From Surf Wiki (app.surf) — the open knowledge base
Blue Line (Bangkok)
Rapid transit line in Thailand
Rapid transit line in Thailand
| Field | Value |
|---|---|
| name | MRT Blue Line |
| color | |
| logo | MRT (Bangkok) logo.svg |
| logo_width | 80px |
| image | BLE Thaphra 23-12-2019.jpg |
| image_width | 300px |
| caption | EMU-BLE approaching Tha Phra station upper-level platform. |
| other_name | Subway (for the original route during its early years) |
| MRT Chaloem Ratchamongkhon Line | |
| native_name | รถไฟใต้ดิน |
| สายสีน้ำเงิน | |
| สายเฉลิมรัชมงคล | |
| type | Rapid transit |
| system | MRT |
| locale | Bangkok |
| start | |
| end | (via ) |
| stations | *Total :* 42 stations |
| 38 (operational) | |
| 4 (future) | |
| daily_ridership | 424,398 (2024) |
| mapcolor | Blue |
| yearcommenced | |
| open | |
| lastextension | |
| character | Elevated: 29.5 km |
| Underground: 26.13 km | |
| depot | Phra Ram 9 Depot |
| Phetkasem Depot | |
| owner | Mass Rapid Transit Authority |
| operator | Bangkok Expressway and Metro |
| stock | Siemens Modular Metro |
| EMU-IBL: 19 three-car trains | |
| Siemens | |
| EMU-BLE: 35 three-car trains | |
| Future Siemens Rolling Stocks | |
| 21 three-car trains | |
| linelength | Total: 55.63 km |
| 46.91 km (operational) | |
| 8.72 km (future) | |
| gauge | |
| electrification | |
| speed_km/h | 80 |
| signalling | Siemens Trainguard LZB700M fixed block ATC under ATO GoA 2 (STO) |
| map | |
| map_state | show |
MRT Chaloem Ratchamongkhon Line สายสีน้ำเงิน สายเฉลิมรัชมงคล 38 (operational) 4 (future) **Underground: **26.13 km Phetkasem Depot EMU-IBL: 19 three-car trains Siemens EMU-BLE: 35 three-car trains Future Siemens Rolling Stocks 21 three-car trains 46.91 km (operational) 8.72 km (future) | speed_km/h = 80 The MRT Blue Line () or MRT Chaloem Ratchamongkon Line () is Bangkok's third rapid transit line, following Sukhumvit Line and Silom Line of the BTS Skytrain. It is the first line of the MRT system and is operated by Bangkok Expressway and Metro (BEM). The line has a total length of 48 km, operating as a semi-circle or spiral route from Lak Song to Tha Phra which also serves as a self-interchange station.
The first stage of the MRT Blue Line, a 20 km semi-circle alignment from Hua Lamphong to Bang Sue opened on 3 July 2004, which was then followed by a 1.2 km extension to Tao Poon opened on 11 August 2017. The line was extended to the west from Hua Lamphong through new stations in the Chinatown and Rattanakosin Island on 29 September 2019. Finally, the line was extended south from Tao Poon to Tha Phra through new stations in Thonburi on 30 March 2020, completing the semi-circle line. Another 7.8 km (4.8 mi), 4 station extension from Lak Song to Phutthamonthon Sai 4 is planned but remains unbuilt.
The MRT Blue line connects major business, residential and cultural areas of Bangkok. In late 2019, the average daily ridership was 400,000. During the third wave of COVID-19 in Bangkok, ridership fell to between 76,000 - 116,000 per weekday during the year 2021.
Route alignment
The MRT Blue Line begins from the upper platform of Tha Phra station. It runs on an elevated viaduct northward along Charan Sanit Wong Road to Bang O station before crossing the Chao Phraya River, entering Bang Pho station and Tao Poon station in Bang Sue District. The line then dives underground to reach Bang Sue. It follows the Kamphaeng Phet, Phahon Yothin and Lat Phrao Roads, then turns south following Ratchadaphisek Road to Queen Sirikit National Convention Centre station. It then turns west following Rama IV Road. It passes Hua Lamphong station in Pathum Wan District, through Chinatown, then under the Chao Phraya River before ascending onto an elevated viaduct to the lower platform of Tha Phra station. The line continues west along Phet Kasem Road to Lak Song station in Bang Khae, situated near Kanchanaphisek Road or Western Outer Ring road. It forms a quasi circle loop around Bangkok.
History




Officially named Chaloem Ratchamongkhon (Thai สายเฉลิมรัชมงคล) – "Celebration of Royal Auspice" – or informally but commonly called as the "MRT Blue Line", this was the first metro line under the newly formed government agency, the Mass Rapid Transit Authority of Thailand (MRTA). Most civil infrastructure was provided by this government agency and handed over to a private sector on a 25-year concessionaire agreement. The winning bidder was Bangkok Expressway and Metro (BEM). Under this agreement, BEM provides maintenance and engineering equipment, including electrical trains, signalling systems, SCADA, communication, platform screen doors and fully operate the system from Hua Lamphong to Bang Sue. BEM has subcontracted maintenance of the system for 10 years to Siemens and seven-year maintenance contracts to two local maintenance services.
In 1996, the Overseas Economic Cooperation Fund (OECF), later known as the Japan Bank for International Cooperation (JBIC), granted the loans for the project with an official development assistance (ODA) scheme. Construction of the line began on 19 November of that year, when Crown Prince His Royal Highness Crown Prince Maha Vajiralongkorn (later King Vajiralongkorn) came to lay the foundation stone for the construction of the MRT project, which is Thailand's first subway project, with the aim of relieving Bangkok's traffic problems. The first contract was awarded to a joint venture between CH. Karnchang Public Company Limited, Bilfinger-Berger, Kumagai Gumi, and Tokyu Construction Co. for the southern section, while one of the remaining contractors, the northern section, was awarded to ION Joint Venture, which comprises Italian Thai Development, Obayashi Corporation, and Nishimatsu Construction, and the depot was awarded to Siam Nippon Metro Consortium, composed of Hazama Corporation, Maeda Corporation, Mitsui & Co., Kajima, T.S.B. Trading, and Siam Syntech Construction Public Co., Ltd. Tunneling works began on 5 February 1999.
During construction, the consultancy was led by the "Berger-CSC 1 Consortium," comprising the following consulting firms: Louis Berger and many more, as well as a joint venture of Mott Macdonald and De Leuw Cather.
The project suffered multiple delays not only because of the 1997 economic crisis, but also due to challenging civil engineering works of constructing massive underground structures deep in the water-logged soil upon which the city is built. The MRT Blue Line opened for a limited public trial period of several weeks starting on 13 April 2004. On 3 July 2004, the line was officially opened at 19:19 local time by HM King Bhumibol and Queen Sirikit who were accompanied by other members of the royal family. Within 30 minutes of its opening, sightseers filled the system to its maximum capacity, but after the initial rush ridership settled down to around 180,000 riders daily—considerably lower than projections of over 400,000, despite fares being slashed in half from 12 to 38 baht to 10-15 baht per trip. It was scheduled to be opened in 2003, in time for the same year's APEC summit, and later pushed back again to April and then August of the following year. However, no problems were encountered during the test run; the official opening was brought forward.
During the early years, it was named the subway as an alternate name.
Extension to Tao Poon
As part of the rapid transit master plan the original MRT Blue Line section was planned to be extended from Hua Lamphong to Lak Song, and from Bang Sue to Tha Phra, forming a circle open-loop route. The contract for the first part of extension to Tao Poon was signed on 26 August 2009 as part of MRT Purple Line contract as it provided interchange to the MRT Purple Line. The 1.2 km Bang Sue to Tao Poon extension opened on 11 August 2017. This added the first elevated station, Tao Poon, to the Blue line.
