From Surf Wiki (app.surf) — the open knowledge base
Charlbury railway station
Railway station in Oxfordshire, England
Railway station in Oxfordshire, England
| Field | Value | ||
|---|---|---|---|
| name | Charlbury | ||
| symbol_location | gb | ||
| symbol | rail | ||
| image | 2019 at Charlbury station - platform 2.JPG | ||
| borough | Charlbury, West Oxfordshire | ||
| country | England | ||
| grid_name | Grid reference | ||
| grid_position | |||
| manager | Great Western Railway | ||
| platforms | 2 | ||
| code | CBY | ||
| classification | DfT category E | ||
| original | Oxford, Worcester and Wolverhampton Railway | ||
| pregroup | Great Western Railway | ||
| postgroup | GWR | ||
| years | 4 June 1853 | ||
| events | Opened | ||
| years1 | 29 November 1971 | ||
| events1 | Line singled | ||
| years2 | 6 June 2011 | ||
| events2 | Line redoubled | ||
| <!--{{Rail pass box | pass_year | 2019/20 | passengers= 0.314 million}}-- |
| {{Rail pass box | pass_year | 2020/21 | passengers= 55,812}} |
| {{Rail pass box | pass_year | 2021/22 | passengers= 0.200 million}} |
| {{Rail pass box | pass_year | 2022/23 | passengers= 0.257 million}} |
| {{Rail pass box | pass_year | 2023/24 | passengers= 0.276 million}} |
| {{Rail pass box | pass_year | 2024/25 | passengers= 0.343 million}} |
| footnotes | Passenger statistics from the Office of Rail and Road | ||
| mapframe | yes | ||
| mapframe-zoom | 13 |
|mapframe-zoom = 13
Charlbury railway station is a railway station serving the town of Charlbury in Oxfordshire, England. This station and all trains serving it are operated by Great Western Railway. After almost 40 years as a single-platform station, the track through Charlbury station was redoubled with the recommissioning of a second platform on 6 June 2011 as part of the project to improve reliability and increase traffic capacity on the Cotswold Line.
History
The Oxford, Worcester and Wolverhampton Railway opened the station in 1853. It is notable for the original station building, a wooden chalet-type structure in the Italianate architectural style of Isambard Kingdom Brunel; together with the early station nameboard this is a Grade II listed building restored in 1979. Until 1970 the station had a goods shed, a 30 cwt crane and a 34-lever signal box. The signal box was demolished when the line through the station was singled on 29 November 1971.
Sir Peter Parker (1924–2002), the former chairman of the British Railways Board, was a regular user of the station.
With the completion of the first stage of the redoubling of the Cotswold Line from to a point east of Charlbury, the second platform, decommissioned in 1971, was reinstated and returned to service on 6 June 2011.
2018 Improvement Works
Charlbury and Kingham are two of the stations on the Cotswold Line that had their platforms lengthened to accommodate longer GWR Class 802 units, which are nine carriages long — one carriage longer than the longest trains that previously used the station.
Facilities
Charlbury station is one of the only two-platform stations on the Cotswold Line to have step-free access to both platforms. This has been achieved by installing a long set of ramps from the lower car park to both platforms.
Charlbury is one of the only stations in the area that has a user-operated ticket machine. Kingham and Finstock, the main stations on the either side of Charlbury, do not have such facilities. However, passengers travelling from either of these stations when the ticket office is closed can board the service and buy a ticket on the train.
Services
Great Western Railway operate all services at Charlbury. The typical off-peak service in trains per hour is:
- 1 tph to London Paddington
- 1 tph to of which some continue to and
References
References
- (1983). "The Railway Heritage of Britain". [[Michael Joseph (publisher).
- Leigh, Chris. (1981). "GWR Country Stations". [[Ian Allan Publishing.
- (2006). "British Railways Past and Present: Oxfordshire; A Second Selection (No. 55)". Past & Present Publishing Ltd.
- George, Rob. (26 May 2018). "Line group call for improvements to be maintained". Evesham Observer.
- (July 2011). "Charlbury redoubling complete". Ian Allan.
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Charlbury railway station — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report