CE-20

Rocket engine developed by ISRO for upper stage of its LVM3 rocket


Rocket engine developed by ISRO for upper stage of its LVM3 rocket

FieldValue
nameCE-20
imageCE-20 Engine Config Model.png
image_size250
captionA computer model of CE-20
country_of_originIndia
first_date5 June 2017
designerLPSC, ISRO
manufacturerHindustan Aeronautics Limited
purposeUpper stage booster
statusActive
typeliquid
oxidiserLOX
fuelLH2
mixture_ratio5.05
cycleGas Generator
combustion_chamber1
nozzle_ratio100
thrust(Vac)186.36 kN
throttle_range180 –
chamber_pressure6 MPa
specific_impulse_vacuum442 isp
burn_time640-800 seconds
restarts
gimbal
dry_weight588 kg
used_inUpper stage of LVM3 & NGLV
references{{Cite weburl= https://www.isro.gov.in/update/12-oct-2018/isro-successfully-tests-cryogenic-engine-ce-20-gslv-mk-iii-chandrayaan-2-missiontitle= ISRO successfully tests Cryogenic Engine (CE-20) for GSLV Mk-III / Chandrayaan-2 Mission
archive-urlhttps://web.archive.org/web/20220804153939/https://www.isro.gov.in/update/12-oct-2018/isro-successfully-tests-cryogenic-engine-ce-20-gslv-mk-iii-chandrayaan-2-missionarchive-date=4 August 2022publisher=ISROlanguage=en }}

|thrust(Vac) = 186.36 kN |thrust(SL) =

|archive-url=https://web.archive.org/web/20220804153939/https://www.isro.gov.in/update/12-oct-2018/isro-successfully-tests-cryogenic-engine-ce-20-gslv-mk-iii-chandrayaan-2-mission |archive-date=4 August 2022 |publisher=ISRO |language=en }}

The CE-20 is a cryogenic rocket engine developed by the Liquid Propulsion Systems Centre (LPSC), a subsidiary of ISRO. It has been developed to power the upper stage of the LVM3. It is the first Indian cryogenic engine to feature a gas-generator cycle. The high thrust cryogenic engine is the most powerful upper stage cryogenic engine in operational service.

Among the thrust levels for which CE-20 is qualified are 19 tonnes for ongoing satellite missions, 20 tonnes for the Gaganyaan, and an upgraded 22 tonnes for future launches like the Bharatiya Antariksh Station's BAS-01 Base Module.

Overview

The CE-20 is the first Indian cryogenic engine to feature a gas-generator cycle. The engine produces a nominal thrust of 200 kN, but has an operating thrust range between 180 kN to 220 kN and can be set to any fixed values between these limits. The combustion chamber burns liquid hydrogen and liquid oxygen at 6 MPa with 5.05 engine mixture ratio. The engine has a thrust-to-weight ratio of 34.7 and a specific impulse of 442 isp in vacuum.

