Skip to content
Surf Wiki
Save to docs
geography/australia

From Surf Wiki (app.surf) — the open knowledge base

Clarkson railway station, Perth

Railway station in Perth, Western Australia

Clarkson railway station, Perth

Summary

Railway station in Perth, Western Australia

FieldValue
nameClarkson
styleTransperth
style2YAN
imageClarkson Station, December 2021 05.jpg
captionSouthbound view, December 2021
altBrick platform with large metal shelter and a train stopped to the left
addressOrenco Bend, Clarkson
boroughWestern Australia
countryAustralia
coordinates
distance33.2 km from Perth Underground
line
bus_routes6
bus_stands6
platform1 island platform with 2 platform edges
tracks2
parking1,059
opened4 October 2004
accessibleYes
ownedPublic Transport Authority
operatorPublic Transport Authority
zone4
passengers2,850 per day
pass_yearMarch 2018
{{Adjacent stationssystemTransperth
line1YANleft1=Currambineright1=Butlernote-mid1=All
line2YANleft2=Currambinetype2=K
mapframeyes
mapframe-captionLocation of Clarkson station
mapframe-zoom13

| mapframe-caption = Location of Clarkson station | mapframe-zoom = 13

Clarkson railway station is a suburban rail station in Clarkson, a suburb of Perth, Western Australia. It is on the Yanchep line, which is part of the Transperth network. Located in the median of the Mitchell Freeway, the station consists of an island platform connected to the west by a pedestrian footbridge. A six-stand bus interchange and two carparks are located near the entrance.

Planning for an extension of the Yanchep line (then known as the Joondalup line) north of Currambine station was underway by 1995. The government committed to an extension to Clarkson the following year, and a plan detailing the extension was released in 2000. The first contract for the project, a A$14million earthworks contract, was awarded to Brierty Contractors in March 2001. In April 2002, Barclay Mowlem and Alstom were awarded a contract worth $17million to design and build the extension's rail infrastructure, and in November 2002, a $8.7million contract was awarded to Transfield for the construction of the station. The station opened on 4 October 2004, with five new Transperth B-series trains entering service that day. The following day, bus services in the area were realigned to feed into Clarkson station. On 3 September 2013, there was a minor train crash at Clarkson station. On 21 September 2014, an extension of the Joondalup line 7.5 km north to Butler station opened.

Clarkson station is 33.2 km from Perth Underground station, with train journeys there taking 32 minutes. Train headways reach as low as five minutes during peak hour, with off-peak services at 15-minute headways. Six bus routes serve Clarkson station.

Description

Under the metal station platform shelter
Stairs and lift up to the station's footbridge.

Clarkson station is in the median of the Mitchell Freeway along the Yanchep line. It is owned by the Public Transport Authority (PTA), a state government agency, and is part of the Transperth system. The station is in Clarkson, a suburb of Perth, Western Australia. It is 33.2 km, or a 32-minute train journey, from Perth Underground station, placing the station in fare zone four. The next station to the north is Butler station and the next station to the south is Currambine station.

The station consists of two platform faces on a single island platform. The platform is 150 m long, or long enough for a Transperth six-car train – the longest trains used on the network. The platforms are linked to the west by a pedestrian bridge. To the east is Neerabup National Park, and so there is no access to the east. The pedestrian bridge is linked to the platforms by stairs, a lift and a set of escalators. On the western side is a six-stand bus interchange, a drop off area and two carparks. The carparks have 1,059 standard bays, 10 short term parking bays and 20 motorcycle bays. At the entrance building is a transit officer booth, toilets and bicycle parking shelters. Clarkson is listed as an independent access station on the Transperth website as the platform can be accessed using lifts, the platform gap is small, and tactile paving is in place.

Public art

Concrete wall with artwork as described below
''The Bag Project'', by Margaret Dillon.

On the wall of the entrance building is a piece of public art titled The Bag Project, by Margaret Dillon from art design and construction company Concreto. It consists of a series of 44 500 by terrazzo tiles. The tiles, which have various colours, "depict images associated with the everyday commuter experience". The other piece of public art at Clarkson station is Line over Contour, by Stuart Green. This consists of stainless steel and painted steel panels mounted on a steel tower above the entrance building.

History

The original stage of the Yanchep line (formerly known as the Joondalup line) began construction in November 1989. It was opened between Perth station and Joondalup station on 20 December 1992, and extended to Currambine station on 8 August 1993. By 1995, planning for extending the Joondalup line north of Currambine was underway. On 20 November 1996, a few weeks before the 1996 state election, Richard Court, the premier of Western Australia, announced that his government would extend the railway to Neerabup Road in Clarkson by the end of 2001 at a cost of A$28million, plus $12million for additional rolling stock. This came in response to a pledge by the opposition Labor Party to build the extension for $25million. Court claimed that Labor's costing was unrealistically low.

