Brightline West
Future American high-speed rail route
Future American high-speed rail route
| Field | Value | ||||||
|---|---|---|---|---|---|---|---|
| name | Brightline West | ||||||
| logo | Brightline West.svg | ||||||
| image | CAHSR location map.svg | ||||||
| caption | A map of planned high-speed rail routes in California and Nevada on I-15 corridor. The separate California High-Speed Rail is indicated in black, grey and light grey. | ||||||
| type | High-speed rail | ||||||
| status | Under construction | ||||||
| locale | California, Nevada | ||||||
| predecessor | Desert Wind | ||||||
| first | September 2029 (anticipated) | ||||||
| operator | Brightline | ||||||
| website | |||||||
| start | Rancho Cucamonga, California, US | ||||||
| stops | Victor Valley and Hesperia, California, US | ||||||
| end | Enterprise, Nevada, US | ||||||
| distance | 218 mi | ||||||
| journeytime | Approx. 2h 10m | ||||||
| stock | |||||||
| gauge | |||||||
| el | |||||||
| speed | {{ubl | class=nowrap | |||||
| {{convert | 180 | or | 200 | mph | abbr | on | round=10}} |
| {{convert | 101 | mph | km/h | abbr | on | round=5}} | |
| owners | DesertXpress Enterprises, LLC (Fortress Investment Group) | ||||||
| map | |||||||
| map_state | uncollapsed |
the passenger rail service between Las Vegas and Southern California
|Maximum (TBC): |180 or |Average: |101 mph
Brightline West is a privately run high-speed rail line under construction in California and Nevada. When complete, it will link the Las Vegas Valley and Rancho Cucamonga in Greater Los Angeles through the California High Desert via Interstate 15. The line will connect with existing rail at the Rancho Cucamonga station of Metrolink's San Bernardino Line, a commuter rail line in Southern California. The project is intended to provide an alternative to air and automobile travel between Southern California and Las Vegas, a popular leisure destination. In December 2023, the United States Department of Transportation awarded Brightline West a $3 billion grant as part of the Infrastructure Investment and Jobs Act. Construction, initially expected to begin shortly after the grant was announced in 2023, began on April 22, 2024. Revenue service is planned to start by September 2029.
The line was developed starting in 2005 as DesertXpress and has passed through several developers and investors. In September 2018, the project known as XpressWest, was acquired by Fortress Investment Group, which owns Brightline in Florida, the only privately run inter-city rail route in the United States. An extension of Brightline West from Victor Valley to the California High-Speed Rail station in Palmdale is also under consideration.
Context
Las Vegas is a gambling and tourist destination for the Greater Los Angeles area. Interstate 15 is a direct route between the two regions. An estimated 50 million people travel between Los Angeles and Las Vegas annually, with 85% using a car. Travel by automobile takes over four hours while scheduled buses cover the route in five to seven hours. Interstate 15 is an important freight route, so reduced congestion on the route would benefit the supply chain.
The highway carries heavy traffic on Thursday, Friday, and Sunday which causes significant delays. Motorists returning to Los Angeles on Sunday can create a 18 mile backup. Airlines have direct flights, but traffic and security at the airport add time to the short flight. Las Vegas lost its last passenger train service in 1997 when Amtrak canceled the Desert Wind.
Brightline project
In September 2018, Fortress Investment Group, which owns an inter-city rail route in Florida called Brightline, announced that it would acquire the federally approved XpressWest rail corridor project, indicating that it would begin construction of the rail line in the second half of 2020 with expected completion in the second half of 2024. After some delays, groundbreaking began on April 22, 2024 with service initially expected to start sometime in 2028. The project is expected to generate around 18,000 jobs at its peak. Los Angeles County finished an environmental assessment for the project in 2016. In October 2019, design plans were almost 30% complete. In September 2020, the line was rebranded to Brightline West, and is being called "a Brightline affiliated company."
Funding assistance
A high speed line following the Palmdale–Apple Valley–Las Vegas route was included in the 2018 California State Rail Plan as part of the 2040 timeline of projects. Subsequently, the state of California issued tax-exempt, private activity bonds to XpressWest to partially fund construction. These bonds are meant to assist private ventures for the public interest.
In September 2019, it was announced that California would assist the project in funding. In October 2019 California Infrastructure and Economic Development Bank approved $3.25 billion in bonds. In April 2020, California government officials signed off on issuing $600 million in tax-exempt private activity bonds for XpressWest. The state of Nevada allocated the company an additional $200 million in private activity bonds in July 2020.
Cofounder and co-CEO of Fortress, Wes Edens, estimated the cost of construction at $8 billion in 2020. In September 2020, up to $3.2 billion in the tax-exempt, private activity bonds were offered. In November, it was decided to let the rights for the sale of the bonds lapse. A bond sale was planned for 2021 but was moved to 2022 to allow continued progress on project planning and for the bonds to be more attractive to investors.
Los Angeles Metro is considering re-programming around $2 billion in Measure M funding slated for the High Desert Corridor, a proposed freeway between Victorville and Palmdale, canceled in October 2019, to instead create a development plan for an extension of the XpressWest route between the two cities.
