Chennai Mass Rapid Transit System

Metropolitan elevated railway line in Chennai, India

Chennai Mass Rapid Transit System

Summary

Metropolitan elevated railway line in Chennai, India

FieldValue
nameChennai Mass Rapid Transit System
imageIndian Railways Suburban Railway Logo.svg
imagesize100px
image2Velachery Railway station June 2010.jpg
imagesize2300
caption2Velachery MRTS Station
ownerSouthern Railway
localeChennai, Tamil Nadu, India
transit_typeRapid Transit
lines1
startChennai Beach
endVelachery
stations18
website
began_operation
operatorSouthern Railway
train_length9 coaches
system_length19.34 km
track_gauge
eloverhead catenary
map
map_statecollapsed
ridership200,000 (2023)
headquartersChennai
notrack2

The Chennai Mass Rapid Transit System, commonly referred to as Chennai MRTS, is a metropolitan rail transit system in Chennai, India. It is operated by Southern Railway of the state-owned Indian Railways. Opened in 1995, it was the first elevated railway line in India. The railway line runs from Chennai Beach to Velachery, covering a distance of 19.34 km with 18 stations and is integrated with the wider Chennai suburban railway network.

While the suburban railway has been operational in Chennai since 1931, the Planning Commission of Government of India formed a research group to recommend development of transportation in major cities including Madras in 1965. The Madras Area Transportation Study Unit identified eight transport corridors including the 39 km north–southeastern rail corridor along the Buckingham Canal. The Government of India approved a Mass Rapid Transit System for the southern section in 1983–84 with the project to be implemented in four phases. The project was implemented by the Ministry of Railways and construction began in 1991. The first phase from Chennai Beach to Chepauk was completed in 1995 with further extension to Thirumayilai in 1997. Part of second phase from Thirumayilai to Thiruvanmiyur was completed in 2004 with further extension to Velachery in 2007. , a planned extension to St. Thomas Mount is under construction.

The Chennai MRTS line is largely elevated with at-grade sections at its terminals. The line runs at-grade initially till Park Town, parallel to the suburban railway network. It becomes elevated thereon, roughly following the course of the Buckingham Canal and running parallel to the Coromandel Coast till Thiruvanmiyur before deviating west towards Velachery. It uses the same broad gauge (5 ft 6in) as the suburban system, thus allowing the movements of trains between the existing suburban lines and the MRTS. The Chennai MRTS uses 9-car electrical multiple unit (EMU) train sets. The trains use 25 kV overhead catenary for traction. The coaches are manufactured by the Integral Coach Factory, Chennai. The coaches are not air-conditioned and are equipped with first-class and second-class passenger seating.

, the system has a daily ridership of 100,000. With the implementation of the Chennai Metro Rail starting in 2015 and planned expansion of the same, further expansion of the MRTS system was put on hold in 2017, with the plans for the MRTS system to be taken over by Chennai Metro Rail Limited. In 2022, the Southern Railway of Indian Railways gave an in-principle approval for the take-over under which the coaches, stations and other infrastructure will be upgraded on par with the Chennai Metro.

Background

The Chennai Suburban Railway started operations in 1931 on a single electrified line from Chennai Beach to Tambaram. Suburban services commenced on the second line between Chennai Central and Gummidipoondi in 1985 the third line from Central towards Arakkonam was added later. In 1965, the Planning Commission formed a group to study the suitability of the existing transportation network, to ascertain the viability of various ways of transportation and advocate plans for the expansion of transportation in metropolitan cities including Madras.

Planning

Surveys were conducted to supplement the existing transport infrastructure in Madras, such as the Madras Area Transportation Study (1968), Integrated Transport Plan (1977) and Madras Route Rationalisation Study (1986). The Madras Area Transportation Study Unit (MATSU) identified eight important transport corridors including the north–southeastern rail corridor connecting Kasturba Nagar and Manali Road. The study suggested the implementation of a rail-based Mass Rapid Transit System (MRTS) on the southern section of the line along the Buckingham Canal, connecting to the existent suburban system. The system was envisaged as a 59.38 km loop line connecting Chennai Beach and Tiruvottiyur.