In June 1999, the minister for transport, Murray Criddle, revealed that the Clarkson extension would not open by 2001 as originally promised. On 28 November 1999, the Parliament of Western Australia passed the Railway Northern and Southern Urban Extension Bill, enabling the construction for the extension to Clarkson and a new railway to Mandurah south of Perth to begin. The Northern Rail Master Plan was released on 21 June 2000, detailing the extension to Clarkson as well as the construction of Greenwood station elsewhere on the Joondalup line. The cost of the extension had been revised to $58million plus $23million for rolling stock. The new railway to Mandurah, the extension to Clarkson and the new station at Greenwood were all brought into a single project called the Perth Urban Rail Development Project (renamed New MetroRail in March 2003). Clarkson station was going to be built just north of Neerabup Road, with 4 km of new double-track railway to be built. The railway was to bridge over Burns Beach Road and go under Neerabup Road. Transport Minister Criddle was hoping for the extension to open by September 2003, which was criticised by the opposition as a broken promise. In October 2000, Court said that the cost was now $99million for the extension to Clarkson.

The first contract for the extension was awarded in March 2001, when Brierty Contractors signed a $14million earthworks contract. Work began in May 2001. Earthworks were completed in November 2002. In July 2001, the contract for the construction of the rail bridge over Burns Beach Road was awarded to Transfield Pty Ltd at a cost of $1.7million. The transport minister, now Alannah MacTiernan, was still confident in the service commencement date of September 2003. The Burns Beach Road bridge was completed on 6 May 2003. In April 2002, Barclay Mowlem and Alstom were awarded a contract worth $17million for the rail infrastructure for the extension. This contract included the design and construction of the track, traction power, signalling and communications systems. It also included work at Greenwood station. In May 2002, the government signed a contract with EDI Rail–Bombardier Transportation for the delivery and maintenance of 31 three car B-series trains, and the construction of the Nowergup depot 2 km north of Clarkson station. The initial batch of those trains was scheduled to be commissioned in September 2004 for the Clarkson extension. The same month, it was revealed that the project's completion date was now September 2004. In November 2002, it was announced that an $8.7million contract had been awarded to Transfield for the construction of Clarkson station. When John Holland Group bought Transfield in January 2003, that company took over the project.

By July 2004, the rail infrastructure was complete and the station was almost done. On 4 October 2004, the station opened, making it the first extension of Perth's rail network since the extension to Currambine in 1993. Five new B-series trains went into operation that day. In celebration of the opening, travel on Transperth train services was free that day, costing the state $50,000. Bus services to Clarkson station commenced on 5 October 2004.{{cite press release |first1=Alannah |last1=MacTiernan

At 6:30 am on 3 September 2013, an empty train travelling at low speed crashed into an occupied train carrying about 40 passengers stopped at Clarkson station. Three people were taken to hospital as a precaution, and five people suffered sore necks due to the crash. Following the crash, the Public Transport Authority investigated whether Portuguese millipedes were the cause. When crushed by train wheels, the millipedes can make the track slippery. There had been previous cases on the Transperth network where trains had overrun platforms due to the millipedes. Later that week, the tracks around the station were sprayed with insecticide. Later, the Rail Tram and Bus Union said that it was unsafe shunting practise that caused the crash, not the millipedes.

On 21 September 2014, an extension of the Joondalup line 7.5 km north to Butler station opened. In 2017, the Mitchell Freeway was extended up to Hester Avenue north of the station, passing through Clarkson. The freeway's carriageways were built along both sides of Clarkson station. On 14 July 2024, the line was further extended to its current terminus at Yanchep station, and the Joondalup line was renamed the Yanchep line.

Services

Concrete station entrance building with bus road in front and shelters on either side of the road
Bus interchange and entrance building. ''Line over Contour'', by Stuart Green, can be seen above the entrance.

Clarkson station is served by Yanchep line trains operated by the PTA. The line goes between Yanchep station and Elizabeth Quay in the Perth central business district, continuing south from there as the Mandurah line.

During the middle of peak hour, trains stop at the station every 10 minutes. At the start of peak hour, southbound trains stop at the station approximately every 5 minutes, with half of those services commencing at Clarkson station after exiting the Nowergup railway depot. At the end of peak hour, northbound trains stop at the station approximately every 5 minutes, with half of those services terminating at Clarkson station to enter the Nowergup railway depot. Services that terminate or start at Clarkson station are part of the K stopping pattern. During weekday between peak hour, on weekends and public holidays, trains stop at Clarkson station every 15 minutes. At night, trains are half-hourly or hourly. In the 2013–14 financial year, Clarkson station had 1,367,712 people board, making it the fifth busiest of the stations on the Yanchep line. In March 2018, Clarkson station had approximately 2,850 boardings on an average weekday, making it still the fifth busiest station on the line.

Platforms

TransperthYanchep}};background-image: linear-gradient(to right, #); background-image: linear-gradient(to right, #; "Clarkson platform arrangementStop IDPlatformLineService PatternDestinationViaNotes
998911****All stations, KElizabeth QuayPerth UndergroundK pattern services to Perth begin at Clarkson Station
998922****All stationsYanchep
KTerminus

Bus Routes

Bus services are operated by Swan Transit under contract from the PTA. Six regular bus routes serve the station. Route 474 links to Joondalup station, passing through Kinross. Routes 480, 482, 483 and 484 link to Butler station, passing through suburbs including Butler, Jindalee, Merriwa, Mindarie, Quinns Rocks and Ridgewood. Route 481 goes northwest from Butler station, terminating at the coast in Quinns Rocks. Rail replacement bus services operate as route 904.