In February 2023, the company applied for $3.75 billion in funding from Infrastructure Investment and Jobs Act. A bipartisan congressional group from Nevada and California wrote a letter in April 2023 in support of the funding. In December 2023, the United States Department of Transportation awarded Brightline West $3 billion of the grant request and in September 2024 signed it. In January 2024, Brightline West received $2.5 billion of private activity bonds from the US Department of Transportation in addition to $1 billion given in 2020. The remainder of the cost (estimated at $12 billion as of April 2024) is expected to be privately financed.
Due to rising costs of labor force and materials, the company requested a $6 billion loan from the U.S. Department of Transportation. The costs are now estimated to be $21.5 billion.
Rancho Cucamonga extension
The company initiated planning on a rail line over the Cajon Pass to Rancho Cucamonga in June 2020. The Infrastructure Investment and Jobs Act passed in November 2021 has billions of dollars for rail projects which provides expanded opportunities for companies such as Brightline. In January 2022, the Federal Transportation Department's Federal Rail Administration began reviewing the 49 mile that would allow speeds of up to 180 mph.
The environmental report for the Rancho Cucamonga route was released in October 2022. The environmental report includes the location of the proposed intermediate station in Hesperia. The report notes some mitigation measures will be necessary: temporary impacts on noise and wetlands, temporary and permanent impacts on some threatened or endangered species, visual impacts on views in the San Gabriel and San Bernardino Mountains, and traffic impacts around stations in Hesperia and Rancho Cucamonga. The report concludes that the project "will not result in a significant impact on the environment" or have "disproportionately high and adverse impacts" on low-income or minority populations. The environmental permit was approved in July 2023.
The San Bernardino County Transportation Authority was awarded a $25-million grant in July 2023 from the Rebuilding American Infrastructure with Sustainability and Equity (RAISE) program to fund design and construction costs of the stations in Hesperia and Apple Valley.
Construction
,_parking_garage_construction_2025-12-23.jpg)
Preparatory work involving ground surveys in the right of way of Interstate 15 and recruitment of up to 11,000 workers began in January 2024. A groundbreaking ceremony was held on April 22, 2024, at the planned Las Vegas station site, marking the official start of construction. Heavy construction was scheduled to begin in early 2025, with the Nevada DOT saying work could start in April 2025. However, as of October 2025, the major construction for the rail line is expected to begin in April 2026. To oversee this critical phase, former CEO Michael Reininger transitioned to a new role in January 2026 as Managing Director dedicated exclusively to the delivery of the brightline West project.
The company originally aimed to have the line operational for the 2028 Summer Olympics in Los Angeles. However, officials now anticipate the line will begin service September 2029, too late for the Olympics. In January 2026, updated financial disclosure revealed that the estimated cost of the project had risen to $21.5 billion.
Since the groundbreaking, field investigations and early-site activities has advanced throughout both Nevada and California. By mid-2025, Brightline West crews were performing geotechnical borings, utility potholing, and survey operations along the Interstate 15 corridor, including bridge-potholing work near the I-15/SR-210 interchange in Rancho Cucamonga.{{cite web |title=Brightline West Update: Field Investigation Work in Southern California Advances on I-15 Corridor |url=https://www.brightlinewest.com/media/press-releases/2025/update-brightline-west-field-investigation-work-southern-california-08-18-25
In North Las Vegas, PCM Railone announced construction of a US $20 million concrete-tie production facility dedicated to the Brightline West project, with tie shipments expected to begin in late 2025. {{cite news |title=PCM Railone AG invests $20 million in Nevada plant to supply Brightline West |url=https://www.rtands.com/news/news-news/pcm-railone-ag-invests-20mm-to-open-facility-near-brightline-west/
Route
The tracks are planned to be laid in the median of Interstate 15, aside from a short section connecting to Rancho Cucamonga and a section on the east side of the highway approaching the Las Vegas station. Sections will pass through federal land controlled by the Bureau of Land Management and the National Park Service. While plans at first called for a fully double-track railway along the route, Brightline intends initially to build the project as a mostly single-track route with passing sidings, partly because additional sections were moved to the highway median where space is more limited.
In the original plan, the route did not extend into Los Angeles due to the high cost of building rail in urban areas. The 50 mi extension from Victor Valley to the city of Palmdale, where it would connect to the California High-Speed Rail system currently in development, in order to provide service to Los Angeles, was not included in the initial phase. In June 2012, the new plan included the link between Victor Valley and Palmdale as part of construction for the first phase of the project. Passengers would transfer to Metrolink to access the Los Angeles area.
In June 2020, the company initiated planning on a rail line south of Apple Valley over the Cajon Pass to Rancho Cucamonga to provide more direct Los Angeles service, while not ruling out the Palmdale expansion. The details of other sections have not been announced. Later phases may include extensions to Phoenix, Arizona; Salt Lake City, Utah; or Denver, Colorado.