Extensions to Lak Song and Tha Phra
The major extension of the MRT Blue Line was the 27 km extension west to Lak Song and from Tao Poon to Tha Phra with 19 stations consisting of four underground and 15 elevated stations. Contracts for civil work were divided into five contracts. Successful bids were announced in late 2010. On 17 February 2011, the five contracts were signed.
| MRT | Blue}}; color:orange;" | Contract | MRT | Blue}}; color:orange;" | Notes | MRT | Blue}}; color:orange;" | Length |
|---|---|---|---|---|---|---|---|---|
| 1 | Hua Lamphong to Sanam Chai (2 stations underground, Bt11.65 billion, contractor ITD) | 2.8 km | ||||||
| 2 | Sanam Chai to Tha Phra (2 stations underground, Bt10.82B, contractor CK) | 2.6 km | ||||||
| 3 | Tao Poon to Tha Phra (8 stations elevated, Bt11.40B, contractor SH-Unique Joint venture) | 11 km | ||||||
| 4 | Tha Phra to Lak Song (7 stations elevated, plus a park-and-ride venue and maintenance yard, Bt13.43B, contractor STEC) | 10.5 km | ||||||
| 5 | Rolling stock and systems, Bt5.17 billion, contractor CK. |
Construction commenced in mid-2011 for a scheduled 2016 opening but this was subsequently delayed to 2019–2020. In August, 2017, BEM awarded the automatic fare collection ticket for the extension to Thales which to install its TransCity system. The contract also includes ongoing training and future support. In September 2017, BEM announced that Siemens and ST Electronics Thailand were awarded the contract (Contract 5) to supply, install and maintain the E&S systems, install station platform screen doors and fit out the depot. Siemens also won the contract to supply 35 sets of rolling stock.
In 2017, the cabinet approved the amendment of the Blue line concession with BEM, and the new agreement was signed on 31 March 2017. Under the new agreement, BEM will operate the new extensions from Hua Lamphong to Lak Song and Bang Sue to Tha Phra. The concession period was extended from 2029 to 2050.
File:Wat Mangkon MRT Station 02.jpg|Wat Mangkon station under construction. The station opened on 29 July 2019. File:Bang Wa MRT Station (under construction), June 2016.jpg|Bang Wa station under construction. The station opened on 29 July 2019. File:MRT Blue Line extension under construction 20-Dec-2013.jpg|Under construction viaduct outside of Lak Song station in 2013. File:Bangkok Noi Streets Ahoerstemeier 12.jpg|Construction of Fai Chai station and Fai Chai junction underpass in 2016.
The extension was opened in stages. The Hua Lamphong - Lak Song extension was opened for trial service on 29 July with full commercial services commencing 29 September 2019.
The Tao Poon - Tha Phra extension opened for limited trial services from 29 November 2019 with full commercial services commencing on 30 March 2020.
Phutthamonthon Sai 4 Extension ''(future)''
Since 2011, there were requests from residents to extend the line farther from Lak Song west to the Phutthamonthon area. The MRTA indicated a willingness to undertake this extension. In July 2014, the MRTA submitted a request for 84 million baht to complete a route survey for a 7.8 km, 4 station extension from Lak Song to Phutthamonthon Sai 4. In late March 2017, the Transport Ministry stated that this 7.8 km extension would be submitted to Cabinet for approval in April 2017 with construction expected to commence in the 4th quarter of 2017. However, the tender was subsequently delayed until late 2019 due to other projects. In late 2019, the project was put on hold due to government budget constraints. In August 2021, the MRTA confirmed that the extension was not a priority especially given delays with the tenders for the MRT Orange and MRT Purple line extensions.
| MRT | Blue}}; color:orange;" rowspan="2" span | Code | MRT | Blue}}; color:orange;" colspan="2" span | Station Name | MRT | Blue}}; color:orange;" span | English | MRT | Blue}}; color:orange;" span | Thai |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Phutthamonthon Sai 2 | พุทธมณฑลสาย 2 | ||||||||||
| Thawi Watthana | ทวีวัฒนา | ||||||||||
| Phutthamonthon Sai 3 | พุทธมณฑลสาย 3 | ||||||||||
| Phutthamonthon Sai 4 | พุทธมณฑลสาย 4 |
Opening timeline
| MRT | Blue}}; color:orange;" | Date | MRT | Blue}}; color:orange;" | Project | MRT | Blue}}; color:orange;" | Notes |
|---|---|---|---|---|---|---|---|---|
| 13 April 2004 | Mass Rapid Transit Initial Phase | Limited trial service from Bang Sue to Hua Lamphong was commenced | ||||||
| 3 July 2004 | Full commercial service was commenced from Bang Sue to Hua Lamphong. | |||||||
| 17 January 2005 | The entire metro line was closed due to a train collision at Thailand Cultural Centre. | |||||||
| 1 February 2005 | MRT Blue Line reopened. | |||||||
| 14 May 2010 | The entire metro line was closed from 17.00 onwards due to 2010 Thai military crackdown. | |||||||
| 25 May 2010 | MRT Blue Line reopened with limited hours from 6:00 to 22:00 due to the curfew. | |||||||
| 29 May 2010 | Resumed normal service. | |||||||
| 22 May 2014 | MRT Blue Line operated with limited hours from 6:00 to 21:00 due to the curfew, which was a result of the 2014 Thai coup d'état. | |||||||
| 28 May 2014 | Service hours were extended to 06.00-23.00 | |||||||
| 1 June 2014 | Phahon Yothin station closed from 10.00 onwards. | |||||||
| 8 June 2014 | Chatuchak Park station closed from 15.00 onwards. | |||||||
| 14 June 2014 | Resumed normal service. | |||||||
| 6 August 2016 | MRT Blue Line Extension Projects | |||||||
| (northern section) | Free shuttle bus services between Tao Poon and Bang Sue & free shuttle train services between Bang Son and Bang Sue Junction were deployed due to the delayed opening of the MRT Blue Line's Tao Poon station, which created a missing link between the line and the newly opened MRT Purple Line. | |||||||
| 11 August 2017 | Service extended to Tao Poon. | |||||||
| 29 July 2019 | MRT Blue Line Extension Projects | |||||||
| (southern section) | Free trial shuttle service from Hua Lumphong to Tha Phra commenced. Service on the extension was only available from 10.00 to 16.00. Passengers were required to change trains at Hua Lumphong for service on an extended route. | |||||||
| 24 August 2019 | Shuttle service extended to Bang Wa. | |||||||
| 21 September 2019 | Shuttle service extended to Lak Song. Service hours on the shuttle service were extended to the line's normal service hours of 06.00-24.00. | |||||||
| 29 September 2019 | Full commercial service was commenced from Tao Poon to Lak Song. | |||||||
| 4 December 2019 | MRT Blue Line Extension Projects | |||||||
| (northern section) | Free trial shuttle service from Tao Poon to Sirindhorn commenced. Service on the extension was only available from 10.00 to 16.00. Passengers were required to change trains at Tao Poon for service on an extended route. | |||||||
| 23 December 2019 | Shuttle service was extended to Tha Phra. | |||||||
| 1 March 2020 | Through-service from Tha Phra to Lak Song via Bang Sue | |||||||
| 30 March 2020 | Full commercial service commenced from Tha Phra to Lak Song via Bang Sue. | |||||||
| 17 October 2020 | The entire metro line was temporarily closed from 12.30 due to the 2020–2021 Thai protests. | |||||||
| 18 October 2020 | Hua Lamphong, Lumphini, Sukhumvit, Phahon Yothin, and Chatuchak Park stations were temporarily closed due to the protests from 14.30 | |||||||
| 28 March 2025 | All services were halted because of the 2025 Myanmar earthquake. | |||||||
| 29 March 2025 | Resumed normal service. |
Stations
| MRT | Blue}}; color:orange;" rowspan="2" span | Code | MRT | Blue}}; color:orange;" colspan="2" span | Station Name | MRT | Blue}}; color:orange;" rowspan="2" | Image | MRT | Blue}}; color:orange;" rowspan="2" span | Opened | MRT | Blue}}; color:orange;" rowspan="2" span | Platform Type | MRT | Blue}}; color:orange;" rowspan="2" span | Position | MRT | Blue}}; color:orange;" rowspan="2" span | Park | MRT | Blue}}; color:orange;" rowspan="2" span | Transfer | MRT | Blue}}; color:orange;" rowspan="2" span | Notes | MRT | Blue}}; color:orange;" span | English | MRT | Blue}}; color:orange;" span | Thai |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Tha Phra | ท่าพระ | [[File:MRT Ta Phra station entrance gate.jpg | frameless | 220x220px]] | Island | Elevated | - | Interchange station to | ||||||||||||||||||||||||
