Skip to content
Surf Wiki
Save to docs
general/wind-farms-in-new-brunswick

From Surf Wiki (app.surf) — the open knowledge base

Caribou Wind Park

Wind park in Bathurst, Canada

Caribou Wind Park

Wind park in Bathurst, Canada

Caribou Wind Park as seen from the top of one of the turbines

Caribou Wind Park is a large wind farm project located approximately 70 km west of Bathurst, New Brunswick which was completed in November 2009. The farm is the second in New Brunswick. It is owned and operated by GDF Suez and the power is purchased by NB Power for supply to consumers.

The farm consists of thirty-three 3 megawatt (MW) wind turbines for a total capacity of 99 MW. The turbines used are Vestas V90-3MW model, which have a rotor diameter of 90 m and sit atop an 80 m tower.

The project's 'phase one' is now completed with a 'phase two' planned at an undetermined date in the future to add more turbines increasing the total output to 200 MW.

References

References

  1. "Caribou {{!}} New Brunswick Energy Institute".
Info: Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Caribou Wind Park — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report