In 2009, XpressWest estimated that it would carry around five million round trip passengers in the first full year of operation, with the company charging fares of around $50 for a one-way trip between Victorville and Las Vegas. In 2012, the round-trip fare was planned to be around $89 (), with trains expected to run every 20 minutes on peak, and up to every 12 minutes as demand requires. , the stated frequency is 45 minutes between departures.
In 2023, Brightline West relocated more sections of the route into the median of I-15. The Victor Valley station was reconfigured to have passenger platforms in the highway median. The vehicle maintenance facility was moved from the Victor Valley site to a 246 acre west of I-15 in Sloan, Nevada, and will connect to the Union Pacific mainline at this location.
Stations
The Las Vegas station will be south of the Las Vegas Strip on Las Vegas Boulevard in Enterprise. The 110 acre is across from the Premium Outlets South mall. The two-story station will feature retail and restaurant space. The Las Vegas station on Las Vegas Boulevard was announced in 2020. The land was acquired in July 2021. In April 2023, renderings of the Las Vegas station were released.
Victor Valley station will be in the northeast portion of the town of Apple Valley, adjacent to I-15 at Dale Evans Parkway. Passenger platforms will be in the median of I-15 and accessed via walkway under the northbound lanes of the highway.
A station in Hesperia will be built in the median of I-15 at the Joshua St exit. Trains will make limited stops here in the morning and evening.
The line will continue into the Greater Los Angeles area, terminating at Rancho Cucamonga Metrolink station. Service to a planned transit center incorporating the station will operate under the jurisdiction of the San Bernardino County Transportation Authority (SBCTA). SBCTA and the city of Rancho Cucamonga approved the sale of a 5 acre to Brightline for the high speed rail station in 2022. A proposed 4.5 km underground people-mover would provide a link to the Ontario International Airport. Omnitrans currently offers direct bus service to the airport from this station.
High Desert Corridor
thumb|The High Desert Corridor along with current and planned future rail connections in Southern California. Main article: High Desert Corridor
The High Desert Corridor is a proposed high-speed rail connection between Brightline West and California High-Speed Rail. It will connect Victor Valley station and Palmdale station. At Palmdale, passengers can connect to the existing Metrolink service or continue into Los Angeles using California High-Speed Rail's tracks.
Right-of-way agreements
In June 2020, the company entered into an agreement to lease the state-owned Interstate 15 right-of-way between Las Vegas and Victor Valley from Caltrans. The 50-year lease is in the amount of $842,000 per year starting in 2020, adjusted according to the consumer price index every three years. A similar agreement for the Apple Valley to Rancho Cucamonga segment was signed in March 2023.
Brightline entered into a memorandum of understanding (MOU) with the San Bernardino County Transportation Authority in 2020 for the spur between Apple Valley to Rancho Cucamonga, as it provided connectivity within the Inland Empire. Metrolink also approved a MOU to study the links to the Rancho Cucamonga and Palmdale Metrolink stations. A MOU was signed in October 2021 with the California State Transportation Agency (CalSTA), Caltrans, and California High-Speed Rail Authority, for the use of 48 miles within Interstate 15 to Rancho Cucamonga.
Environmental impact
The Brightline West project underwent detailed federal and state environmental reviews led by the Federal Railroad Administration (FRA) and Caltrans. The final Environmental Impact Statement (EIS) was approved in July 2023, determining that the rail line would not cause significant adverse impacts with appropriate mitigation measures. {{cite web |title=Federal Railroad Administration Issues Final Environmental Impact Statement for Brightline West |url=https://railroads.dot.gov/environment/environmental-reviews/brightline-west-eis-2023
Wildlife crossings
A 6 foot will keep vehicles away from the rail line along the center divider of Interstate 15. This will prevent animals from making what is already a dangerous crossing of the freeway. Desert bighorn sheep once thrived in these mountain ranges, though they now face many challenges. Wildlife researchers determined that wildlife crossings at Soda, Cady and Clark mountains could help sustain the sheep and other wildlife.
Under an agreement with Caltrans and the California Department of Fish and Wildlife, wildlife crossings will cross over the freeway and the rail line at the three proposed locations. Hundreds of existing culverts and crossings under the Interstate will be maintained or improved. Fencing to protect the desert tortoise and to exclude wildlife will be restored or installed as part of the project.
Brightline West has also pledged to offset its construction-related emission through pilot programs using battery-electric machinery and solar-powered construction offices. {{cite web |title=Brightline West Sustainability Update 2025 |url=https://www.brightlinewest.com/media/reports/2025-sustainability-update
Rolling stock
Vehicles will require a high power-to-weight ratio to climb steep grades on the planned route – up to 4.5% between Victorville and Las Vegas, and up to 6% through Cajon Pass.
Brightline was in active discussion until mid-2024 with Alstom and Siemens Mobility to procure rolling stock for the service and for potential future routes. In May 2024, Siemens announced that Brightline had selected them as the preferred train vendor for Brightline West service. The initial order consists of 10 seven-car American Pioneer 220 trainsets, with a capacity of 434–450 passengers.
The service plans to use the American Pioneer 220, an American variant of the Siemens Velaro Novo high-speed electric multiple unit. Brightline would be the first customer of the Siemens Velaro Novo platform, which has been tested in Germany using the ICE-S train, and has a designed top speed of 360 km/h.