| • (for Hua Lamphong and Lak Song) | ||||||||||||||||||||||||||||||||
| • (future) | Exit to Tha Phra Temple | |||||||||||||||||||||||||||||||
| Charan 13 | จรัญฯ 13 | [[File:MRT Charan 13 – Platform.jpg | frameless | 220x220px]] | Side | - | Exit to: | |||||||||||||||||||||||||
| • HomePro Charansanitwong | ||||||||||||||||||||||||||||||||
| • Siam Technology College | ||||||||||||||||||||||||||||||||
| Fai Chai | ไฟฉาย | [[File:MRT Fai Chai – bowstring bridge – train crossing.jpg | frameless | 220x220px]] | Side | - | ||||||||||||||||||||||||||
| Bang Khun Non | บางขุนนนท์ | [[File:MRT bang Khun Non - Station.jpg | frameless | 220x220px]] | Side | - | Connecting station to | |||||||||||||||||||||||||
| • *** (under construction)* | ||||||||||||||||||||||||||||||||
| • (future) | ||||||||||||||||||||||||||||||||
| and Charansanitwong Halt for SRT Southern Line | Exit to: | |||||||||||||||||||||||||||||||
| • Makro Charansanitwong | ||||||||||||||||||||||||||||||||
| • MWA Bangkok Noi | ||||||||||||||||||||||||||||||||
| • Suwannaram School | ||||||||||||||||||||||||||||||||
| • Suwannaram Temple | ||||||||||||||||||||||||||||||||
| • Si Sudaram Temple | ||||||||||||||||||||||||||||||||
| Bang Yi Khan | บางยี่ขัน | [[File:MRT Bang Yi Khan – Platform – intersection crossing bridge.jpg | frameless]] | Side | - | Exit to: | ||||||||||||||||||||||||||
| • Indie Market Pin Klao | ||||||||||||||||||||||||||||||||
| • Pata Department Store | ||||||||||||||||||||||||||||||||
| Sirindhorn | สิรินธร | [[File:MRT Sirindhorn – Station 1.jpg | frameless]] | Side | - | |||||||||||||||||||||||||||
| Bang Phlat | บางพลัด | [[File:MRT Bang Plad - Platform with glass wall.jpg | frameless]] | Side | - | Exit to Bang Phlat District Office | ||||||||||||||||||||||||||
| Bang O | บางอ้อ | [[File:MRT Bang O - Station.jpg | frameless]] | Side | - | Exit to Yanhee Hospital | ||||||||||||||||||||||||||
| Bang Pho | บางโพ | [[File:MRT Bang Pho - Exit 1.jpg | frameless]] | Side | - | Connecting station with Bang Pho Pier for: | ||||||||||||||||||||||||||
| • | ||||||||||||||||||||||||||||||||
| • | Exit to: | |||||||||||||||||||||||||||||||
| • Quartermaster School | ||||||||||||||||||||||||||||||||
| • Gateway At Bangsue | ||||||||||||||||||||||||||||||||
| Tao Poon | เตาปูน | [[File:MRT Purple Line Tao Poon Station (34).jpg | frameless]] | Side | - | Interchange station to | Exit to: | |||||||||||||||||||||||||
| • Tao Poon Market | ||||||||||||||||||||||||||||||||
| • Lotus's Prachachuen | ||||||||||||||||||||||||||||||||
| Bang Sue | บางซื่อ | [[File:201701 Exit 2 of Bang Sue Station.jpg | frameless]] | Side | Underground | - | Connecting station with Krung Thep Aphiwat Central Terminal for | |||||||||||||||||||||||||
| • | ||||||||||||||||||||||||||||||||
| • | ||||||||||||||||||||||||||||||||
| • (future) | ||||||||||||||||||||||||||||||||
| • SRT Northern Line | ||||||||||||||||||||||||||||||||
| • SRT Northeastern Line | ||||||||||||||||||||||||||||||||
| • SRT Southern Line | ||||||||||||||||||||||||||||||||
| • HSR Northern Line (future) | ||||||||||||||||||||||||||||||||
| • HSR Northeastern Line (under construction) | ||||||||||||||||||||||||||||||||
| • HSR Eastern Line (future) | ||||||||||||||||||||||||||||||||
| • HSR Southern Line (future) | Exit to: | |||||||||||||||||||||||||||||||
| • Siam Cement Group Office | ||||||||||||||||||||||||||||||||
| • Central Juvenile and Family Court | ||||||||||||||||||||||||||||||||
| • Bangkok Bus Terminal (Chatuchak) | ||||||||||||||||||||||||||||||||
| Kamphaeng Phet | กำแพงเพชร | [[File:D85 7046 MRT in Thailand Photographed by Trisorn Triboon (122).jpg | frameless]] | Island | √ | Exit to: | ||||||||||||||||||||||||||
| • Or Tor Kor Market | ||||||||||||||||||||||||||||||||
| • Red Building | ||||||||||||||||||||||||||||||||
| • Chatuchak Weekend Market | ||||||||||||||||||||||||||||||||
| • Mixt Chatuchak | ||||||||||||||||||||||||||||||||
| • J.J Mall | ||||||||||||||||||||||||||||||||
| Chatuchak Park | สวนจตุจักร | [[File:Chatuchak Park MRT Station, Aug 2016.jpg | frameless]] | Island | - | Connecting station to Mo Chit for | Exit to: | |||||||||||||||||||||||||
| • Chatuchak Weekend Market | ||||||||||||||||||||||||||||||||
| • Mixt Chatuchak | ||||||||||||||||||||||||||||||||
| • J.J Mall | ||||||||||||||||||||||||||||||||
| • Chatuchak Park | ||||||||||||||||||||||||||||||||
| • Children's Discovery Museum | ||||||||||||||||||||||||||||||||
| • Queen Sirikit Park | ||||||||||||||||||||||||||||||||
| • Rot Fai Park | ||||||||||||||||||||||||||||||||
| • Civil Aviation Training Centre | ||||||||||||||||||||||||||||||||
| • Department of Land Transport | ||||||||||||||||||||||||||||||||
| Phahon Yothin | พหลโยธิน | [[File:Phahon Yothin MRT Station platforms (2).jpg | frameless]] | Island | - | Connecting station to Ha Yaek Lat Phrao for | Exit to: | |||||||||||||||||||||||||
| • Central Ladphrao & Centara Grand at Central Ladphrao Hotel | ||||||||||||||||||||||||||||||||
| • Union Mall | ||||||||||||||||||||||||||||||||
| Lat Phrao | ลาดพร้าว | [[File:Lat Phrao Station - platform level (2).jpg | frameless]] | Island | √ | Connecting station to | Exit to: | |||||||||||||||||||||||||
| • Ratchada-Lat Phrao Intersection | ||||||||||||||||||||||||||||||||
| • The Bazaar Hotel Bangkok | ||||||||||||||||||||||||||||||||
| • Gourmet Market MRT Lat Phrao | ||||||||||||||||||||||||||||||||
| Ratchadaphisek | รัชดาภิเษก | [[File:Ratchadaphisek Station - platform level (1).jpg | frameless]] | Island | √ | |||||||||||||||||||||||||||
| Sutthisan | สุทธิสาร | [[File:Sutthisan Station - entrance no.3 (2).jpg | frameless]] | Island | - | Exit to: | ||||||||||||||||||||||||||
| • Sutthisan Police Station | ||||||||||||||||||||||||||||||||
| • Muang Thai Life Assurance Head Office | ||||||||||||||||||||||||||||||||
| Huai Khwang | ห้วยขวาง | [[File:Huai Khwang Station MRT สถานี ห้วยขวาง (April2021) 01.jpg | frameless]] | Island | √ | |||||||||||||||||||||||||||
| Thailand Cultural Centre | ศูนย์วัฒนธรรมแห่งประเทศไทย | [[File:TLCC Station - Blue Line platform level (1).jpg | frameless]] | Island | √ | Interchange station to (under construction) | Exit to: | |||||||||||||||||||||||||
| • The Esplanade Ratchada | ||||||||||||||||||||||||||||||||
| • The One Ratchada Market | ||||||||||||||||||||||||||||||||
| • AIA Capital Centre | ||||||||||||||||||||||||||||||||
| • Stock Exchange of Thailand | ||||||||||||||||||||||||||||||||
| • Embassy of The People's Republic of China | ||||||||||||||||||||||||||||||||
| • Thailand Cultural Centre | ||||||||||||||||||||||||||||||||
| • China Cultural Centre | ||||||||||||||||||||||||||||||||
| • Ministry of Culture | ||||||||||||||||||||||||||||||||
| • Thai Life Insurance Head Office | ||||||||||||||||||||||||||||||||
| • Big C Place Ratchada | ||||||||||||||||||||||||||||||||
| • The Street Ratchada | ||||||||||||||||||||||||||||||||
| • CW Tower | ||||||||||||||||||||||||||||||||
| • RS Tower | ||||||||||||||||||||||||||||||||
| Phra Ram 9 | พระราม 9 | [[File:Phra Ram 9 Station - platform level.jpg | frameless]] | Island | √ | Exit to: | ||||||||||||||||||||||||||
| • Central Rama 9 | ||||||||||||||||||||||||||||||||
| • G Tower | ||||||||||||||||||||||||||||||||
| • Fortune Town | ||||||||||||||||||||||||||||||||
| • Jodd Fairs Rama 9 | ||||||||||||||||||||||||||||||||
| • Uniliver House | ||||||||||||||||||||||||||||||||
| Phetchaburi | เพชรบุรี | [[File:Phetchaburi MRT Station platform level.jpg | frameless]] | Island | √ | Connecting station with (future) and Makkasan for | Exit to: | |||||||||||||||||||||||||
| • Singha Complex | ||||||||||||||||||||||||||||||||
| • Don Bosco Technological College | ||||||||||||||||||||||||||||||||
