihardate=2010-10-03title=Metro to JLN Stadium from todayurl=https://indianexpress.com/article/cities/delhi/metro-to-jln-stadium-from-today/access-date=2024-04-27website=The Indian Expresslanguage=enarchive-date=27 April 2024archive-url=https://web.archive.org/web/20240427213519/https://indianexpress.com/article/cities/delhi/metro-to-jln-stadium-from-today/url-status=live }}
34.82Sarita ViharBadarpur Border14 January 2011
Delhi MetroAirport Express}};text-align:center; "Airport Express422.91New DelhiDwarka Sector 21date=2011-02-23title=Airport Express Corridor opens; reach IGI in 18 minutesurl=https://www.thehindu.com/news/cities/Delhi/Airport-Express-Corridor-opens-reach-IGI-in-18-minutes/article15455824.eceaccess-date=2024-04-27work=The Hindulanguage=en-INissn=0971-751Xarchive-date=27 April 2024archive-url=https://web.archive.org/web/20240427213517/https://www.thehindu.com/news/cities/Delhi/Airport-Express-Corridor-opens-reach-IGI-in-18-minutes/article15455824.eceurl-status=live }}
2Dhaula Kuan & Delhi Aerocity15 August 2011

Phase III

Phase I (Red, Yellow and Blue Lines) and Phase II (Green, Violet, and Airport Express Lines) focused on adding radial lines to expand the network. To further reduce congestion and improve connectivity, Phase III included eight extensions to existing lines, two ring lines (the Pink and Magenta Lines) and the Grey Line. It has 28 underground stations, three new lines and seven route extensions, totaling 162.08 km, at a cost of . The three new Phase III lines are the Pink Line on Inner Ring Road (Line 7), the Magenta Line on Outer Ring Road (Line 8) and the Grey Line connecting Dwarka and Najafgarh (Line 9).

Phase 3 networkNo.LineStationsLength (km)TerminalsOpening date12356-789Total109162.08
Delhi MetroRed}} ; text-align: center;"Red Line89.64Dilshad Garden metro stationShaheed Sthal
(New Bus Adda)date=2019-03-08title=PM flags off Red Line extensionlanguage=en-INwork=The Hinduurl=https://www.thehindu.com/news/cities/Delhi/pm-flags-off-red-line-extension/article26476439.eceaccess-date=2022-04-25issn=0971-751Xarchive-date=12 April 2024archive-url=https://web.archive.org/web/20240412143442/https://www.thehindu.com/news/cities/Delhi/pm-flags-off-red-line-extension/article26476439.eceurl-status=live }}
Delhi Metroyellow}}; text-align: center;"Yellow Line34.37JahangirpuriSamaypur Badlidate=2015-11-10title=Naidu, Kejriwal to flag-off Jahangirpuri-Samaypur Badli extension of Delhi Metrourl=https://zeenews.india.com/news/delhi/naidu-kejriwal-to-flag-off-jahangirpuri-samaypur-badli-extension-of-delhi-metro_1820546.htmlaccess-date=2024-04-26website=Zee Newslanguage=enarchive-date=1 May 2024archive-url=https://web.archive.org/web/20240501120446/https://zeenews.india.com/news/delhi/naidu-kejriwal-to-flag-off-jahangirpuri-samaypur-badli-extension-of-delhi-metro_1820546.htmlurl-status=live }}
Delhi Metroblue}}; text-align: center; "Blue Line66.80Noida City CentreNoida Electronic Cityurl=https://timesofindia.indiatimes.com/city/noida/pm-modi-inaugurates-delhi-metros-blue-line-extension/articleshow/68331659.cmstitle=Blue Line Metro: PM Modi inaugurates Delhi Metro's Blue Line extension | Noida Newswebsite=The Times of Indiadate=9 March 2019archive-date=17 April 2023access-date=9 March 2019archive-url=https://web.archive.org/web/20230417215556/https://timesofindia.indiatimes.com/city/noida/pm-modi-inaugurates-delhi-metros-blue-line-extension/articleshow/68331659.cmsurl-status=live}}
Delhi Metrogreen}}; text-align: center; "Green Line711.19MundkaBrigadier Hoshiyar Singhdate=2018-06-24title=Delhi Metro Green Line: Mundka-Bahadurgarh section inaugurated by PM Modi; 5 facts every commuter should knowurl=https://www.financialexpress.com/business/infrastructure/delhi-metro-green-line-mundka-bahadurgarh-pm-modi-haryana-stations/1217981/access-date=2024-04-26website=Financialexpresslanguage=enarchive-date=26 April 2024archive-url=https://web.archive.org/web/20240426212651/https://www.financialexpress.com/business/infrastructure/delhi-metro-green-line-mundka-bahadurgarh-pm-modi-haryana-stations/1217981/url-status=live }}
Delhi Metroviolet}};text-align:center; "Violet Line23.23Mandi HouseCentral Secretariat26 June 2014
10.97Mandi HouseITO8 June 2015
913.56Badarpur BorderEscorts Mujesar6 September 2015
45.07Kashmere GateITO28 May 2017
23.35Escorts MujesarRaja Nahar Singhdate=2018-11-19title=Delhi Metro Violet Line: PM Modi flags off new Escorts Mujesar-Ballabhgarh section; check route, stationsurl=https://www.financialexpress.com/business/infrastructure-delhi-metro-violet-line-pm-modi-flags-off-new-escorts-mujesar-ballabhgarh-section-check-route-stations-1386438/access-date=2024-04-26website=Financialexpresslanguage=enarchive-date=26 April 2024archive-url=https://web.archive.org/web/20240426211202/https://www.financialexpress.com/business/infrastructure-delhi-metro-violet-line-pm-modi-flags-off-new-escorts-mujesar-ballabhgarh-section-check-route-stations-1386438/url-status=live }}
Delhi MetroAirport Express}};text-align:center;"Airport Express12.01Dwarka Sector 21Yashobhoomi - Dwarka Sector 25date=2023-09-17title=Airport Line extension opens for passengers, ends at YashoBhoomi Dwarka Sector 25 stationurl=https://timesofindia.indiatimes.com/business/india-business/airport-line-extension-opens-for-passengers-ends-at-yashobhoomi-dwarka-sector-25-station/articleshow/103733029.cmsaccess-date=2024-04-26work=The Times of Indiaissn=0971-8257archive-date=26 April 2024archive-url=https://web.archive.org/web/20240426212659/https://timesofindia.indiatimes.com/business/india-business/airport-line-extension-opens-for-passengers-ends-at-yashobhoomi-dwarka-sector-25-station/articleshow/103733029.cmsurl-status=live }}
Delhi Metropink}};text-align:center; "Pink Line1221.57Majlis ParkDurgabai Deshmukh
South Campusdate=2018-03-14title=Majlis Park-South Campus corridor of Delhi Metro's Pink Line inauguratedurl=https://timesofindia.indiatimes.com/city/delhi/majlis-park-south-campus-corridor-of-delhi-metros-pink-line-inaugurated/articleshow/63301856.cmsaccess-date=2024-04-26work=The Times of Indiaissn=0971-8257archive-date=26 April 2024archive-url=https://web.archive.org/web/20240426203029/https://timesofindia.indiatimes.com/city/delhi/majlis-park-south-campus-corridor-of-delhi-metros-pink-line-inaugurated/articleshow/63301856.cmsurl-status=live }}
68.53Durgabai Deshmukh
South CampusLajpat Nagar6 August 2018
1517.86Trilokpuri Sanjay LakeShiv Vihar31 October 2018
59.63Lajpat NagarMayur Vihar Pocket I31 December 2018
01.65Mayur Vihar Pocket ITrilokpuri Sanjay Lakedate=2021-08-06title=Pink Line: Cut Travel Time & Save Money As Trilokpuri - Mayur Vihar Pocket 1 To Open Todayurl=https://news.abplive.com/news/india/trilokpuri-sanjay-lake-mayur-vihar-pocket-1-section-of-the-pink-line-to-launch-today-dmrc-1474439access-date=2024-04-25website=news.abplive.comlanguage=enarchive-date=25 April 2024archive-url=https://web.archive.org/web/20240425213403/https://news.abplive.com/news/india/trilokpuri-sanjay-lake-mayur-vihar-pocket-1-section-of-the-pink-line-to-launch-today-dmrc-1474439url-status=live }}
Delhi Metromagenta}} ;text-align:center;"Magenta Line912.64Kalkaji MandirBotanical Gardendate=2017-12-25title=Delhi Metro's Magenta Line open to public from 5 pm; expected to ferry over 3.6 lakh commuters dailyurl=https://www.firstpost.com/india/delhi-metros-magenta-line-open-to-public-from-5-pm-expected-to-ferry-over-3-6-lakh-commuters-daily-4275079.htmlaccess-date=2024-04-26website=Firstpostlanguage=en-usarchive-date=26 April 2024archive-url=https://web.archive.org/web/20240426203028/https://www.firstpost.com/india/delhi-metros-magenta-line-open-to-public-from-5-pm-expected-to-ferry-over-3-6-lakh-commuters-daily-4275079.htmlurl-status=live }}
1624.82Janakpuri WestKalkaji Mandirdate=2018-05-28title=Delhi Metro's Kalkaji Mandir-Janakpuri West stretch inauguratedurl=https://www.hindustantimes.com/delhi-news/kalkaji-mandir-janakpuri-west-stretch-of-delhi-metro-s-magenta-line-inaugurated/story-rdqM2YxNUnr0XcVq43ek1O.htmlaccess-date=2024-04-26website=Hindustan Timeslanguage=enarchive-date=26 April 2024archive-url=https://web.archive.org/web/20240426192958/https://www.hindustantimes.com/delhi-news/kalkaji-mandir-janakpuri-west-stretch-of-delhi-metro-s-magenta-line-inaugurated/story-rdqM2YxNUnr0XcVq43ek1O.htmlurl-status=live }}
Delhi Metrogrey}}; text-align: center;"Grey Line34.30DwarkaNajafgarhdate=2019-10-04title=Delhi Metro's Grey Line connecting Dwarka and Najafgarh inauguratedurl=https://www.businesstoday.in/latest/story/delhi-metro-grey-line-connecting-dwarka-and-najafgarh-inaugurated-232267-2019-10-04access-date=2024-04-26website=Business Todaylanguage=enarchive-date=26 April 2024archive-url=https://web.archive.org/web/20240426203026/https://www.businesstoday.in/latest/story/delhi-metro-grey-line-connecting-dwarka-and-najafgarh-inaugurated-232267-2019-10-04url-status=live }}
10.89NajafgarhDhansa Bus Standdate=2021-09-18title=Grey Line: Delhi Metro's Najafgarh-Dhansa Bus Stand corridor inauguratedurl=https://www.thehindu.com/news/cities/Delhi/grey-line-delhi-metros-najafgarh-dhansa-bus-stand-corridor-inaugurated/article36531274.eceaccess-date=2024-04-25work=The Hindulanguage=en-INissn=0971-751Xarchive-date=25 April 2024archive-url=https://web.archive.org/web/20240425213405/https://www.thehindu.com/news/cities/Delhi/grey-line-delhi-metros-najafgarh-dhansa-bus-stand-corridor-inaugurated/article36531274.eceurl-status=live }}

Work on Phase III began in 2011, with 2016 the planned deadline. Over 20 tunnel-boring machines were used simultaneously to expedite construction, which was completed in March 2019 (except for a small stretch due to non-availability of land). Short extensions were later added to Phase III, which was expected to be completed by the end of 2020, but construction was delayed due to the COVID-19 pandemic. It was completed on 18 September 2021 with the opening of the Grey Line extension from Najafgarh to Dhansa Bus Stand. An extension of the Airport Line to Yashobhoomi Dwarka Sector - 25 metro station was later added, and it was completed on 17 September 2023.

Driverless operations on the 38 km Magenta line began on 28 December 2021, making it the Delhi Metro's (and India's) first driverless metro line. On 25 November 2021, the 59 km Pink Line also began driverless operations. The total driverless DMRC network is nearly 97 km, putting Delhi Metro in fourth position globally among such networks behind Kuala Lumpur.