Development and Testing

  • On 28 April 2015, CE-20 cleared a 635 seconds long duration hot test at IPRC, Mahendragiri test facility. This test was preceded by two cold start tests and four short duration hot tests.
  • On 16 July 2015, the first developmental CE-20 engine 'E1' was successfully endurance hot tested at ISRO Propulsion Complex, Mahendragiri for a duration of 800 seconds with Mixture Ratio Controller (MRC) in closed loop mode. This duration is approximately 25% more than the engine burn duration in flight. This was tenth development test for CE-20.
  • On 10 August 2015, a short duration (5.7 seconds) hot test on the CE-20 engine was done to demonstrate the successful engine ignition with tank pressure conditions as in flight.
  • On 19 February 2016, the second developmental CE-20 engine 'E2' was hot-tested for a duration of 640 seconds with Mixture Ratio Controller (MRC) in closed loop mode at ISRO Propulsion Complex, Mahendragiri.
  • On 03 December 2016, flight acceptance test of 25 seconds in high altitude conditions was carried out on third developmental CE-20 engine (E3). It was successfully flown on the first developmental flight 'D1' of the GSLV Mk-III on 5 June 2017.
  • On 25 January 2017, CE-20 engine E2 integrated with development stage for GSLV Mk III, C25 'D' was tested for duration of 50 seconds.
  • On 17 February 2017, CE-20 engine E2 integrated with development stage for GSLV Mk III, C25 'D' was tested for duration of 640 seconds.
  • On 11 October 2018, CE-20 engine E6 completed 25 second long flight acceptance test in high altitude conditions for GSLV Mk III M1/Chandrayaan-2 mission
  • On 16 December 2021, CE-20 (E9 engine) was tested to demonstrate the repeatability of engine ignition with stable combustion. Two ignition trial tests of 3.2 seconds duration were conducted nominally followed by a nominal hot test of 50 seconds duration.
  • On 12 January 2022, CE-20 engine E9 completed 720 second long qualification test for Gaganyaan programme.
  • On 29 October 2022, CE-20 engine E11 completed flight acceptance hot test for 25 seconds. Test was conducted to check the integrity of hardware, subsystems' performance and tuning the engine for LVM3 M3 mission.
  • On 9 November 2022, CE-20 engine E9 was hot tested for 70 seconds. During this test the engine operated at thrust level of approximately 20 tonnes for the first 40 seconds and then switched to an uprated thrust regime of 21.8 tonnes lasting ~30 seconds. This uprated engine would increase payload capacity of LVM3 to GTO by up to 450 kg along an appropriate stage with additional propellant loading. As part of engine modification, Thrust Control Valve (TCV), 3D-printed LOX and LH2 turbine, and exhaust casings were introduced for the first time.
  • On 23 December 2022, CE-20 engine E9 was hot tested for 650 second duration. For the first 40 seconds of test, the engine was operated at 20.2 tonne thrust level, after this engine was operated at 20 tonne off-nominal zones and then for 435 seconds it was operated at 22.2 tonne thrust level. With this test, the 'E9' engine has been qualified for induction in flight. The E9 engine with this hot test has undergone twelve hot tests with 3370 seconds cumulative burn duration at different thrust & mixture ratio levels.
  • On 24 February 2023, CE-20 engine went through flight acceptance testing for LVM3-M4/Chandrayaan-3 successfully. The test was done at High Altitude Test Facility and lasted for of nominal 25 seconds duration.
  • On 2 November 2025, the thrust chamber on CE-20 engine of C25 stage on LVM3-M5 flight was reignited 100 seconds after the injection of CMS-03 (aka GSAT-7R).
  • On 7 November 2025, a boot-strap mode start test on the CE20 engine was conducted under vacuum conditions in the High-Altitude Test (HAT) facility at IPRC, Mahendragiri for 10 second duration. Using a multi-element igniter first the thrust chamber and then the gas generator were ignited under tank head conditions, and the turbopumps were started without the use of the start-up system. Boot-strap mode build-up and steady-state operation of the engine were successfully demonstrated.