The service will use up to 25 train pairs, traveling up to 200 mph,
The Siemens rolling stock will be assembled at a new factory in Horseheads, New York.
In 2025, Siemens Mobility began detailed work on the American Pioneer 220 trainsets, incorporating energy-efficient systems and interior layouts customized for the Las Vegas-Southern California corridor. {{cite news |title=Siemens unveils design updates for Brightline West’s high-speed trains |url=https://www.trains.com/news/news-wire/siemens-unveils-design-updates-for-brightline-west-high-speed-trains/
The Horseheads facility, which opened in late 2024, will serve as Siemens Mobility's North American high-speed rail assembly hub, producing Brightline West's carshells, final train integration, and testing before delivery to Nevada for commissioning. {{cite web |title=Siemens Horseheads plant begins work on Brightline West high-speed trainsets |url=https://www.railwaygazette.com/rolling-stock/siemens-horseheads-plant-begins-work-on-brightline-west-high-speed-trainsets/66182.article
Impacts
Oak View Group plans a 20,000-seat arena on a 25 acre site adjacent to the Las Vegas station. This project is part of a larger 66 acre development envisioned as a sports and entertainment district. According to Tim Leiweke, CEO of Oak View Group, this is a prime location for future growth in Las Vegas' gaming and entertainment corridor.
announced in June 2024 that they would build a production facility for concrete ties and open a North American headquarters in North Las Vegas.
Early project development
DesertXpress
The original plan under the name DesertXpress was to provide an alternative to automobile travel and airline travel between the Los Angeles area and the Las Vegas area along Interstate 15. The city of Victorville was selected as the location for the westernmost terminal, as extending the train line farther into the Los Angeles Basin through the Cajon Pass was considered to be prohibitively expensive. The station would include free parking and through-checking of baggage straight to the Las Vegas Strip resorts. A future extension would have included a new link to the California High-Speed Rail station in Palmdale.
DesertXpress Enterprises, LLC was founded in 2005 to develop, construct, own and operate the high-speed rail project. 70% of the company was held by Anthony A. Marnell II of Marnell Corrao Associates through his DX, LLC company. Gary Tharaldson and François Badeau held 20 and 10%, respectively. In 2006, the preparation of a first Federal Railroad Administration-Environmental Impact Statement (EIS) was started.
The total cost of the link between Apple Valley and Las Vegas was expected to be around US$5 billion. In March 2010, project planners said they could obtain the full funding amount through exclusively private investors, but had also applied for a $4.9 billion loan through the federal Railroad Rehabilitation & Improvement Financing program. As of October 2011, the start of the project was contingent on receiving a $6 billion loan from the federal government, the approval or denial of which was expected in mid-2012.
A preferred design was identified with the release of the Final Environmental Impact Statement in April 2011, which began a public comment period that ended in May 2011. The federal government approved the design in July 2011. The planned route was approved by the Surface Transportation Board in October 2011. The trains were to be self-propelled, all electric multiple unit (EMU) trains with maximum speed of 150 mph.
The train would travel at speeds of up to 150 mph averaging 130 mph and making the 186 mi trip from Victorville to Las Vegas in about 1 hour 24 minutes. In March 2010, executives with the project said they expected construction to begin in 2010. In October 2011, construction was planned to begin in the last quarter of 2012, with completion in the last quarter of 2016, subject to funding.
Transformation to XpressWest
In June 2012, the developer announced a new plan to build a network of high-speed rail for the region by expanding to Arizona, Utah and Colorado. The initial phase was to include high-speed tracks, Las Vegas to Apple Valley and Apple Valley to Palmdale.
The 185 mi link between Las Vegas and Victorville was designed to be double-tracked which is dedicated for the high-speed trains. The costs of this section was estimated at $6.9 billion. The developer would put up $1.4 billion in private investment and the rest of funding would borrowed under the Railroad Rehabilitation and Improvement Financing program provided by the Federal Railroad Administration.
Future plans include a link between Las Vegas and Phoenix, Arizona, and another from Las Vegas to Salt Lake City, Utah, and Denver, Colorado. The project was rebranded to XpressWest to reflect the expanded mission.
DesertXpress Enterprises signed a document with Los Angeles County Metropolitan Transportation Authority officials in June 2012 to explore the plan to build a 50 mi high-speed rail link between Victor Valley and Palmdale. The link would initially connect to the Metrolink system in Palmdale. This would allow passengers to complete a train ride between Los Angeles and Las Vegas with one transfer, by using Metrolink in the Los Angeles area and a transfer to the high-speed train at Palmdale station. The station would eventually connect with California High-Speed Rail, and is designed to have the same specifications and technology, allowing it to continue on California High-Speed Rail further into Burbank and Los Angeles. The early estimate of the costs for this link was $1.5 billion. and the earliest environmental work was to be completed by the end of 2013. The date of the service for this link has not been determined.
Joint venture
In February 2013, the federal loan remained unapproved and construction was not expected to start until mid-2014 at the earliest.