The expected daily ridership of the network after the completion of Phase III was estimated at 53.47 lakh passengers. Actual DMRC ridership was 27.79 lakh in 2019–20, 51.97 percent of the projected ridership. Actual ridership of the Phase III corridors was 4.38 lakh, compared with a projected ridership of 20.89 lakh in 2019–20 (a deficit of 79.02 percent). The communication-based train control (CBTC) on Phase III trains enables them to run at a 90-second headway, although the actual headway between trains is higher because of the relatively low demand on the new corridors. Keeping the short headway and other constraints in mind, DMRC changed its decision to build nine-car-long stations for new lines and opted for shorter stations which can accommodate six-car trains.

Phase IV

Phase IV, with a length of 103 km and six lines, was finalized by the Government of Delhi in December 2018. Approval from the government of India was received for three priority corridors in March 2019. Construction of the corridors 65.1 km began on 30 December 2019, with an expected completion date of 2026. The metro's total length will exceed 450 km at the end of Phase IV, not including other independently operated systems in the National Capital Region such as the 29.7 km Aqua Line of the Noida-Greater Noida Metro and the 11.7 km Rapid Metro Gurgaon which connect to the Delhi Metro.

Phase IV networkLine No.NameStationsLength (km)TerminalsStatusExpected completion dateTotal83112.44
8Delhi Metromagenta}};text-align:center;"Magenta Line2129.26Krishna Park ExtensionRK Ashram Margurl=https://www.thehindu.com/news/cities/Delhi/work-begins-on-delhi-metro-phase-iv/article30437781.ecetitle=Work begins on Delhi Metro Phase-IVdate=31 December 2019work=The Hinduaccess-date=31 December 2019language=en-INissn=0971-751X}}date=2023-11-05title=First section of Delhi Metro phase-IV to open by July 2024, says DMRC chiefurl=https://www.timesnownews.com/delhi/first-section-of-delhi-metro-phase-iv-to-open-by-july-2024-says-dmrc-chief-article-104978294access-date=2023-11-24website=TimesNowlanguage=enarchive-date=24 November 2023archive-url=https://web.archive.org/web/20231124152229/https://www.timesnownews.com/delhi/first-section-of-delhi-metro-phase-iv-to-open-by-july-2024-says-dmrc-chief-article-104978294url-status=live }}
10Delhi Metrogolden}};text-align:center;"Golden Line1523.62TughlakabadTerminal 1-IGI AirportUnder construction2026
7Delhi Metropink}};text-align:center; "Pink Line812.32Majlis ParkMaujpur - BabarpurUnder construction2026
5Delhi Metrogreen}};text-align:center; "Green Line1012.38InderlokIndraprasthadate=2024-03-13title=Cabinet okays two new Delhi Metro corridors at ₹8400 crore project cost All you need to knowurl=https://www.hindustantimes.com/india-news/cabinet-okays-two-new-delhi-metro-corridors-at-rs-8400-crore-project-cost-all-you-need-to-know-101710323830812.htmlaccess-date=2024-03-13website=Hindustan Timeslanguage=enarchive-date=12 October 2024archive-url=https://web.archive.org/web/20241012011634/https://www.hindustantimes.com/india-news/cabinet-okays-two-new-delhi-metro-corridors-at-rs-8400-crore-project-cost-all-you-need-to-know-101710323830812.htmlurl-status=live }}date=2024-03-13title=Delhi Metro Update: Two new metro lines announced for National Capital! Inderlok to Indraprastha and Lajpat Nagar to Saket G Block - Here' all you need to know - Infrastructure News The Financial Expressurl=https://www.financialexpress.com/business/infrastructure-delhi-metro-update-two-new-metro-lines-announced-for-national-capital-inderlok-to-indraprastha-and-lajpat-nagar-to-saket-g-block-here-all-you-need-to-know-3424118/access-date=2024-03-14website=www.financialexpress.comlanguage=enarchive-date=1 December 2024archive-url=https://web.archive.org/web/20241201004522/https://www.financialexpress.com/business/infrastructure-delhi-metro-update-two-new-metro-lines-announced-for-national-capital-inderlok-to-indraprastha-and-lajpat-nagar-to-saket-g-block-here-all-you-need-to-know-3424118/url-status=live }}
12Delhi Metrogolden}};text-align:center;"Golden Line - Branch Line88.4Lajpat NagarSaket G-BlockUnder construction2029
1Delhi MetroRed}}; text-align: center;"Red Line2126.46RithalaKundliApproved2029

Construction Incidents

On 19 October 2008, a launching gantry and part of the overhead Blue Line extension under construction in Laxmi Nagar collapsed and fell on a passing bus. Workers were using a crane to lift a 400-tonne concrete span of the bridge when the gantry and a 34 m span of the bridge collapsed on the bus. The driver and a construction worker were killed.

On 12 July 2009, a section of a bridge collapsed while it was being erected at Zamrudpur, east of Kailash, on the Central Secretariat – Badarpur corridor. Six people died and 15 were injured. A crane removing the debris collapsed the following day and collapsed two other nearby cranes, injuring six. On 22 July 2009, a worker at the Ashok Park Metro station was killed when a steel beam fell on him. Over a hundred people, including 93 workers, have died since work on the metro began in 1998.

On 23 April 2018, five people were injured when an iron girder fell off the elevated section of a Metro structure under construction at the Mohan Nagar intersection in Ghaziabad. A car, an auto rickshaw, and a motorbike were also damaged in the incident.

Lines

Red Line (Line 1)

Main article: Red Line (Delhi Metro)

Older, but still modern, rapid-transit train at a station
Older rolling stock used by the DMRC on Line 1. Most of the stock running on Lines 2, 3, and 4 are planned to be sent to Line 1.

The Red Line, the first metro line opened, connects Rithala in the west to Shaheed Sthal (New Bus Adda) in the east for a distance of 34.55 km. Partly elevated and partly at grade, it crosses the Yamuna River between the Kashmere Gate and Shastri Park stations. The opening of the first stretch on 24 December 2002, between Shahdara and Tis Hazari, crashed the ticketing system due to demand. Subsequent sections were opened from Tis Hazari – Trinagar (later renamed Inderlok) on 4 October 2003, Inderlok – Rithala on 31 March 2004, and Shahdara – Dilshad Garden on 4 June 2008. The Red Line has interchanges at Kashmere Gate with the Yellow and Violet Lines, at Inderlok with the Green Line, and at Netaji Subhash Place and Welcome with the Pink Line. An interchange with the Blue Line at Mohan Nagar is planned. Six-coach trains were commissioned on the line on 24 November 2013. An extension from Dilshad Garden to Shaheed Sthal (New Bus Adda) opened on 8 March 2019. The metro introduced a set of two eight-coach trains on the Red Line, converted from the existing fleet of 39 six-coach trains, in November 2022.

Yellow Line (Line 2)

Main article: Yellow Line (Delhi Metro)

Still-modern train at a station
Old Yellow Line Mitsubishi-Rotem trainset
See caption
Train arriving at a Yellow Line station

The Yellow Line, the metro's second line, was its first underground line. Running 49 km north to south, it connects Samaypur Badli with Millennium City Centre Gurugram in Gurugram. The northern and southern parts of the line are elevated, and the central section (which passes through some of the most congested parts of Delhi) is underground. The underground section between Vishwa Vidyalaya and Kashmere Gate opened on 20 December 2004; the Kashmere Gate – Central Secretariat section opened on 3 July 2005, and Vishwa Vidyalaya – Jahangirpuri on 4 February 2009. The line has India's second-deepest metro station at Chawri Bazar, 25 m below ground level.

An additional stretch from Qutab Minar to Millennium City Centre Gurugram, initially operating separately from the mainline, opened on 21 June 2010; the Chhatarpur station on this stretch opened on 26 August of that year. Due to delays in acquiring land to construct the station, it was built with prefabricated structures in nine months and is the only Delhi Metro station made completely of steel. The connecting link between Central Secretariat and Qutub Minar opened on 3 September 2010. On 10 November 2015, the line was further extended between Jahangirpuri and Samaypur Badli in Outer Delhi.

Interchanges are available with the Red Line and Kashmere Gate ISBT at Kashmere Gate, with the Blue Line at Rajiv Chowk, with the Violet Line at Kashmere Gate and Central Secretariat, with the Airport Express at New Delhi, with the Pink Line at Azadpur and Dilli Haat - INA, with the Magenta Line at Hauz Khas, with Rapid Metro Gurgaon at Sikanderpur, and with Indian Railways at Chandni Chowk and New Delhi.

The Yellow Line is the metro's first line to replace four-coach trains with six- and eight-coach configurations. The Metro Museum at Patel Chowk metro station, South Asia's only rapid-transit museum, has a collection of display panels, historical photographs and exhibits tracing the genesis of the Delhi Metro. The museum was opened on 1 January 2009.

{{anchor|Blue Line (Line 3 & Line 4)}}Blue Line (Lines 3 and 4)

Main article: Blue Line (Delhi Metro)

Modern train at a station
New Bombardier Blue Line trainset

The Blue Line, the third line of the metro open, was the first to connect areas outside Delhi. Mainly elevated and partly underground, it connects Dwarka Sub City in the west with the satellite city of Noida in the east for a distance of 56.61 km. The line's first section, between Dwarka and Barakhamba Road, opened on 31 December 2005, and subsequent sections opened between Dwarka – Dwarka Sector 9 on 1 April 2006, Barakhamba Road – Indraprastha on 11 November 2006, Indraprastha – Yamuna Bank on 10 May 2009, Yamuna Bank – Noida City Centre on 12 November 2009, and Dwarka Sector 9 – Dwarka Sector 21 on 30 October 2010. The line crosses the Yamuna River between the Indraprastha and Yamuna Bank stations, and has India's second extradosed bridge across the Northern Railways mainlines near Pragati Maidan.

A branch of the Blue Line, inaugurated on 8 January 2010, runs for 6.25 km from the Yamuna Bank station to Anand Vihar in East Delhi. It was extended to Vaishali on 14 July 2011. A 2.76 km stretch from Dwarka Sector 9 to Dwarka Sector 21 opened on 30 October 2010. On 9 March 2019, a 6.67 km extension from Noida City Centre to Noida Electronic City was opened by Prime Minister Narendra Modi. Interchanges are available with the Aqua Line (Noida Metro) Noida Sector 51 station at Noida Sector 52, with the Yellow Line at Rajiv Chowk, with the Green Line at Kirti Nagar, with the Violet Line at Mandi House, with the Airport Express at Dwarka Sector 21, with the Pink Line at Rajouri Garden, Mayur Vihar Phase-I, Karkarduma and Anand Vihar, with the Magenta Line at Janakpuri West and Botanical Garden, and with Indian Railways and the Interstate Bus Station (ISBT) at Anand Vihar station (which connects with Anand Vihar Railway Terminal and Anand Vihar ISBT). An interchange with the Red Line at Mohan Nagar is planned.

Green Line (Line 5)

Main article: Green Line (Delhi Metro)

A modern train pulling into a station
Mitsubishi-Rotem-BEML rolling stock on the Green Line

Opened in 2010, the Green Line (Line 5) was Delhi Metro's fifth and its first standard-gauge line; the others were broad gauge. It runs between Inderlok (a Red Line station) and Brigadier Hoshiyar Singh, with a branch line connecting its Ashok Park Main station with Kirti Nagar on the Blue Line. The elevated line, built as part of Phase-II, runs primarily along the busy NH-10 route in West Delhi. It has 24 stations, including an interchange with the Pink Line at Punjabi Bagh West, and covers a distance of 29.64 km. The line had India's first standard-gauge maintenance depot at Mundka.