CE20 Hot Tests for the Gaganyaan and 22t Thrust Qualification

  • On 9 August 2023, CE-20 engine E13 successfully operated with uprated thrust level of 22t for a nominal duration of 50 seconds. This hot test (HT-01) was aimed at engine tuning.
  • On 30 August 2023, CE-20 engine E13 conducted second hot test (HT-02) to demonstrate the engine's reliability and stability for a long duration of 720 seconds with a thrust level of 19.7t.
  • On 22 September 2023, CE-20 engine E13 successfully conducted for a long duration of 670 seconds with an uprated thrust level of 22t. With this third hot test (HT-03), qualification activities of the CE-20 engine for the Gaganyaan program were successfully completed.
  • On 9 October 2023, CE-20 engine E13 underwent fourth hot test (HT-04), to demonstrate engine operation in off-nominal conditions. It was conducted nominally for a duration of 125 seconds. With this test, the CE-20 engine was qualified for operation at 22t thrust level during flight.
  • On 19 October 2023, flight acceptance testing of CE-20 engine E12 was successfully completed for a duration of 25 seconds. This engine is assigned for the first uncrewed Gaganyaan mission HLVM3-GX.
  • On 8 November 2023, CE-20 engine E13 underwent fifth hot test (HT-05) for evaluating the off-nominal operation of the engine. Test was successfully conducted for the duration of 140 second at MET facility, IPRC, Mahendragiri and qualified the CE20 engine for operating at 22t thrust level during flight.
  • On 5 January 2024, CE-20 engine E13 underwent sixth hot test (HT-06). This vacuum ignition test was conducted for a duration of 2.5 seconds in High Altitude Test condition at Thrust chamber test facility of IPRC.
  • On 13 February 2024, CE-20 engine identified for the first uncrewed Gaganyaan-1 mission passed flight acceptance after a series of ground qualification tests. With this, human rating of CE-20 cryogenic engine for the Gaganyaan Programme was completed.
  • On 29 November 2024, ISRO carried out a sea-level hot test for the CE-20, which has a nozzle protection system and a high-area nozzle ratio of 100. A multi-element igniter's capacity for engine restart was proven. While keeping an eye on the health condition of the other two parts, ISRO activated the first element of a multi-element igniter. All necessary performance requirements were met.
  • On 7 February 2025, using a multi-element igniter under vacuum, ISRO successfully tested the ignition of CE-20 at High Altitude Test Facility (IPRC). The test results matched the tank pressure parameters needed for engine restart during actual space flight. The use of bootstrap mode for turbopump startup rather than conventional stored gas systems is one of the new restart strategies being investigated by ISRO. This test was part of the larger effort to allow multiple restart of cryogenic engine while in orbit. The engine performed well.This was the first time a Gas Generator cycle engine was tested in bootstrap mode in the world.

Manufacturing

The CE-20 cryogenic engine is manufactured by Hindustan Aeronautics Limited at its Integrated Cryogenic Engine Manufacturing Facility (ICEMF) in New Tippasandra, a suburb of Bengaluru.

Variants

  • CE-20[U] is the upgraded version of CE-20 with more thrust and performance. It also has restarting capabilities in space. It is planned to used on LVM3-SC.