Since the planned railway line would pass through congested parts of the city, an elevated rail system was selected, to avoid land acquisition problems. The project was intended to be implemented in four phases: Chennai Beach to Thirumayilai, Tirumayilai to St. Thomas Mount, St. Thomas Mount to Villivakkam and Villivakkam to Ennore.

Construction and opening

Railway map of the Chennai showing the MRTS line in olive green

Phase I

The project was sanctioned for implementation by the Ministry of Railways, Government of India in 1983-84. After multiple delays, construction began in 1991 and part of the first phase from Chennai Beach to Chepauk was completed in 1995. It became operational on 16 November 1995 and was the first operational elevated railway line in India. The line was extended to Thirumayilai in 1997. The cost of construction of the first phase between Chennai Beach and Thirumayilai, estimated to be , was fully financed by the Government of India. The first phase was projected to serve about 600,000 passengers per day.

Phase II

RITES conducted further studies in 1987 and 1994 on the effectiveness of the existing public transport system for the growing population. The studies proposed further expansion of the MRTS line. In 1998, the Railway Board sanctioned Phase II of the project from Thirumayilai to Velachery. Part of the Phase II line from Thirumaylai to Thiruvanmiyur was opened on 26 January 2004. It initially consisted of a single line of track for both forward and return journeys. On 19 November 2007, the network was extended from Thiruvanmiyur to Velachery. While the state government gave only the required land for the first phase, it contributed two-thirds of the total project cost of for the second phase.

Phase II extension

The construction for the extended second phase of the project connecting Velachery with St. Thomas Mount started in 2008. It was planned at an estimated cost of with the central government bearing two-thirds of the cost and the state government bearing the rest. The initial planned alignment was altered subsequently and necessitated the demolition of over 70 residential units, which led to protests by the locals. In the Government of India's annual Railway Budget of 2012, it was announced that the line would be commissioned in 2013. In October 2012, Chennai Metropolitan Development Authority (CMDA) resumed the land acquisition for the proposed extension after the Madras High Court vacated its earlier stay order on the same. While land acquisition was completed for the construction of majority of the line by April 2013, there were further delays in acquiring land for about 0.5 km of the stretch and the construction of Puzhuthivakkam station. , the construction of about 3.7 km of the proposed extension was complete.

In May 2014, the High Court ruled that compensation be paid as per newly enacted Land Acquisition Act 2013 on the cases filed by the land owners. In March 2016, the Southern Railway stated that the final phase of the MRTS would take at least 18 months after the state government handed over land to Indian Railways and that it had not yet done so. In 2018, further discussion between the CMDA and the land owners on the compensation to be paid for the land acquisition failed. , the Indian Railways had completed the construction of Adambakkam Puzhuthivakkam stations and about 0.5 km of the line was pending for construction. In 2019, the Madras High Court directed the CMDA to pay higher compensation to the land owners. However, the CMDA filed a review petition against the order in the Indian Supreme Court.

The Supreme Court ordered fair compensation for the land owners and directed the CMDA to complete the land acquisition by 8 January 2021. In June 2022, officials announced that the land acquisition for the final stretch would be completed in the next three months. In July 2023, the authorities said that the construction will be completed by the end of the month and the line will be commissioned for use within the end of the year. On 18 January 2024, a concrete girder on the stretch collapsed, which was expected to further delay the opening of the line. Multiple deadlines to make complete the construction of the final phase have not been met.

Future plans

The third and fourth phases of the MRTS were initially planned to connect St. Thomas Mount with Villivakkam and Villivakkam with Ennore. The plans have been shelved after the lines overlapped with the proposed extension of the Chennai Metro Rail. In early 2024, a feasibility report was submitted to the state government for a new line from Poonamallee and the planned new airport at Parandur. The 43.63 km line would have 19 stations and is expected to cost .