Representative Paul Ryan (R-WI), the chairman of the House Budget Committee and senator Jeff Sessions (R-AL), the ranking minority member of the Senate Committee on the Budget were the main opponents to the federal loan application of XpressWest. They argued that the project represented high risk to the taxpayer. They wrote to then-Transportation Secretary Ray LaHood in March 2013 and recommended the administration to reject the loan application. The letter indicated that the total cost was estimated to be $6.9 billion. The $1.4 billion would come from the private sources and the remaining $5.5 billion would come from the federal loan. The letter cited a taxpayer risk analysis report as a basis of their recommendation.
In July 2013, there were reports that loan was indefinitely suspended, which were later confirmed by the federal government, which said that it had been suspended in part due to the failure of the application in regard to the "Buy America" policy, which required applicants to use American-made products. Despite the indefinite suspension of the federal loan application, which was viewed as a denial of the application, the developer indicated that the XpressWest project would proceed without providing the details on financial plan.
In 2014, Nevada Senator Harry Reid mentioned that the federal loan request may resurface, but little had been seen so far of the project's continued viability. In 2015, the Nevada High-Speed Rail Authority was proposed to look into the feasibility of high-speed rail into southern Nevada from California, possibly XpressWest. The bill was introduced in April 2015, and was passed by the legislature in May 2015, by a vote of 40–1. It was approved by the Governor in May 2015.
In September 2015, XpressWest and the newly formed China Railway International USA, a consortium of Chinese rail industry companies, announced a joint venture to design, build, and operate the service between Las Vegas and Palmdale, with construction planned to begin in September 2016. A CAHSRA spokesperson said that there have been ongoing discussions concerning allowing the trains to use California High-Speed Rail lines to go further into the Los Angeles area, although no commitments had been made.
In June 2016, XpressWest announced that the joint venture had been called off. The biggest reason cited for the termination of the joint venture was a federal regulation requiring the manufacture of the high speed trains inside the United States. XpressWest said that they are "undeterred by this development and remains dedicated to completing its high-speed passenger rail project."
References
References
- "Brightline West | Brightline".
- (April 14, 2021). "Rail News – Brightline on track to begin Las Vegas high-speed rail project.". Progressive Railroading.
- Varghese, Romy. (August 26, 2020). "Fortress Wins California Approval for Vegas Rail Reimbursement". Bloomberg.
- Seeman, Matthew. (July 15, 2023). "Brightline West high-speed train clears environmental regulatory hurdle". News3lv.
- (2021-01-14). "Spring start eyed for construction of Vegas-to-So Cal rail line". Las Vegas Review-Journal.
- Akers, Mick. (2022-11-16). "High-speed rail project construction could begin in '23". Las Vegas Review-Journal.
- (April 22, 2024). "Brightline West Breaks Ground in Nevada".
- Braun, Martin Z.. (2025-10-01). "California-to-Vegas High-Speed Rail Costs Jump $5.5 Billion". Bloomberg.com.
- Uranga, Rachel. (2023-12-05). "SoCal to Vegas in two hours? High-speed rail comes closer to reality with $3-billion award". Los Angeles Times.
- Gillan, Jeff. (2021-10-22). "High-speed rail takes step to link Las Vegas with Los Angeles". KSNV.
- Ohnsman, Alan. (April 25, 2023). "'The Greenest Bullet Train In The World': Wes Edens Wants To Kickstart U.S. High-Speed Rail With A Vegas-L.A. Line".
- Newton, Damien. (2022-11-02). "Brightline Releases Environmental Documents for High-Speed Rail from Victorville to Las Vegas". Streetsblog California.
- "Los Angeles to Las Vegas Travel Options". About.com.
- Lassen, David. (2024-04-24). "Governments in alignment as Brightline West work begins".
- "Interstate 15 Northbound – Barstow to Nevada". AARoads.
- Dowd, Katie. (2022-11-27). "18-mile gridlock on Calif.-Nevada border amid slammed travel day". SFGATE.
- Jernigan, Meg. (December 21, 2017). "How to Travel From Las Vegas to Los Angeles". Travel Tips – USA Today.
- (2021-04-18). "US infrastructure plan spurs talk of Vegas-LA rail service". AP News.
- Ritter, Ken. (2024-04-22). "Rail spikes hammered, bullet train being built from Sin City to the City of Angels".
- (October 23, 2019). "Virgin Trains USA to Move Ahead on Vegas to Calif. Line".
- "West Coast {{!}} Brightline".
- "LA To Vegas Fact Sheet". Brightline.
- "2018 California State Rail Plan (Draft)". CalTrans.
- (September 21, 2019). "State Treasurer Fiona Ma announces CDLAC Board approval of $300M in bonds for Apple Valley-Las Vegas high-speed rail". Orange County Breeze.
- Varghese, Romy. (December 21, 2021). "Fortress-Backed Rail Company Brightline Gets an Ally in California's Treasurer". Yahoo News {{!}} Finance.
- (September 19, 2019). "California to assist financing of private California-Vegas train".
- (October 24, 2019). "Virgin Trains USA hoping to start construction of train line from Victorville to Las Vegas in 2020". Victor Valley News Group.