It opened in two stages, with the 15.1 km Inderlok–Mundka section opening on 3 April 2010 and the 3.5 km Kirti Nagar–Ashok Park Main branch line opening on 27 August 2011. On 6 August 2012, to improve commuting in the National Capital Region, the government of India approved an extension from Mundka to Bahadurgarh in Haryana. The 11.18 km stretch has seven stations (Mundka Industrial Area, Ghevra, Tikri Kalan, Tikri Border, Pandit Shree Ram Sharma, Bahadurgarh City and Brigadier Hoshiyar Singh) between Mundka and Bahadurgarh, and opened on 24 June 2018.

Violet Line (Line 6)

Main article: Violet Line (Delhi Metro)

Modern train with the number 6 in front
Mitsubishi-Rotem-BEML rolling stock on the Violet Line

The Violet Line is the sixth metro line opened and the second standard-gauge corridor, after the Green Line. The 47 km line connects Raja Nahar Singh in Ballabgarh via Faridabad to Kashmere Gate in New Delhi, with 26 km overhead and the rest underground. The first section between Central Secretariat and Sarita Vihar opened on 3 October 2010, hours before the inaugural ceremony of the 2010 Commonwealth Games, and connects Jawaharlal Nehru Stadium (the venue for the games' opening and closing ceremonies). Completed in 41 months, it includes a 100 m bridge over the Indian Railways mainlines and a 167.5 m cable-stayed bridge across a road flyover; it connects several hospitals, tourist attractions, and an industrial estate. Service is provided at five-minute intervals. An interchange with the Yellow Line is available at Central Secretariat through an integrated concourse. On 14 January 2011, the remaining portion from Sarita Vihar to Badarpur was opened; this added three new stations to the network.

The section between Mandi House and Central Secretariat was opened on 26 June 2014, and a 971 m section between ITO and Mandi House was opened on 8 June 2015. A 14 km extension south to Escorts Mujesar in Faridabad was inaugurated by Prime Minister Narendra Modi on 6 September 2015. All nine stations on the Badarpur–Escorts Mujesar (Faridabad) section of the metro's Phase III received the highest rating (platinum) for adherence to green-building norms from the Indian Green Building Council (IGBC). The awards were given to DMRC Managing Director Mangu Singh by IGBC chair P. C. Jain on 10 September 2015.

The line's Faridabad corridor is the longest corridor outside Delhi: 11 stations and 17 km. On 28 May 2017, the ITO–Kashmere Gate corridor was opened by Union Minister of Urban Development Venkaiah Naidu and Chief Minister of Delhi Arvind Kejriwal. The underground section is popularly known as the Heritage Line. Interchanges are available with the Red Line at Kashmere Gate, with the Yellow Line at Kashmere Gate and Central Secretariat, with the Blue Line at Mandi House, with the Pink Line at Lajpat Nagar and with the Magenta Line at Kalkaji Mandir.

Airport Express Line / Orange (Line 7)

Main article: Airport Express Line (Delhi Metro)

The outside of an Airport Express train, outdoors
The Airport Express Line
Roomy, comfortable-looking train interior
Interior of an Airport Express train

The Airport Express line runs 22.7 km from New Delhi to Yashobhoomi Dwarka Sector - 25, linking the New Delhi railway station and Indira Gandhi International Airport. The line was operated by Delhi Airport Metro Express Pvt. Limited (DAMEL), a subsidiary of Reliance Infrastructure (the line's concessionaire until 30 June 2013). It is now operated by DMRC. The line was built at a cost of , of which Reliance Infrastructure invested and will pay fees in a revenue-share model. It has six stations (Dhaula Kuan and Delhi Aerocity became operational on 15 August 2011), and some have check-in facilities, parking, and eateries. Rolling stock consists of six-coach trains, operating at ten-minute intervals, with a maximum speed of 120 km/h.

Originally scheduled to open before the 2010 Commonwealth Games, the line failed to obtain the mandatory safety clearance and was opened on 23 February 2011 after a delay of about five months. Sixteen months after beginning operations, it was shut down for viaduct repairs on 7 July 2012. The line reopened on 22 January 2013. On 27 June 2013, Reliance Infrastructure told DMRC that they were unable to operate the line beyond 30 June of that year. DMRC took over the line on 1 July 2013 with a 100-person operations and maintenance team. In January 2015, DMRC reported that the line's ridership had increased about 30 percent after a fare reduction of up to 40 percent the previous July. DMRC announced a further fare reduction on 14 September 2015, with a maximum fare of ₹60 and minimum of ₹10 instead of ₹100 and ₹20. DMRC said that this was done to reduce crowding on the Blue Line, diverting some Dwarka-bound passengers to the Airport Express Line (which was underutilised and faster than the Blue Line). The line's speed was increased from 100 km/h to 110 km/h on 24 June 2023, enabling a 16-minute ride from New Delhi to IGI Airport.

Interchanges are available with the Yellow Line at New Delhi, with the Blue Line at Dwarka Sector 21, with the Durgabai Deshmukh South Campus metro station of the Pink Line at Dhaula Kuan, and with Indian Railways at New Delhi. An expansion of Dwarka Sector 25 was inaugurated on 17 September 2023 with the opening of the adjacent India International Convention Centre.

Pink Line (Line 8)

Main article: Pink Line (Delhi Metro)

The Pink Line is the second new line of the Delhi Metro's third phase. It was opened on 14 March 2018, with an extension opening on 6 August. The Trilokpuri Sanjay Lake-to-Shiv Vihar section was opened on 31 October, and the Lajpat Nagar-to-Mayur Vihar Pocket I section opened on 31 December of that year. The final section, between Mayur Vihar Pocket I and Trilokpuri Sanjay Lake, was opened on 6 August 2021 after delays due to land-acquisition and rehabilitation issues.

The Pink Line has 38 stations from Majlis Park to Shiv Vihar, both in North Delhi. With a length of 58.43 km, it is the Delhi Metro's longest line. The mostly elevated line covers Delhi in a U-shaped pattern. It is also known as the Ring Road Line, since it runs along the busy Ring Road.

The line has interchanges with most of the metro's other lines, including with the Red Line at Netaji Subhash Place and Welcome, with the Yellow Line at Azadpur and Dilli Haat – INA, with the Blue Line at Rajouri Garden, Mayur Vihar Phase-I, Anand Vihar and Karkarduma, with the Green Line at Punjabi Bagh West, with Dhaula Kuan of the Airport Express at Durgabai Deshmukh South Campus, with the Violet Line at Lajpat Nagar, with Indian Railways at Hazrat Nizamuddin and Anand Vihar Terminal, and the ISBTs at Anand Vihar and Sarai Kale Khan. The Pink Line reaches the Delhi Metro's highest point at Dhaula Kuan23.6 m, passing over the Dhaula Kuan grade-separator flyovers and the Airport Express Line.

Magenta Line (Line 9)

Main article: Magenta Line (Delhi Metro)

See caption
A Magenta Line train at a station

The Magenta Line is the Delhi Metro's first new line of its third phase. The Botanical Garden-to-Kalkaji Mandir section opened on 25 December 2017, and the remainder of the line opened on 28 May 2018.

It has 26 stations, from Krishna Park Extension to Botanical Garden. The line directly connects to Terminal 1D of Indira Gandhi International Airport. The Hauz Khas station on this line and the Yellow Line is the deepest metro station, at a depth of 29 m. The Magenta Line has interchanges with the Yellow Line at Hauz Khas, with the Blue Line at Janakpuri West and Botanical Garden, and with the Violet Line at Kalkaji Mandir. India's first driverless train service began on the Magenta Line in December 2020.

Grey Line (Line 10)

Main article: Grey Line (Delhi Metro)

A train at a station
A Hyundai Rotem train on the Grey Line

The Grey Line (also known as Line 9), the Delhi metro's shortest line, runs from Dwarka to Dhansa Bus Stand in western Delhi. The 4.295 km line has four stations (Dhansa Bus Stand, Najafgarh, Nangli and Dwarka), and has an interchange with the Blue Line at Dwarka. The Najafgarh-to-Dwarka section was opened on 4 October 2019. The extension to Dhansa Bus Stand was scheduled to open in December 2020, but construction was delayed by the COVID-19 pandemic; it opened on 18 September 2021.

Network

Main article: List of Delhi Metro stations

The Delhi Metro has been undergoing construction in phases. Phase I consisted of 59 stations and 64.75 km of route length, of which 13.0 km is underground and 52.0 km at grade or elevated. The inauguration of the Dwarka–Barakhamba Road corridor of the Blue Line completed Phase I in October 2006. Phase II consists of 123.3 km of route length and 86 stations, and is completed; the first section opened in June 2008, and the last section opened in August 2011. Phase III consists of 109 stations, three new lines and seven route extensions, totaling 160.07 km, at a cost of . Most of it was completed on 5 April 2019, except for a small section of the Pink Line between the Mayur Vihar Pocket 1 and Trilokpuri Sanjay Lake stations (opened on 6 August 2021), the Grey Line extension from Najafgarh to Dhansa Bus Stand (opened on 18 September 2021), and the Airport Express extension from Dwarka Sector 21 to Yashbhoomi-Dwarka Sector 25 (opened on 17 September 2023). Phase IV, with six lines totaling 103.93 km, was finalized in July 2015. Of this, 61.679 km across three lines (priority corridors) with 45 stations was approved by the government of India for construction on 7 March 2019. The Golden Line was lengthened in October 2020, making the project 65.1 km long. Magenta Line's one station extension along the RK Ashram Marg opened on 5 January 2025 currently as far as Krishna Park Extension, with the rest of the network (Along with planned routes) is planned to be completed by at least 2029.

Delhi Metro networkLine No.Line NameOpenedLast extensionStationsLength (km)TerminalsRolling stockTrack gauge
(mm)1Delhi MetroRed}}; text-align: center;"Red Line2Delhi Metroyellow}}; text-align: center;"Yellow Line3Delhi Metroblue}}; text-align: center;"Blue Line45Delhi Metrogreen}}; text-align: center;"Green Line6Delhi Metroviolet}};text-align:center;"Violet Line-Delhi MetroAirport Express}};text-align:center;"Airport Express Line7Delhi Metropink}};"Pink Line8Delhi Metromagenta}}; text-align: center;"Magenta Line9Delhi Metrogrey}} ; text-align: center;"Grey LineTotal256350.42--268 trains, 1821 coaches-
25 December 20029 March 20192934.55Shaheed SthalRithala31 trains, 219 coaches1676
20 December 200410 November 20153749.02Samaypur BadliMillennium City Centre54 trains, 429 coaches
31 December 20059 March 20195056.11Noida Electronic CityDwarka Sector 2160 trains, 480 coaches
7 January 201014 July 201188.51Vaishali
3 April 201024 June 20182428.78InderlokBrigadier Hoshiyar Singh City Park20 trains, 80 coaches1435
27 August 2011Kirti Nagar
3 October 201019 November 20183446.34Kashmere GateRaja Nahar Singh Ballabhgarh37 trains, 220 coaches
23 February 201117 September 2023722.91New DelhiYashobhoomi Dwarka Sector 256 trains, 36 coaches
14 March 20186 August 20213859.24Majlis ParkShiv Vihar33 trains, 196 coaches
25 December 20175 Jan 20252640.26Botanical GardenKrishna Park Extension24 trains, 144 coaches
4 October 201918 September 202145.19DwarkaDhansa Bus Stand3 trains, 17 coaches

Expansion

Delhi

Delhi Metro Expansion Phase-V

Former DMRC managing director E. Sreedharan stated that by the time Phase IV is completed, the city will need Phase V to cope with increased population and transport needs. Following extensions are planned as part of Phase-V.