| • Saint Dominic School | ||||||||||||||||||||||||||||||||
| • Srinakharinwirot University | ||||||||||||||||||||||||||||||||
| Sukhumvit | สุขุมวิท | [[File:Sukhumvit Station platform level.jpg | frameless]] | Island | √ | Connecting station to Asok for | Exit to: | |||||||||||||||||||||||||
| • Terminal 21 | ||||||||||||||||||||||||||||||||
| • Interchange 21 | ||||||||||||||||||||||||||||||||
| • Soi Cowboy | ||||||||||||||||||||||||||||||||
| • Exchange Tower | ||||||||||||||||||||||||||||||||
| Queen Sirikit National Convention Centre | ศูนย์การประชุมแห่งชาติสิริกิติ์ | [[File:Platform 2 of Queen Sirikit Centre Station.jpg | frameless]] | Island | √ | Exit to: | ||||||||||||||||||||||||||
| • Queen Sirikit National Convention Centre | ||||||||||||||||||||||||||||||||
| • Benjakitti Park | ||||||||||||||||||||||||||||||||
| • ThaiBev Quarter | ||||||||||||||||||||||||||||||||
| • Khlong Toei Witthaya School | ||||||||||||||||||||||||||||||||
| • The Parq | ||||||||||||||||||||||||||||||||
| • FYI Centre | ||||||||||||||||||||||||||||||||
| • Khlong Toei Market | ||||||||||||||||||||||||||||||||
| Khlong Toei | คลองเตย | [[File:Platform 1 of Khlong Toei Station.jpg | frameless]] | Side | - | Exit to: | ||||||||||||||||||||||||||
| • MEA Khlong Toei Head Office | ||||||||||||||||||||||||||||||||
| • MedPark Hospital | ||||||||||||||||||||||||||||||||
| • Tobacco Authority of Thailand | ||||||||||||||||||||||||||||||||
| • Benjakitti Park Hospital | ||||||||||||||||||||||||||||||||
| • Plai Nern Palace | ||||||||||||||||||||||||||||||||
| Lumphini | ลุมพินี | [[File:Si Lom Station entrance at Lumphini Park.jpg | frameless]] | Stacked | - | Connecting station with (future) | Exit to: | |||||||||||||||||||||||||
| • One Bangkok | ||||||||||||||||||||||||||||||||
| • Lumphini Park Gate 2 | ||||||||||||||||||||||||||||||||
| • Q House Lumphini | ||||||||||||||||||||||||||||||||
| • Embassy of Germany | ||||||||||||||||||||||||||||||||
| • Embassy of Japan | ||||||||||||||||||||||||||||||||
| • Embassy of Australia | ||||||||||||||||||||||||||||||||
| • Goethe-Institut Thailand | ||||||||||||||||||||||||||||||||
| Si Lom | สีลม | [[File:MRT Blue Line Silom Station (1).jpg | frameless]] | Stacked | - | Connecting station to Sala Daeng for via a 180-metre elevated pedestrian walkway. | Exit to: | |||||||||||||||||||||||||
| • Lumphini Park Gate 4 | ||||||||||||||||||||||||||||||||
| • Dusit Central Park | ||||||||||||||||||||||||||||||||
| • Silom Edge | ||||||||||||||||||||||||||||||||
| • Chulalongkorn Hospital | ||||||||||||||||||||||||||||||||
| • Silom Complex | ||||||||||||||||||||||||||||||||
| • Thaniya Shopping Centre | ||||||||||||||||||||||||||||||||
| • Patpong Night Market | ||||||||||||||||||||||||||||||||
| Sam Yan | สามย่าน | [[File:201701 Exit 2 of Sam Yan Station.jpg | frameless]] | Stacked | √ | Exit to: | ||||||||||||||||||||||||||
| • Chamchuri Square | ||||||||||||||||||||||||||||||||
| • Samyan Mitrtown | ||||||||||||||||||||||||||||||||
| • Hua Lamphong Temple | ||||||||||||||||||||||||||||||||
| • Chulalongkorn University | ||||||||||||||||||||||||||||||||
| Hua Lamphong | หัวลำโพง | [[File:Hua Lamphong MRT Station 202104.jpg | frameless]] | Island | - | Connecting station with Bangkok for | ||||||||||||||||||||||||||
| • (future) | ||||||||||||||||||||||||||||||||
| • SRT Northern Line | ||||||||||||||||||||||||||||||||
| • SRT Northeastern Line | ||||||||||||||||||||||||||||||||
| • SRT Eastern Line | ||||||||||||||||||||||||||||||||
| • SRT Southern Line | Exit to: | |||||||||||||||||||||||||||||||
| • Khlong Phadung Krung Kasem | ||||||||||||||||||||||||||||||||
| • Traimit Withayaram Temple | ||||||||||||||||||||||||||||||||
| • The Chinatown Gate | ||||||||||||||||||||||||||||||||
| • Yaowarat Road | ||||||||||||||||||||||||||||||||
| Wat Mangkon | วัดมังกร | [[File:MRT Wat Mangkon train station (Entrance 1).jpg | frameless]] | Stacked | - | Exit to: | ||||||||||||||||||||||||||
| • Mangkon Kamalawat Temple | ||||||||||||||||||||||||||||||||
| • Chinatown | ||||||||||||||||||||||||||||||||
| • Suea Pa Plaza | ||||||||||||||||||||||||||||||||
| • Kanma Tuyaram Temple | ||||||||||||||||||||||||||||||||
| Sam Yot | สามยอด | [[File:MRT Sam Yot train station (Entrance 1).jpg | frameless]] | Stacked | - | Interchange station with (under construction) | Exit to: | |||||||||||||||||||||||||
| • Giant Swing (including Wat Suthat and Wat Dev Mandir) | ||||||||||||||||||||||||||||||||
| • Khlong Ong Ang | ||||||||||||||||||||||||||||||||
| • Mega Plaza Saphan Lek | ||||||||||||||||||||||||||||||||
| • Phahurat | ||||||||||||||||||||||||||||||||
| • Rommaninat Park | ||||||||||||||||||||||||||||||||
| • The Old Siam Plaza | ||||||||||||||||||||||||||||||||
| Sanam Chai | สนามไชย | [[File:202403 Exit 1 of Sanam Chai Station in Front of Museum Siam.jpg | frameless]] | Island | - | Connecting station with Rajinee Pier for | ||||||||||||||||||||||||||
| • | ||||||||||||||||||||||||||||||||
| • | Exit to: | |||||||||||||||||||||||||||||||
| • Museum Siam | ||||||||||||||||||||||||||||||||
| • Wat Rajabopit School | ||||||||||||||||||||||||||||||||
| • Rajinee School | ||||||||||||||||||||||||||||||||
| • Pak Khlong Talat | ||||||||||||||||||||||||||||||||
| • Wat Pho | ||||||||||||||||||||||||||||||||
| • The Grand Palace | ||||||||||||||||||||||||||||||||
| • Wat Phra Kaew | ||||||||||||||||||||||||||||||||
| • Tha Tian Market | ||||||||||||||||||||||||||||||||
| • Silpakorn University | ||||||||||||||||||||||||||||||||
| Itsaraphap | อิสรภาพ | [[File:Itsaraphap MRT Station 03.jpg | frameless]] | Island | - | Exit to: | ||||||||||||||||||||||||||
| • Wat Ratchasihatharam School | ||||||||||||||||||||||||||||||||
| • Ratchasihatharam Temple | ||||||||||||||||||||||||||||||||
| • Mai Phiren Temple | ||||||||||||||||||||||||||||||||
| Tha Phra | ท่าพระ | [[File:MRT Ta Phra station entrance gate.jpg | frameless | 220x220px]] | Side | Elevated | - | Interchange station to | ||||||||||||||||||||||||
| • (for Tao Poon and Chatuchak Park) | ||||||||||||||||||||||||||||||||
| • (future) | Exit to Tha Phra Temple | |||||||||||||||||||||||||||||||
| Bang Phai | บางไผ่ | [[File:Steel footbridge, Bang Phai MRT Station.jpg | frameless]] | Side | - | Exit to: | ||||||||||||||||||||||||||
| • Wat Nuannoradit School | ||||||||||||||||||||||||||||||||
| • Nuannoradit Temple | ||||||||||||||||||||||||||||||||
| • Phaya Thai 3 Hospital | ||||||||||||||||||||||||||||||||
| Bang Wa | บางหว้า | [[File:Platform level Bang Wa Station.jpg | frameless]] | Side | - | Connecting station to and Bang Wa Pier for Khlong Phasi Charoen Boat Service via a 200-metre elevated pedestrian walkway. | Exit to Siam University | |||||||||||||||||||||||||
| Phetkasem 48 | เพชรเกษม 48 | [[File:MRT Phetkasem 48 station - platform toward Bang Wa station.jpg | frameless]] | Side | - | Exit to | ||||||||||||||||||||||||||
| Phasi Charoen | ภาษีเจริญ | [[File:MRT Phasi Charoen station - Station view from Seacon Bangkae.jpg | frameless]] | Side | - | Exit to Seacon Bangkhae | ||||||||||||||||||||||||||
| Bang Khae | บางแค | [[File:MRT Bangkae station - station.jpg | frameless]] | Side | - | Exit to: | ||||||||||||||||||||||||||
| • Bang Khae Market | ||||||||||||||||||||||||||||||||
| • Wonder Department Store | ||||||||||||||||||||||||||||||||
| • Wat Nimmanoradee School | ||||||||||||||||||||||||||||||||
| • Nimmanoradee Temple | ||||||||||||||||||||||||||||||||
| • Lotus's Bang Khae | ||||||||||||||||||||||||||||||||
| • Ban Bang Khae Social Welfare Development | ||||||||||||||||||||||||||||||||
| Lak Song | หลักสอง | [[File:MRT Blue Line Lak Song Station (2).jpg | frameless]] | Side | √ | Exit to The Mall Lifestore Bangkhae |
Infrastructure
Depot
The MRT Blue Line has two depots. The main maintenance depot, Huai Khwang Depot, is located on Rama IX Road within the premises of the Mass Rapid Transit Authority of Thailand. Construction began in 2005 and was completed the following year. The site is also shared with the MRT Orange Line project.