- O'Connor, Devin. (April 15, 2020). "Virgin Hotels Las Vegas Remains Focused on Fall 2020 Opening, Virgin Trains Receives $600M". Casino.org.
- Hass, Greg. (July 21, 2020). "Financing for DesertXpress line from Las Vegas to Apple Valley takes step forward". KLAS.
- Ohnsman, Alan. (July 24, 2020). "Los Angeles-To-Las Vegas High-Speed Train Wins $200 Million Nevada Bond Allocation".
- Akers, Mick. (2020-10-05). "Vegas-to-LA high-speed train could serve as Raiders fan pipeline". Las Vegas Review-Journal.
- Horwath, Bryan. (2020-11-02). "Las Vegas-California high-speed rail project hits snag". Las Vegas Sun.
- Akers, Mike. (2020-10-26). "Brightline reveals more details about Vegas-to-LA high-speed rail line". Las Vegas Review-Journal.
- Akers, Mick. (2020-12-09). "Nevada reallocates $200M in bonds from high-speed rail to affordable housing". Las Vegas Review-Journal.
- Akers, Mick. (2021-06-22). "Las Vegas-LA high-speed rail plan delayed until 2022". Las Vegas Review-Journal.
- De La Cruz, Rene Ray. (January 19, 2021). "With revised plan, Brightline eyes 2021 groundbreaking of Apple Valley rail project". Victor Valley Daily Press.
- Komenda, Ed. (April 9, 2021). "Brightline CEO: Vegas-to-LA high-speed rail line still on track to break ground in 2021". Reno Gazette Journal.
- (October 6, 2019). "Editorial: It was a terrible idea to build a new freeway in Los Angeles County. Now it's on hold for good". Los Angeles Times.
- Linton, Joe. (August 19, 2020). "Metro Looks to Shift High Desert Freeway Funds to High-Speed Rail".
- Ritter, Ken. (April 24, 2023). "Las Vegas-to-California bullet train gets bipartisan backing". ABC News.
- Luczak, Marybeth. (2024-09-27). "FRA Advances Brightline West Project With Signed Agreement".
- Seeman, Matthew. (January 23, 2024). "$2.5 billion in bonds approved for Brightline West high-speed train to Las Vegas". News 3.
- Luczak, Marybeth. (2024-01-23). "Brightline West Lands $2.5B in Private Activity Bonds".
- Ritter, Ken. (April 22, 2024). "Rail spikes hammered, bullet train being built from Sin City to the City of Angels". Associated Press News.
- (5 December 2023). "Vegas to L.A. high-speed rail line secures $3 billion in federal funding". The Nevada Independent.
- Cruz, Rene Ray De La. "Cost spikes for Brightline West’s high-speed rail project from Vegas to Southern California".
- Varghese, Romy. (2022-04-18). "Will a Fast Train to Vegas Lure Road Trippers From Their Cars?". Bloomberg.
- "Comment period begins for environmental report on Brightline West Cajon Pass project". Federal Infrastructure Projects Permitting Dashboard.
- (November 10, 2022). "Comment period begins for environmental report on Brightline West Cajon Pass project". Kalmbach Media.
- Akers, Mick. (July 14, 2023). "High-speed rail receives key approval for link into LA". Las Vegas Review Journal.
- (November 20, 2023). "STB approves Brightline West high speed rail modifications and extension across Cajon Pass". Kalmbach Media.
- McLawhorn, Jennifer. (January 18, 2024). "Brightline West Will Begin Hiring Workers and Launch Field Investigation Work". Simmons-Boardman Publishing Inc.
- De La Cruz, Rene Ray. (January 29, 2024). "Brightline West conducts fieldwork in California ahead of high-speed rail groundbreaking".
- Akers, Mick. (April 19, 2024). "Brightline West to break ground on Las Vegas high-speed rail project". Las Vegas Review-Journal.
- Akers, Mick. (2024-09-26). "Brightline West's $3B high-speed rail grant signed; heavy construction to begin in 2025". Las Vegas Review-Journal.
- Schultz, Jaclyn. (2025-02-25). "Brightline project 'on budget, on time,' according to new U.S. Transportation Secretary Sean Duffy".
- Cruz, Rene Ray De La. "Brightline West eyes 2026 for California construction of high-speed rail project".
- (January 2026). "Brightline appoints Nicolas Petrovic as new CEO". RailMarket.
- (June 30, 2020). "Caltrans and XpressWest Complete Lease Agreement". Caltrans.
- (September 2023). "Project Description". Federal Railroad Administration.
- Akers, Mick. (June 30, 2020). "High-speed rail project gets OK to use I-15 right of way in California". Las Vegas Review-Journal.
- (17 September 2020). "Digest: Proposed Las Vegas high speed project seeks STB approval of route changes". [[Trains (magazine).
- Schneider, Benjamin. (December 13, 2023). "Brightline's new Las Vegas train line could be the start of a U.S. high-speed rail revolution". Fast Company.
- "Expansion and connectivity".
