Amistad Dam
| Field | Value |
|---|---|
| name | Amistad Dam |
| image | Amistad-NRA.jpg |
| image_caption | Amistad Dam |
| coordinates | |
| country | United States / Mexico |
| location | Val Verde County, Texas / Acuña Municipality, Coahuila |
| status | In use |
| construction_began | 1963 |
| opening | |
| cost | US$125 million ($808 million in 2014) |
| owner | International Boundary and Water Commission |
| dam_type | Earthfill |
| dam_height | 254 ft |
| dam_length | 32022 ft |
| dam_volume | 17055000 yd3 |
| dam_crosses | Rio Grande |
| spillway_type | Ogee crest, 16 tainter gates |
| spillway_capacity | 1507000 cuft/s |
| res_name | Amistad Reservoir |
| res_capacity_total | 5658600 acre.ft |
| res_surface | 64900 acre |
| plant_turbines | 4x Francis |
| plant_capacity | 132 MW |
| plant_hydraulic_head | 234 ft |
Amistad Dam (Spanish: Presa la Amistad) is a major embankment dam across the Rio Grande between Texas, United States, and Coahuila, Mexico. Built to provide irrigation water storage, flood control, and hydropower generation, it is the largest dam along the international boundary reach of the Rio Grande. The dam is over 6 mi long, lies mostly on the Mexican side of the border, and forms Amistad Reservoir.{{cite web |access-date=2011-01-25 |url-status=dead |archive-url=https://web.archive.org/web/20110721072710/http://www.wapa.gov/crsp/planprojectscrsp/amistadproj.html |archive-date=2011-07-21
The dam is owned and operated by the International Boundary and Water Commission (IBWC), and also facilitates the Amistad Dam Port of Entry. Amistad is derived from the Spanish word for "friendship", representing the two nations' cooperation on the dam.
History
Because of the Rio Grande's frequent floods and droughts, the sharing of its water between the US and Mexico has been a contentious issue since the 1800s. The 1906 Treaty for Equitable Distribution of the Waters of the Rio Grande enabled the construction of Elephant Butte Dam, the first major Rio Grande dam, in New Mexico. While this benefited water users along the middle Rio Grande, it did little to help the lower Rio Grande Valley, where water flows remained uncontrolled. The 1944 Treaty relating to the utilization of waters of the Colorado and Tijuana Rivers and of the Rio Grande authorized the IBWC to build dams on the uncontrolled border segment of the Rio Grande. The first dam to be completed under the treaty was Falcon Dam in 1953.{{cite web|title=Historic American Buildings Survey|website=loc.gov|access-date=19 July 2023
After the Rio Grande flooded massively in 1954, with a peak flow of 1158000 cuft/s recorded at Del Rio, planners realized that a much larger dam would be needed to control the river and two unregulated tributaries, the Pecos and Devils Rivers. The proposed site for the larger dam was about a mile (1.6 km) below the confluence of the Devils River and 12 mi upstream of Del Rio. During the initial planning stage, it was known as "Diablo Reservoir", a nod to the name of Devils River (diablo meaning "devil" in Spanish). The final design was approved by the two governments as Minute 207, and authorized by an act of U.S. Congress on July 7, 1960. Work at the dam site began in August 1963 with foundation drilling and grouting in the river bed to support the future concrete section of the dam. Actual construction of the dam itself began in January 1965 and water was first impounded in 1968. U.S. president Richard Nixon and Mexican president Gustavo Díaz Ordaz dedicated the dam in 1969.
The construction of the dam required the relocation of 14.3 mi of the Southern Pacific Railroad tracks, 19 mi of highways, and two bridges. When the reservoir filled, it inundated ancient rock art left by Native Americans who once lived in the areas. More than 170 archaeological sites were cataloged during salvage operations between 1958 and 1969, a difficult undertaking due to the arid and remote conditions of the area.
The hydroelectric power plants were added later, with the US plant completed in 1983 and the Mexican plant in 1987. Of the dam's roughly US$125 million cost, the US paid about 57% and Mexico 43%, in accordance with the division of water storage rights in the reservoir.
In 1993, the dam was determined to be silting up at the rate of 14000 acre feet per year, about 31% greater than had been expected at the time of construction.
Specifications
Dam and spillways
The dam has a total length of 32022 ft, almost 6 miles (10 km), of which 22347 ft are in Mexico and 9585 ft in the United States. The center section at the Rio Grande is a concrete gravity dam 2182 ft long, with the remainder being earthen embankment. In total, the dam contains 13.5 million cubic yards (10,300,000 m3) of earth, 1.8 million cubic yards (1,400,000 m3) of concrete, 1.76 million cubic yards (1,300,000 m3) of riprap, and 12,500 tons (11,300 metric tons) of steel. The maximum height above the riverbed is 254 ft, and the elevation at the dam crest is 1152.3 ft above sea level. The roadway along the dam crest is 32.8 ft wide.
The embankments are protected on both sides by riprap to reduce erosion. The riprap is 9.8 ft thick on the upstream (reservoir) side and 3.28 ft thick on the downstream side. Because the dam is founded on karstic limestone of the Georgetown formation, a very deep grout curtain was extended underground to block seepage and the risk of dam failure by internal erosion. Despite this, more than 30 sinkholes have been discovered near the upstream side of the dam and seepage rates have been recorded at over 180 cuft/s, which may be much higher due to unmeasured seepage on the Mexican side of the dam. However, because the water is traveling through bedrock and not the dam itself, this poses little threat to the dam's structural stability. During extreme flood events, however, this may still be a cause for concern.