With the Chennai Metro operational since 2015, the Indian Railways proposed for the MRTS system to be taken over by Chennai Metro Rail Limited in 2017. In July 2018, PwC said that the merger would be expensive, costing around to replace the train-sets and establish other facilities. On 11 May 2022, the Southern Railway zone of the Indian Railways granted in-principle approval for the takeover. , the take over was still pending as the Indian Railway Board had not approved the same.

Infrastructure

OMR highway

Network and lines

The MRTS line is largely elevated, with at-grade sections at its terminals. The 19 km line from Chennai Beach to Velachery has a 15 km elevated section and runs for about 4 km at surface. From Chennai Beach to Park Town, the line runs at-grade along the suburban railway line. From the Park Town station, the line becomes elevated and roughly follows the course of the Buckingham Canal, which runs parallel to the Coromandel Coast. The line remains elevated for the alignment of the second phase up to Perungudi, after which it returns to an at-grade section at the Velachery station. The 5 km extension of the line from Velachery to St. Thomas Mount is planned to be elevated.

PhaseLengthRouteStationsOpening DateStatus
Phase I-A5.00 kmChennai BeachChepauk516 November 1995Operational
Phase I-B3.66 kmChepaukThirumayilai419 October 1997Operational
Phase II-A5.99 kmThirumayilaiThiruvanmiyur626 January 2004Operational
Phase II-B4.69 kmThiruvanmiyurVelachery319 November 2007Operational
Phase II-B Extension5 kmVelacherySt. Thomas Mount3TBDUnder construction

The route taken by the MRTS line has resulted in the pillars of the elevated section of the railway encroaching the Buckingham Canal. Although the pillars were placed basis the approval of the state government, the government later proposed plans to restore the canal to make it navigable. However, as the MRTS pillars have reduced the canal width, a section of the canal is not navigable, and the pillars block the flow of rainwater discharge.

Track

Velachery station

The Chennai MRTS line bears greater resemblance to the suburban railway than a rapid transit line as it uses the same broad gauge (5 ft 6in) as the Chennai Suburban Railway system, allowing the usage of same train-sets across the existing suburban lines and the MRTS. Ballastless track is used between Tirumayilai and Velachery stations. The trains use 25 kV overhead catenary for traction.

Rolling stock

The Chennai MRTS uses nine-car electrical multiple unit train sets. A nine-car rake typically has three sets of three motor coaches each at the front, the middle and the last with electric motors used to drive the wheels of the train at a stipulated speed. The EMU coaches are manufactured by the Integral Coach Factory in Chennai. The coaches are not air-conditioned and are equipped with two-class (first and second class) passenger seating configuration.

Stations

Chintadripet station]], one of the stations on the MRTS line

, the MRTS line has 18 operational stations. The Chennai Beach station, one of the termini, is a hub for several suburban trains. Along with the Chennai Fort station, it offers connectivity to the commercial area of Broadway. The Park Town station is located near the Chennai Central station, which is a hub for other suburban lines and for long-distance express trains.

Places of interest such as Parthasarathy Temple, Kapaleeshwarar Temple and Mundagakanniamman Koil are located close to the MRTS railway line. Marina Beach spans along a stretch of the line close to Thiruvallikeni station. The Chepauk station is located close to the M. A. Chidambaram Stadium. The MRTS passes along the Old Mahabalipuram Road (OMR), which also forms part of the information technology corridor where many companies are located.

Upon completion of the St. Thomas Mount station at the southern end of the proposed alignment, the station will have three types of railway networks. The suburban and long-distance express trains would ply on the conventional tracks at ground level, the elevated MRTS line will be located at the first level and the Chennai Metro operating at the second level. There are large stations on the existing MRTS line designed to accommodate six and nine-car train rakes with attached parking lots.