The secondary depot, Phetkasem Depot, is located on Kanlapaphruek Road. It was built as part of the Blue Line extension projects and was completed in 2019.
Park & Ride
There are fourteen Park & Ride facilities located at eleven stations, consisting of three Park & Ride buildings and eleven parking lots, with a total capacity of 5,144 vehicles.
Station
There are 38 stations on the network, 22 of which are underground and 16 of which are elevated.[[File:TLCC Station - Blue Line platform level (1).jpg|thumb|Platforms at [[Thailand Cultural Centre MRT station|Thailand Cultural Centre station]].]] The stations are generally about 150 meters in length, except for the Thailand Cultural Centre Station, which extends to 358 meters due to its role as an interchange station for the MRT Orange Line and as a junction for tracks leading to the Huai Khwang Depot. The stations are designed to accommodate a maximum of six cars per train. All stations are equipped with both half-height and full-height platform screen doors. The underground stations and tracks are designed to be durable and resilient to land subsidence and to withstand vibrations in the event of an earthquake, without causing damage to the structure. The entrances to the stations are designed to be about one meter above ground level to accommodate potential flooding events in the future, based on the highest recorded flood levels in Bangkok. Elevated stations are designed to avoid underground and above-ground utilities and to preserve the road surface as much as possible. In general, station pillars are located in the median of roads, except for stations that need to span underground tunnels, where the station pillars are placed on the sidewalks instead.
Rolling stocks
The MRT Blue line is served by 54 three-car trains of which, 19 are first generation Siemens Modular Metro sets and 35 sets are second generation. The trains are powered by 750 V DC via third rail system, are air-conditioned and capable of traveling at up to 80 km/h.
Siemens Modular Metro EMU-IBL
Nineteen three-car Siemens Modular Metro were ordered for the initial part of the line. The trains entered service on 3 July 2004. In 2017, BEM starts removing some seats from the train to increase interior space to cope with rising number of passengers. In 2019, the BEM stated that it is interested in refurbishing the first generation trains. Including the CCTV cameras, and new dynamic route map replacing the traditional ones.
In 2000, Alstom won a contract to supply 21x3 car Metropolis train sets, and this design would have been similar to C751A used for Singapore's North East MRT line if it had been built. The trains were provided by a consortium called Nippon-Euro Subway Consortium, which also includes Mitsubishi Electric. Mitsubishi Corporation, another consortium member, had also planned to undertake it. However, the negotiations with the French firm have failed. The bidding for rolling stock was conducted again, and bidders include Bombardier Transportation (later acquired by Alstom in 2021) and Siemens, both from Canada and Germany. On 3 January 2002, Siemens won the contract for a cost of $385 million.
In late 2019, IBL trains were refurbished with the installation of CCTV, LED lights, and an LCD dynamic route map.
| Car No. | 1 | 2 | 3 | Designation | Length (mm) | Numbering |
|---|---|---|---|---|---|---|
| M1 | Tc1 | M2 | ||||
| 21,800 | 21,500 | 21,800 | ||||
| 1001 | ||||||
| 1003 | ||||||
| 1005 | ||||||
| 1013 | ||||||
| 1015 | ||||||
| 1017 | ||||||
| 1025 | ||||||
| 1027 | ||||||
| 1029 | ||||||
| 1037 | 3001 | |||||
| 3002 | ||||||
| 3003 | ||||||
| 3007 | ||||||
| 3008 | ||||||
| 3009 | ||||||
| 3013 | ||||||
| 3014 | ||||||
| 3015 | ||||||
| 3019 | 1002 | |||||
| 1004 | ||||||
| 1006 | ||||||
| 1014 | ||||||
| 1028* | ||||||
| 1018 | ||||||
| 1026 | ||||||
| 1016* | ||||||
| 1030 | ||||||
| 1038 |
- Car 1016 and 1028 were swapped after the train collision in 2005. File:MRT-BLUELINE-IBL.jpg|The first generation train, Siemens Modular Metro EMU-IBL (Initial Blue Line stock) File:MRT Blue Line Bangpai Station (9).jpg|EMU-IBL approaching Bang Phai station with Tha Phra station in the background. File:MRT Blue Line Bangpai Station (11).jpg|Another picture of EMU-IBL approaching Bang Phai station. File:MRT blue Line Train 14 20180917.jpg|EMU-IBL approaching Tao Poon station with the unfinished Krung Thep Aphiwat Central Terminal in the background in 2018. File:Inside the train of MRT blue line.jpg|The interior of EMU-IBL before the refurbishment.
Siemens EMU-BLE
In 2017, BEM ordered 35 three-car as part of the line extension program. Under the contract, Siemens were to supply 35 trains and provide maintenance for ten years with a price tag of 20 billion baht. The fleet was built at the Siemens plant in Vienna and tested in Germany. The first train arrived in 2019 with all trains delivered by early 2020.
| Car No. | 1 | 2 | 3 | Designation | Length (mm) | Numbering |
|---|---|---|---|---|---|---|
| M1 | Tc1 | M2 | ||||
| 21,800 | 21,500 | 21,800 | ||||
| 1039 | ||||||
| 1041 | ||||||
| 1043 | ||||||
| 1107 | 3020 | |||||
| 3021 | ||||||
| 3022 | ||||||
| 3054 | 1040 | |||||
| 1042 | ||||||
| 1044 | ||||||
| 1108 |
File:MRT-BLUELINE-BLE.jpg|The second generation train,Siemens EMU-BLE (Blue Line Extension stock) File:MRT Fai Chai – Platform – train leaving 1.jpg|EMU-BLE departing Fai Chai station. File:MRT Blue Line Bangpai Station (6).jpg|EMU-BLE approaching Bang Phai station with Tha Phra station in the background. File:MRT Blue line EMU-BLE Interior.jpg|Interior of the EMU-BLE File:Dynamic Route Map in EMU-BLE.jpg|Dynamic Route Map on the EMU-BLE.
Extra rolling stock order
On 18 July 2024, Mr. Phongsarit Tantisuvanitchkul, executive chairman of BEM revealed that the company will order an additional 21 train sets, each comprising three cars, for the MRT Blue line to meliorate congestion during peak hour. The turnkey contract was announced on 18 December 2024. A consortium consisting of Siemens and Bozankaya won a contract from Ch. Karnchang. The contract includes the supply of 21 Siemens three-car trains, with the design same as the EMU-BLE fleet that is currently used on the project. These trains will be manufactured at the Bozankaya Factory in Ankara, Turkey. Siemens and ST Electronics will supply the bogies, traction, braking, and auxiliary systems, and will be responsible for project management, development, construction, and commissioning. Siemens will also provide service and maintenance for 15 years, from 2024 to 2039.