References

References

  1. (April 2019). "Public Transport Authority: Railway System: April 2019".
  2. (30 August 2021). "Manual – Rail Access".
  3. "Yanchep Line Train Timetable".
  4. "Clarkson Station – Access Map".
  5. "Clarkson Station".
  6. "Clarkson Station : The Bag Project".
  7. "Home Page".
  8. "Clarkson Station : Line Over Contour".
  9. "Our history".
  10. (21 December 1992). "Transperth tips rail boom". The West Australian.
  11. (18 December 2017). "Joondalup and Mandurah train lines celebrate significant anniversaries".
  12. (17 July 1993). "Opening of Currambine railway station next month". Government of Western Australia.
  13. (18 March 1995). "Opposition promise to 'fast track' transport systems pre-empted by Govt". Government of Western Australia.
  14. (20 November 1996). "Extension of northern suburbs transit system to Neerabup Drive, Clarkson". Government of Western Australia.
  15. (21 November 1996). "Pledge War On Northern Line". The West Australian.
  16. (5 June 1999). "Northern Rail Line Promise Off The Rails". The West Australian.
  17. (26 November 1999). "Way cleared for construction of SW Metropolitan Railway to Mandurah.". Government of Western Australia.
  18. (20 March 2003). "Visionary rail expansion moves from plan to reality". Government of Western Australia.
  19. (2007). "Marble Bar to Mandurah: A history of passenger rail services in Western Australia". Rail Heritage WA.
  20. (21 June 2000). "Minister says the push is on for earlier Clarkson rail link". Government of Western Australia.
  21. (9 June 2000). "Cabinet lacks will to expand rail: ALP". The West Australian.
  22. (17 June 2000). "Train pledges off track: ALP". The West Australian.
  23. (18 October 2000). "Green light for rail extension to Clarkson: Premier". Government of Western Australia.
  24. "OnTrack: March 2003".
  25. (1 May 2001). "Trains Revamp – New lines, rail carriages to cost $1.5b". The West Australian.
  26. (2 May 2001). "Minister to commence extension to the Northern Suburbs Transit System". Government of Western Australia.
  27. "Bulk Earthworks".
  28. (11 July 2001). "Contract Awarded for Burns Beach Road Rail Bridges". Government of Western Australia.
  29. "Bridges".
  30. (1 March 2002). "Team stuck on city rail route". The West Australian.
  31. "Railway and Track Infrastructure".
  32. (12 May 2002). "Railcar contract seals railway commitment". Government of Western Australia.
  33. (13 May 2002). "$437m deal for fast rail cars". The West Australian.
  34. (5 May 2002). "Northern rail link delayed". The Sunday Times.
  35. (13 November 2002). "$8.7million contract awarded for construction of Clarkson Station". Government of Western Australia.
  36. (18 November 2002). "New station to boost rail use". The West Australian.
  37. "Clarkson Station Construction".
  38. (July 2004). "OnTrack: July 2004".
  39. (5 October 2004). "Costs spiral on $1.5bn WA rail link". Australian Financial Review.
  40. (1 October 2004). "Ticket to ride is free". The West Australian.
  41. (30 September 2004). "Free rail travel to celebrate network expansion". Government of Western Australia.
  42. (30 September 2004). "Day of free train travel for Perth residents".
  43. (3 September 2013). "Millipedes suspected in Clarkson train crash".
  44. (4 September 2013). "Did millipedes really cause this crash?".
  45. (5 October 2012). "More train woes, but this time the problem is tiny".
  46. (20 September 2013). "Union denies millipedes behind WA crash".
  47. (18 August 2014). "Butler rail station opens September 21".
  48. (21 September 2014). "Extended northern railway: Butler train station open today".
  49. (3 August 2017). "Joint media statement – Traffic moves freely on the new Mitchell Freeway extension". Government of Western Australia.
  50. (3 August 2017). "PM opens long-awaited Mitchell Freeway extension north of Perth".
  51. (14 July 2024). "Yanchep rail extension officially opened after significant delays and cost blow outs".
  52. (23 April 2024). "Joint Media Statement – Date Announced For First Train Services On Metronet Yanchep Rail Extension". Government of Western Australia.
  53. "Transperth".
  54. "Question On Notice No. 4246 asked in the Legislative Assembly on 25 June 2015 by Mr M. Mcgowan".
  55. (June 2018). "Yanchep Rail Extension Project Definition Plan".
  56. "About Transperth".
  57. "Transperth Bus Contracting Model – Bus Service Franchising Masterclass".
  58. "Transperth Network Sheet 1".
  59. "Transperth Network Sheet 2".
Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Clarkson railway station, Perth — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report