Skip to content
Surf Wiki
Save to docs
general/railway-stations-in-surrey

From Surf Wiki (app.surf) — the open knowledge base

Banstead railway station

National Rail station in Surrey, England

Banstead railway station

Summary

National Rail station in Surrey, England

FieldValue
nameBanstead
symbolrail
managerSouthern
localeBanstead
boroughBorough of Reigate and Banstead
platforms1
fare_zone6
railcodeBAD
image_nameBanstead station building.JPG
coordinates
map_typeSurrey
originalLondon, Brighton and South Coast Railway
pregroupLondon, Brighton and South Coast Railway
postgroupSouthern Railway
years122 May 1865
years21 June 1898
years3August 1928
events1Opened as Banstead
events2Renamed Banstead and Burgh Heath
events3Renamed Banstead
<!--raillowexits040593,069
raillowexits050696,173
raillowexits060796,248
railexits07080.106
railexits08090.115
railexits09100.108
railexits10110.116
railexits11120.128
railexits12130.135
railexits13140.131
railexits14150.139
railexits15160.164
railexits16170.142
railexits17180.126
railexits18190.151
railexits19200.151 --
raillowexits202142,692
raillowexits212294,576
railexits22230.115
railexits23240.139
railexits24250.149
dft_categoryF1

Banstead railway station serves the village of Banstead in the borough of Reigate and Banstead in Surrey. Its wider definition of Banstead Village and Nork wards is relevant here as both are equally well served by it as it lies narrowly in the latter. The station, and all trains serving it, are operated by Southern. It is on the Epsom Downs branch line, which is served as part of Southern's Sutton & Mole Valley Line services. It is between and , down the line from , measured via West Croydon.

Housing and gardens in Banstead in this area border Greater London 500m away to the north. Accordingly, since January 2006, the station has been included in London fare zone 6. The station lies some distance to the north-west of the High Street on the edge of Banstead Downs.

Station buildings

The station in 1961

The station was opened by the London, Brighton and South Coast Railway on 22 May 1865 as part of the Epsom Downs branch line. The branch was originally laid as double track to accommodate Epsom Downs horse race traffic and was electrified on 17 June 1928. In the 1920s, the station's name was painted in large letters on the roof as a navigation tool for pilots coming into Croydon Airport. Due to the destruction by fire of the Epsom Downs signal box in November 1981, the branch was singled for most of its length in October 1982 and trains stopping at Banstead now use only the Down platform where there is a shelter. The Up track and platform have been removed.

Services

All services at Banstead are operated by Southern using EMUs.

The typical off-peak service in trains per hour is:

  • 2 tph to via
  • 2 tph to

Prior to May 2018, the station was served by an hourly service on weekdays and Saturdays only, with no Sunday service. In May 2018, a half-hourly service was introduced on all days of the week.

There is an electronic display showing arrivals and departures. A ticket machine was installed in October 2011 replacing a Permit to Travel machine and there are also two Oystercard readers.

References

References

  1. Yonge, John. (November 2008). "Railway Track Diagrams 5: Southern & TfL". Trackmaps.
  2. (1977). "The First Croydon Airport 1915-1928". Sutton Libraries & Arts Services.
  3. {{NRtimes. May 2022. 172
Wikipedia Source

This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.

Want to explore this topic further?

Ask Mako anything about Banstead railway station — get instant answers, deeper analysis, and related topics.

Research with Mako

Free with your Surf account

Content sourced from Wikipedia, available under CC BY-SA 4.0.

This content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.

Report