Signaling system
Siemens Trainguard LZB700M signaling system, a Fixed Block system, has been implemented on the MRT Blue Line. It utilizes a computer-based system to automatically control train operations for maximum efficiency, speed, and safety. The system is divided into three subsystems:
- Automatic Train Operation (ATO) – Controls various functions of the train, such as propulsion, speed regulation, braking, stopping the train, and reporting the status of various components to the control center.
- Automatic Train Protection (ATP) – Ensures that the train does not exceed the set speed limit and regulates the train's speed relative to the distance from the train ahead. In the event of abnormal situations, ATP will automatically apply the brakes. It also prevents the train from departing a station if the train doors or platform screen doors are not properly closed. Unlike ATO, which can be manually overridden if it malfunctions, ATP continues to control train operations independently.
- Automatic Train Supervision (ATS) – Oversees the entire train network to ensure that operations adhere to the timetable. It monitors and displays the speed and location of all trains within the system and prepares control measures in case of disruptions.
Operation
Service hour
The MRT Blue Line operates from 05:30 to 24:00 on weekdays and from 06:00 to 24:00 on weekends and public holidays. During the weekday morning rush hour, there are two service patterns:
- Full Line operation from Tha Phra to Lak Song.
- Short-run train from Bang Pho to Lak Song. Additionally, some trains may terminate at Chatuchak Park or Bang Wa stations during rush hour.
Headways
| MRT | Blue}}; color:orange;" colspan="3" | MRT Blue Line headway | MRT | Blue}}; color:orange;" | Time | MRT | Blue}}; color:orange;" | Section | MRT | Blue}}; color:orange;" | Headway (Minutes:Seconds) | Monday - Friday | Saturday | Sunday and Public Holiday |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 05.30 - 07.00 | Full Line | 05:00 | ||||||||||||
| 07:00 - 09:00 | Tha Phra - Bang Pho | 06:58 | ||||||||||||
| Bang Pho - Lak Song | 03:29 | |||||||||||||
| 09:00 - 16:30 | Full Line | 06:40 | ||||||||||||
| 16:30 - 17:00 | 05:00 | |||||||||||||
| 17:00 - 20:00 | 03:50 | |||||||||||||
| 20:00 - 21:00 | 05:20 | |||||||||||||
| 21:00 - 24:00 | 07:15 | |||||||||||||
| 06:00 - 11:00 | Full Line | 07:15 | ||||||||||||
| 11:00 - 16:00 | 06:30 | |||||||||||||
| 16:00 - 21:00 | 05:30 | |||||||||||||
| 21:00 - 24:00 | 07:15 | |||||||||||||
| 06:00 - 17:00 | Full Line | 07:15 | ||||||||||||
| 17:00 - 21:00 | 06:30 | |||||||||||||
| 21:00 - 24:00 | 07:15 |
Ridership
At opening in 2004, initial ridership was 180,000 per day—considerably lower than the projections of over 400,000. By 2016, the average daily ridership was 273,637. By September 2017, BEM stated that average daily ridership had increased to 360,000 after the opening of the extension to Tao Poon.
After the opening of the extension to Lak Song on 29 September 2019, average daily ridership increased to 400,000. The MRT Blue line was expected to grow to a daily ridership of 800,000 once the Lak Song and Tha Phra extensions opened. However, the impact of the COVID-19 pandemic by late 2020 had resulted in a dramatic reduction of ridership down to an average of 360,000 per weekday reverting to September 2017 levels. By August 2021, during a COVID-19 3rd wave in Bangkok ridership plummeted to only 76,000 per weekday. In 2023 an average of 376,000 passengers rode the blue line.
From 25 January to 31 January 2025, Prime Minister Paetongtarn Shinawatra has implemented a policy of free public transportation in Bangkok for one week. This measure aims to address the worsening air pollution caused by surging dust levels across all districts of the capital.
| MRT | Blue}}; color:orange;" | MRT Blue Line Ridership | MRT | Blue}}; color:orange;" | Year | MRT | Blue}}; color:orange;" | Quarter | MRT | Blue}}; color:orange;" | Quarterly Ridership | MRT | Blue}}; color:orange;" | Daily Ridership | MRT | Blue}}; color:orange;" | Annual Ridership | MRT | Blue}}; color:orange;" | Remarks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2004 | Q1 | 26,695,557 | ||||||||||||||||||
| Q2 | ||||||||||||||||||||
| Q3 | 14,771,017 | 165,967 | Bang Sue - Hua Lamphong section opened on 3 July 2004. | |||||||||||||||||
| Q4 | 11,924,540 | 129,615 | ||||||||||||||||||
| 2005 | Q1 | 11,839,737 | 155,787 | 57,204,154 | Train collision at Thailand Cultural Centre station caused the entire line to be closed from 17 January 2004 until 31 January 2004. | |||||||||||||||
| Q2 | 15,032,372 | 165,191 | ||||||||||||||||||
| Q3 | 15,270,957 | 165,989 | ||||||||||||||||||
| Q4 | 15,061,088 | 163,708 | ||||||||||||||||||
| 2006 | Q1 | 14,196,691 | 157,742 | 57,826,397 | ||||||||||||||||
| Q2 | 13,806,282 | 151,718 | ||||||||||||||||||
| Q3 | 14,630,414 | 159,027 | ||||||||||||||||||
| Q4 | 15,193,010 | 165,142 | ||||||||||||||||||
| 2007 | Q1 | 14,472,879 | 160,810 | 59,922,345 | ||||||||||||||||
| Q2 | 14,634,584 | 160,820 | ||||||||||||||||||
| Q3 | 15,385,544 | 167,235 | ||||||||||||||||||
| Q4 | 15,429,338 | 167,711 | ||||||||||||||||||
| 2008 | Q1 | 15,571,126 | 171,112 | 62,108,418 | ||||||||||||||||
| Q2 | 14,697,561 | 161,512 | ||||||||||||||||||
| Q3 | 15,720,108 | 170,871 | ||||||||||||||||||
| Q4 | 16,119,623 | 175,214 | ||||||||||||||||||
| 2009 | Q1 | 15,824,077 | 175,824 | 63,749,784 | ||||||||||||||||
| Q2 | 15,133,589 | 164,496 | ||||||||||||||||||
| Q3 | 16,086,300 | 174,852 | ||||||||||||||||||
| Q4 | 16,705,818 | 181,585 | ||||||||||||||||||
| 2010 | Q1 | 16,657,590 | 185,085 | 64,927,467 | ||||||||||||||||
| Q2 | 14,088,416 | 169,740 | Blue Line was closed from 14 May 2010 until 25 May 2010 due to the 2010 Thai military crackdown. | |||||||||||||||||
| Q3 | 17,149,043 | 186,403 | Airport Rail Link opened on 23 August 2010, and Phetchaburi station became a connecting station. | |||||||||||||||||
| Q4 | 17,032,418 | 185,135 | ||||||||||||||||||
| 2011 | Q1 | 17,256,842 | 191,743 | 69,040,480 | ||||||||||||||||
| Q2 | 16,412,289 | 180,355 | ||||||||||||||||||
| Q3 | 18,861,231 | 205,014 | ||||||||||||||||||
| Q4 | 16,510,118 | 179,458 | ** Blue Line** daily ridership decreased due to 2011 Thailand floods. | |||||||||||||||||
| 2012 | Q1 | 20,051,013 | 220,341 | 80,602,327 | ||||||||||||||||
| Q2 | 18,988,016 | 208,660 | ||||||||||||||||||
| Q3 | 20,876,732 | 226,921 | ||||||||||||||||||
| Q4 | 20,686,566 | 224,854 | ||||||||||||||||||
| 2013 | Q1 | 20,995,960 | 233,289 | 86,435,968 | ||||||||||||||||
| Q2 | 20,728,994 | 227,792 | ||||||||||||||||||
| Q3 | 22,268,239 | 242,047 | ||||||||||||||||||
| Q4 | 22,442,775 | 243,944 | ||||||||||||||||||
| 2014 | Q1 | 24,949,649 | 277,219 | 92,437,991 | ||||||||||||||||
| Q2 | 21,654,739 | 237,965 | ||||||||||||||||||
| Q3 | 22,705,980 | 246,805 | ||||||||||||||||||
| Q4 | 23,127,623 | 251,388 | ||||||||||||||||||
| 2015 | Q1 | 23,482,811 | 260,921 | 95,018,696 | ||||||||||||||||
| Q2 | 22,592,917 | 248,274 | ||||||||||||||||||
| Q3 | 24,585,847 | 267,238 | ||||||||||||||||||
| Q4 | 24,357,121 | 264,752 | ||||||||||||||||||
| 2016 | Q1 | 24,752,983 | 272,011 | 100,369,988 | ||||||||||||||||
| Q2 | 23,429,701 | 257,470 | ||||||||||||||||||