  • BL1Delhi Blue Line Metro: Yamuna Bank to Loni From the existing Yamuna Bank metro station, the Blue Line will be further extended 12 km to the Loni on Delhi-Ghaziabad border in Phase-V. See also Delhi Pink Line: Shiv Vihar-Loni extension below.
  • Central Vista Loop Line (4 stations, including 1 existing) As part of Central Vista Redevelopment Project, this underground line with 4 stations, including the existing Central Secretariat metro station interchange of existing Yellow Line and Violet Line, by connecting the new government buildings coming up as part of the Central Vista Redevelopment project.
  • Delhi Yellow Line: Samaypur Badli to Khera Kalan extension (3 stations, 2 new and 1 existing) From existing Samaypur Badli metro station to Khera Kalan in North Delhi via a proposed station at Siraspur has been proposed. This extension will have 2 new stations, Khera Kalan and Siraspur. A detailed project report (DPR) was prepared in 2024.
  • Delhi Airport Air Train (IGI APM). It is a proposed Automated Peoples Mover (APM) at Indira Gandhi International Airport (IGI Airport) which will have 4 airside and 1 outside station, namely Terminal T1 air side station, Aerocity Business Park outside air side station, Aerocity air side station, Cargo Terminal outside air side station, T2&T3 air side station.

Haryana

Har

Bahadurgarh

Bahadurgarh or Rohtak do not have own separate metro network, these cities in Haryana state are or will be connected to Delhi by the Delhi Metro.

  • Delhi Green Line Metro: Bahadurgarh to Asaudha (studies and DPR done): from the existing Bahadurgarh (Brigadier Hoshiyar Singh metro station) to Asaudha (Asaudah railway station) has been approved, where it will interchange with Haryana Orbital Rail Corridor.
  • Delhi Green Line Metro: Asaudha to Rohtak (studies done): further extension to Rohtak city.

Faridabad

Faridabad and Palwal do not have own separate metro network, these cities in Haryana state are or will be connected to Delhi by Delhi Metro Violet Line.

  • Faridabad-Gurugram link (studied and DPR done): see below in Gurugram section.
  • Delhi-Palwal extension (studied and DPR done): extension of Delhi Metro Violet Line.
  • Palwal-Noida Airport extension (no studied done or approved): extension of Delhi Metro Violet Line.

Gurugram

Gurugram has own separate light metro network called the Rapid Metro Gurgaon, with the following several extensions planned:

  • Inter-city links

GuruFarid

  • Faridabad-Gurugram link (studies and DPR done): from the existing Bata Chowk metro station on Delhi Metro Violet Line to Gurugram Vatika Chowk".

GuruIGI

  • Gurugram-IGI Airport link (studies and DPR done): from the Rezang La Chowk in Gurugram to the existing Delhi Orange Line Yashobhoomi Dwarka Sector 25 station for the IGI Airport.Joy after long wait as Gurgaon Metro gets central green light , Times of India, 8 June 2023.

  • Gurugram-Southeast Delhi link (no studies done or approved): from Vatika Chowk on SPR in southeast Gurugram to Mehrauli in southeast Delhi, not yet approved and no studies done yet.

  • Intera-city links

GuruLoop

  • Gurugram Metro Loop (studies and DPR done): from the existing Millennium City Centre Gurugram metro station to existing Cyber City station. In March 2025, Haryana invited tenders to begin civil construction of 15 km section from Millennium City metro station to Sector 9 metro station.
  • Radial lines within Gurugram such as the following:

GuruNS - North–south link or Old Gurugram Metro (studies and DPR done): from Kapashera to Manesar-Panchgaon (Pachgaon to integrate with RRTS station and WPE).

GuruSS - Southwest-South link, 17 km, DPR underway: from Gurgaon railway station, Rajiv Chowk, Vatika Chowk on SPR (Souther Peripheral Road), and Bhondsi, will connect to Metro extension from Millennium City Centre metro station at the Gurugram railway station and Delhi-Gurugram-Alwar RRTS line at Rajiv Chowk. In March 2025, Haryana invited tenders to hire consultant to prepare DPR for this route.

GuruEW - East–west link (no studies done or approved): from Gurugram Golf Course Extension Road to Gurugram Sector 5 along Sheetla Mata Road, with stations at Millennium City Centre Gurugram metro station (existing), Signature Tower crossing, Rana Pratap Chowk, and Atul Kataria Chowk. In March 2025, Haryana invited tenders to hire consultant to prepare DPR for this route.

Jhajjhar

Jhajjhar does not have own separate metro network, this city in Haryana state will be connected to Delhi in future by extension to the Delhi Metro.

  • Delhi Grey Line Metro Phase-V: Dhansa-Jhajjhar extension (studies done): Delhi Metro Grey Line from the existing Dhansa Bus Stand in Najafgarh to Jhajjar City via Badli.
  • Gurugram-Jhajjhar Metro (no studies done or approved): as extension of Gurugram Metro via Badsa AIIMS and Badli.

Sonipat

Sonipat does not have own separate metro network, Sonepat city in Haryana state will be connected to Delhi in future through extensions to the Delhi Metro in the following two phases:

  • Red Line Phase-IV Rithala-Narela-Nathupur extension (under-construction).
  • Red Line Phase-V Nathupur-Sector7 extension (studies done):

Uttar Pradesh

UP

Ghaziabad

Following are the extensions of Delhi Metro as Ghaziabad does not have separate Metro network.

  • PL1Delhi Pink Line: Shiv Vihar-Loni extension, from Shiv Vihar to Loni extension as part of Phase-V. See also Delhi Blue Line Metro: Yamuna Bank to Loni above.
  • Delhi Pink Line: Gokulpuri-Hindon Airport-Arthala extension, 13 km link from the existing Gokulpuri metro station of pink Line to the west Ghaziabad (existing Arthala metro station of Red Line metro) via Hindon Airport.

Noida

Main article: Noida Metro

Noida has own separate network called Noida Metro, which connects to the Delhi Metro.

  • Noida Aqua Line: Sector 51 - Knowledge Park-V extension.
  • Noida Film City-Noida Sector 142 PRT
  • Greater Noida-Noida Airport Metro: from the existing Noida Sector 148 metro station on Noida Aqua Line to Noida International Airport.
  • Ballabhgarh-Noida Airport Metro: From Ballabhgarh metro station on Delhi Metro Violet Line to Palwal and Jewar Airport.

{{anchor|Integration with RRTS (RapidX)|Stations and Overview}}Integration with RRTS

Delhi RRTS system, a RapidX "Regional Rapid Transit System" (RRTS) which aims to connect Delhi with its neighbouring cities via eight lines of semi-high-speed trains operating at a maximum speed of 160 km/h. Phase I of the project consists of three corridors: Delhi–Meerut, Delhi–Alwar, and Delhi–Panipat corridor. The Delhi–Meerut corridor, also known as the Delhi–Meerut RRTS, is currently under development by the National Capital Region Transport Corporation (NCRTC).

The Delhi–Meerut RRTS is 82.15 km long and costs . It will comprise 14 stations (with nine additional stations for the Meerut Metro) and two depots. Three of the 14 stations (Sarai Kale Khan, New Ashok Nagar, and Anand Vihar) will be in Delhi, and are planned for seamless integration with the Delhi Metro.

Operations

Exterior of a modern building
Millenium City Centre metro station

Trains operate at a frequency of one to two minutes to five to ten minutes between 05:00 and 00:00, depending upon peak and off-peak hours. They typically travel up to 75 km/h, and stop for about 20 seconds at each station. Automated station announcements are in Hindi and English. Many stations have ATMs, food outlets, cafés, convenience stores and mobile recharge. Eating, drinking, smoking, and chewing gum are prohibited. The metro has a sophisticated fire alarm system for advance warning in emergencies, and fire retardant material is used in trains and stations. Navigation information is available on Google Maps. Since October 2010, the first coach of every train is reserved for women; the last coach is also reserved when the train changes tracks at the terminal stations on the Red, Green and Violet Lines. The mobile Delhi Metro Rail app has been introduced for iPhone and Android users with information such as the location of the nearest metro station, fares, parking availability, nearby tourist attractions, security and emergency helpline numbers.

Security

Security has been provided by the CISF Unit DMRC since 2007. Closed-circuit cameras monitor trains and stations, and their feeds are monitored by the CISF and Delhi Metro authorities. Over 7,000 CISF personnel have been deployed for security in addition to metal detectors, X-ray baggage-inspection systems, and detection dogs. Eighteen Delhi Metro Rail Police stations have been established, and about 5,200 CCTV cameras have been installed. Each underground station has 45 to 50 cameras, and each elevated station has 16 to 20 cameras. The cameras are monitored by the CISF and the Delhi Metro Rail Corporation. Intercoms are provided in each train car for emergency communication between passengers and the train operator. Periodic security drills are carried out at stations and on trains. The DMRC is considering raising station walls and railings for passenger safety.

{{anchor|Ticketing and recharge}}Ticketing

A token with a picture of a train
A Delhi Metro token

The metro's fares were last revised on 10 October 2017, based on the recommendation of the 4th Fare Fixation Committee in May 2016. Metro commuters have five choices for ticket purchases:

  • RFID token: RFID tokens are valid only for a single journey on the day of purchase. Their value depends on the distance travelled, with fares for a single journey ranging from to . Fares are calculated based on the distance between the origin and destination stations. As of 2024 they are no longer in use.
  • Smart card: Smart cards are available for longer terms, and are the most convenient for frequent commuters. Valid for ten years from the date of purchase or the date of the last recharge, they are available in denominations of to . A 10-percent discount is given, with an additional 10-percent discount for off-peak travel. A new card has a deposit, refundable on its return before expiry if physically undamaged. For women commuters, the Delhi government unsuccessfully proposed a fare-exemption scheme. A common ticketing facility, allowing commuters to use smart cards on Delhi Transport Corporation (DTC) buses and the metro, was introduced on 28 August 2018.
  • Tourist card: Tourist cards can be used for unlimited travel on the Delhi Metro for short periods of time. There are two kinds of tourist cards, valid for one and three days. The cost of a one-day card is and a three-day card is , including a refundable deposit of paid at purchase.
  • National Common Mobility Card: Part of the Indian government's One Nation, One Card policy, the National Common Mobility Card is an inter-operable transport card enabling a user to pay for travel, tolls, shopping and cash. Enabled through RuPay, the NCMC was commissioned on the Airport Express Line on 28 December 2020. In June 2023, DMRC completed the upgrade of its automatic fare collection (AFC) systems to be compliant with NCMC services.[[File:QR based ticket - DMRC.jpg|alt=Paper QR ticket|thumb|Delhi Metro QR ticket]]
  • QR code based ticketing: A Delhi Metro QR ticket is a mobile-based ticket allowing travel like a token or recharge card. A ticket can be bought online with the RIDLR app. For entry and exit, the QR ticket is scanned at the AFC gates. Similar to mobile-based tickets, paper QR tickets can be bought at a station.

Problems

An urban landscape
url-status=live}}</ref>
Exterior of a large station
The [[Jasola Apollo metro station

As the metro has expanded, high ridership on new trains has led to increasing overcrowding and delays. To alleviate the problem, eight-coach trains have been introduced on the Yellow and Blue Lines and more-frequent trains have been proposed. Infrequent, overcrowded and erratic feeder bus services connecting stations to nearby localities have also been a concern. Although the quality and cleanliness of the Delhi Metro have been praised, rising fares have been criticized; fares are higher than those of the bus services the metro replaced. According to a recent study, Delhi Metro fares are the second-most unaffordable among metros charging less than US$0.5 per ride. Another study finds that Delhi Metro may also have a low ridership problem compared to its size and may not be generating the amount of traffic a metro system generates.

Feeder buses

Front view of a bus
A DMRC electric feeder bus at the [[Anand Vihar metro station

DMRC began its feeder bus service in 2007 with a fleet of 117 minibuses on 16 routes. In January 2024, it had a fleet of 47 electric feeder buses on five routes to nine metro stations: Kashmere Gate, Gokulpuri, Shastri Park, Laxmi Nagar, East Vinod Nagar - Mayur Vihar-II, Anand Vihar, Dilshad Garden, Vishwavidyalaya, and GTB Nagar. The routes are:

  • MC-127: Kashmere Gate to Harsh Vihar
  • MC-137: Shastri Park to Mayur Vihar Phase-III
  • MC-137 (Mini): Udyog Bhawan to Vanijya Bhawan
  • MC-341: Mayur Vihar Phase-III to Harsh Vihar
  • ML-06: Vishwavidyalaya to Shankarpura

Ridership

Note that DMRC reports different metrics versus the daily ridership below. DMRC report "daily passenger journeys" - for example, in 2022–23, DMRC reported that average daily passenger journeys were approx 4.63 million per day as compared to 5.16 million per day in 2019-20 (pre-Covid).