Flood waters are released through a concrete ogee crest spillway with 16 tainter gates. The gates measure 50 x and can spill up to 1507000 cuft/s. The spillway empties into a stilling basin 950 ft long, designed to dissipate erosion.
Water supply and flood control
The Amistad reservoir covers 65000 acre at normal (conservation) water levels of 1117 ft above sea level. It is one of the largest lakes in the Rio Grande system by both surface area and volume. Of the reservoir's 5535000 acre feet capacity, 61% is dedicated to water conservation and sediment control, 32% to flood control, and 7% to surcharge (flood storage above the top of the spillway gates, but below the crest of the dam). At the top of the flood control pool, the reservoir is 84000 acre and at the top of the surcharge pool it is 89000 acre. The lowest lake elevation at which water can be released is 930 ft, or 187 ft below normal levels. At the top of the conservation pool, the reservoir extends 78 mi up the Rio Grande, 25 mi up the Devils River, and 14 mi up the Pecos River. It has a shoreline of 851 mi, of which 547 mi are in the US and 304 mi are in Mexico.{{cite map |access-date=2016-01-04

About 56.2% of the water released from Amistad Dam is allocated to the United States, and 43.8% to Mexico. The IBWC determines the fraction of water stored in Amistad Reservoir belonging to either country on a biweekly basis, based on this allocation. The reservoir levels fluctuate greatly due to the region's highly variable annual precipitation as well as heavy water use. The record high level was 1135.66 ft on September 22, 1974. It reached a record low level of 1055.93 ft on May 23, 2013, or 61 ft below normal levels, after several consecutive years of drought.
The average annual inflow to Amistad Reservoir is about 2080000 acre feet.{{cite web
Because of diversions of the Rio Grande in the upriver U.S. states of Colorado and New Mexico, the Rio Conchos (which originates in Chihuahua, Mexico) actually provides the majority of the water flowing from the Rio Grande into the lake. Increasing water use in upriver communities has caused a steady decline in Rio Grande flows throughout the 20th and 21st centuries and has led to concerns about future water levels and supplies at Amistad.
Power generation
The dam has two hydroelectric power stations, one on either side of the border, with a capacity of 66 megawatts (MW) each. The maximum hydraulic head is 234 ft, with a minimum of 115 ft required to run the plants. The four generators have a capacity of 33 MW each and are powered by a 42,300-hp (31.54-MW) Francis turbine. The maximum combined water flow through the power plants is 9200 cuft/s.
In 2009, the Amistad Dam plants produced a total of 296,734,000 kilowatt hours.
Border crossing
Main article: Amistad Dam Port of Entry
The Amistad Dam Port of Entry was built when Amistad Dam was completed in 1969. The Dam was a bi-national effort to establish flood control on the Rio Grande and provide sources of water. Although US Department of Transportation statistics combine traffic counts with Del Rio Texas Port of Entry, approximately 65,000 vehicles crossed the dam into the US in 2005. The border station was rebuilt by the US Army Corps of Engineers in 2012.
Recreation
The dam and reservoir are part of the Amistad National Recreation Area.
References
Links
- Archival film footage of the Amistad Dam and Reservoir from the Texas Archive of the Moving Image
References
- "Amistad Project Office".
- "San Antonio". Rowman & Littlefield.
- (1967). "Departments of State, Justice, Commerce, the Judiciary and Related Agencies ... - United States. Congress. House. Appropriations - Google Books".
- "Amistad Reservoir". TSHA Texas State Historical Association.
- "Lower Pecos-Before Amistad".
- "Amistad International Reservoir (Rio Grande River Basin) | Texas Water Development Board".
- "Archived copy".
- "Archived copy".
- (February 2022). "Concerns raised over safety of Falcon, Amistad dams". Valley Morning Star}}{{Dead link.
- "Frequently Asked Questions - Amistad National Recreation Area (U.S. National Park Service)".
- "Water Data For Texas".
- "Archived copy".
- "Lake Levels".
- (1977). "Departments of State, Justice, and Commerce, the Judiciary, and related ...".
- "Archived copy".
- "Archived copy".
- (May 2009). "Simulation of Impacts of Streamflow and Climate Conditions on Amistad Reservoir". Journal of Contemporary Water Research & Education.
- "Archived copy".
- Forum One Communications. "CARMA - Carbon Monitoring for Action".
- Forum One Communications. "CARMA - Carbon Monitoring for Action".
- "Border Crossing Travel Time Study, FINAL Study Report, Volume II: TxDOT Laredo District". RJ RIVERA Associates, Inc. for Texas Department of Transportation, Transportation Planning and Programming Division.
- "New Amistad Dam port of entry opens at Del Rio, Texas, border crossing". US Army.
This article was imported from Wikipedia and is available under the Creative Commons Attribution-ShareAlike 4.0 License. Content has been adapted to SurfDoc format. Original contributors can be found on the article history page.
Ask Mako anything about Amistad Dam — get instant answers, deeper analysis, and related topics.
Research with MakoFree with your Surf account
Create a free account to save articles, ask Mako questions, and organize your research.
Sign up freeThis content may have been generated or modified by AI. CloudSurf Software LLC is not responsible for the accuracy, completeness, or reliability of AI-generated content. Always verify important information from primary sources.
Report