| Q3 | 26,036,662 | 283,008 | Free shuttle bus services between Tao Poon and Bang Sue were deployed to fill in the missing link between the line and the newly opened ** Purple Line**. | |||||||||||||||||
| Q4 | 26,150,642 | 284,247 | ||||||||||||||||||
| 2017 | Q1 | 26,487,114 | 294,302 | 107,537,778 | ||||||||||||||||
| Q2 | 25,560,321 | 280,883 | ||||||||||||||||||
| Q3 | 28,064,600 | 305,050 | Tao Poon - Bang Sue section opened on 11 August 2017, Tao Poon became an interchange station | |||||||||||||||||
| Q4 | 27,425,743 | 298,106 | ||||||||||||||||||
| 2018 | Q1 | 28,104,618 | 312,274 | 113,711,335 | ||||||||||||||||
| Q2 | 26,974,909 | 296,428 | ||||||||||||||||||
| Q3 | 29,356,120 | 319,089 | ||||||||||||||||||
| Q4 | 29,275,688 | 318,214 | ||||||||||||||||||
| 2019 | Q1 | 29,075,352 | 323,060 | 123,621,585 | ||||||||||||||||
| Q2 | 27,011,565 | 296,831 | ||||||||||||||||||
| Q3 | 32,505,523 | 353,321 | Hua Lamphong - Lak Song section opened, Bang Wa became an interchange station. | |||||||||||||||||
| [[File:BTS_N8.svg | 20px]] Mo Chit - [[File:BTS_N9.svg | 20px]] Ha Yaek Lat Phrao section opened, Phahon Yothin became a connecting station. | ||||||||||||||||||
| Q4 | 35,029,145 | 380,752 | Tha Phra - Tao Poon section opened, Tha Phra became a self-interchange station. | |||||||||||||||||
| 2020 | Q1 | 30,392,770 | 333,987 | 95,601,532 | 1st wave of COVID-19 outbreaks (January 2020 - May 2020) | |||||||||||||||
| Q2 | 12,120,957 | 133,198 | ||||||||||||||||||
| Q3 | 26,095,682 | 283,649 | ||||||||||||||||||
| Q4 | 26,992,123 | 293,393 | 2nd wave of COVID-19 outbreaks (December 2020 - February 2021) | |||||||||||||||||
| 2021 | Q1 | 19,232,363 | 213,693 | 53,529,435 | ||||||||||||||||
| Q2 | 10,834,779 | 119,064 | 3rd wave of COVID-19 outbreaks (April 2021 - June 2021) | |||||||||||||||||
| Q3 | 7,331,345 | 79,689 | 4th wave of COVID-19 outbreaks (July 2021 - early 2022) | |||||||||||||||||
| Q4 | 16,130,948 | 175,337 | ||||||||||||||||||
| 2022 | Q1 | 16,902,272 | 187,804 | 99,001,410 | ||||||||||||||||
| Q2 | 20,996,415 | 230,730 | ||||||||||||||||||
| Q3 | 28,764,950 | 312,663 | ||||||||||||||||||
| Q4 | 32,337,773 | 351,498 | ||||||||||||||||||
| 2023 | Q1 | 34,513,622 | 383,485 | 144,105,284 | SRT long-distance train services moved to Krung Thep Aphiwat Central Terminal on 19 January 2023. | |||||||||||||||
| Q2 | 32,262,358 | 354,532 | ||||||||||||||||||
| Q3 | 38,739,263 | 421,079 | ** Yellow Line** opened on 3 July 2023, Lat Phrao became a connecting station. | |||||||||||||||||
| Q4 | 38,590,041 | 419,457 | ||||||||||||||||||
| 2024 | Q1 | 39,428,634 | 433,282 | 156,827,292 | ||||||||||||||||
| Q2 | 36,037,227 | 396,014 | ||||||||||||||||||
| Q3 | 40,495,053 | 440,164 | ||||||||||||||||||
| Q4 | 40,866,378 | 444,200 | ||||||||||||||||||
| 2025 | Q1 | 40,231,680 | 447,019 | 156,443,901 | 2025 Myanmar Earthquake]] on 28 March 2025. | |||||||||||||||
| Q2 | 36,447,300 | 400,850 | ||||||||||||||||||
| Q3 | 39,660,085 | 431,088 | ||||||||||||||||||
| Q4 | 40,104,836 | 435,923 | As of December 2025. |
Fares
Fares for the MRT Blue Line are calculated based on the shortest travel distance between the origin and destination stations, regardless of the actual route taken. Passengers may stay within the system for up to 180 minutes; exceeding this limit will result in a penalty fare. Regular fares range from 17 to 45 baht, with a maximum fare of 51 baht when transferring to the Purple Line. Discounted fares are available for children under 14 years old and senior citizens, ranging from 9 to 23 baht (up to 36 baht with a transfer to the Purple Line), while student fares range from 14 to 41 baht (up to 48 baht with a transfer to the Purple Line).
Starting in 2024, passengers using a Credit/Debit card, Visa, or Mastercard will receive a 15 baht discount when transferring from the Blue Line to the Yellow Line, or a 14 baht discount when transferring from the Yellow Line to the Blue Line. Furthermore, senior citizens will receive an 8 baht discount when transferring from the Blue Line to the Yellow Line, and a 7 baht discount when transferring from the Yellow Line to the Blue Line. Students will receive a 15 baht discount when transferring from the Blue Line to the Yellow Line, and a 13 baht discount when transferring from the Yellow Line to the Blue Line.
Incidents
Train collision
On 17 January 2005, just after 09:15, an empty train returning to the depot collided with a peak-hour train filled with passengers at the Thailand Cultural Centre station. Around 100-262 people, depending on the news source, were injured. Most of whom sustained only minor injuries, and the entire Metro network was shut down for two weeks. On 31 January 2005, then prime minister Thaksin Shinawatra rode the metro to increase public confidence in the system.
After initial investigations, it was found that the empty train had run into problems shortly before the accident, grinding to a halt on a curve leading to the depot. The driver applied its brake and was waiting to be towed to the depot close to Thailand Cultural Centre station. A rescue train was attempting to connect to the stalled train when the driver was told to release the brake while coupling had not yet been successful. It was then that the empty train began to roll backwards at a speed of ten meters per second, before smashing into the other train, which was carrying passengers. Therefore, it was believed that the incident was caused by negligence due to insufficient training of operation staff. This accident also resulted in two damaged trains with heavily damaged areas limited to the two leading cars. The colliding speed was suspected to be about 60 km/h due to the appearance of damaged areas. However, one train, which was rebuilt from the repair of the minor-damaged cars, was already fitted for operation at the end of 2006 and the remaining one was still under heavy repair until mid of 2007; it was released into service in October 2007. The cost resulting from the accident might be a much higher figure than BEM quoted, and it was expected to be at least 400 million baht, which was totally insured by a local insurance company.
The line resumed full operations on 1 February 2005. Passenger numbers soon rose back to pre-crash levels, partly due to a temporary promotional fare scheme which allowed passengers to travel any distance on the MRT for only ten baht.
2025 Myanmar Earthquake
On March 28, a 7.7-magnitude earthquake in Myanmar struck Bangkok, leading to the temporary suspension of all train services to ensure readiness for resumption and to prepare for potential aftershocks. The line resumed normal service on the next day.
Route map
| frame-lat = 13.7664 | frame-long = 100.495 | frame-width = 950 | frame-height = 350 | frame-align = left
Network map
References
References
- https://www.khaosod.co.th/economics/news_2933591. ''Khaosod'', 30 September 2019
- "BEM website. Monthly ridership.".
- "BEM Investor presentation".
- "M.R.T. Chaloem Ratchamongkhon Line".
- "Mass Rapid Transit Authority of Thailand".
- (3 January 2021). "รถไฟใต้ดินจำลองของจริง".
- Messe München. (1 January 1998). "Tunnel Construction". [[CRC Press]].
- "Thailand starts digging tunnels for 1st Bangkok subway. - Free Online Library".
- "M.R.T. Chaloem Ratchamongkhon Line".
- (1998). "Rail Business Report". Railway Gazette International.