Metro service was suspended on 25 March 2020 due to the COVID-19 pandemic. Operations resumed on 12 September 2020, and the average daily ridership fell to 8.78 lakh (0.88 million) in FY 2020–21.

The maximum daily ridership (passenger journeys) of 7.86 million was reported on 18 November 2024.

  • Includes Rapid Metro Gurgaon

^ From 2019 onwards the DMRC changed the ridership calculation to count every trip taken by a passenger on a line. This means that a passenger that takes 2 connections will count 3 times towards ridership. This is different from the more standard practice of counting entire journeys applied in other metro systems. Therefore, Delhi metro reports approximately 55% higher ridership when compared to similar transit systems worldwide.

Finances

Summary financials

Source:

The Delhi Metro has been operating with a loss in EBT (earnings before taxes) since 2010, although the loss has shrunk since 2015–16. Its EBITDA (earnings before interest, taxes, depreciation, and amortization) declined from 73 percent in FY 2007 to 27 percent in FY 2016–17 before improving to 30 percent in 2017–18. The metro began a naming policy for stations in 2014, awarded by an open e-tendering process, to generate non-fare revenue.

Funding and Capitalisation

DMRC is owned by the government of the National Capital Territory of Delhi and the government of India. Total debt was in March 2016, and equity capital was . The cost of the debt is zero percent for Union Government and Delhi Government loans, and from 0.01 and 2.3 percent for Japan International Cooperation Agency (JICA) loans. On 31 March 2016, was paid-up capital; the rest is reserves and surplus.

Depots

Delhi Metro has 15 depots.

LineLine nameNumber of depotsLocationOpening date123 / 456-789
Delhi Metrored}}; text-align: center;"Red Line1Shastri Park25 December 2002
NarelaUnder construction
Delhi Metroyellow}}; text-align: center;"Yellow Line3Khyber Pass20 December 2004
Sultanpur21 June 2010
Samaypur Badli28 May 2020
Delhi Metroblue}}; text-align: center;"Blue Line2Najafgarh31 December 2005
Yamuna Bank10 May 2009
Delhi Metrogreen}}; text-align: center;"Green Line2Mundka2 April 2010
Bahadurgarh24 June 2018
IndraprasthaUnder construction
Delhi Metroviolet}}; text-align: center;"Violet Line2Sarita Vihar3 October 2010
Neelam Chowk Ajronda6 September 2015
Delhi MetroAirport Express}}; text-align: center;"Airport Express1Dwarka Sector 2123 February 2011
Delhi MetroPink}}; text-align: center;"Pink Line2Mukundpur14 March 2018
Vinod Nagar - Ghazipur31 October 2018
Delhi Metromagenta}}; text-align: center;"Magenta Line1Kalindi Kunj - Jasola Vihar25 December 2017
MukundpurUnder construction
Delhi Metrogrey}}; text-align: center;"Grey Line1Najafgarh4 October 2019

Some depots, such as Shastri Park and Yamuna Bank, are near their respective at-grade station complexes; others, such as Sarita Vihar and Mundka, are joined indirectly to the main line. The Najafgarh depot is unique in housing both broad gauge and standard gauge trains from the Blue and Grey Lines, respectively; the Sarita Vihar depot will house Violet and Golden Line trains in the future. The Phase III Kalindi Kunj and Vinod Nagar depots were built differently due to land-acquisition issues; the former has an extra elevated stabling yard adjacent to the Jasola Vihar - Shaheen Bagh station, and the latter has two sub-depots (one with two floors). An elevated stabling yard was also built adjacent to the Noida Electronic City station, but it is not considered a depot. As part of Phase IV, the Mukundpur depot will be expanded to accommodate the Pink and Magenta Lines without land-acquisition issues.

The metro has two rail gauges. Phase I lines have broad gauge rolling stock, while all the newer lines have rolling stock. As mentioned in the above table, trains are maintained at 15 depots across Delhi. Maglev trains were considered for some Phase III lines, but DMRC decided to continue with conventional rail in August 2012.

By 31 March 2015, the company had a total of 1,306 coaches (220 trains). In addition to line extensions, two new lines (7 and 8) were proposed in Phase III. Unattended train operation (UTO) will be in 486 coaches (81 six-car trains). An additional 258 broad-gauge (BG) coaches for Lines 1 to 4 and 138 standard-gauge (SG) coaches for Lines 5 and 6 were proposed. At the end of Phase III, there would be 2,188 coaches (333 trains). Except for a few four-car trains on Line 5, 93 percent of the trains would have a six- or eight-car configuration at the end of Phase III.

Broad gauge

Rolling stock is provided by two major suppliers. Phase I rolling stock was supplied by a consortium of companies (Hyundai Rotem, Mitsubishi Corporation, and MELCO). The coaches look similar to the MTR Rotem EMU, but have only four doors; sliding doors, instead of plug doors, are used. The coaches were initially built in South Korea by Rotem, then in Bangalore by BEML through a technology transfer arrangement. The trains consist of four lightweight 3.2 m stainless-steel coaches with vestibules (permitting movement throughout them) and can carry up to 1,500 passengers, with 50 seated and 330 standing passengers per coach. The coaches are air-conditioned, equipped with automatic doors, microprocessor-controlled brakes and secondary air suspension, and can maintain an average speed of 32 km/h over a distance of 1.1 km. The system is extendable to eight coaches, and platforms have been designed accordingly.

Phase II rolling stock is supplied by Bombardier Transportation, which received an order for 614 cars at a cost of about . Although the initial trains were made in Görlitz, Germany and Sweden, the remainder will be built at Bombardier's factory in Savli (near Vadodara). The four- and six-car trains have a capacity of 1,178 and 1,792 commuters each, respectively. Coaches have closed-circuit television (CCTV) cameras with eight-hour backup, chargers for cell phones and laptops, and improved climate control.

Standard gauge

Standard-gauge rolling stock is manufactured by BEML at its factory in Bangalore, and most of these trains are supplied to BEML by Hyundai Rotem. The four-car trains have a capacity of 1,506 passengers, accommodating 50 seated and 292 standing passengers in each coach. The trains, with CCTV cameras in and outside the coaches, chargers for mobile phones and laptops, improved climate control and microprocessor-controlled disc brakes, will be capable of maintaining an average speed of 34 km/h over a distance of 1.1 km.

Airport Express

Eight six-car trains supplied by CAF Beasain were imported from Spain. CAF held five-percent equity in the DAME project, and Reliance Infrastructure held the remaining 95 percent before DMRC took over operations. Trains on this line have noise reduction and padded fabric seats. Coaches are equipped with LCD screens for entertainment and flight information. Trains have an event recorder which can withstand high levels of temperature and impact, and wheels have a flange-lubrication system for reduced noise and improved comfort.

Signaling and telecommunication

Elevated-train signal, with high-rise buildings in the background
Metro signal

The metro uses cab signaling with a centralised automatic train control system consisting of automatic operation, protection and signaling modules. A 380 MHz digital trunked TETRA radio communication system from Motorola Solutions is used on all lines to carry voice and data information. For the Blue Line, Siemens supplied the electronic interlocking Sicas, the Vicos OC 500 operation-control system and the LZB 700 M automation-control system. An integrated system with optical fibre cable, on-train radio, CCTV, and a centralised clock and public address system is used for telecommunication during normal operations and emergencies. Alstom supplied the signaling system for the Red and Yellow Lines, and Bombardier Transportation supplied its CITYFLO 350 signaling system for the Green and Violet Lines.

The Airport Express line introduced WiFi service at all its stations on 13 January 2012. Connectivity in trains is expected in the future. WiFi service is provided by YOU Broadband and Cable India. In August 2017, Wifi service began at all the 50 stations of the Blue Line. A fully automated, operator-less train system was offered to the metro by the French technology firm Thales.

Environment and aesthetics

See caption
A rooftop solar-power system at the Anand Vihar metro station

The metro has received awards for environmentally-friendly practices from organisations including the United Nations, RINA, and the International Organization for Standardization; it is the second metro in the world, after the New York City Subway, to be ISO 14001 certified for environmentally-friendly construction. By March 2023, 64 metro stations, four sections on the central verge between piers, and 12 other Phase I and II locations on the network have rainwater harvesting for environmental protection; all 27 Phase-IV elevated stations will also harvest rainwater, and 52 recharge pits are being constructed for this purpose. It is the world's first railway project to earn carbon credits after being registered with the United Nations under the UN's Clean Development Mechanism, and has earned 400,000 carbon credits with the regenerative braking systems on its trains.

DMRC installed the metro's first rooftop solar power plant at the Dwarka Sector-21 station in 2014. The network received 35 percent of its energy from renewable sources by April 2023, which it intends to increase to 50 percent by 2031. Of this, 30 percent comes from the Rewa Ultra Mega Solar park in Madhya Pradesh; four percent (50 MWp) comes from rooftop solar panels, and one percent comes from a waste-to-energy plant in Ghazipur. DMRC has installed solar panels at 142 locations: 15 depots, 93 stations, and 34 other buildings.

The metro has been promoted as an integral part of community infrastructure, and artwork depicting the local way of life has been displayed at stations. Students at local art colleges have designed murals at metro stations, and the viaduct pillars of some elevated sections have been decorated with mosaic murals created by local schoolchildren. The metro station at INA Colony has a gallery of artwork and handicrafts from across India, and all stations on the Central Secretariat – Qutub Minar section of the Yellow Line have panels depicting Delhi's architectural heritage. The Nobel Memorial Wall at Rajiv Chowk has portraits of the seven Indian Nobel laureates: Rabindranath Tagore, CV Raman, Hargobind Khorana, Mother Teresa, Subrahmanyan Chandrasekhar, Amartya Sen and Venkatraman Ramakrishnan.