#Station nameDistance (km)OpeningConnectionsLayoutEnglishTamilTransliteration
1Chennai Beachசென்னை கடற்கரைCennaī Kadarkarai016 November 1995Chennai Beach (South Line)
2Chennai Fortசென்னை கோட்டைCennaī Kottai1.70Chennai Fort (South Line)
Broadway bus terminus
3Chennai Park Townசென்னை பூங்கா நகர்Cennaī Poonga Nagar2.54Chennai Central
4Chintadripetசிந்தாதிரிப்பேட்டைChinthadripettai3.43Government EstateElevated
5Chepaukசேப்பாக்கம்Chepakkam5rowspan="14"
6Thiruvallikeniதிருவல்லிக்கேணிThiruvallikeni5.7419 October 1997
7Light Houseகலங்கரை விளக்கம்Kalangarai Vilakkam6.95
8Mundagakanniamman Koilமுண்டகக்கண்ணியம்மன் கோவில்Mundagakanniamman Kovil7.925url=https://www-newindianexpress-com.translate.goog/cities/chennai/2014/May/15/mylapore-locals-get-a-new-stop-612741.htmltitle=Mylapore Locals Get a New Stopdate=15 May 2014access-date=1 December 2023newspaper=The New Indian Express}}
9ThirumayilaiதிருமயிலைThirumayilai8.6619 October 1997
10Mandaveliமந்தைவெளிMandaiveli9.69926 January 2004
11Greenways Roadபசுமைவழிச் சாலைPasumaivazhi Salai11.02
12Kotturpuramகோட்டூர்புரம்Kottoorpuram11.892
13Kasturba Nagarகஸ்தூரிபாய் நகர்Kasturibai Nagar12.824
14Indira Nagarஇந்திரா நகர்Indira Nagar13.796
15Thiruvanmiyurதிருவான்மியூர்Thiruvanmiyur14.655
16TaramaniதரமணிTharamani16.5719 November 2007
17Perungudiபெருங்குடிPerungudi17.713At Grade
18Velacheryவேளச்சேரிVelachery19.34
Thirumayilai

Indian Railways has made various plans to use the empty space in the MRTS stations. In February 2009, Indian Railway Catering and Tourism Corporation (IRCTC) announced plans to set up food stalls at MRTS stations with the first such stall inaugurated in April 2018 at Thiruvanmiyur station.

MRTS has been criticised by the public for poor maintenance of the stations, lack of inter-modal transport facilities and security issues. The director of Chennai Metro called for the various government agencies to work together to improve the connectivity to the stations. The stations often face issues such as seepage of rainwater and no access to clean drinking water. A 2006 report by the Comptroller and Auditor General of India cited delays in installation of station amenities such as escalators.

In 2012, there was a shortage of the Railway Protection Force personnel at MRTS stations, which raised security concerns. In 2013, to improve the security for the passengers using the network, Indian Railways declared that the MRTS stations would have a single designated entry and exit point as it was difficult for the existing RPF personnel to monitor multiple gates at the same time. If the planned takeover by Chennai Metro is completed, the existing line is planned to be upgraded to be compatible with the metro system. Plans to modernise infrastructure include improved facilities at stations and single integrated ticketing system among others.

Operations

The operational route length between Chennai Beach and Velachery is 19.34 km with a journey time of more than 45 minutes one way. The system handles about 70 trains on weekdays and reduced capacity on Sundays. In 2012, Indian Railways made the schedule for the MRTS services available on Google Maps on Android smartphones. The trains can be tracked in real time and the users are provided with updates through an automated SMS system.

Fares and ticketing

The minimum fare for a second class is . A second class ticket from Beach to Velachery is priced at . First class tickets cost about five times higher than the second class fare. In addition to one-time tickets, the Southern Railway issues monthly tickets and quarterly season tickets for frequent travelers. Short validity tickets are available for tourists. The tickets can be bought at the railway ticket counters or booked through a mobile application.

Patronage

Average daily patronage by station (2009–10)

The ridership of the Chennai MRTS system increased from approximately 9,000 in 2003 to 66,518 passengers per day in 2008. When the line was extended up to Velachery in 2007, the daily ridership increased and it saw a three-fold increase in the revenue. , the daily ridership is about 100,000. Three stations—Beach, Thirumayilai, and Velachery—account for nearly 40 percent of the ridership.