- Rosenberg, Mike. (July 29, 2012). "Bay Area to Sin City? Las Vegas bullet train backers gamble on record loan". San Jose Mercury News.
- (September 16, 2015). "China, U.S. Reach Agreement on High-Speed Rail Before Xi Visit". [[Bloomberg News.
- "DesertXpress – Las Vegas to Victorville Environmental Impact Statement".
- Lisa Mascaro. (July 2, 2009). "Path clears for federal support of fast train to California". Las Vegas Sun.
- "The Trains".
- (April 15, 2020). "Construction on Las Vegas-California train could start this year". Las Vegas Sun.
- (2023-11-21). "Brightline West's Modified Alignment Approval Brings High-Speed Rail Project Closer to Reality". Victor Valley News Group.
- Emerson, Elaine. (July 6, 2021). "Brightline buys land on Las Vegas Boulevard for planned train terminal". FOX5 Las Vegas.
- Martin, Bradley. (February 11, 2020). "Dine Outdoors at the Virgin Trains Las Vegas Terminal in 2023". Eater Vegas.
- Akers, Mick. (April 22, 2023). "First look: Brightline's Vegas high-speed train station revealed". [[Las Vegas Review-Journal]].
- "Brightline West: High Speed Train from Apple Valley to Las Vegas".
- Sharp, Steven. (2023-07-05). "$25M awarded for Brightline West stations in Hesperia and Apple Valley". Urbanize LA.
- (March 4, 2020). "Clark County OKs plans for high-speed train station". Las Vegas Review-Journal.
- (March 13, 2020). "Virgin Trains USA buys land in California". KTNV.
- Akers, Mick. (August 2022). "Sisolak believes LV-LA high-speed train will come to fruition". Las Vegas Review-Journal.
- (November 5, 2022). "Hesperia Passenger Station Proposed for Cajon Pass High-Speed Rail System connecting Hesperia to Rancho Cucamonga". Victor Valley News Group.
- Cruz, Rene Ray De La. (October 27, 2021). "Brightline adds Rancho Cucamonga to high-speed rail project bound for Las Vegas". Victor Valley Daily Press.
- Darling, Jordan B.. (27 October 2022). "Rancho Cucamonga, SBCTA approve sale of 5 acres for high-speed rail station". The Sun.
- Lin, Summer. (2022-07-27). "Elon Musk abandoned plans for a four-mile tunnel at Ontario airport. Locals are picking it up".
- Brightline. "Rancho Cucamonga, SBCTA move progress sale of Cucamonga Station to Brightline West". Mass Transit Magazine.
- Lilly, Caitlin. (June 30, 2020). "XpressWest receives permission to use I-15 right-of-way in California". KVVU-TV.
- Sharp, Steven. (July 7, 2020). "High-Speed Train to Las Vegas Takes Another Step Forward". Urbanize LA.
- (June 30, 2020). "High-speed train company receives permission to use I-15 right-of-way in California". KTNV.
- Parsons, Jim. (July 8, 2020). "Vegas-LA High-Speed Rail Line Can Use Interstate 15 Right-of-Way". Engineering News-Record.
- De La Cruz, Rene Ray. (March 14, 2023). "Brightline, Caltrans to sign pact for Apple Valley to Rancho Cucamonga rail line". Victorville Daily Press.
- Burroughs, David. (July 2, 2020). "Virgin Trains plans extension of LA – Las Vegas high-speed line". International Railway Journal.
- Ohnsman, Alan. (August 22, 2020). "High-Speed Rail Heats Up In California As Brightline Eyes Las Vegas Route Extensions".
- Luczak, Marybeth. (2021-10-22). "Brightline West Project Advancing in California". Railway Age.
- (21 Oct 2021). "Brightline West on Track to Rancho Cucamonga". Brightline.
- Sahagún, Louis. (2021-09-16). "High-speed train to Las Vegas is hailed as an eco jackpot. But will it harm desert sheep?". Los Angeles Times.
- Martinez, Christian. (2023-02-16). "As trains tear from L.A. to Vegas at 180 mph, bighorn sheep will have safe passage". Los Angeles Times.
- "DesertXpress "XpressWest" – Las Vegas to Victorville environmental review". Federal Railroad Administration.
- (December 20, 2005). "I-15 Comprehensive Corridor Study". San Bernardino County Transportation Authority.
- Mann, Ted. (2023-09-06). "European Rail Giants Fight for Slice of U.S. High-Speed Train Line". WSJ.
- (2024-05-01). "Brightline West Selects Siemens To Manufacture High Speed Rail Train Sets". Siemens Mobility.
- (2023-03-14). "FRA-2020-0096 Decision Letter 2023". [[Federal Railroad Administration]].
- "The American Pioneer 220: High Speed Rail for the U.S.".
- (October 30, 2021). "ICE S auf Messfahrt mit dem EWET – Nürnberger Eisenbahnfreunde e.V.".
- Ohnsman, Alan. (25 September 2020). "Rail Startup Brightline Kicks Off $3.2 Billion Bond Sale For LA-To-Vegas High-Speed Train". [[Forbes]].