References

References

  1. (27 April 2013). "HAL to produce cryogenic engines for ISRO". The Hindu.
  2. "Indigenous Cryogenic Engine Tested Successfully".
  3. (22 February 2016). "India's heavy-lift rocket on track for December debut following engine test". Spacenews.
  4. (February 2017). "Development of Cryogenic Engine for GSLV MkIII: Technological Challenges". IOP Conference Series: Materials Science and Engineering.
  5. (29 June 2024). "Robotic Version Of Indian Space Station By 2028: ISRO Chief To NDTV".
  6. (22 January 2014). "GSLV MkIII, the next milestone".
  7. (2009-03-13). "LPSC Handouts at Aer India-2009". Liquid Propulsion Systems Centre.
  8. "Aero India 2009, LPSC specification sheet :: IMG_0159".
  9. (29 April 2015). "Isro's desi cryogenic engine test successful - Times of India". The Times of India.
  10. "Indigenously Developed High Thrust Cryogenic Rocket Engine Successfully Ground Tested for a duration for 800 seconds - ISRO".
  11. "Year End Review: Achievements of Department of Space during the year 2015".
  12. "CE 20 Engine of GSLV MKIII successfully hot tested - ISRO".
  13. (20 February 2016). "ISRO upbeat as indigenous cryo engine passes test". The Hindu.
  14. (19 Feb 2016). "ISRO successfully conducts hot test of Cryo CE 20 engine". The Hindu.
  15. (19 Feb 2016). "ISRO successfully conducts hot test of Cryo CE 20 engine".
  16. "High Altitude Flight Acceptance Test of CE20 Engine Conducted Successfully".
  17. (3 December 2016). "GSLV engine tested at Mahendragiri". The Hindu.
  18. "Department of Space Outcome Budget 2016-17".
  19. Malik, Tariq. (2017-06-05). "India Just Launched Its Heaviest & Most Powerful Rocket Yet". Space.com.
  20. "ISRO Successfully Tests C25 Cryogenic Upper Stage of GSLV MkIII - ISRO".
  21. "ISRO Successfully Tests its Cryogenic Stage (C25) for GSLV MkIII for the Flight Duration - ISRO".
  22. "ISRO successfully tests Cryogenic Engine (CE-20) for GSLV Mk-III / Chandrayaan-2 Mission - ISRO".
  23. "Annual Report of Department of Space 2021-2022".
  24. "Qualification testing of Cryogenic Engine for Gaganyaan Programme - ISRO".
  25. "CE20 engine hot test video".
  26. Kumar, Chethan. (29 October 2022). "Isro hot-tests CE-20 engine for GSLV-Mk3 to be used for next OneWeb launch".
  27. (2022-11-09). "Successful CE20 uprated Engine Hot Test with 21.8 T vacuum thrust". Indian Space Research Organisation.
  28. "Successful CE-20 Engine Hot Test with 20t off-nominal & 22.2t vacuum thrust".
  29. (27 February 2023). "Successful Flight Acceptance Hot Test of CE-20 Cryogenic Engine for LVM3-M4/Chandrayaan-3 Mission".
  30. Siddiqui, Huma. (1 March 2023). "ISRO gets ready for Chandrayaan-3 mission; CE-20 cryogenic engine's hot test successful".
  31. (2025-11-02). "ISRO scientists perform vital experiment in LVM3-M05 mission's cryogenic stage". The Economic Times.
  32. Jagannathan, Venkatachari. (2025-11-03). "India’s New Naval Sentinel Up In The Sky-GSAT-7R Strengthens Maritime Communications".
  33. (2025-11-03). "ISRO Chief Reveals Big Test In Space Quietly Accomplished During The LMV3 Launch On Nov 2".
  34. "Successful Demonstration of Boot-Strap Mode Start of CE20 Cryogenic engine".
  35. "Monthly Summary of Department of space for the month of August 2023".
  36. "CE20 E13 Engine Hot Test for the Gaganyaan & 22t Thrust Qualification".
  37. "Monthly Summary of Department of space for the month of September 2023".
  38. "CE20 E13 Engine Hot Test for 22t Thrust Qualification".
  39. "Monthly Summary of Department of space for the month of October 2023".
  40. "Monthly Summary of Department of space for the month of November 2023".
  41. "Monthly Summary of Department of space for the month of January, 2024".
  42. "Successful completion of Human rating of CE20 Cryogenic engine for the Gaganyaan Programme".
  43. Kumar, Chethan. (2024-12-12). "Isro's CE20 Cryogenic Engine passes critical sea-level hot test". The Times of India.
  44. "Preparing for inflight re-ignition, full nozzle cryogenic engine (CE20) undergoes test outside vacuum chamber.".
  45. "Preparing for inflight re-ignition - Vacuum ignition trial of Cryogenic engine with Multi-element Igniter conducted successfully".
  46. Kumar, Chethan. (2025-02-08). "Isro achieves key milestone in cryogenic engine testing". The Times of India.
  47. "Achievements of Department of Space - 2025".
  48. (2022-09-28). "HAL Bengaluru: President Murmu inaugurates Integrated Cryogenic Engine Manufacturing Facility at HAL".
  49. "ISRO's LVM3 rocket is on the verge of a big transformation, where its core stage & upper stage will be replaced by new stages". X (Formerly Twitter).
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about CE-20 — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report