Notes

References

References

  1. "Board of Directors of DMRC".
  2. (16 September 2023). "Delhi Metro increases speed to 120 kmph on Airport Line. Know how long will it take to reach Delhi airport". Live Mint.
  3. (23 March 2023). "Delhi airport metro line, now running at 100 KMPH".
  4. (22 March 2023). "VROOM! Delhi metro top speed increased! Now, IGI Airport to New Delhi Railway Station in just".
  5. Dayal, Anuj. (15 November 2024). "FIRST TRAIN SET ORDERED FOR DELHI METRO'S PHASE 4 OPERATIONS REACHES DELHI". [[Delhi Metro Rail Corporation.
  6. (2021-04-04). "Delhi Metro adding 120 more coaches to upgrade remaining fleet of 6-coach trains".
  7. Gandhiok, Jasjeev. (18 January 2024). "Delhi Metro logs 2 billion passenger trips for 2023 — highest ever". Hindustan Times.
  8. Dua, Tanya. (24 November 2018). "After 5 years of riding the New York City subway, I tried the Delhi Metro at the busiest time of the year – and it showed me exactly what I'm missing". Business Insider.
  9. "Present Network".
  10. "Route map".
  11. "Introduction {{!}} DMRC".
  12. (24 October 2023). "DMRC Services Update". Delhi Metro Rail Corporation (DMRC).
  13. Roy, Sidharatha. (25 December 2017). "Delhi Metro: It all started 15 Xmas days ago".
  14. (18 September 2023). "DMRC's remarkable growth: Delhi Metro surpasses 390 kms, becomes India's longest metro network".
  15. "Project Update an Janakpuri West – R. K. Ashram Marg corridor".
  16. (29 October 2018). "Delhi Metro to join global club of metro networks having span of over 300 km".
  17. "PM inaugurates KMP expressway, Ballabhgarh-Mujesar Metro rail link". Tribuneindia News Service.
  18. (23 October 2019). "Delhi Metro takes over operations of Gurgaon Rapid Metro".
  19. Gandhiok, Jasjeev. (18 January 2024). "Delhi Metro logs 2 billion passenger trips for 2023 — highest ever". Hindustan Times.
  20. Ashish Chandrorkar. (19 February 2021). "A comprehensive report on Metro rail systems in India".
  21. (2025-09-16). "Delhi-NCR travel boost: RRTS, metro together solve connectivity puzzle; Namo Bharat stations integrated with DMRC". The Times of India.
  22. Siemiatycki, Matti. (June 2006). "Message in a Metro: Building Urban Rail Infrastructure and Image in Delhi, India". International Journal of Urban and Regional Research.
  23. "History of Delhi Metro". [[Delhi Metro Rail Corporation.
  24. Pucher, John. (2004). "The Crisis of Public Transport in India". Journal of Public Transportation.
  25. (2 March 2021). "The derailment of E Sreedharan".
  26. "Structure of Delhi Metro". [[Delhi Metro Rail Corporation.
  27. "Sreedharan calls it a day; Mangu Singh takes over as new chief of Delhi Metro".
  28. "Breaking Ground: A Narrative on the Making of Delhi Metro".
  29. "Delhi metro rail work begins but without fanfare". [[The Indian Express]].
  30. (13 April 2007). "Delhi Metro showcases public sector success".
  31. CAG of India. (2008). "Chapter 2, Coordination and Planning – Implementation of Phase I of Delhi Mass Rapid Transit System by DMRC Limited (Report No. PA 17 of 2008)".
  32. "二零零一度".
  33. (7 August 2000). "Delhi Metro Rail to adopt BG system". [[The Hindu]].
  34. CAG of India. (2008). "Chapter 3, Selection of Technologies – Implementation of Phase I of Delhi Mass Rapid Transit System by DMRC Limited (Report No. PA 17 of 2008)".
  35. CAG of India. (2008). "Annexures – Implementation of Phase I of Delhi Mass Rapid Transit System by DMRC Limited (Report No. PA 17 of 2008)".
  36. (24 December 2002). "Indian PM launches Delhi metro". BBC News.
  37. "The Tribune, Chandigarh, India – Delhi and neighbourhood".
  38. "The Tribune – Magazine section – Saturday Extra".
  39. Nandini Lakshman. (19 March 2007). "The Miracle-Worker of the Delhi Metro".
  40. "Economic Survey of Delhi 2022–23".
  41. "Economic Survey of Delhi 2014-15".
  42. (2019-05-07). "25 years of DMRC! How Delhi Metro has become a lifeline for the national capital – from 1995 to 2019".
  43. (2005-07-02). "Delhi Metro goes underground". The Times of India.
  44. (2005-12-30). "PM inaugurates Barakhamba-Dwarka Metro line". The Times of India.
  45. (2006-11-11). "Barakhamba-Indraprastha section of Metro opens".
  46. (2008-06-03). "Metro comes to Dilshad Garden".
  47. (2009-02-04). "DU-Jahangirpuri Metro line flagged off, opens to public from today".
  48. (2010-06-21). "Delhi Metro reaches Gurgaon, brings smiles to residents".
  49. (2010-08-26). "Chattarpur station to open today". The Times of India.
  50. (2010-09-03). "Central Secretariat-Qutub Minar Metro line gets operational".
  51. (2009-05-10). "Delhi Metro chugs into East Delhi".
  52. (2009-11-12). "Delhi Metro enters Noida, to open to public tomorrow". The Times of India.
  53. (2010-10-30). "Noida Metro line extended to Dwarka Sec-21". The Economic Times.
  54. (2010-01-07). "Anand Vihar Metro line opens for public".
  55. (2011-07-14). "Delhi Metro begins service to Ghaziabad".
  56. (2010-04-02). "Metro's Green Line opened". The Hindu.
  57. (2011-08-27). "Kirti Nagar-Ashok Park Metro opens to public".
  58. (2010-10-03). "Metro to JLN Stadium from today".
  59. (2011-01-14). "DMRC opens Sarita Vihar-Badarpur section". The Hindu.
  60. (2011-02-23). "Airport Express Corridor opens; reach IGI in 18 minutes". The Hindu.
  61. (2011-08-15). "Airport Metro gets 2 new stations".
  62. (5 April 2019). "Funding". Delhi Metro Rail Corporation.
  63. (1 January 2012). "Delhi Metro rings in the New Year under new chief". [[Dainik Jagran]].
  64. (2019-03-08). "PM flags off Red Line extension". The Hindu.
  65. (2015-11-10). "Naidu, Kejriwal to flag-off Jahangirpuri-Samaypur Badli extension of Delhi Metro".
  66. (9 March 2019). "Blue Line Metro: PM Modi inaugurates Delhi Metro's Blue Line extension | Noida News".
  67. (2018-06-24). "Delhi Metro Green Line: Mundka-Bahadurgarh section inaugurated by PM Modi; 5 facts every commuter should know".
  68. (2014-06-26). "Delhi Metro's Mandi House-Central Secretariat line opens". The Times of India.
  69. (2015-06-08). "Delhi Metro services begin on ITO-Mandi House section".
  70. (2015-09-06). "PM Narendra Modi inaugurates Badarpur-Faridabad metro line".
  71. (28 May 2017). "Delhi Metro's ITO-Kashmere Gate 'Heritage Line' opens for public".
  72. (2018-11-19). "Delhi Metro Violet Line: PM Modi flags off new Escorts Mujesar-Ballabhgarh section; check route, stations".
  73. (2023-09-17). "Airport Line extension opens for passengers, ends at YashoBhoomi Dwarka Sector 25 station". The Times of India.
  74. (2018-03-14). "Majlis Park-South Campus corridor of Delhi Metro's Pink Line inaugurated". The Times of India.
  75. (2018-08-06). "Delhi Metro's South Campus-Lajpat Nagar section on Pink Line inaugurated".
  76. (2018-10-31). "Delhi Metro's Pink Line from Shiv Vihar to Trilokpuri now open for public".
  77. (2018-12-31). "Delhi metro pink line: Lajpat Nagar-Mayur Vihar Pocket 1 corridor inaugurated". The Times of India.
  78. (2021-08-06). "Pink Line: Cut Travel Time & Save Money As Trilokpuri - Mayur Vihar Pocket 1 To Open Today".
  79. (2017-12-25). "Delhi Metro's Magenta Line open to public from 5 pm; expected to ferry over 3.6 lakh commuters daily".
  80. (2018-05-28). "Delhi Metro's Kalkaji Mandir-Janakpuri West stretch inaugurated".
  81. (2019-10-04). "Delhi Metro's Grey Line connecting Dwarka and Najafgarh inaugurated".
  82. (2021-09-18). "Grey Line: Delhi Metro's Najafgarh-Dhansa Bus Stand corridor inaugurated". The Hindu.
  83. (11 December 2011). "Metro to cover whole of Delhi by 2012". The Economic Times.
  84. (23 April 2014). "Jung wants better access to all Metro stations". The Indian Express.
  85. "Phase 3 Corridors". [[Delhi Metro Rail Corporation.
  86. (31 January 2012). "Tunnelling work starts for Metro's Phase III". The Economic Times.
  87. [http://economictimes.indiatimes.com/industry/transportation/railways/will-not-let-funding-row-derail-phase-iv-government/articleshow/59435629.cms Will not let funding row derail Phase-IV: Government] {{webarchive. link. (7 July 2017, [[The Economic Times]], 4 July 2017.)
  88. Prasad, Nikita. (17 September 2021). "Grey Line's Najafgarh-Dhansa Bus Stand Corridor To Open For Services Tomorrow". NDTV.
  89. (2023-09-17). "Airport Line extension opens for passengers, ends at YashoBhoomi Dwarka Sector 25 station". The Times of India.
  90. Bedi, Aneesa. (28 December 2020). "PM Modi launches India's first driverless metro train in Delhi. Here's all you need to know". The Print.
  91. (25 November 2021). "Driverless train operations on Pink Line flagged off". Money Control.
  92. Chitlangia, Risha. (3 December 2021). "Delhi Metro ridership only half of the figure projected by DMRC: CAG report". Hindustan Times.
  93. (2 December 2021). "Report No.11 of 2021 - Performance Audit on Implementation of Phase III, Delhi Mass Rapid Transit System by DMRC, Ministry of Housing and Urban Affairs". Comptroller and Auditor General of India.
  94. "Delhi metro average train frequency during peak and off-peak hours ( As on 31.12.2021)". Delhi Metro Rail Corporation.
  95. (2 December 2021). "Report No.11 of 2021 - Performance Audit on Implementation of Phase III, Delhi Mass Rapid Transit System by DMRC, Ministry of Housing and Urban Affairs". Comptroller and Auditor General of India.
  96. (2018-12-20). "Delhi Metro's Much-awaited Phase 4 Gets AAP Govt's Nod, Likely to be Ready by 2024".
  97. "Delhi Metro: Cabinet approves three corridors of Delhi Metro Phase IV". The Economic Times.
  98. (20 June 2021). "Completion targets of Metro Phase-4 will depend on Covid-19 scenario: DMRC". Hindustan Times.
  99. [https://timesofindia.indiatimes.com/city/delhi/delhi-metro-phase-4-gets-government-nod/articleshow/56379166.cms Delhi Metro Phase-4 gets government nod] {{Webarchive. link. (19 April 2023 , ''[[The Times of India]]'', 6 January 2017.)
  100. Gaurav Vivek Bhatnagar. (25 December 2006). "Delhi Metro map to cover Greater Noida". [[The Hindu]].
  101. Megha Suri. (30 January 2010). "Pvt metro link to get Central nod soon". [[The Times of India]].
  102. [https://www.financialexpress.com/infrastructure/delhi-metro-dmrc-to-come-up-with-elevated-road-network-below-these-3-new-lines-details-here/1420938/ Delhi Metro: DMRC to come up with elevated road network below these 3 new lines] {{Webarchive. link. (21 December 2018 , ''The Financial Express'', 21 December 2018.)
  103. (31 December 2019). "Work begins on Delhi Metro Phase-IV". The Hindu.
  104. (2023-11-05). "First section of Delhi Metro phase-IV to open by July 2024, says DMRC chief".
  105. (March 13, 2024). "Cabinet approves two corridors of Delhi Metro Phase-IV projects namely (i) Lajpat Nagar to Saket G-Block and (ii) Inderlok to Indraprastha".
  106. (2024-03-13). "Cabinet okays two new Delhi Metro corridors at ₹8400 crore project cost {{!}} All you need to know".
  107. (2024-03-13). "Delhi Metro Update: Two new metro lines announced for National Capital! Inderlok to Indraprastha and Lajpat Nagar to Saket G Block - Here' all you need to know - Infrastructure News {{!}} The Financial Express".
  108. (2025-12-12). "Golden Line: DMRC begins work on Lajpat Nagar-Saket G block metro corridor". The Economic Times.