- (2018-06-13). "Siemens reveals Velaro Novo 360 km/h train concept".
- "Velaro Novo".
- Simmons, Mark. (2024-01-22). "Brightline West starts preparatory works". International Railway Journal.
- (September 9, 2024). "First US high-speed rail production facility to set up shop in Horseheads, New York". [[Trains (magazine).
- (March 30, 2022). "Stadium developer plans $3 billion sports arena and casino project in Las Vegas". [[CNBC]].
- Stutz, Howard. (June 15, 2023). "Vegas basketball arena developer says $10B project is growing, won't require public money". [[The Nevada Independent]].
- (March 30, 2022). "Oak View Group Acquires 25 Acres in Las Vegas With Vision to Build Retail & Entertainment District Including 20,000 Seat Arena, Casino and Hotel". [[Oak View Group]].
- Hemmersmeier, Sean. (2024-06-25). "German railway manufacturer to open $20M facility in North Las Vegas". Las Vegas Review-Journal.
- (July 25, 2006). "KVBC Las Vegas Story". [[KSNV-DT.
- Richard N. Velotta. (March 25, 2010). "Work on high-speed rail set to begin this year". Las Vegas Sun.
- Velotta, Richard N.. (October 22, 2010). "Pressure on DesertXpress in first run at high-speed rail". Las Vegas Sun.
- (2018). "Conduit Exempt Facility Bondfinancing: DesertXpress Enterprises, LLC". California Infrastructure and Economic Development Bank.
- (July 14, 2006). "Federal Railroad Administration, Environmental Impact Statement: DesertXpress High Speed Train Between Apple Valley, CA and Las Vegas, NV". [[Federal Register]].
- Maldonado, Cinthia. (August 28, 2019). "High-speed train back on track, construction set for 2020". KTNV.
- Richard N. Velotta. (March 25, 2011). "DesertXpress high-speed rail project rolls forward". Las Vegas Sun.
- Cy Ryan. (October 10, 2011). "DesertXpress hopes for federal loan, aims for 2012 start on work". Las Vegas Sun.
- (October 27, 2011). "STB approves DesertXpress route". Progressive Railroading.
- Gloria Hillard. (April 30, 2012). "Towns Debate Impact of Calif.-Las Vegas Bullet Train". NPR.
- (2008). "Proven, Reliable, Safe Technology".
- Benjamin Spillman. (June 28, 2009). "DesertXpress on right track?". Las Vegas Review-Journal.
- "Progress".
- Tavss, Jeff. (2023-12-08). "Plans for high-speed rail between Salt Lake City and Las Vegas not moving forward".
- "The Network".
- Richard N. Velotta. (June 11, 2012). "DesertXpress Vegas-California rail project renamed".
- Richard N. Velotta. (June 7, 2012). "DesertXpress inks deal to add train link from Victorville to Palmdale, making travel to L.A. possible". Vegas Inc..
- (March 30, 2017). "High Speed Rail To Las Vegas Breaks Ground 2017".
- Laura Carroll. (February 12, 2013). "High-speed train project at least months away from start". Las Vegas Review-Journal.
- Velotta, Richard N.. (April 22, 2017). "Arrival of Las Vegas Raiders breathes new life into high-speed rail project". [[Las Vegas Review-Journal]].
- Demirjian, Karoun. (March 18, 2013). "High-speed rail project beset by political mine fields". Las Vegas Sun.
- "Letter from Ryan and Sessions to LaHood". United States Senate Committee on the Budget Republicans.
- Warren, Mackenzie. (July 12, 2013). "Feds suspend $5.5B loan application for XpressWest". KSNV MyNews3.com.
- Tetreault, Steve. (July 16, 2013). "Feds: XPressWest failed to meet 'Buy America' rules for high-speed train". Las Vegas Review Journal.
- (July 22, 2013). "XpressWest vows to proceed, despite federal loan denial". Railway Track & Structures.
- (September 2, 2014). "Las Vegas rail service plans have seen starts, stops". Las Vegas Review-Journal.
- Young, Allen. (May 26, 2015). "Nevada joins the high-speed rail bandwagon with plans for Vegas, SoCal link".
- (May 20, 2015). "Vote on SB457". Nevada Legislative Counsel Bureau.
- "Nevada Legislature SB457". Nevada State Legislature.
- (September 18, 2015). "US-Chinese joint venture to develop Las Vegas high speed line".
- (2015-09-18). "A high-speed rail from L.A. to Las Vegas? China says it's partnering with U.S. to build". Los Angeles Times.
- Makinen, Julie. (June 8, 2016). "China will not build L.A.-to-Vegas rail line – U.S. company calls the deal off". [[Los Angeles Times]].
- Akers, Mick. (2021-07-06). "Brightline buys land for high-speed rail terminal". Las Vegas Review-Journal.
- Ohnsman, Alan. (January 24, 2022). "High-Speed Las Vegas Train Back On Track As U.S. Reviews L.A. Extension".
- Akers, Mick. (February 15, 2023). "Brightline West agrees to build wildlife crossings along I-15". Las Vegas Review-Journal.
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Brightline West — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report