- Bangkok's First Underground Metro Opens ''[[International Railway Journal]]'' July 2004 page 32
- (2004-07-03). "Congested Bangkok opens subway". ABC News.
- (14 January 2003). "Bangkok to launch subway system in 2004".
- (2009-08-26). "ลงนามสัญญาที่1 รถไฟสีม่วง ช.การช่างได้เฮ".
- (12 July 2017). "Purple Line to connect with MRT on Aug 11". Bangkok Post.
- (11 August 2017). "Blue Line Tao Poon extension opening date (Thai)".
- (11 August 2017). "เปิดวิ่งเชื่อมต่อสถานีเตาปูน-บางซื่อ 12.00 วันนี้".
- (July 2010). "ช.การช่างคว้าประมูลรถไฟฟ้าสีน้ำเงินหัวลำโพง-ท่าพระ".
- (2010-06-02). "ยูนิค-ชิโนไทย ชนะประมูลสร้างรถไฟฟ้าสีน้ำเงิน 2 สัญญา".
- (2010-08-25). "ช.เข้าวินวางรางสีน้ำเงิน รฟม.ยัน 5 สัญญาเซ็นได้ ต.ค.นี้".
- "Published {{!}} การรถไฟฟ้าขนส่งมวลชนแห่งประเทศไทย".
- [https://www.railwaygazette.com/bangkok-to-complete-blue-line-loop/35788.article Bangkok to complete Blue Line loop] ''[[Railway Gazette International]]'' 19 March 2011
- (23 August 2017). "Thales wins Bangkok metro fare collection contract". International Railway Journal.
- (19 September 2017). "Siemens consortium wins Bangkok Blue Line extension contract". International Railway Journal.
- (28 March 2017). "ปิดดีลเดินรถสีน้ำเงิน ครม.ผ่านฉลุย เร่งเซ็นสัญญาจ้าง Bem ทยอยเปิดเดินรถปลายปี 62".
- "BEM significant event in 2017".
- (15 July 2014). link
- (26 March 2017). "Blue Line extension, freeway pends Cabinet approval". The Bangkok Post.
- "ชะลอทำรถไฟฟ้า3สายหวั่นผู้โดยสารน้อย/ไม่คุ้มทุน".
- (19 August 2021). "รฟม.ขึงไทม์ไลน์ ต.ค.ประมูล "สายสีส้ม-สีม่วงใต้" ยึด กม.จัดซื้อฯ ยันเกณฑ์เทคนิคและราคาเหมาะสม". Manager.
- "รถไฟฟ้า BTS-MRT ปิดให้บริการ 3 ทุ่มตั้งแต่คืนนี้ เปิด 6".
- "รถไฟฟ้า BTS-MRT ปรับเวลาเดินรถใหม่ 06.00-23.00 น. ตั้งแต่ 28".
- "รถไฟใต้ดินปิดให้บริการที่สถานีพหลโยธินตั้งแต่ 10 โมงจนกว่าจะเปลี่ยนแปลง".
- "รถไฟใต้ดิน MRT สถานีจตุจักรปิดให้บริการชั่วคราวตั้งแต่ 15.00".
- "รัฐมนตรีว่าการกระทรวงคมนาคม กดปุ่มเปิดการทดลองให้บริการโครงการรถไฟฟ้าสายสีน้ำเงิน ส่วนต่อขยาย ช่วงหัวลำโพง – บางแค".
- "24 สิงหาคมนี้ รฟม. และ BEM เปิดให้ประชาชนทดลองใช้บริการรถไฟฟ้า เพิ่มอีก 2 สถานี (สถานีวัดมังกร – สถานีบางหว้า)".
- (4 December 2019). "Free travel between new BTS, MRT train stations".
- "วันที่ 23 ธันวาคม 2562 รฟม. และ BEM เปิดให้ประชาชนทดลองใช้บริการรถไฟฟ้าสายสีน้ำเงินส่วนต่อขยาย ช่วงเตาปูน - ท่าพระ".
- "1 มีนาคมนี้ รฟม. และ BEM ให้บริการรถไฟฟ้าสายสีน้ำเงินส่วนต่อขยายเดินทางต่อเนื่อง โดยไม่ต้องเปลี่ยนขบวนรถที่สถานีเตาปูน".
- "30 มีนาคมนี้ รฟม. และ BEM พร้อมเปิดให้บริการรถไฟฟ้าสายเฉลิมรัชมงคลช่วงเตาปูน – ท่าพระ (สายสีน้ำเงินส่วนต่อขยาย) อย่างเป็นทางการ".
- (17 October 2020). "ความเคลื่อนไหวก่อนชุมนุม 17 ตุลา".
- (2020-10-18). "รถไฟฟ้าMRT ปิด 5 สถานี ส่วน BTS ปิด10 สถานี จนกว่าสถานการณ์คลี่คลาย".
- Mail, Pattaya. (2025-03-30). "Daily summary of the earthquake situation; Bangkok's BTS and MRT train services resume".
- Thailand, Render. (2016-02-27). "MRT ที่สร้างยากสุด ลึกสุด และบันไดเลื่อนยาวสุด..?".
- "ศูนย์ซ่อมบำรุงรถไฟฟ้าใต้ดินสายเฉลิมรัชมงคล".
- "ที่จอดรถสายเฉลิมรัชมงคล (สายสีน้ำเงิน)".
- "BEM บริษัททางด่วนและรถไฟฟ้ากรุงเทพจำกัด (มหาชน)".
- "Bangkok Metro".
- (18 November 2019). "บุกโรงงานซีเมนส์...ผลิตรถไฟฟ้า MRT-BEM ดีไซน์เพิ่มระบบเซฟตี้รองรับผู้โดยสารทุกกลุ่ม".
- "ALSTOM chosen for the Blue Line of the Bangkok metro".
- "Rail News - Alstom-led consortium lands Bangkok concession. For Railroad Career Professionals".
- (1 January 2002). "Siemens wins $385-M contract for Bangkok subway system". AFP.
- International, Railway Gazette. (2002-02-01). "Siemens scoops Bangkok order".
- (15 September 2017). "BEM to buy 35 more Blue Line trains". Bangkok Post.
- (2017-09-19). "Siemens wins contract for Bangkok Blue line extension".
- "MRTA – BEM Announce that the First New Train for the MRT Blue Line Extension Has Arrived".
- Siripanjana, Maneerat. "วันนี้ที่รอคอย! ลงนามร่วมทุน "สายสีส้ม" เร่งเปิดเดินรถปลายปี 70 ของขวัญปีใหม่ประชาชน".
- "Siemens Mobility and Consortium Partners Secure Important Rail Contracts in Thailand to Transform Public Transportation".
- "Data Sheet Blue Line Extension Bangkok English".
- (2017). "Financial Summary of the Consolidated Financial Statements of Bangkok Expressway and Metro Public Company Limited and its Subsidiaries".
- (15 September 2017). "BEM to buy 35 more Blue Line trains". Bangkok Post.
- เช็กคืบหน้ารถไฟฟ้าทุกสี ต้นปี 64 เปิดประมูล สีม่วง "เตาปูน-ราษฎร์บูรณะ. ''Prachachat'', 1 December 2020
- "BEM website. Monthly ridership.".
- "Minisery of rail transport.".
- Boyle, Gary. (2025-01-25). "PM orders week of free public transport to combat PM2.5". Bangkok Post.
- "สถิติจำนวนผู้โดยสารโครงการรถไฟฟ้ามหานคร สายเฉลิมรัชมงคล (สีน้ำเงิน)".
- (2025-03-29). "รถไฟฟ้า BTS และ MRT เปิดปกติแล้ว ยกเว้น สายสีเหลือง-สายสีชมพู ปิดต่ออีก 1 วัน".
- (2025-11-06). "ปริมาณผู้ใช้บริการระบบขนส่งทางราง ประจำเดือนตุลาคม 2568".
- (2025-12-05). "ปริมาณผู้ใช้บริการระบบขนส่งทางราง ประจำเดือนพฤศจิกายน 2568".
- "Facebook".
- "อัตราค่าโดยสาร".
- (2019-04-14). "3 นาทีคดีดัง : ชนสนั่น! วันโกลาหล รถไฟฟ้าใต้ดิน (คลิป)".
- (17 January 2005). "เจ็บเป็นร้อย!!! รถไฟฟ้าใต้ดินชนกัน คนขับสาหัส".
- "Article with photos of an event".
- (17 January 2005). "Thai subway shut for safety probe". [[BBC News]].
- (2025-03-28). "Train services suspended for safety after earthquake in Myanmar".
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Blue Line (Bangkok) — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report