In 2010, the Indian Railways rolled out dedicated trains for women, which saw poor patronage. In 2023, Chennai Unified Metropolitan Transport Authority (CUMTA) introduced new plans to improve last-mile connectivity to the stations. Indian Railways operates special trains on certain occasions to boost revenue. As the route passes close to some popular religious sites, the MRTS operates special trains during popular religious festivals such as the Vaikunta Ekadashi at Parthasarathy Temple in Thiruvallikeni and the Arupathumoovar festival at the Kapaleeshwarar Temple in Thirumayilai. Special trains are run when cricket matches are hosted at the M. A. Chidambaram Stadium in Chepauk, during Kaanum Pongal festival at Marina Beach, and during bus strikes.

As the MRTS system is not fully integrated with other modes of transportation in the city, access to the stations is an issue. As per a survey conducted in 2012, the public called for special focus on pedestrian facilities that would provide access to MRTS stations from nearby roads and bus stops, as well as identifying new feeder routes for the network. Post the completion of the under construction extension, the MRTS system will be connected to the Suburban Railway and the Metro. This would enable commuters to access the railway grid of the different operational rail systems and facilitate improved connectivity from the stations on the MRTS network. The proposed extension up to St. Thomas Mount is expected to increase patronage from people working in the IT establishments, residences and other offices located close to the MRTS network.

Finances

In a 10 month period in 2009–10, the MRTS earned a revenue of with coming from ticketing sales. It had operating expenses of about , which translated to net loss of more than . , the MRTS registered revenues of annually. With estimated operational expenses of about , the annual loss widened to . A major contributor to the losses is the revenue deficit due to subsidised cheaper fares offered by the Southern Railway, which runs the service.