  109. "Delhi Metro: Red Line to Extend to Kundli in Haryana, Check Station Names - News18". News18.
  110. (2024-12-06). "Union Cabinet approves Rithala-Kundli corridor of Delhi Metro". The Hindu.
  111. (19 October 2008). "Delhi Metro bridge collapses; 1 dead". CNN-IBN.
  112. (12 July 2009). "A chronology of Delhi Metro accidents". [[Hindustan Times]].
  113. Suri, Megha. (14 July 2009). "Day 2: 3 cranes fall, Metro image takes beating". [[The Times of India]].
  114. (22 July 2009). "Labourer dies at Delhi Metro construction site". Central Chronicle.
  115. Mathur, Atul. (7 December 2009). "City's nightmare on wheels". [[Hindustan Times]].
  116. (23 April 2018). "Five injured as iron girder falls off Metro structure in Ghaziabad". [[Hindustan Times]].
  117. "Delhi Metro Red Line".
  118. (24 April 2009). "On May 2, Metro to cross the Yamuna again". [[The Times of India]].
  119. (24 December 2002). "Prime Minister inaugurates Metro Rail services between Tis Hazari and Shahdara". Press Information Bureau, Government of India.
  120. (27 December 2002). "Passengers swamp Delhi's new metro". [[The Sydney Morning Herald]].
  121. (5 October 2003). "70,000 travel by Tri Nagar-Tis Hazari Metro rail". [[The Times of India]].
  122. "Metro Station Information". [[Delhi Metro Rail Corporation.
  123. (23 November 2013). "DMRC to introduce six-coach trains on Dilshad Garden-Rithala line on Sunday". [[The Times of India]].
  124. (8 November 2022). "Eight-coach trains introduced on Red line: Delhi Metro". The Times of India.
  125. (20 December 2004). "A subterranean journey begins". [[The Times of India]].
  126. "Delhi Metro Museum Celebrates 3rd Anniversary".
  127. (16 September 2014). "Hauz Khas set to get deepest underground metro station by March 2016". [[The Indian Express]].
  128. (25 August 2010). "Chhattarpur Metro Station To Become Operational From Tomorrow". Delhi Metro Rail Corporation.
  129. (26 August 2010). "Chattarpur station to open today". [[The Times of India]].
  130. (8 September 2010). "Gurgaon gets a lifeline as CST-Qutub corridor opens". Sify News.
  131. "The Jahangirpuri- Samaypur Badli section (Extension of Line-2)". Delhi Metro.
  132. Sharma, Nidhi. (29 June 2005). "New Delhi Metro station, your connect with National rail". [[The Times of India]].
  133. (1 July 2005). "Secretariat to DU in 18 minutes flat". [[The Hindu]].
  134. "Metro Museum".
  135. (12 November 2009). "Metro enters Noida, set to change travelling habits of people". [[Daily News and Analysis]].
  136. (28 December 2005). "Metro to travel underground and overhead".
  137. Gaurav Vivek Bhatnagar. (12 November 2006). "Delhi Metro just got bigger and better". [[The Hindu]].
  138. (7 January 2010). "Delhi Anand Vihar Metro line opens for public". [[The Economic Times]].
  139. (13 July 2011). "Anand Vihar – Vaishali Section To Open For Passenger Services From 14th July 2011". [[Delhi Metro Rail Corporation.
  140. (30 October 2010). "Press Release: DMRC Extends Metro Services To Dwarka Sector 21 on Line-3". [[Delhi Metro Rail Corporation.
  141. (9 March 2019). "PM Modi flags off Noida City Centre-Noida Electronic City section of Delhi Metro 's Blue Line {{!}} Business News".
  142. (7 January 2010). "40000 Footfalls at Anand Vihar Metro on Day 1". [[Outlook India]].
  143. (23 February 2010). "Metro gets first standard gauge depot". [[The Hindu]].
  144. (3 October 2010). "Metro from Central Secretariat to Sarita Vihar too". [[Yahoo! News]].
  145. Suri, Megha. (16 October 2010). "Train services on Delhi Metro's Central Secretariat to Sarita Vihar section will start one hour late (from 7 am) from October 17 to October 24 for integration of the section with the extension to Badarpur.".
  146. (14 January 2011). "DMRC opens Sarita Vihar–Badarpur section". Hindustan Times.
  147. (6 September 2015). "Janpath to Faridabad: On Sunday morning, a Metro ride for PM Modi".
  148. "Faridabad Metro Stations get highest Green Building Rating".
  149. Ray, Subhendu. (23 January 2012). "NCR's longest Metro line in Faridabad".
  150. (26 May 2017). "Delhi: Kashmere Gate set to become biggest interchange station".
  151. Dayal, Anuj. (5 April 2018). "Delhi Metro - Phase 3 Challenges". Delhi Metro Rail Corporation.
  152. Singh, Megha Suri. (17 August 2010). "Hawk-eyed vigil on airport metro line". [[The Times of India]].
  153. "Delhi Airport Express rail link opens".
  154. (6 November 2009). "Airport Express Link: Metro gives a preview". [[The Indian Express]].
  155. (3 October 2010). "Airport Metro misses CWG deadline". [[NDTV]].
  156. (21 February 2011). "Cities / Delhi : Airport to be 20 minutes from Connaught Place from Wednesday". The Hindu.
  157. (22 January 2013). "Delhi Airport Metro Express back on track". [[HT Media Ltd]].
  158. (1 July 2013). "Delhi Metro takes over operations of Airport Express Line". The Hindu.
  159. (1 January 2015). "Airport Metro sees 30% rise in ridership after fare reduction". Business Standard.
  160. (15 September 2015). "DMRC to reduce Airport line fares". The Times of India.
  161. "PM Modi Inaugurates Delhi Metro Airport Express Line Extension, Takes Ride To YashoBhoomi".
  162. (6 August 2021). "Delhi Metro Pink Line's Trilokpuri Sanjay Lake-Mayur Vihar Pocket-1 stretch inaugurated". The Hindu.
  163. (26 September 2014). "New high for Metro with the track at 24m". The Indian Express.
  164. Gulati, Sumegha. (2014-09-16). "Hauz Khas set to get deepest underground metro station". [[The Indian Express]].
  165. (28 December 2020). "First driverless metro in Delhi: All you need to know about Magenta line".
  166. (18 September 2021). "Grey Line's Najafgarh- Dhansa Bus Stand Section Opens: How It Will Benefit Commuters".
  167. "Network". Delhi Metro Rail Corporation.
  168. "Underground network in Phase 1 is 13 km". The Economic Times.
  169. (27 October 2006). "Phase 1 complete, Pragati Maidan now on Metro map". Express India.
  170. Ramachandran, Smriti Kak. (17 September 2007). "Delhi Metro confident of meeting deadline". [[The Hindu]].
  171. Ramnani, Vandana. (6 August 2021). "Delhi's 59-km Pink Line Metro now fully operational; becomes longest operational corridor". Money Control.
  172. Prasad, Nikita. (17 September 2021). "Grey Line's Najafgarh-Dhansa Bus Stand Corridor To Open For Services Tomorrow". NDTV.
  173. "Approved Phase IV (3 Priority) Corridors". Delhi Metro Rail Corporation.
  174. (20 June 2021). "Completion targets of Metro Phase-4 will depend on Covid-19 scenario: DMRC". Hindustan Times.
  175. "Monthly average of trains/coaches run in delhi metro - (updated as on 31.12.2021)". Delhi Metro Rail Corporation.
  176. (24 May 2014). "Delhi Metro to come up with eight new corridors in Phase IV".
  177. "New Delhi underground metro aims to transform Central Vista by 2026".
  178. "बादली-सिरसपुर मेट्रो कॉरिडोर की डीपीआर तैयार, छह महीने से सरकार से मंजूरी का इंतजार".
  179. (2023-09-30). "Delhi: Air Train To Be Introduced At Indira Gandhi International Airport, Authorities To Decide Between Two Options".
  180. [https://www.dnaindia.com/india/report-ncr-news-new-metro-link-from-gurugram-s-rezang-la-chowk-to-delhi-igi-airport-two-more-proposed-kmp-manesar-3026125 NCR news: New Metro link from Gurugram’s Rezang La Chowk to Delhi IGI Airport, two more proposed] {{Webarchive. link. (9 June 2023 , DNA, 24 Feb 2023.)
  181. (10 September 2020). "Survey complete for Gurugram-Faridabad metro link {{!}} Gurgaon News".
  182. [https://metrorailnews.in/gurgaon-faridabad-metro-system-fostering-connectivity-economic-development-and-seamless-travel/ Gurgaon – Faridabad Metro System: Fostering Connectivity, Economic Development and Seamless Travel] {{Webarchive. link. (18 March 2025 , metrorailnews.in, 7/1/2024.)
  183. [https://navbharattimes.indiatimes.com/state/punjab-and-haryana/faridabad/haryana-budget-2025-intercity-express-metro-will-run-from-bata-chowk-in-faridabad-to-gurugram/articleshow/119137639.cms फरीदाबाद के बाटा चौक से गुरुग्राम के लिए चलेगी इंटरसिटी एक्सप्रेस मेट्रो, हरियाणा सरकार ने बजट में की घोषणा] {{Webarchive. link. (18 March 2025 , navbharattimes, 18 Mar 2025.)
  184. (13 August 2020). "Gurgaon Metro News: Haryana govt clears final DPR of Metro Rail Connection from HUDA City Centre to other parts of Gurugram {{!}} Gurgaon News".
  185. [https://www.hindustantimes.com/cities/gurugram-news/hry-budget-focuses-on-ai-metro-and-infra-growth-in-gurugram-101742235304928.html Hry budget focuses on AI, metro, and infra growth in Gurugram] {{Webarchive. link. (18 March 2025 , Hindustan Times, 1 Mar 2025.)
  186. "TCP department realigns metro route linking Gurgaon to Manesar". The Times of India.
  187. [http://www.dnaindia.com/india/report-expected-pm-narendra-modi-to-announce-metro-s-extension-to-other-parts-of-haryana-says-cm-bhupinder-hooda-2122498 Expected PM Narendra Modi to announce Metro's extension to other parts of Haryana, says CM Bhupinder Hooda] {{webarchive. link. (26 October 2016, DNA India News, September 2015.)
  188. [https://timesofindia.indiatimes.com/city/gurgaon/rapid-rail-to-transform-commuting-multi-model-transit-hubs-proposed-in-gurgaon/articleshow/115540639.cms 5 Multimodel Hubs in Gurugram on Delhi-Alwar RRTS] {{Webarchive. link. (24 January 2025 , India TImes, 22 Nov 2024.)
  189. [https://www.hindustantimes.com/cities/others/ggm-hmrtc-to-hire-consultant-for-2-new-metro-corridors-101742494383392.html Ggm: HMRTC to hire consultant for 2 new metro corridors] {{Webarchive. link. (21 April 2025 , Hindustan Times, 21 March 2025.)
  190. "Haryana CM announces extension of Delhi Metro up to Jhajjar town – RailNews Media India Ltd".
  191. [https://www.dainiktribuneonline.com/news/haryana/there-is-hope-for-the-metro-line-to-be-extended-till-sonepat-sector-7/ मेट्रो लाइन का विस्तार सोनीपत सेक्टर-7 तक होने की उम्मीद बंधी] {{Webarchive. link. (20 April 2025 , dainiktribuneonline, 16 Apr 2025.)
  192. (2020-01-01). "Ghaziabad looks to extend three Metro lines, seeks DPRs".
  193. [https://www.timesnownews.com/delhi/new-metro-line-to-connect-north-east-delhi-with-trans-hindon-area-in-ghaziabad-article-113263970 New Metro Line To Connect North-East Delhi With Trans Hindon Area In Ghaziabad] {{Webarchive. link. (29 March 2025 , timesnownews.com, 11 Sept 2024.)
  194. (2018-12-04). "Greater Noida Authority approves phase 2 of Aqua Line".
  195. (7 September 2021). "Driverless pod car between Jewar airport & amusement park in Film City: Plan details". The Times of India.
  196. (2023-12-03). "Noida Metro: Extension Plan from Sector 142 to Botanical Garden Gains Momentum".
  197. (2023-12-01). "Noida Metro Submits Report For Approval Of 11.5-km Aqua Line extension. Check Areas It will Connect".
  198. (3 September 2021). "Metro corridor to link Capital, Jewar airport". Hindustan Times.
  199. Shalabh. (9 April 2021). "Greater Noida to Jewar airport in less than 25 minutes? DMRC to ready plan". The Times of India.
  200. "NCRTC {{!}} Delhi – Meerut Corridor".
  201. Staff Reporter. "Delhi-Meerut rapid rail project gets green light". NDTV.
  202. (12 October 2023). "India's first rapid rail to open next week, with women driving RAPIDX". Construction World.
  203. "Details - NCRTC". NCRTC.
