From Surf Wiki (app.surf) — the open knowledge base
Construction management
Professional service
Professional service
Construction management (CM) is a professional service that applies project management techniques to the planning, design, and construction of a project, from its beginning to its completion. The goal of CM is to control a project's scope, time, cost, and quality (sometimes called the project management triangle or "triple constraints") to achieve the owner’s objectives.
Practitioners of construction management are called construction managers. They combine knowledge of building science and business management to coordinate and deliver capital projects such as commercial real estate, transportation infrastructure, and military infrastructure. Professional services firms in North America and Europe increasingly provide CM alongside related specialties such as critical path method (CPM) scheduling, delay analysis, and expert witness testimony for construction disputes.
Overview
Construction management focuses on integrating cost, schedule, quality, safety, and scope throughout the project lifecycle. Unlike a general contractor, a CM firm or professional may be engaged as an owner’s representative to advise during feasibility, design, procurement, and construction.
Roles and responsibilities
A construction manager’s responsibilities typically include:
- Planning and scheduling
- Budgeting and cost control
- Contract administration
- Quality and safety management
- Communication and stakeholder coordination
- Documentation and claims management
According to the Construction Management Association of America (CMAA), the seven common categories of responsibility are: Project Management Planning, Cost Management, Time Management, Quality Management, Contract Administration, Safety Management, and CM Professional Practice.
Functions
Core functions of construction management include:
- Specifying project objectives and plans, including scope, budgeting, scheduling, performance requirements, and selecting participants
- Maximizing resource efficiency through procurement of labor, materials, and equipment
- Coordinating design, estimating, contracting, and construction
- Establishing communication systems and conflict-resolution mechanisms
Procurement
Bids
- Open bid: Any contractor can submit a bid (common in public projects).
- Closed bid: Only invited contractors can submit (common in private projects).
Selection methods
- Low-bid selection: Chooses the lowest price.
- Best-value selection: Considers price and qualifications.
- Qualifications-based selection: Considers qualifications only. Often used in early design stages.
Contract types
- Lump sum – Fixed price for project delivery
- Cost plus fee – Owner pays cost plus a fee/percentage
- Guaranteed maximum price – Cost-plus contract with a cap
- Unit price – Used when scope is uncertain, priced per unit
Project stages
- Feasibility and design – Programming, schematic design, design development, contract documents
- Pre-construction – Assigning the project team, site investigation, permitting
- Procurement – Hiring subcontractors and purchasing materials
- Construction – On-site work, progress payments, quality control
- Owner occupancy – Warranty period and closeout
Common issues
- Dust and mud control
- Environmental protection (stormwater, endangered species, vegetation, wetlands, cultural artifacts)
Documentation
Project documentation may include diaries, logs, and daily field reports. These records are important for dispute resolution and can be used as evidence in legal proceedings.
Dispute resolution
Methods include mediation, minitrial, and arbitration. Arbitration is binding and typically more costly than mediation.
Education and practice
CM is taught in associate, bachelor’s, master’s, and doctoral programs. Accreditation bodies include ABET, the American Council for Construction Education (ACCE), and the Associated Schools of Construction (ASC). Programs cover management, construction methods, and law.
Software
Construction and capital project management software (CPMS) help manage budgets, schedules, documents, and collaboration. Increasingly, cloud platforms allow owners, contractors, and consultants to work together in real time.
Skills required
- Building science and technology
- Public safety and risk management
- Human resources and leadership
- Cost engineering and mathematics
- Communication and negotiation
Project delivery methods
- Design–bid–build
- Design–build – Combines design and construction under one contract
- Turnkey contracts
- Construction management as a PDM (agency CM, CM-at-risk)
- CM at-risk, including its risks and advantages
- Accelerated construction techniques (e.g., Massachusetts DOT Fast 14 program)
References
References
- Patrick, C. (2003). ''Construction Project Planning and Scheduling'' (1st ed.). Prentice Hall.
- 3rd Forum "International Construction Project Management," Berlin, 26–27 June 2003.
- Construction Management: Project Delivery Methods. (2017). LinkedIn Learning. Retrieved November 1, 2023.
- "Construction Consulting Services Market". IBISWorld.
- "Construction Management Association of America".
- (September 2008). "What Is Construction Project Management?".
- Barbara J. Jackson. (2010). "Construction Management Jumpstart". Wiley.
- Minks, William. (2011). "Construction Jobsite Management".
- Wheelwash Ltd. (2025). [https://wheelwash.com/knowledge-hub/construction-site-planning-including-a-wheel-washing-system/ Construction site planning: Including a wheel washing system].
- "Standards and criteria for accreditation of post-secondary construction education degree programs". ACCE.
- "America's Best Colleges 2008".
- Stagner, Steve. "Design-Build and Alternative Project Delivery in Texas". Texas Council of Engineering Companies.
- Halpin, Daniel. ''Construction Management''. Hoboken, NJ: Wiley, 2006.
- Strang, Warner. (2002). "The Risk In CM "At-Risk"". CM eJournal.
- (2013-01-14). "Advantages and Disadvantages of Construction Delivery Methods".
- "Public Roads - The Fast 14 Project, May/June 2012".
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Construction management — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report