References

References

  1. (7 February 2023). "Velachery-St Thomas Mount MRTS stretch to get metro like stations". [[Times of India]].
  2. "Chennai Division, SR". [[Southern Railway zone]].
  3. "Chennai Metro, project brief". [[Chennai Metro Rail Limited]].
  4. "Institutional Development of Suburban Rail systems". [[Indian Railway]].
  5. "Report No.5 of 2006 (Railways)". [[Comptroller and Auditor General of India]].
  6. "Traffic and Transportation in CMA". [[Chennai Metropolitan Development Authority]].
  7. "Indian Engineering Heritage". [[Indian National Academy of Engineering]].
  8. Sreevatsan, Ajai. (10 August 2010). "Metro Rail may take over MRTS". [[The Hindu]].
  9. (4 April 2010). "Mass rejected transit system". Business Today.
  10. "Towards a discussion of support to Urban Transport development in India, March 2005". [[World Bank]].
  11. "Development of MRTS in Chennai". [[Chennai Metropolitan Development Authority]].
  12. (1 November 2022). "MRTS connectivity from Velachery to St Thomas Mount to be ready by March". [[The Hindu]].
  13. (16 July 1994). "MRTS work in progress". [[New Indian Express]].
  14. (27 January 2004). "MRTS services extended". [[Business Line]].
  15. (18 August 2007). "Extended MRTS stretch in Chennai ready for inauguration". [[Business Line]].
  16. (20 November 2007). "Tiruvanmiyur-Velachery MRTS service opened". [[Business Line]].
  17. "Traffic and Transportation, Chapter 5". [[Chennai Metropolitan Development Authority]].
  18. Sreevatsan, Ajai. (31 October 2011). "Evolution of Chennai's Public Transport System". [[The Hindu]].
  19. (31 October 2023). "MRTS Phase II: Three steel girders installed across existing tracks". [[The Times of India]].
  20. (28 December 2021). "Velachery-St Thomas Mount MRTS by 2022-end". [[The New Indian Express]].
  21. (2 October 2010). "Protest against MRTS corridor realignment". [[The Hindu]].
  22. (1 August 2010). "Threat of relocation evokes protests as Southern Railway alters MRTS alignment". [[The Times of India]].
  23. "Railway Budget 2012-13". [[Government of India]].
  24. (16 October 2012). "MRTS upto St. Thomas Mount back on track". [[The Hindu]].
  25. (16 March 2011). "MRTS extension stopped in its tracks". [[The Times of India]].
  26. (10 April 2013). "Decks cleared for acquisition of land for Adambakkam station". [[The Hindu]].
  27. Shivakumar, C.. (23 May 2014). "MRTS Phase II Extension Starts Next Month". [[The New Indian Express]].
  28. (27 February 2016). "The final leg of Mass Rapid Transit System for a distance of 500 metres is not likely to be completed in the near future". [[The Hindu]].
  29. Shivakumar, C.. (29 December 2021). "Velachery-St Thomas Mount MRTS by 2022-end". [[The New Indian Express]].
  30. "Land acquisition talks for MRTS link fail again". [[The Times of India]].
  31. (13 November 2019). "After 11-year wait, construction on St Thomas Mount-Adambakkam MRTS stretch in Chennai to begin soon". [[The Indian Express]].
  32. (21 September 2020). "Chennai MRTS's last stretch to be delayed further as CMDA approaches SC". [[The News Minute]].
  33. (7 January 2021). "Chennai: Last-mile demolition to acquire land for MRTS extension begins". [[Times of India]].
  34. Shivakumar, C.. (24 June 2022). "Construction of MRTS' final pillar to start in six months, land acquisition nearing end". [[The Indian Express]].
  35. (13 July 2023). "Construction of Velachery-St. Thomas Mount MRTS stretch will be completed by end of July". [[The Hindu]].
  36. (18 January 2024). "Concrete girder of bridge collapses at MRTS worksite in Thillai Ganga Nagar". [[The Hindu]].
  37. (19 January 2024). "Part of bridge falls, rail project delayed again". [[The Times of India]].
  38. (31 October 2018). "Hope for Chennai MRTS phase-II extension". [[The Indian Express]].
  39. (27 April 2024). "Mount-Velachery-Beach MRTS misses deadline, again". [[The Times of India]].
  40. (5 January 2024). "Parandur-Poonamallee MRTS in Chennai to cost Rs 10k crore". [[The New Indian Express]].
  41. (29 May 2017). "Chennai Metro-MRTS merger report in six months". The Hindu.
  42. Sekar, Sunitha. (19 July 2018). "Metro-MRTS merger likely to be a costly affair". [[The Hindu]].
  43. (15 May 2022). "MRTS merger with Chennai Metro gets railway's approval". [[The New Indian Express]].