  204. "Delhi–Meerut RRTS – Information, Route Map, Fares, Tenders & Updates". The Metro Rail Guy.
  205. (27 August 2010). "Measures to Ensure Safe Passage for Metro Train Passengers". Press Information Bureau, Government of India.
  206. (5 March 2010). "Delhi Metro routes now on Google Maps". [[The Economic Times]].
  207. (2 October 2010). "Women get exclusive coach in Delhi Metro". [[Hindustan Times]].
  208. (24 July 2018). "Delhi Metro launches new app with additional features".
  209. (23 August 2013). "DMRC launches smartphone app". [[The Hindu]].
  210. (7 March 2007). "CISF to take over Delhi Metro security". [[The Times of India]].
  211. (21 March 2010). "Delhi metro parking areas to be bought under CCTV cameras". Daily News and Analysis.
  212. Megha Suri Singh. (30 March 2010). "Moscow blasts put Metro security in alert mode". [[The Times of India]].
  213. "Commuters Guide to Security on Delhi Metro". [[Delhi Metro Rail Corporation.
  214. (26 March 2010). "Mock drills at 4 Metro stations". [[The Times of India]].
  215. (9 May 2012). "Metro to raise height of walls at stations". [[The Times of India]].
  216. (10 October 2017). "Delhi Metro fare hike chart: DMRC raises ticket prices".
  217. (10 May 2017). "Delhi Metro fares revised: Here's all you need to know about the fare hike and fare slabs {{!}} India.com".
  218. "Ticket". Delhi Metro Rail Corporation.
  219. "Smart Cards". [[Delhi Metro Rail Corporation.
  220. (1 October 2019). "Information on Delhi metro's tokens and smart cards". [[India Today]].
  221. Nag, Devanjana. (11 June 2019). "Delhi Metro free rides for women: Travelling from Delhi to NCR and vice-versa? Here's the proposed rule". The Financial Express.
  222. Bedi, Aneesha. (6 November 2019). "Delhi Metro chief says free rides for women not possible until tech updated to check misuse". ThePrint.
  223. Dixit, Manas. (24 August 2018). "Common Mobility Card for DTC bus, metro". ED Times.
  224. "Tourist Card".
  225. (1 September 2023). "NCMC - Tap & Transit, Pan India with RuPay". National Payments Corporation of India (NPCI).
  226. (25 February 2022). "Indigenously Developed National Common Mobility Card, QR Ticket, Account Based Ticketing To Be Made Available in the Entire Metro Network; Contract for Implementing the Same Awarded". DMRC.
  227. (5 March 2019). "National Common Mobility Card". Drishti IAS.
  228. (2020-12-28). "Delhi Metro: National Common Mobility Card facility introduced on Airport Express Line".
  229. "Delhi Metro network to be fully NCMC-compliant by Jun 2023: DMRC".
  230. Web Team, BS. (29 May 2023). "You can now use RuPay debit card for traveling in Delhi metro". Business Standard.
  231. "App based QR- Ticketing System". Delhi Metro Rail Corporation.
  232. Singh, Ramneek. (9 March 2022). "Delhi Metro QR ticket: How to book Delhi Metro ticket using QR code via Android mobile phone and iPhone". 91 Mobiles.
  233. "Paper QR Ticket". Delhi Metro Rail Corporation.
  234. Prashar, Sakshi. (16 February 2021). "Delhi Metro to introduce QR code-based ticketing system in a bid to go contactless". The Economic Times.
  235. Chitlangia, Risha. (15 February 2021). "Delhi Metro to go contactless as DMRC pushes for QR code, RuPay-based ticketing". The Hindustan Times.
  236. (2011). "Noise barriers not enough, residents want speed of Metro trains to be slowed". [[Hindustan Times]].
  237. Dutta, Sweta. (16 November 2009). "Widening reach, Metro looks at ways to ease rush". [[The Indian Express]].
  238. Atul Mathur. (19 November 2009). "Crowded stations, slow trains". Hindustan Times.
  239. Atul Mathur. (8 December 2009). "Feeder service or the lack of it". Hindustan Times.
  240. "Parking, feeder bus woes on Metros Noida line".
  241. "Delhi Metro is second-most unaffordable in world: CSE". The Times of India.
  242. (December 2018). "Concerns with Delhi Metro". The Leap Blog.
  243. (4 November 2007). "DMRC to introduce new feeder buses from Monday". PTI.
  244. "Public Demands for Metro Feeder Services". DMRC.
  245. "Metro Feeder Buses - Routes". DMRC.
  246. "Search Results: Feeder Bus". DMRC.
  247. "Last Mile Connectivity". DMRC.
  248. (11 March 2024). "Delhi Metro Annual Report 2022-23".
  249. (24 March 2020). "PM calls for a complete lockdown of the entire nation for 21 days".
  250. (12 September 2020). "Delhi Metro resumes full services from today. 5 facts you should know".
  251. "Economic Survey of Delhi 2021–22".
  252. (19 November 2024). "Delhi Metro recorded its highest-ever daily ridership on November 18". The Times of India.
  253. "Average daily ridership 2004- 14".
  254. "Economic Survey of Delhi 2023–24, Chapter 12: Transport".
  255. (2024-01-18). "Delhi Metro logs 2 billion passenger trips for 2023 — highest ever".
  256. "PERFORMANCE OF INDIAN METRO SYSTEMS: LESSONS FOR UPCOMING URBAN RAIL PROJECTS".
  257. "Annual Report 2006–07".
  258. "Annual Report 2007–08".
  259. "Annual Report 2008–09".
  260. "Annual Report 2009–10".
  261. "Annual Report 2010–11".
  262. "Annual Report 2011–12".
  263. "Annual Report 2012-13".
  264. "Annual Report 2013–14".
  265. "Annual Report 2014–15".
  266. "Annual Report 2015-16".
  267. Singh, Sudheer Pal. (31 May 2016). "Delhi Metro Rail finances in the red".
  268. "Annual Accounts And Directors Report 2016–17".
  269. "Annual Accounts And Directors Report 2017–18".
  270. "Annual Report 2018-19".
  271. "Annual Report 2019-20".
  272. "Annual Report 2020-21".
  273. "Annual Report 2021-22".
  274. "Annual Report 2022-23".
  275. "Annual Report 2023-24".
  276. "Annual Report 2024-25".
  277. (April 2019). "Delhi: Station naming rights pushing up metro income {{!}} Delhi News".
  278. (2018-05-03). "43 and counting… station branding is doing wonders for Delhi Metro revenue".
  279. "IIT Delhi: How a premier IIT fought and won a brand war at Delhi's metro station". The Economic Times.
  280. Pillai, Soumya. (3 June 2019). "Grey Line puts villages of Najafgarh on Delhi Metro map". [[Hindustan Times]].
  281. Sinha, Snehil. (3 November 2021). "Electronic City station may become a depot by next March". [[Times of India]].
  282. (24 April 2022). "Himcon Begins Delhi Metro Mukundpur Depot's Expansion Work". The Metro Rail Guy.
  283. (17 April 2022). "Delhi Metro to expand capacity at Mukundpur depot to cater requirements of phase 4 corridors". Livemint.
  284. (2022-04-17). "Delhi Metro to augment capacity of Mukundpur depot: DMRC".
  285. [https://web.archive.org/web/20180412082051/https://in.reuters.com/article/businessNews/idINIndia-30371920071107 Reuters – Hyundai Rotem gets m order to supply trains]. In.reuters.com. Retrieved 24 October 2011.
  286. (18 March 2009). "Delhi Metro gets standard gauge train". [[The Hindu]].
  287. (23 March 2009). "Delhi Metro begins shift to standard gauge rails". [[Times of India]].
  288. (23 February 2010). "Metro gets first standard gauge depot". [[The Hindu]].
  289. "Delhi Metro, India".
  290. (8 August 2012). "Delhi Metro says no to Maglev technology". [[The Indian Express]].
  291. P. Manoj. (25 August 2005). "BEML to rake in big money from proposed metro projects". [[The Hindu]].
  292. (15 October 2002). "Second Metro rail arrives in Delhi". [[The Times of India]].
  293. "Rolling Stock: Ensuring Passenger Comfort, Safety and Reliability". [[Delhi Metro Rail Corporation.
  294. (27 July 2002). "Metro Rail gets first train". The Hindu.
  295. (5 September 2011). "Bombardier to Deliver Further 76 MOVIA Metro Cars to Delhi Metro from Savli India Site". Bombardier.
  296. "Bombardier to supply coaches to Delhi Metro".
  297. (17 September 2009). "Metro to get swankier, bigger coaches". [[The Times of India]].
  298. (11 September 2009). "BEML delivers India's 1st standard gauge metro car". [[The Economic Times]].
  299. Ramachandran, Smriti Kak. (30 July 2009). "Trial run begins on first standard gauge Metro line". [[The Hindu]].
  300. (20 May 2010). "Airport line handed over to Reliance Infra". [[The Indian Express]].
  301. "Delhi Airport line contracts finalised". [[Construcciones y Auxiliar de Ferrocarriles]].
  302. (26 September 2010). "Delhi Metro to reserve coach for women from October 2". [[The Times of India]].
  303. "Technical Notes: Signalling". [[Delhi Metro Rail Corporation.
  304. "Delhi Metro Railway Corporation, India". Motorola Electronics.
  305. "Metro Line 3, New Delhi, India". Siemens.
  306. "Technical Notes: Telecommunication". [[Delhi Metro Rail Corporation.
  307. "Delhi Airport Metro Express". Delhi metro times.
  308. "Reliance Metro Airport Express, WiFi-enabled, EVS Chakravarthy, CEO YOU Broadband". Business Wire India.
  309. (25 August 2017). "Delhi Metro launches WiFi on Blue Line stations". The Economic Times.
  310. "Delhi Metro offered {{sic".
  311. (22 February 2009). "Delhi Metro gets UN certificate for preventing carbon emission". [[The Times of India]].
  312. "Delhi Metro gets OHSAS 18001". [[Delhi Metro Rail Corporation.
  313. (24 December 2002). "Press Release: Delhi Metro Receives ISO 14001 For Eco-friendly Systems". [[USAID]].
  314. "Details of Rain Water Harvesting in Various Metro Lines / Stations". Delhi Metro Rail Corporation.
  315. (26 September 2005). "Delhi Metro shows the way with water harvesting units". [[The Times of India]].
  316. Agarwal, Priyangi. (13 March 2023). "Metro Phase-IV elevated stations in Delhi to go for rainwater harvesting". Times of India.
  317. (5 January 2008). "Delhi Metro is first rail project to earn carbon credits". [[The Economic Times]].
  318. Sinha, Neha. (20 December 2009). "Delhi Metro on track to earn carbon credits". [[The Indian Express]].
  319. "60% of Delhi Metro now powered by solar energy from Madhya Pradesh".
  320. Agarwal, Priyangi. (4 April 2023). "Elevated plans: Delhi Metro eyes solar share of 50% in 8 years". Times of India.
  321. (5 June 2012). "Metro mulls solar panels at stations to go green". [[The Times of India]].
  322. Roy, Sidhartha. (24 May 2022). "Vertical solar panels to help bridge power gap for metro". Times of India.
  323. Mukherjee, Anuradha. (13 December 2002). "Vibrant murals bring cheer". [[The Times of India]].
  324. Preeti Jha. (10 October 2007). "Murals by Salwan Public School students decorate Metro pillars on Pusa Road". The Indian Express.
  325. (2 September 2010). "At INA Metro station, a gallery for traditional art, crafts". [[The Indian Express]].
  326. Smriti Kak Ramachandran. (2 September 2010). "Delhi metro gets a handicrafts gallery". [[The Hindu]].
  327. Sharma, Garima. "Delhi Metro in Bollywood films". The Times of India.
  328. Lal, Niharika. "From 5-6 per year, films shot in Metro down to 1". The Times of India.
  329. (2016-03-26). "Delhi Metro's fleeting 15 minutes of fame". The Hindu.
  330. (2014-07-21). "Delhi Metro finds many takers in film world".
  331. (31 May 2009). "Amitabh, Abhishek shoot for Paa in Delhi Metro".
  332. (2014-03-03). "Hrithik-Katrina film shoot creates traffic mess". The Times of India.
  333. (2014-03-02). "Hrithik Roshan, Katrina Kaif's Bang Bang shoot halts Delhi traffic".
  334. (2019-10-05). "War is entertaining and worth every penny".
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Delhi Metro — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report