  44. (15 July 2024). "CMRL's takeover of MRTS yet to make any headway". [[Daily Thanthi]].
  45. (27 December 2018). "How Buckingham canal could have saved Chennai". [[The Hindu]].
  46. "Presentation on MRTS & Rail facilities in and around Chennai". [[Chennai Metropolitan Development Authority]].
  47. (20 February 2021). "MRTS-suburban train linking work resumes after long delay". [[The Hindu]].
  48. "Feasibility report". [[Government of Tamil Nadu]].
  49. (3 October 2023). "Buckingham canal restoration: WRD submits plan". [[The New Indian Express]].
  50. (29 August 2003). "River restoration only on paper, a sham on ground". [[The Times of India]].
  51. (5 November 2016). "Civic infrastructure struggling to be rain-ready". [[The Hindu]].
  52. "Waterways". [[Chennai Metropolitan Development Authority]].
  53. "Metro – Urban – Suburban Systems". IRFCA.
  54. (24 July 2017). "MRTS cuts ride time from Beach to Velachery". [[The Times of India]].
  55. "General Description of Electrical Rolling Stock". [[Indian Railways]].
  56. "MRTS goes full nine-car". [[The Hindu]].
  57. "Three phase EMU". [[Indian Railways]].
  58. (1 April 2017). "Fort station to be MRTS hub post CMRL merger". [[The Times of India]].
  59. "Integral Coach Factory".
  60. Ananthakrishnan, G. (27 February 2013). "Why no AC train for Chennai MRTS?". [[The Hindu]].
  61. (11 October 2022). "Chennai Metro Rail Limited to assess if suburban trains can have AC coaches". [[The Times of India]].
  62. (29 December 2015). "A first class conundrum for MRTS ticket checkers". [[The Hindu]].
  63. (17 October 2021). "Plan to launch AC coaches on Chennai suburban trains a non-starter". [[The Times of India]].
  64. "Indian Railways Time Table". Indian Railways.
  65. (26 September 2017). "Beach station awaits makeover as Metro plans MRTS takeover". [[The New Indian Express]].
  66. (24 February 2022). "Chennai: 21-storey building, skywalk part of Broadway bus terminal". [[The Times of India]].
  67. (11 March 2023). "Central to Park station, an ordeal". [[The Times of India]].
  68. "Eight biggest railway stations in India". [[Daily news and analysis]].
  69. (8 March 2012). "Temples on metro route strike gold". [[The Times of India]].
  70. (27 January 2024). "IIT Madras to study upgrade of two MRTS stations". [[The Times of India]].
  71. (21 March 2024). "Southern Railway to run special MRTS trains". [[The Times of India]].
  72. (16 October 2012). "MRTS upto St. Thomas Mount back on track". [[The Hindu]].
  73. (13 April 2023). "U-shaped flyover on OMR to be completed by May end". [[The Hindu]].
  74. "Detailed project report for Chennai Metro". [[Chennai Metro]].
  75. (3 November 2023). "BRTS: One solution for two problems on OMR". [[The Times of India]].
  76. Srivathsan, A.. (13 April 2010). "Integrated station at St. Thomas Mount planned". [[The Hindu]].
  77. (16 March 2010). "Can Chennai's Mass Rapid Transit System revive itself?". [[Business Today (India).
  78. "Chennai metro map". [[Chennai Metro]].
  79. (15 May 2014). "Mylapore Locals Get a New Stop". [[The New Indian Express]].
  80. Lopez, Aloysius Xavier. (5 October 2013). "Amma canteens may soon come up at Chennai's MRTS stations". [[The Hindu]].
  81. (27 February 2009). "Snazzy food stalls at MRTS stations". [[Times of India]].
  82. Ayyappan, V.. (30 March 2012). "IRCTC to build food kiosks at MRTS stations off-track". [[The Times of India]].
  83. Narayanan, Vivek. (28 September 2013). "Missed a meal? Grab a bite at MRTS station in Chennai". [[The Hindu]].
  84. "IRCTC opens 1st food plaza at Thiruvanmiyur MRTS station". [[The Times of India]].
  85. (1 February 2011). "Lack of safety measures turn incomplete MRTS stations into death trap". [[The Times of India]].
  86. Ayyappan, V.. (25 December 2009). "Badly maintained stations hamper optimum patronage". [[The Times of India]].
  87. (25 February 2011). "Need to integrate MRTS with other public transport systems". [[Business Line]].
  88. (14 November 2008). "Rain leak leaves MRTS stations in mess". [[The Times of India]].
  89. (11 November 2009). "MRTS stations in terrible state after rain". [[The Times of India]].
  90. Ashok, Sowmiya. (14 July 2011). "How safe is drinking water at train terminals ?". [[The Hindu]].
  91. "Planning, execution and operation of Mass 1Rapid Transit System, Chennai. Chapter III". [[Comptroller and Auditor General of India]].
  92. Narayanan, Vivek. (6 December 2012). "Railway cops shortage hits security at MRTS stations". [[The Hindu]].
  93. Narayanan, Vivek. (5 January 2013). "MRTS stations to have 1 entry, exit". [[The Hindu]].
  94. "Protection of Passengers and their belongings including Strategy to Control Crime". [[Indian Railways]].
  95. "Chennai Metro rail likely to take over MRTS". [[Times of India]].
  96. (1 July 2012). "Operational time of MRTS trains revised". [[The Hindu]].
  97. Srikanth, R.. (18 March 2012). "Technical snag delays MRTS services". [[The Hindu]].
  98. "Chennai Beach – Velachery – Chennai Beach Week days service". [[Southern Railway zone]], [[Indian Railways]].
  99. "Chennai Beach – Velachery – Chennai Beach Sunday service". [[Southern Railway zone]], [[Indian Railways]].
  100. Subramanian, Karthik. (19 August 2012). "Google simplifies public transit information". [[The Hindu]].
  101. Karthikeyan, Hemalatha. (20 August 2012). "Mass Rapid Transit System, Metro path map is now part of mobile app". [[The Times of India]].
  102. Kabirdoss, Yogesh. (18 February 2012). "Track MRTS trains through SMS". [[The New Indian Express]].
  103. (5 May 2023). "MRTS fare hike in the offing as Tamil Nadu govt prepares for takeover". [[The New Indian Express]].
  104. (20 January 2018). "Chennai: Post-Metro merger, MRTS fares may go up by five to seven times". [[The New Indian Express]].
  105. (12 December 2018). "First-class MRTS commuters complain of shoddy facilities". [[The Times of India]].
  106. "Season ticket fare list". [[Southern Railway zone]], [[Indian Railways]].
  107. Narayanan, Vivek. (8 May 2012). "Wait for ticket gets painful". [[The Hindu]].
  108. (24 December 2019). "Tourist Tickets introduced in Chennai Suburban". [[Southern Railway zone]], [[Indian Railways]].
  109. (January 2020). "ICF monthly bulletin". [[Integral Coach Factory]].
  110. (25 December 2019). "Southern Railway introduces tourist tickets in Chennai suburban areas". [[The New Indian Express]].
  111. (1 February 2021). "Buy suburban train tickets via app". [[The Hindu]].
  112. Srikanth, R.. (11 November 2008). "MRTS getting popular, yet it has miles to go". [[The Hindu]].
  113. "Updated project brief". [[Chennai Metro]].
  114. "20 years on, a favourite with commuters". [[The Hindu]].
  115. Sreevatsan, Ajai. (17 January 2012). "Swanky new road, but MTC buses shy away". [[The Hindu]].
  116. Sreevatsan, Ajai. (24 February 2010). "Poor patronage for MRTS Ladies Special service". [[The Hindu]].
  117. (18 December 2010). "Huge crowds throng temples on Vaikunta Ekadasi". [[The Times of India]].
  118. (7 April 2017). "MRTS specials for 'Arupathumoovar' festival". [[Southern Railway zone]], [[Indian Railways]].
  119. (19 March 2011). "Special trains for cricket match". [[The Hindu]].
  120. "Special trains on MRTS in view of ICC World Cup Cricket Match". [[Southern Railway zone]], [[Indian Railways]].
  121. (17 January 2008). "Thousands throng Marina for Kaanum Pongal". [[One India]] News.
  122. (7 January 2018). "Commuters stranded across Tamil Nadu as bus strike enters 4th day". [[The Economic Times]].
  123. "Review of First Master Plan, Chapter 1". [[Chennai Metropolitan Development Authority]].
  124. Ananthakrishnan, G.. (23 September 2013). "Not all together here". [[The Hindu]].
  125. (19 October 2012). "Survey to identify lacunae in facilities near MRTS stations". [[The Hindu]].
  126. (15 March 2012). "Last mile MRTS link likely to redefine train travel in city". [[The Times of India]].
  127. Raja Simhan, E.. (16 March 2012). "Velachery-St Thomas Mount MRTS link, boon for biz units". [[Business Line]].
  128. "Three avatars of rail services under one house". [[The Times of India]].
  129. (15 September 2023). "CUMTA to promote last mile connectivity at 18 stations". [[The Times of India]].
  130. (16 October 2012). "MRTS upto St. Thomas Mount back on track". [[The Hindu]].
Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Chennai Mass Rapid Transit System — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report